08.04.2014 Views

EOR TECHNOLOGIES AND APPLICATIONS IN MALAYSIA - CCOP

EOR TECHNOLOGIES AND APPLICATIONS IN MALAYSIA - CCOP

EOR TECHNOLOGIES AND APPLICATIONS IN MALAYSIA - CCOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Phases for <strong>EOR</strong> implementation: 4 stages with 3<br />

decision gates review<br />

Stage<br />

Stage<br />

Activities<br />

Activities<br />

STAGE 1<br />

Screening<br />

study<br />

STAGE 2<br />

Detail study<br />

i.e. lab and<br />

simulation<br />

STAGE 3<br />

Pilot<br />

implementation<br />

STAGE 4<br />

Full field<br />

implementation<br />

Field and<br />

<strong>EOR</strong> process<br />

identification<br />

Preliminary<br />

economic<br />

assessment<br />

Pilot design<br />

and<br />

surveillance<br />

Economic<br />

assessment<br />

New data<br />

acquisition &<br />

processing<br />

Full field<br />

design &<br />

Economic<br />

Assessment<br />

Operation,<br />

maintenance<br />

and<br />

surveillance<br />

Decision<br />

Decision<br />

Gates<br />

Gates<br />

Gate 1 Gate 2<br />

Gate 3<br />

Viability<br />

Approval<br />

Concept<br />

Approval<br />

Project<br />

Sanction<br />

Yes Yes Yes<br />

No No No<br />

Alternative or Abandon<br />

Cost<br />

Cost<br />

Exposure<br />

Exposure<br />

Very low<br />

(Expense)<br />

Low<br />

(Expense)<br />

Med / High<br />

(Expense/capitalise)<br />

High<br />

(Capitalise)<br />

Currently we have 11 actively on-going <strong>EOR</strong> projects in<br />

Malaysia<br />

• At different level of maturity. Will discuss the progress of top 5 candidates<br />

Stage 3/4<br />

(Pilot or full field implementation)<br />

Stage 2<br />

(Detailed study)<br />

Stage 1<br />

(Preliminary / screening level)<br />

FIELD<br />

Dulang<br />

Tabu<br />

Baronia<br />

West Lutong<br />

FIELD<br />

Tapis<br />

Bokor<br />

C<strong>EOR</strong><br />

Tiong/Kepong<br />

FIELD<br />

Baram<br />

Guntong<br />

St. Joseph<br />

PROCESS<br />

Immiscible WAG Injection<br />

Double Displacement<br />

Immiscible WAG Injection<br />

Miscible Gas Injection<br />

PROCESS<br />

Miscible WAG Injection<br />

Aquifer assisted WAG<br />

Chemical Injection<br />

Immiscible Gas Injection<br />

PROCESS<br />

WAG Injection<br />

Miscible WAG Injection<br />

Immiscible WAG Injection

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!