<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> <strong>Framework</strong><br />

Approved 20th August 2009<br />

Prepared for ORKNEY ISLANDS COUNCIL<br />

by Land Use Consultants


Consultant Team<br />

Land Use Consultants<br />

studio KAP architects<br />

Roger Tym & <strong>Part</strong>ners<br />

Atkins<br />

Small Town & Rural Development Group<br />

<strong>Orkney</strong> <strong>Islands</strong> <strong>Council</strong><br />

School Place, <strong>Kirkwall</strong> KW15 1NY<br />

T: 01856 873 535<br />

customerservice@orkney.gov.uk<br />

Land Use Consultants<br />

Glasgow<br />

37 Otago Street, Glasgow G12 8JJ<br />

T: 0141 334 9595<br />

glasgow@landuse.co.uk


Table of Contents<br />

1.0 INTRODUCTION 1<br />

2.0 vISION STATEmENT 7<br />

3.0 PLANNING + URbAN DESIGN PRINCIPLES 13<br />

4.0 DEvELOPING ThE vISION 31<br />

5.0 DELIvERY AND ImPLEmENTATION 85<br />

APPENDICES<br />

A. ASSESSmENT Of CURRENT URbAN fORm 109<br />

b. TOWNSCAPE ChARACTERISATION 147<br />

C. TRANSPORT REvIEW 167<br />

D. ECONOmIC REvIEW 187<br />

E. CONSULTATION 215<br />

f. SWOT ANALYSIS 221


1.0 INTRODUCTION


1.0 introduction<br />

BACKgrOUnD AnD COnTexT<br />

1.1 This document is the <strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework (“the<br />

<strong>Kirkwall</strong> UDf”). It is a strategic planning and urban design document which<br />

establishes a coordinated approach to planning the development of <strong>Kirkwall</strong> for<br />

the next 10-20 year period. The UDf will be a material consideration in future<br />

planning decision making for development in <strong>Kirkwall</strong>. Sections 3 and 4 set out<br />

the main Development management Guidance which planning applications will<br />

be assessed against. The UDf will also inform the review of the <strong>Orkney</strong> Local<br />

Development Plan.<br />

a t l a n t i c<br />

o c e a n<br />

S H e T L A n D<br />

O r K n e Y<br />

1.2 <strong>Kirkwall</strong> is located on the mainland of <strong>Orkney</strong>, an island archipelago in the far<br />

north of Scotland. Separated from mainland Scotland by the Pentland firth,<br />

<strong>Orkney</strong> comprises over 70 islands of which 19 are inhabited.The islands have a<br />

population of approximately 20,000 with the majority of the population living on<br />

the largest island “The mainland”.<br />

1.3 <strong>Kirkwall</strong> has a population of over 7,000 and is the principal settlement in <strong>Orkney</strong><br />

acting as the administrative, commercial and transportation centre for the islands.<br />

The town is located centrally on the narrow ‘pinch-point’ of land between<br />

East and West mainland. It is home to the impressive St magnus Cathedral and<br />

therefore the settlement retains ‘City’ status.<br />

the<br />

hebrides<br />

<strong>Kirkwall</strong><br />

t h e<br />

n or t h<br />

s e a<br />

1.4 <strong>Kirkwall</strong> has Norse origins that are evident in its name and its historic core.The<br />

town developed as a medieval port, market and religious centre through the<br />

Middle Ages but changed little until it underwent significant improvements in the<br />

late 19 th century. Since the early 1900s the city has grown steadily, with expansion<br />

onto reclaimed land and into surrounding farmland.<br />

Inverness<br />

Aberdeen<br />

1.5 <strong>Kirkwall</strong> continues to develop and to perform a central and diverse role within<br />

the islands. <strong>Orkney</strong> <strong>Islands</strong> <strong>Council</strong> has therefore stated its intentions to be<br />

proactive in planning for future development, setting strategic objectives and<br />

preparing an urban design development framework.<br />

Dundee<br />

glasgow<br />

edinburgh<br />

Figure 1.1 Mainland Scotland and Isles Location map, scale 1 : 6 000 000<br />

This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100021621. 2008.<br />

N<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p2


PAPA<br />

WESTRAY<br />

NORTH <br />

RONALDSAY<br />

WESTRAY<br />

SANDAY<br />

B A Y O F<br />

K I R K W A L L<br />

ROUSAY<br />

EGILSAY<br />

EDAY<br />

STRONSAY<br />

Dounby<br />

M A I N L A N D<br />

Finstown<br />

wide firth<br />

SHAPINSAY<br />

Stromness<br />

hoy sound<br />

<strong>Kirkwall</strong><br />

B A Y O F<br />

B E R S T A N E<br />

scapa flow<br />

HOY<br />

SOUTH<br />

WALLS<br />

FLOTTA<br />

St Margaret’s Hope<br />

SOUTH<br />

RONALDSAY<br />

kirkwall<br />

airport<br />

The National Trust for Scotland<br />

S C A P A B A Y<br />

N<br />

N<br />

Figure 1.2 Isles of <strong>Orkney</strong> Location map, scale 1 : 500 000 Figure 1.3 <strong>Kirkwall</strong> and surrounding area, scale 1 : 50 000<br />

This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100021621. 2008.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework p3


1.0 introduction<br />

KIrKWALL UrBAn DeSIgn DeVeLOPMenT FrAMeWOrK<br />

1.6 The <strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework (KUDDf) was<br />

commissioned by <strong>Orkney</strong> <strong>Islands</strong> <strong>Council</strong> (OIC) in December 2007, following a<br />

competitive tender process. The commission was awarded to the consultancy<br />

team led by Land Use Consultants (LUC) and also comprising Roger Tym &<br />

<strong>Part</strong>ners (RTP),Atkins, Small Town and Rural Regeneration Group, and StudioKap<br />

Architects.<br />

1.7 The key aims of this Study are identified as follows:<br />

• to establish a strategic framework and vision which would direct future<br />

proposals towards a coordinated and legible urban form to benefit both<br />

<strong>Kirkwall</strong> and <strong>Orkney</strong> as a whole;<br />

• to identify its key spatial and urban design qualities and use these to help<br />

guide and coordinate the development of the city over the next 10 years;<br />

• to define key planning and urban design principles and objectives which<br />

respond to the urban characteristics and sensitivities of <strong>Kirkwall</strong>;<br />

• to provide the basis for detailed development briefs and masterplans for a<br />

number of separate sites, which will assist developers in the formulation of<br />

proposals which contribute to a high quality urban form and which respond<br />

to the local character;<br />

1.8 The more detailed objectives for study are as follows:<br />

i. To review historic economic and physical development patterns, identifying<br />

opportunities and constraints and explaining the functional, design and physical<br />

linkages between different parts of the town and/or barriers to be overcome.<br />

ii.<br />

iii.<br />

iv.<br />

To examine the socio-economic character of <strong>Kirkwall</strong> and its role in <strong>Orkney</strong> in<br />

order to formulate scenarios for the growth of the town to 2017, identifying<br />

realistic and sustainable development potential for different sectors, and the<br />

impact of these scenarios on the rest of <strong>Orkney</strong>.<br />

To examine capacity for future development and identify necessary infrastructure<br />

requirements and the planning management required to ensure a legible and high<br />

quality urban form and development which can bring the most benefits to <strong>Orkney</strong><br />

as a whole.<br />

To define the key spatial qualities of the town in terms of townscape character,<br />

urban form and public realm including for instance consideration of the hierarchy<br />

of streets and spaces in 2 and 3-dimensional forms, urban grain and permeability,<br />

landmarks, mix of uses, heights and massing, heritage assets and design character.<br />

v. To advise on the necessary delivery mechanisms to implement the <strong>Urban</strong> <strong>Design</strong><br />

Development framework objectives.<br />

• to inform the review of the Local Plan;<br />

• to be suitable for adoption as supplementary planning guidance and assist in<br />

the determination of planning applications;<br />

• to identify development opportunities;<br />

• to identify broad timescales and delivery mechanisms for implementation of<br />

the objectives;<br />

• to assist in the <strong>Council</strong>’s undertaking of a Strategic Environmental <br />

Assessment (SEA) for <strong>Kirkwall</strong>.<br />

vi.<br />

To advise on the direction of future planning policy for key land uses and <br />

development opportunities in the town in relation to the review of the Local <br />

Plan.”<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p4


FOrMAT OF THe rePOrT<br />

1.9 This document is the <strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

Document. The format is as follows:<br />

1. Introduction<br />

2. vision Statement<br />

3. Planning and <strong>Urban</strong> <strong>Design</strong> Principles<br />

4. Developing the vision<br />

5. Delivery and Implementation<br />

APPenDICeS<br />

1.10 Supplementary information is provided in a separate document that comprises<br />

a series of Appendices.The information contained within the appendices<br />

has informed the preparation of the <strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development<br />

framework, and provides underlying supporting evidence for the Strategic<br />

Proposals Plan.The format of the Appendices is as follows:<br />

A. Assessment of Current <strong>Urban</strong> Form : provides baseline<br />

information in relation to physical context, historical development and<br />

the key components of <strong>Kirkwall</strong>’s urban form;<br />

B. Townscape Characterisation : identifies several ‘ Townscape<br />

Character Areas’ based on factors such as architectural style and built<br />

form, spatial arrangements and age;<br />

C. Transport Appraisal : provides an overview of transportation and<br />

public access baseline and highlights relevant issues in the provision of<br />

future development;<br />

D. economic Appraisal : provides an overview of the socio-economic<br />

characteristics of <strong>Kirkwall</strong> including projected population figures,<br />

potential economic growth areas and residential supply and demand;<br />

e. Consultation Findings: outlines the community and stakeholder<br />

findings, and<br />

F. SWOT Analysis : represents the analysis of <strong>Kirkwall</strong>’s Strengths,<br />

Weaknesses, Opportunities and Threats produced for built<br />

Environment,Transport and Economic issues.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p5


2.0 vISION STATEmENT


2.0 vision statement<br />

InTrODUCTIOn<br />

2.1 Section 2 establishes a series of aspirational objectives for the future of <strong>Kirkwall</strong><br />

as a context to the UDf. Together these objectives present a vision for <strong>Kirkwall</strong><br />

in 20 years time.<br />

generAL<br />

2.2 <strong>Kirkwall</strong> will continue to act as the commercial and administrative centre within<br />

<strong>Orkney</strong>.<br />

2.3 The town will continue to offer a range of services including; a diverse,<br />

competitive and thriving retail sector; business and industry, education and<br />

learning for all ages; and health care facilities.<br />

2.4 <strong>Kirkwall</strong> will be considered a unique settlement with a strong sense of place and<br />

distinct character that attracts investment and visitors, and supports and retains<br />

the existing community.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p8


DeVeLOPMenT AnD grOWTH<br />

2.5 Many of the town’s current vacant ‘brownfield’ sites will be regenerated to allow<br />

growth and development within the existing town boundary.This development<br />

will positively contribute to the existing built environment and take priority over<br />

the development of Greenfield sites.<br />

2.6 Where new development is necessary to allow growth and sustainable<br />

development of the town, it will be used to redefine and strengthen the town’s<br />

boundary.<br />

2.7 New development will be part of a strategic plan as outlined in this document.<br />

Individual buildings will respond to <strong>Kirkwall</strong>’s unique landscape setting and<br />

contribute positively to the existing built environment. New development will<br />

consider physical benefits to the neighbourhood and the community in which it is<br />

proposed, and the town as a whole.<br />

2.8 New development will take into consideration the <strong>Orkney</strong> climate. New<br />

development will be sustainable with the consideration being given to energy<br />

efficiency and sustainable power sources.<br />

TrAnSPOrT<br />

2.14 <strong>Kirkwall</strong> will continue to act as the main transport hub within <strong>Orkney</strong> with an<br />

integrated transport network between land based bus services, inter-islands ferry<br />

services and air links to the rest of the UK and Europe.<br />

2.15 The transport network will be effective and efficient and will support economic<br />

vitality, community wellbeing and the environmental.<br />

2.16 The transport network will be developed to support development with emphasis<br />

on public transport connections and access and active travel (walking and cycling).<br />

2.17 There will be increased opportunities for active travel including walking and<br />

cycling around the town which will improve health, reduce traffic levels and<br />

isolated traffic congestion.<br />

2.18 There will be a reduction in traffic levels in the historic core of the town more<br />

emphasis on pedestrian priority and improving the environmental quality of the<br />

town.<br />

2.9 New development will incorporate Sustainable <strong>Urban</strong> Drainage Systems (SUDS).<br />

The existing built environment will also benefit from the introduction of new<br />

SUDS.<br />

2.10 <strong>Kirkwall</strong> shall embrace contemporary architecture of the highest quality which<br />

will reflect <strong>Orkney</strong>’s international and national reputation for archaeology, historic<br />

built form, food and drinks sector, bird life, jewellery etc.<br />

2.11 New development in the conservation area will respect the authentic<br />

architectural character of the historic spine.<br />

2.12 The integrity and architecture of the historic spine will be preserved and<br />

respected within the historic spine.<br />

2.13 Best practice is achieved in coping with flood risk and sustainable flood<br />

management.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p9


2.0 vision statement<br />

enVIrOnMenT<br />

2.19 Existing biodiversity in and around the town will be conserved and enhanced<br />

ensuring that new development does not endanger existing habitats.<br />

2.20 Existing areas of woodland and trees will be preserved and maintained in a<br />

sustainable way. New areas of woodland and trees will be encouraged to provide a<br />

landscape framework for the town especially in relation to natural watercourses.<br />

2.21 habitats such as coastal areas, beaches, and watercourses will be protected from<br />

damage through development.<br />

eCOnOMY<br />

2.22 The retail core will be located between the harbour and Cathedral with<br />

secondary retail streets including victoria Street and Junction Road, creating a rich<br />

street of shops and cafes offering activities throughout the day and evening.<br />

2.23 from the retail core it will be a stone’s throw to key community and civic facilities<br />

such as the library, the travel centre, schools and college as well as key green<br />

spaces such as the Peedie Sea.<br />

2.24 Good pedestrian routes will connect the retail core to a series of outlying<br />

attractions and civic and community buildings: the Pickaquoy centre; hatson<br />

Industrial Estate; the coast; Scapa beach; and Wideford hill.<br />

2.25 A new community ‘centre’ will evolve between the Peedie Sea, the Pickaquoy<br />

Centre offered a choice of shops, business premises and residential properties<br />

This neighbourhood will offer a range of housing types and have a strong<br />

architectural style and a clear relationship and physical connectivity to the town<br />

centre and the Peedie Sea.<br />

2.26 visitors will be encouraged by good signage to explore <strong>Kirkwall</strong>’s built heritage via<br />

a series of town trails and heritage walks taking in iconic buildings such as the St<br />

magnus Cathedral.<br />

2.27 The shopping streets in the retail core will be well paved in stone and good<br />

quality paving which will create a strong sense of place and express the hierarchy<br />

of space from the harbour to an improved civic space outside the Cathedral.The<br />

streetscape will respond to the architecture and form of individual buildings and<br />

there will be frequent benches and features.<br />

2.28 historic shop fronts in the conservation area will be restored and will be<br />

contrasted with dynamic, contemporary design which will have an intimate and<br />

rich pattern of cladding, planting and fenestration elsewhere.<br />

2.29 The people of <strong>Kirkwall</strong> and the surrounding area will be assisted help achieve<br />

their full potential on long term basis, sustainable basis.<br />

2.30 The businesses of <strong>Kirkwall</strong> and <strong>Orkney</strong> will be equipped for the global economy<br />

and investment shall be encouraged.<br />

2.31 <strong>Kirkwall</strong> and <strong>Orkney</strong> shall be promoting as an attractive place to live, work and<br />

invest.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p10


CULTUre<br />

2.32 A sense of place and history underpins the health and wellbeing of individuals and<br />

their community. Uniqueness of place and its heritage also brings an economic<br />

boost to <strong>Orkney</strong> through cultural tourists.<br />

2.33 A culture which values, develops and encourages artistic excellence, innovation<br />

and participation in all artforms.<br />

2.34 The arts will play a central role in life in <strong>Kirkwall</strong>.<br />

2.35 A community which values, develops and encourages sport and physical activity<br />

whether it be at a recreational, competitive or elite level.<br />

2.36 A culture which values, develops and encourages artistic excellence, innovation<br />

and participation in all artforms.<br />

Photo: John Wishart.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p11


3.0 PLANNING + URbAN DESIGN PRINCIPLES


3.0 planning and urban design principles<br />

3.1 The strategic objectives of the urban design development framework will be<br />

delivered through the following planning and design principles:<br />

1. To ‘centre’ the community on the heart of <strong>Kirkwall</strong>;<br />

2. To reinforce <strong>Kirkwall</strong>’s distinctiveness and unique sense of place through its<br />

new development, and protect and enhance its historic environment;<br />

3. To achieve urban repair through redevelopment of derelict / underused or<br />

fragmented ‘Brownfield’ sites within the current town boundary;<br />

4. To ensure new developments respond to the landscape setting and capacity;<br />

5. To reclaim the reclaimed – to realise the exciting potential of the Peedie Sea<br />

and the area around Junction Road / Great Western Road as the focus for<br />

new development;<br />

6. To improve connectivity within the town, and between town and country<br />

through active travel (walking and cycling, prime consideration for new<br />

development);<br />

7. To create a greenspace network for <strong>Kirkwall</strong>;<br />

8. To create a Woodland framework for the existing built environment and<br />

future developments;<br />

9. To redefine the fragmented urban edge through development and improve<br />

gateways into <strong>Kirkwall</strong>;<br />

gUIDAnCe TO APPLICAnTS<br />

3.3 Planning applications will be expected to demonstrate how they respond to<br />

each of these principles at the planning application stage.This information will be<br />

requested in the form of a “<strong>Design</strong> Statement” which will be submitted in support<br />

of planning applications.The purpose is to ensure that all future development that<br />

occurs in <strong>Kirkwall</strong> responds to the common approach to design quality which is<br />

established in this <strong>Urban</strong> <strong>Design</strong> framework.<br />

3.4 The level of information that will be required will vary depending of the scale of<br />

the development proposed. for example, it is likely that small scale development<br />

(such as a single house or house extension) will require very limited information<br />

and that this will focus mostly on demonstrating that the chosen design of the<br />

building respects the local context. for these small scale developments, the<br />

<strong>Design</strong> Statement is likely to be very short, outlining the key factors which<br />

have influenced the chosen design. Larger scale developments such as multiple<br />

house or flatted developments, larger retail or commercial premises will be<br />

expected to provide a more comprehensive assessment of the 12 Principles in the<br />

Planning and <strong>Design</strong> Statement. Clarification should be sought from the planning<br />

department at the pre-application stage on the level of information that will be<br />

required.<br />

3.5 As a general guide, reference should be made to the ‘Developing the vision<br />

<strong>Part</strong> C’ of this document and the accompanying ‘Townscape Characterisation’<br />

information provided at Appendix b for information on the local context/design<br />

issues which applicants will be expected to respond to in developing the design of<br />

new development.<br />

10. To improve <strong>Kirkwall</strong>’s streetscape and public realm on a hierarchical basis;<br />

11. To create a robust landscape framework for the future development of<br />

hatston Industrial area;<br />

12. To ensure that all new development is energy efficient and aims to be<br />

sustainable.<br />

3.2 The above objectives are described and illustrated in the following pages.<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p14


Principle 1:To ‘Centre’ the Community on the Heart of <strong>Kirkwall</strong><br />

Bay of <strong>Kirkwall</strong><br />

3.6 The first principle seeks to achieve balance in the size and the distribution of<br />

developments and of facilities in <strong>Kirkwall</strong>. It also seeks to reinforce the importance<br />

and usability of the town centre for retail, social and cultural activities. During the<br />

twentieth century the town has expanded significantly to the south and south<br />

east, so much so that significant numbers of households are outside the 10 and<br />

15 minute walking distance from core facilities (such as supermarkets, shops,<br />

community services and public transport hubs).This encourages and in some cases<br />

necessitates car use for basic activities for households in the most southerly/<br />

easterly parts of the town.This problem is compounded by the lack of local<br />

facilities in the outer housing areas.<br />

3.7 This objective therefore seeks to see greater balance in the shape of <strong>Kirkwall</strong><br />

with an emphasis for future development/ redevelopment on the western side<br />

of the centre, around and to the west of the Peedie Sea.This would allow more<br />

equitable use of key facilities with access to the historic core possible within 10­<br />

15 minutes by foot.This would reinforce the importance of the town centre and<br />

potentially be a catalyst for new development and/or business growth in the core<br />

area.This objective would give added value to the Peedie Sea area. It would allow<br />

new developments to achieve strong relationships with distinctive components<br />

of the town including St magnus Cathedral, the historic core, <strong>Kirkwall</strong> bay and<br />

the harbour. Secondary benefits would be reduced car dependency for the new<br />

developments.<br />

UNDEVELOPED<br />

WITHIN WALKING<br />

DISTANCE OF TOWN CENTRE<br />

PEEDIE<br />

SEA<br />

HISTORIC<br />

CORE<br />

5mins<br />

3.8 It is also important that there remain opportunities for compatible business/<br />

employment in the central area. To this end, subject to the requirements for<br />

detailed consideration of potential flood risk issues in the central areas, business<br />

development are encouraged in the central area where there will be no adverse<br />

impact on neighbouring amenity and these contribute to the overall sense of place<br />

and defining character of the central area promoted by this UDF.<br />

3.9 Planning applications must demonstrate that they:<br />

• Utilise sites which are in accordance with the proposed allocations and phased<br />

expansion of the settlement boundary set out in the Strategic Proposals map;<br />

• Encourage walking/cycling through the provision of clear and convenient<br />

links to walk and cycle ways and (where relevant) linking into the primary<br />

greenspace network identified in the Strategic Proposals Plan;<br />

• Demonstrate adequate provision for cycle parking/storage;<br />

• for larger schemes pedestrian/cycle networks should form the central part<br />

of the landscape scheme and innovative approaches to street and public space<br />

design should be explored.<br />

10mins<br />

15mins<br />

Centred Community N<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework p15


3.0 planning and urban design principles<br />

Bay of <strong>Kirkwall</strong><br />

Principle 2:To reinforce <strong>Kirkwall</strong>’s Distinctiveness through its new <br />

Development, and Protect and enhance its Historic environment.<br />

3.10 The second principle seeks to see <strong>Kirkwall</strong> embrace and promote opportunities<br />

for new high quality architecture which responds to the distinctive character<br />

of <strong>Orkney</strong> and the town, but which is forward-looking and sustainable. Respect<br />

for the local context is an essential requirement for new developments and<br />

development within the historic core must respect and enhance the local<br />

environment.<br />

THE HARBOUR<br />

3.11 <strong>Kirkwall</strong> offers a range of different potential development opportunities from<br />

small gap sites to large greenfield sites.These opportunities should all be used<br />

to positively reinforce the image and functionality of the town regardless of<br />

scale or budget. Development projects must be addressed holistically, with<br />

consideration of how the other objectives listed in this chapter might also apply.<br />

The development zone masterplans, the environmental improvement strategies<br />

and the outline design guidance in Chapter 4, indicate the recommended approach<br />

for key development areas, however there should be high aspirations for design<br />

quality in all cases.This should include consideration of how each development<br />

responds to context both in the immediate vicinity of the development and the<br />

town as a whole including views and vistas to and from the development site. Key<br />

landmarks, such as St magnus Cathedral should be protected from development<br />

which would impact on the visual dominance of these on the main land and sea<br />

approaches to the town. New developments should seek to respond to distinctive<br />

elements of <strong>Kirkwall</strong>’s physical setting and landmark features such as <strong>Kirkwall</strong><br />

bay, the harbour, the historic core including St magnus, and surrounding Orcadian<br />

landscape etc. The use of non standard materials, colours and incorporation of<br />

landscape proposals (external layout and spatial arrangement as well as ‘planting’)<br />

can all contribute to the creation of distinctive places. and this may warrant the<br />

use of architectural design competitions for strategic sites.<br />

PEEDIE<br />

SEA<br />

HISTORIC CORE +<br />

ST. MAGNUS<br />

PAPDALE<br />

HOUSE<br />

BLACK<br />

BUILDING<br />

3.12 Planning applications must demonstrate that they:<br />

• Are of an appropriate design quality which respects local surroundings<br />

and enhances the local area (reference should be made to the ‘Developing<br />

the vision <strong>Part</strong> C’ of this document and the accompanying ‘Townscape<br />

Characterisation’ information provided at Appendix b);<br />

• Contribute to the creation of a high quality public realm through good site<br />

layout, landscaping and use of materials;<br />

• Protect listed buildings and their setting, and preserve or enhance the<br />

conservation area.<br />

‘IDENTITY’ Distinctiveness / Sense of Place<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

N<br />

p16


Bay of <strong>Kirkwall</strong><br />

Principle 3:To achieve <strong>Urban</strong> repair through redevelopment of<br />

Brownfield/Derelict Sites<br />

3.13 Principle 3 sets out a sequential approach to urban repair.This implies that the<br />

redevelopment of gap sites, derelict and brownfield areas of <strong>Kirkwall</strong> should<br />

ideally be prioritised before expansion into Greenfield areas. In practical<br />

terms, it may not be possible for brownfield sites to meet all of <strong>Kirkwall</strong>’s<br />

development demands, but this principle seeks to ensure that urban sites are not<br />

inappropriately disregarded due to their relative complexity. Generally, brownfield<br />

sites represent opportunities to repair the urban morphology and to introduce<br />

new developments in accessible, strategic locations. They will demand more<br />

‘urban’ architectural solutions of a high order which can also have a dynamic<br />

influence on the town. Denser developments may be possible, thereby improving<br />

development economics and enabling a high quality product. In <strong>Kirkwall</strong>, key<br />

brownfield sites and potential longer term urban redevelopment areas have been<br />

identified on the adjacent figure; they include:<br />

• the harbour quayside areas, including the Oil Storage Depot and the<br />

Ambulance Depot;<br />

• the former Todds building;<br />

• Great Western Road / Junction Road sites, including the former Jewsons site;<br />

• Pickaquoy Road sites, including the areas around the existing supermarkets;<br />

• the former bus station;<br />

• the black building, and<br />

• <strong>Kirkwall</strong> Grammar School site.<br />

3.14 While the above sites vary in size, most are prominent. Their redevelopment will,<br />

therefore, have a significant impact on <strong>Kirkwall</strong>’s image and spatial integrity.<br />

PICKAQUOY<br />

ROAD SITES<br />

GREAT WESTERN RD<br />

& JUNCTION RD<br />

SITES<br />

FORMER BUS<br />

STATION<br />

HARBOUR<br />

QUAYSIDE<br />

AREAS<br />

KIRKWALL<br />

GRAMMAR<br />

SCHOOL<br />

BLACK<br />

BUILDING<br />

3.15 Planning applications must demonstrate that they:<br />

• Where Greenfield sites are proposed for development, applicants must<br />

explain the process of decision making which has led to the choice of a<br />

Greenfield site over previously developed land elsewhere in <strong>Kirkwall</strong>;<br />

• Development of greenfield sites must demonstrate that it conserves or<br />

enhances the landscape setting of <strong>Kirkwall</strong> and includes landscape proposals<br />

that will improve local amenity and enhance biodiversity;<br />

• Development of prominent brownfield sites must demonstrate that they<br />

have responded to the site development guidance provided in Section 4 of<br />

this UDf.<br />

Redevelopment of Brownfield / Derelict Sites<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

N<br />

p17


3.0 planning and urban design principles<br />

Bay of <strong>Kirkwall</strong><br />

Principle 4:To ensure new Developments respond to the Landscape<br />

Setting and Capacity<br />

3.16 Principle 4 seeks to highlight the importance of preventing the town from<br />

expanding outside its natural topographic ‘cradle’.The town is currently cradled<br />

between the ridgeline of Seatter and Towerhill to the south east, and Wideford hill<br />

and prominent ridgeline of Corse farm to the west. built areas of the town have<br />

already expanded onto higher elevations on the south and south east edges of the<br />

town.These built areas have started to break the horizon from some viewpoints<br />

and can be visually prominent from surrounding areas especially with the lack of<br />

urban trees and woodland within the urban fabric. The green backcloth of the<br />

rounded ridgelines and hills is considered important in relation to the distinctive<br />

landscape setting of the town.These areas of the town at higher elevations have<br />

also lost physical and visual connections with distinctive components of <strong>Kirkwall</strong><br />

including St magnus Cathedral, the Peedie Sea, the harbour and <strong>Kirkwall</strong> bay.<br />

At a secondary level the encroachment of the town up to and over ridgelines<br />

where they would be visible from adjacent landscape areas should be avoided.<br />

for example, the further development of the area surrounding the highland Park<br />

distillery would soon be visible from Scapa beach which would be detrimental to<br />

this location.This objective further enhances the cause for development to the<br />

immediate west of the town where there is substantial areas of undeveloped land<br />

under 40-50AOD.<br />

UNDEVELOPED<br />

UNDEVELOPED<br />

T:\42\<br />

3.17 Localised changes in topography also provide opportunities to reinforce boundary<br />

edges. for example Weyland burn on the east side of the town offers a natural<br />

topographical ‘indentation’ that could reinforce the edge to the town.<br />

RIDGELINE<br />

3.18 Planning applications must demonstrate that they:<br />

• Are of an appropriate height and scale to preserve the landscape setting of<br />

the town, including consideration of impact on ridgelines,<br />

• Where relevant, improve the landscape setting of the town boundary<br />

through planting and sympathetic boundary treatment which reinforces the<br />

edge of the town positively<br />

SCAPA<br />

FLOODPLAIN<br />

RIDGELINE<br />

Landscape Setting<br />

N<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p18


Bay of <strong>Kirkwall</strong><br />

Principle 5:To reclaim the reclaimed – to realise the Potential of the<br />

Peedie Sea as the Focus for new Development<br />

3.19 Principle 5 seeks to highlight the importance of the Peedie Sea to the identity<br />

of <strong>Kirkwall</strong> and to recognise its unrealised potential to provide <strong>Kirkwall</strong> with a<br />

second dynamic waterfront.The development of the surrounding area should<br />

be considered an opportunity to enhance and improve the vitality of the Peedie<br />

Sea as a significant green space within the town.The provision and enhancement<br />

of a circular walkway around the Peedie Sea waterfront should be considered a<br />

priority for any new development in this area.<br />

INDUSTRIAL<br />

3.20 The process of land reclamation has obscured the historic relationship between<br />

the Peedie Sea and the medieval spine of the town, however, the remaining<br />

water body and associated parkland is still a major feature and an obvious focus<br />

for new development west of the town centre.<br />

NEWCORE<br />

HISTORIC CORE<br />

3.21 Planning applications must demonstrate that they:<br />

• Where relevant, address the waterfront of the Peedie Sea, providing<br />

a positive, high quality edge to the Peedie Sea which will encourage<br />

pedestrian movement around the Peedie Sea;<br />

• Where appropriate, contribute to the creation of a walkway around<br />

the Peedie Sea;<br />

• facilitate pedestrian and cycle movement through sites, including where<br />

relevant linking to existing networks and the Peedie Sea walkways;<br />

• Where relevant, provide for views of the Peedie Sea through sites from<br />

the surrounding area in site layout and design.<br />

NEW<br />

DEVELOPMENT<br />

SUPERMARKETS<br />

Reclaiming the Reclaimed N<br />

<strong>Kirkwall</strong> <strong>Urban</strong> <strong>Design</strong> Development framework<br />

p19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!