neighbouring buildings, are particularly<br />

solid for reasons of avoiding vibration<br />

and structure-borne sound emissions.<br />

Thus, the base plates have a thickness<br />

of 1.80 m, the T-beams of the tunnel<br />

ceiling have a height of 3.0 m and the<br />

inner shell on the side towards the<br />

neighbouring buildings has a thickness<br />

of 1.20 m.<br />

The line from the former train station<br />

Unterhetzendorf up to the crossing of<br />

<strong>Lainzer</strong> <strong>Tunnel</strong> 11<br />

the U6 was built in a closed construction<br />

method.<br />

From the crossing of the U6 up to<br />

Eibesbrunnergasse, the dig-and-cast<br />

construction method was then used<br />

again – using bored piles with a diameter<br />

of 120 cm.