Public Hearing 2 Preliminary Subdivision Plan Foothills of Mount Dora
Public Hearing 2 Preliminary Subdivision Plan Foothills of Mount Dora
Public Hearing 2 Preliminary Subdivision Plan Foothills of Mount Dora
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Board <strong>of</strong> County<br />
Commissioners<br />
DRC Recommendations Cont’d.<br />
6. This project shall be a gated community and shall comply with the minimum<br />
requirements <strong>of</strong> the Gated Community Ordinance, Orange County Code<br />
Sections 34-280, 34-290, and 34-291, as they may be amended from time to<br />
time.<br />
7. The applicant must apply for and obtain a capacity encumbrance letter prior<br />
to construction plan submittal and must apply for and obtain a capacity<br />
reservation certificate prior to platting. Nothing in this condition, and<br />
nothing in the decision to approve this preliminary subdivision plan, shall be<br />
construed as a guarantee that the applicant will be able to satisfy the<br />
requirements for obtaining a capacity encumbrance letter or a capacity<br />
reservation certificate.<br />
8. A waiver from Section 34-290 is granted to allow the co-mingling <strong>of</strong> private<br />
and public stormwater run<strong>of</strong>f in the joint use retention ponds. The waiver is<br />
based on the Boulevard A Extension (Spine Road) being public in order to<br />
provide open access to the proposed school sites and emergency access to<br />
the east.