PROCEDURE FOR REVISIONS<br />

The rules set forth in this Standard Electrical Service Requirements (SESR) change from<br />

time to time due to improved methods <strong>of</strong> construction, product application, and changes in<br />

Safety <strong>standard</strong>s. <strong>Lakeland</strong> Electric (LE) reserves the right to change or amend its rules,<br />

regulations, rates, or other charges, at any time and such changes or amendments, shall<br />

become effective upon the date determined by <strong>Lakeland</strong> Electric.<br />

These changes follow a sequence <strong>of</strong> approval which enables the establishment and<br />

enforcement <strong>of</strong> the <strong>requirements</strong>. Additionally, routine review <strong>of</strong> the <strong>requirements</strong> by<br />

Manager <strong>of</strong> Engineering insures that the information does not become outdated.<br />

Proposed revisions are received by the SESR Committee Chairperson, reviewed and<br />

studied for viability with input from the originator. If the change is viable it will be passed to<br />

the SESR Committee for preliminary approval. A draft will be written and passed to<br />

Administration for final approval. If approved, the final draft <strong>of</strong> the new or revised rule is then<br />

copied and distributed with the appropriate cover letter to all Policy Manual holders. The<br />

originator will be notified whether the proposal was rejected or passed.<br />

EFFECTIVE DATE: JULY 1, 1998<br />

REVISED DATE: SEPTEMBER 2006<br />