31.03.2014 Views

Table of Contents - Other Procurement, Army - U.S. Army

Table of Contents - Other Procurement, Army - U.S. Army

Table of Contents - Other Procurement, Army - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SIMP COLL PROT EQUIP M20<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

SIMP COLL PROT EQUIP M20 (M97400)<br />

M01001 (M97400)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 12.7 12.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.7 12.7<br />

Initial Spares<br />

Total Proc Cost 12.7 12.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M20A1 is a lightweight, low cost system that provides Nuclear, Biological, Chemical(NBC) collective protection for existing structures. It consists <strong>of</strong> a large,cylindrical shaped Room Liner,<br />

designed to be pressurized inside a room or building. A Support Kit contains a motor blower for pressurization and flexible air ducts to direct the air. A Hermetically Sealed Filter Canister (HSFC)<br />

is provided to filter ambient air before it is ducted into the liner. A collapsible Protective Entrance (PE) attaches to the pressurized liner and serves as an airlock for personnel entry/exit. A<br />

Recirculation Filter, located inside the Room Liner near the PE, provides an extra margin <strong>of</strong> agent filtration. The system comes with two packaged spare Room Liners. Room Liners can be<br />

interconnected with an adapter to enlarge the protective area (with the addition <strong>of</strong> a Support Kit and HSFC per additional liner). A single packaged M20A1 SCPE system weighs about 500 lbs and<br />

requires 40 cu. ft.<br />

Justification:<br />

FY08 Baseline: Procures 89 SCPE. <strong>Procurement</strong> will support deployed and deploying combat units.<br />

FY08 Global War on Terrorism (GWOT) request: Procures 567 additional SCPE.<br />

FY08 Global War on Terrorism Amendment funds the M20 A1 SCPE. The porgram provides a safe environment for command and control operations (CCO) and an area for releif from the<br />

degrading effects <strong>of</strong> individual protective equipment. The SCPE will be used whenever a CB attack is imminent. The protective entrance, filter unit, liner and sealants will be used withing the<br />

existing structures (room/basement). If not funded, <strong>Army</strong> systems needs will remain below 60% <strong>of</strong> the total force requirement.<br />

FY08 Base Appropriation - $1.818 million<br />

FY08 GWOT Request - $0<br />

FY08 GWOT Cost Adjustment Request - $10.857 million<br />

FY08 Total - $12.675 million<br />

M01001 (M97400) Item No. 122 Page 10 <strong>of</strong> 47 Exhibit P-40<br />

SIMP COLL PROT EQUIP M20 13 Budget Item Justification Sheet

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!