<strong>of</strong>fice will sign the inspection seals. However, the procedure <strong>of</strong> inspection will be finalized<br />

in consultation with the successful Tenderer. The vendor shall, report the details including<br />

purchase order, corresponding number <strong>of</strong> equipments dispatched, license numbers,<br />

packing list and other such documents. Equipment dispatched without such reports considered<br />

as violation <strong>of</strong> rate contracts and necessary action will be taken against the vendor as per<br />

Terms and Conditions <strong>of</strong> the contract<br />

5. Installation and Commissioning S<strong>of</strong>tware Drivers and Manuals<br />

The Vendor shall be responsible for installation <strong>of</strong> the equipment ordered making<br />

them fully operational <strong>of</strong> receiving the purchase order / letter.<br />

The equipment will have to be supplied with all the s<strong>of</strong>tware drivers and<br />

detailed operational and maintenance manuals for each <strong>of</strong> the items and important<br />

components therein such as Display Monitor, Display Controller,etc. for a particular operating<br />

system as applicable, free <strong>of</strong> cost.<br />

The Vendor must also take required steps to successfully install all the<br />

S<strong>of</strong>tware components supplied by the Vendor on the hardware. Moreover, if any relevant<br />

patches which need be applied to the system s<strong>of</strong>tware to make the s<strong>of</strong>tware up-to-date,<br />

in connection with a specific hardware, must be identified and installed in the hardware<br />

from time to time during the warranty period.<br />

The Vendor must integrate the hardware, s<strong>of</strong>tware supplied by him to make them<br />

fully functional. However, in case <strong>of</strong> problems with it will be the Vendor’s responsibility<br />

to locate the exact nature <strong>of</strong> the problem and rectify the same except for the problems in the<br />

application s<strong>of</strong>tware installed on the machine, if any. Under no circumstances will a<br />

problem be posed on the application s<strong>of</strong>tware without sufficient reasons and justification.<br />

6. Completeness <strong>of</strong> Contract<br />

The contract will be deemed as incomplete if any component <strong>of</strong> the hardware, s<strong>of</strong>tware,<br />

network devices, etc., or any documentation relating thereto is not delivered, or<br />

is delivered but not installed and /or not operational or not acceptable to the Indentor<br />

after acceptance testing / examination.<br />

In such an event, the supply and installation will be termed as incomplete and it will<br />

not be accepted and the warranty period will not commence. The equipment will be accepted<br />

after complete commission and satisfactory functioning <strong>of</strong> equipment for a minimum<br />

period <strong>of</strong> 10 days. The Warranty period will commence only on acceptance (based on<br />

acceptance test) <strong>of</strong> equipment.<br />

7. Operational Training<br />

The vendor will have to train users for operation <strong>of</strong> equipment supplied and installed at his<br />

cost. The training will be as per the satisfaction <strong>of</strong> the purchaser.<br />

8. Liquidated Damages for delayed supply<br />

If the vendor fails to deliver equipment or does not perform the Services within the time<br />

period(s) specified in the Contract, the Purchaser shall, without prejudice to its other remedies<br />

under the Contract, deduct from the Payable Amount, as liquidated damages, a sum<br />

equivalent to 0.5 percent <strong>of</strong> the price <strong>of</strong> the undelivered stores at the stipulated rate for<br />

each week or part there <strong>of</strong> during which the delivery <strong>of</strong> such stores may be delayed subject<br />

to a maximum limit <strong>of</strong> 10 percent <strong>of</strong> the stipulated price <strong>of</strong> the stores so undelivered. Such<br />

penalty is to be deducted always by the Purchaser from the bill <strong>of</strong> the amount paid will<br />

be recovered from the Vendor.<br />

D:\ABD_NIC\web_upd_abd\Feb12_upd\<strong>Tablet</strong><strong>PC</strong> Tender form.doc<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!