San Fernando Basin<br />
GROUNDWATER<br />
MANAGEMENT<br />
Local groundwater has always been<br />
an integral component of the <strong>LA</strong>DWP<br />
water supply portfolio, comprising<br />
approximately 15% of the supply<br />
during normal years and up to 30% in<br />
drought years. Local groundwater has<br />
also been heavily relied upon in the<br />
event of emergencies, such as the 1994<br />
Northridge Earthquake, when delivery<br />
systems were temporarily disrupted.<br />
The San Fernando Groundwater Basin<br />
(SFB) is the largest of these resources,<br />
accounting for nearly 80% of all local<br />
groundwater pumped by <strong>LA</strong>DWP. While<br />
local groundwater has historically<br />
provided Los Angeles with a highquality,<br />
reliable water supply, existing<br />
groundwater contamination in the SFB<br />
has impacted <strong>LA</strong>DWP’s ability to utilize<br />
this valuable resource. Recent years<br />
have seen a decrease in groundwater’s<br />
contribution to <strong>LA</strong>’s water supply from<br />
15% to 11%.<br />
The primary contaminants of concern<br />
include trichloroethylene (TCE),<br />
perchloroethylene (PCE), nitrates,<br />
perchlorate, hexavalent chromium,<br />
and emerging contaminants. To date,<br />
more than 47% of <strong>LA</strong>DWP’s production<br />
wells in the SFB have been removed<br />
from service due to contamination<br />
issues. With the discovery of new<br />
contamination sites and the migration<br />
of existing contaminant plumes, it<br />
is expected that more of <strong>LA</strong>DWP’s<br />
production wells will be curtailed,<br />
thereby forcing <strong>LA</strong>DWP to increase<br />
dependence on already fragile<br />
imported supplies.<br />
<strong>TEN</strong>-<strong>YEAR</strong> <strong>CAPITAL</strong> <strong>IMPROVEMENT</strong> <strong>PROGRAM</strong><br />