Section 3: Steps to Approval<br />
Step 1:<br />
Pre-Consultation Meeting<br />
4 copies <strong>of</strong> a full-scale site plan, together with the<br />
application form and cover letter outlining the proposed<br />
site works must be submitted for exemption.<br />
Step 2:<br />
Submission <strong>of</strong> Application<br />
Package<br />
NOTE:<br />
The calculation <strong>of</strong> the gross floor area <strong>of</strong> the exempted<br />
additions is made on a cumulative basis.<br />
Step 3:<br />
Circulation Review<br />
Step 4:<br />
Co-ordination <strong>of</strong> Comments<br />
Step 5:<br />
Revised Submission<br />
Step 6:<br />
Conditional Approval<br />
Step 7:<br />
Final Approval<br />
Step 8:<br />
Building Permit Issuance<br />
Step 9:<br />
Release <strong>of</strong> Securities<br />
6<br />
July 2010