Section 3: Steps to Approval<br />

Step 1:<br />

Pre-Consultation Meeting<br />

4 copies <strong>of</strong> a full-scale site plan, together with the<br />

application form and cover letter outlining the proposed<br />

site works must be submitted for exemption.<br />

Step 2:<br />

Submission <strong>of</strong> Application<br />

Package<br />

NOTE:<br />

The calculation <strong>of</strong> the gross floor area <strong>of</strong> the exempted<br />

additions is made on a cumulative basis.<br />

Step 3:<br />

Circulation Review<br />

Step 4:<br />

Co-ordination <strong>of</strong> Comments<br />

Step 5:<br />

Revised Submission<br />

Step 6:<br />

Conditional Approval<br />

Step 7:<br />

Final Approval<br />

Step 8:<br />

Building Permit Issuance<br />

Step 9:<br />

Release <strong>of</strong> Securities<br />

6<br />