neighbouring buildings, are particularly<br />
solid for reasons of avoiding vibration<br />
and structure-borne sound emissions.<br />
Thus, the base plates have a thickness<br />
of 1.80 m, the T-beams of the tunnel<br />
ceiling have a height of 3.0 m and the<br />
inner shell on the side towards the<br />
neighbouring buildings has a thickness<br />
of 1.20 m.<br />
The line from the former train station<br />
Unterhetzendorf up to the crossing of<br />
<strong>Lainzer</strong> <strong>Tunnel</strong> 11<br />
the U6 was built in a closed construction<br />
method.<br />
From the crossing of the U6 up to<br />
Eibesbrunnergasse, the dig-and-cast<br />
construction method was then used<br />
again – using bored piles with a diameter<br />
of 120 cm.