04.04.2014 Views

Leaflet SMLT - Sarens

Leaflet SMLT - Sarens

Leaflet SMLT - Sarens

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

www.sarens.com - info@sarens.com<br />

Houston - USA<br />

Thornton Bank - Belgium<br />

<strong>Sarens</strong> Multi Lifting Tower<br />

The basic principle of the <strong>Sarens</strong> Multi<br />

Lifting Tower (<strong>SMLT</strong>) is a free standing tower<br />

(without guy wires or bracings) or multiple<br />

towers with lifting beams on top, often used in<br />

combination with Strand Jacks.<br />

The towers are designed to withstand<br />

both vertical and horizontal loads.<br />

The <strong>SMLT</strong>’s modular design is flexible<br />

in use and therefore capable of providing<br />

a tailor-made solution for each heavy<br />

lifting problem. The tower sections can<br />

be transported on standard trucks.<br />

The <strong>Sarens</strong> Group currently owns<br />

tower sections equivalent to 600m.<br />

A standard <strong>SMLT</strong> of 100m high has a<br />

capacity up to 6.000t. Truly a costeffective<br />

solution for your heavy lifting needs.<br />

Safety and quality are paramount to our<br />

company and all works are executed to the<br />

highest ISO/OHSAS standards.


www.sarens.com - info@sarens.com<br />

Solna - Sweden<br />

Ulsan - Gunsan - South Korea<br />

Stord - Norway<br />

<strong>Sarens</strong> Multi Lifting Tower<br />

Reference projects:<br />

• Stord, Norway: Load-out and lifting of 2 drilling rigs H6<br />

8 <strong>SMLT</strong> (12m x 12m - height 42m) - lifted weight 10.900t<br />

• Ulsan - Gunsan, South Korea: Lifting of 2 Goliath cranes<br />

2 <strong>SMLT</strong> (12m x 12m - height 130m) - lifted weight 5.900t<br />

• Thornton Bank, Belgium: Offshore installation of 6 windmills 5MW each<br />

1 <strong>SMLT</strong> (12m x 12m - height 38m) - equipped with LR1750<br />

• Port Arthur, Texas USA: Exchange of a reactor<br />

2 <strong>SMLT</strong> (12m x 12m - height 42m) and 1 <strong>SMLT</strong> (26m x 12m - height 60m) - design capacity 1.500t<br />

• Solna, Sweden: Swedbank Arena<br />

4 <strong>SMLT</strong> (12m - height 51m) - lifted weight 500t<br />

06/2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!