31.03.2014 Views

Wind farms integration in coordinated voltage and reactive power ...

Wind farms integration in coordinated voltage and reactive power ...

Wind farms integration in coordinated voltage and reactive power ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>W<strong>in</strong>d</strong> <strong>farms</strong> <strong><strong>in</strong>tegration</strong><br />

<strong>in</strong> coord<strong>in</strong>ated <strong>voltage</strong><br />

<strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

Dariusz Kolodziej<br />

Institute of Power Eng<strong>in</strong>eer<strong>in</strong>g, Gdansk Division, POLAND


AGENDA<br />

1. Profile of Institute of Power Eng<strong>in</strong>eer<strong>in</strong>g Gdansk Division<br />

2. ARNE – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control of <strong>power</strong> plant<br />

3. ARST – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control of transformer substation<br />

4. <strong>W<strong>in</strong>d</strong> farm requirements of TSO <strong>and</strong> DSOs<br />

5. <strong>W<strong>in</strong>d</strong> farm <strong><strong>in</strong>tegration</strong> <strong>in</strong> coord<strong>in</strong>ated control


Profile of Institute of Power Eng<strong>in</strong>eer<strong>in</strong>g (IEN)<br />

Gdansk Division<br />

‣ State owned research Institute<br />

‣ Established <strong>in</strong> 1954<br />

‣ Five R&D departments focused on different aspects of<br />

<strong>power</strong> system control <strong>and</strong> operation.<br />

‣ Employs over 75 qualified eng<strong>in</strong>eers.<br />

‣ Application oriented with projects performed ma<strong>in</strong>ly <strong>in</strong>house<br />

‣ Cooperation with ABB, Alstom, West<strong>in</strong>ghouse,<br />

Siemens<br />

‣ Quality Management System PN-EN ISO 9001-2009<br />

www.eera-set.eu


ARNE – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

of <strong>power</strong> plant<br />

ARNE – Automatic <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control system of <strong>power</strong> plants<br />

‣ Implemented s<strong>in</strong>ce 70’s<br />

‣ <strong>in</strong>stalled <strong>in</strong> all large <strong>power</strong> plants <strong>in</strong> Pol<strong>and</strong> (<strong>and</strong> pumped-storage plants)<br />

‣ Full automation of <strong>power</strong> plant operation with<strong>in</strong> the scope of ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the<br />

optimum <strong>voltage</strong> level <strong>and</strong> <strong>reactive</strong> <strong>power</strong> flow<br />

‣ Remote control from dispatch<strong>in</strong>g centres<br />

‣ Steady <strong>and</strong> safe operation of generators <strong>in</strong> so-called group control mode<br />

www.eera-set.eu


ARNE – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

of <strong>power</strong> plant<br />

Reactive <strong>power</strong> available for <strong>voltage</strong> control<br />

Circle diagram of generator<br />

www.eera-set.eu<br />

Limits:<br />

theta – <strong>power</strong> angle<br />

Is – stator current<br />

Iw – excit<strong>in</strong>g current<br />

Ptm<strong>in</strong> – m<strong>in</strong>imal turb<strong>in</strong>e <strong>power</strong><br />

Ptmax – maximal turb<strong>in</strong>e <strong>power</strong><br />

A – generator limits<br />

B – generator <strong>voltage</strong> regulator limits<br />

C – ARNE limits<br />

D – limits set by <strong>power</strong> plant<br />

dispatcher


ARNE – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

of <strong>power</strong> plant<br />

www.eera-set.eu


ARNE – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

of <strong>power</strong> plant<br />

Characteristics of ARNE <strong>voltage</strong> control<br />

www.eera-set.eu


ARST – <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control<br />

of transformer substation<br />

ARST – Automatic <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control system of transformer<br />

substation<br />

‣ Implemented s<strong>in</strong>ce 90’s<br />

‣ <strong>in</strong>stalled <strong>in</strong> most of TSO owned transformer substations <strong>in</strong> Pol<strong>and</strong><br />

‣ <strong>voltage</strong> level <strong>and</strong> <strong>reactive</strong> <strong>power</strong> flow control<br />

‣ Remote control from dispatch<strong>in</strong>g centres<br />

New requirements:<br />

‣ Cooperation ARST with w<strong>in</strong>d <strong>farms</strong> <strong>and</strong> other DERs<br />

‣ Supervisory role (coord<strong>in</strong>ator)<br />

www.eera-set.eu


<strong>W<strong>in</strong>d</strong> farm requirements of TSO <strong>and</strong> DSOs<br />

‣ automatic control of <strong>voltage</strong>, <strong>reactive</strong> <strong>power</strong> or <strong>power</strong> factor at connection po<strong>in</strong>t<br />

‣ cooperation with the supervisory <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control systems<br />

(ARST)<br />

cosφ=0,95 (poj)<br />

P<br />

cosφ=0,95 (<strong>in</strong>d)<br />

S<br />

Pos<br />

PQ characteristics<br />

φ<br />

Required range of available <strong>reactive</strong><br />

Q<br />

<strong>power</strong> when generat<strong>in</strong>g active <strong>power</strong><br />

Q<br />

Qmax gen<br />

Characteristics of <strong>voltage</strong> control at<br />

Qmax pob<br />

Um<strong>in</strong><br />

Uprog1<br />

Uz<br />

Uprog2<br />

Umax<br />

U<br />

connection po<strong>in</strong>t when operat<strong>in</strong>g<br />

autonomously<br />

www.eera-set.eu


<strong>W<strong>in</strong>d</strong> farm <strong><strong>in</strong>tegration</strong> <strong>in</strong> coord<strong>in</strong>ated control<br />

Goals:<br />

‣ <strong>W<strong>in</strong>d</strong> <strong>farms</strong> should play active role <strong>in</strong> <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control like<br />

generators <strong>in</strong> ARNE systems<br />

‣ Focus on fast „generator” regulation realised by w<strong>in</strong>d <strong>farms</strong><br />

‣ Slow transformer regulation<br />

‣ cooperation with the supervisory <strong>voltage</strong> <strong>and</strong> <strong>reactive</strong> <strong>power</strong> control systems<br />

(ARST)<br />

Where is Smart Grid?<br />

‣ 110 kV is the DSO <strong>voltage</strong> level<br />

‣ developed solutions/algorithms could also be usefull for MV<br />

www.eera-set.eu


<strong>W<strong>in</strong>d</strong> farm <strong><strong>in</strong>tegration</strong> <strong>in</strong> coord<strong>in</strong>ated control<br />

www.eera-set.eu


<strong>W<strong>in</strong>d</strong> farm <strong><strong>in</strong>tegration</strong> <strong>in</strong> coord<strong>in</strong>ated control<br />

Challenges:<br />

‣ Different PQ characteristics of w<strong>in</strong>d <strong>farms</strong><br />

‣ Communication between ARST <strong>and</strong> distant w<strong>in</strong>d <strong>farms</strong> (tens of km)<br />

‣ Variety of communication protocols (sometimes lack of comm capabilities!)<br />

First implementation of ARST (400/110 kV) with two coord<strong>in</strong>ated w<strong>in</strong>d<br />

<strong>farms</strong> (connected to 110 kV <strong>and</strong> to 400 kV) <strong>in</strong> Q3 2012<br />

www.eera-set.eu


Thank you for your attention<br />

Institute of Power Eng<strong>in</strong>eer<strong>in</strong>g<br />

Research Institute<br />

Gdansk Division<br />

Mikolaja Reja 27<br />

80-870 Gdansk<br />

Pol<strong>and</strong><br />

www.eera-set.eu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!