24.04.2014 Views

Almanac-Issue9

Almanac-Issue9

Almanac-Issue9

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GLO-1<br />

System Name:<br />

Landing Points:<br />

GLO-1<br />

RFS Year: 2010<br />

Est. End of Service Date: 2034<br />

Est. System Cost (US$): $800,000,000<br />

Total Length (kms): 9,800<br />

Initial Capacity:<br />

Design Capacity:<br />

Fiber Information:<br />

Owners:<br />

System Supplier:<br />

System Installer:<br />

Cableship:<br />

Marine Surveyor:<br />

Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria),<br />

Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain)<br />

640 Gb/s<br />

2.5 Tb/s<br />

2 Fiber Pairs<br />

Globacom Ltd.<br />

Alcatel Submarine Networks<br />

Alcatel Submarine Networks<br />

Ile de Batz, IT Intrepid<br />

Alcatel Submarine Networks<br />

139

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!