24.04.2014 Views

Almanac-Issue9

Almanac-Issue9

Almanac-Issue9

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Arcos-1<br />

System Name:<br />

Landing Points:<br />

Arcos-1<br />

RFS Year: 2001<br />

Total Length (kms): 8,201<br />

Initial Capacity:<br />

Design Capacity:<br />

Owners:<br />

System Supplier:<br />

Marine Surveyor:<br />

Upgrader<br />

Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island<br />

(Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas),<br />

Providenciales (Turks and Caicos Islands), Puerto Barrios (Guatemala), Puerto Cabezas (Nicuragua), Puerto<br />

Cortes (Honduras), Puerto Lempira (Honduras), Puerto Limon (Costa Rica), Puerto Plata (Dominican<br />

Republic), Punta Cana (Dominican Republic), Punto Fijo (Venezuela), Riohacha (Columbia), San Juan<br />

(Puerto Rico), Trojillo (Honduras), Tulum (Mexico), Ustupo (Panama), Willemstad (Netherlands Antilles)<br />

80 Gb/s<br />

1 Tb/s<br />

Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel<br />

(Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica),<br />

Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia), Racsa (Costa Rica), Telecarrier (Panama),<br />

Tricom (Dominican Republic), Ultracom (Puerto Rico), UTS (Curacao), Verizon<br />

Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)<br />

Fugro<br />

Xtera<br />

Upgrade Year 2008<br />

Upgraded Capacity<br />

40 Gb/s<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!