14.05.2014 Views

Recent Flooding and Flood Mitigation in Manitoba

Recent Flooding and Flood Mitigation in Manitoba

Recent Flooding and Flood Mitigation in Manitoba

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Recent</strong> <strong><strong>Flood</strong><strong>in</strong>g</strong><br />

<strong>and</strong><br />

<strong>Flood</strong> <strong>Mitigation</strong><br />

<strong>in</strong> <strong>Manitoba</strong><br />

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •<br />

Eugene F. Kozera, P. Eng.<br />

Director, Water Control System<br />

Management Branch<br />

Water Stewardship


Saskatchewan R.<br />

Souris<br />

Red<br />

W<strong>in</strong>nipeg


Flow (cubic feet per second)<br />

250,000<br />

200,000<br />

1826<br />

Red River:<br />

natural <strong>in</strong><br />

W<strong>in</strong>nipeg<br />

150,000<br />

1852<br />

1950 1979<br />

1997 2 0<br />

0<br />

9<br />

2<br />

0<br />

1<br />

1<br />

100,000<br />

50,000<br />

0


Flow (cubic feet per second)<br />

50,000<br />

45,000<br />

40,000<br />

1882<br />

Ass<strong>in</strong>ibo<strong>in</strong>e River<br />

at Br<strong>and</strong>on<br />

2011<br />

35,000<br />

30,000<br />

1904<br />

1995<br />

25,000<br />

20,000<br />

1923<br />

1955<br />

1976<br />

15,000<br />

10,000<br />

5,000<br />

0


Flow (cubic feet per second)<br />

30,000<br />

Souris River at Westhope<br />

25,000<br />

2011<br />

20,000<br />

1882<br />

15,000<br />

1976<br />

10,000<br />

5,000<br />

0


Ass<strong>in</strong>ibo<strong>in</strong>e River dikes east of Portage<br />

Ass<strong>in</strong>ibo<strong>in</strong>e R. dikes


1950 flood<br />

Damages: over $700 M<br />

100,000 people evacuated<br />

10,000 homes flooded


W<strong>in</strong>nipeg’s<br />

Primary Dikes<br />

•Built <strong>in</strong> 1950 <strong>and</strong> 1951<br />

•Top of dikes: 4 ft below 1950 peak water level<br />

Cost: $4.6 million<br />

(Canada, <strong>Manitoba</strong>, City of W<strong>in</strong>nipeg)


Br<strong>and</strong>on<br />

Portage<br />

W<strong>in</strong>nipeg


Br<strong>and</strong>on<br />

Portage<br />

Diversion<br />

Portage<br />

W<strong>in</strong>nipeg


Br<strong>and</strong>on<br />

Portage<br />

W<strong>in</strong>nipeg


1966 Red River Valley flood<br />

La<br />

Salle<br />

St. Adolphe<br />

River<br />

Se<strong>in</strong>e<br />

Se<strong>in</strong><br />

River<br />

River Diversion<br />

Mann<strong>in</strong>g<br />

11 - A Dra<strong>in</strong><br />

Canal<br />

Norquay<br />

Channel<br />

Brunkild<br />

D - 20<br />

Dra<strong>in</strong><br />

Tourond Creek<br />

L.<br />

Morris<br />

R.<br />

Morris<br />

River<br />

Rosenort<br />

River<br />

Rat<br />

R.<br />

1967-72: $5.4 M<br />

1980-89: $5.4 M<br />

Tobacco<br />

Creek<br />

Graham<br />

Deadhorse<br />

Shan non<br />

Creek<br />

Shannon<br />

Creek<br />

Creek<br />

Hespeler<br />

Creek<br />

Dra<strong>in</strong><br />

Morris<br />

Deadhorse Creek<br />

Plum R.<br />

Red<br />

Marsh<br />

River<br />

St. Jean Baptiste<br />

Roseau<br />

River<br />

RosenheimDra<strong>in</strong><br />

Buffalo<br />

Ck<br />

Letellier<br />

Dom<strong>in</strong>ion<br />

Ma<strong>in</strong> Dr.<br />

City<br />

Morris<br />

Emerson


1997 Red<br />

River Valley<br />

flood


Morris


<strong>Flood</strong> preparation, fight<strong>in</strong>g,<br />

damages: $500 M<br />

Ste. Agathe<br />

Evacuations: 28,000 people


Se<strong>in</strong><br />

River<br />

La<br />

Community flood protection<br />

11 - A Dra<strong>in</strong><br />

14 new or exp<strong>and</strong>ed<br />

Norquay<br />

communities dike<br />

Channel<br />

Salle<br />

River<br />

Ste. Agathe<br />

Se<strong>in</strong>e River Diversion<br />

Mann<strong>in</strong>g<br />

Niverville<br />

D - 20 Dra<strong>in</strong><br />

Tourond Creek<br />

Canal<br />

$35.5 M<br />

Rosenort<br />

L.<br />

Morris<br />

R.<br />

Morris<br />

Rat<br />

Aubigny<br />

R.<br />

Tobacco<br />

Graham<br />

Shan non<br />

Creek<br />

Shannon<br />

Creek<br />

Creek<br />

Riverside<br />

River<br />

Creek<br />

Lowe Farm<br />

Red<br />

River<br />

Marsh<br />

River<br />

St. Pierre<br />

Jolys<br />

Deadhorse<br />

Creek<br />

Rosenfeld<br />

Hespeler<br />

Dra<strong>in</strong><br />

Deadhorse Creek<br />

Plum R.<br />

River<br />

Roseau<br />

RosenheimDra<strong>in</strong><br />

Buffalo<br />

Ck<br />

Gretna<br />

Emerson<br />

Dom<strong>in</strong>ion<br />

Ma<strong>in</strong> Dr.<br />

City


Rais<strong>in</strong>g<br />

Dik<strong>in</strong>g<br />

Individual flood protection:<br />

1,750 structures; $59 M<br />

Reta<strong>in</strong><strong>in</strong>g wall<br />

Structural dike


W<strong>in</strong>nipeg<br />

secondary<br />

r<strong>in</strong>g dikes<br />

– 23 sites considered<br />

– 9 sites short-listed<br />

– $10.4 M


<strong>Manitoba</strong><br />

Enhanced hydrometric network<br />

Exist<strong>in</strong>g Stations<br />

Upgraded Stations<br />

Reactivated Stations<br />

New Stations


<strong>Flood</strong>way Expansion - Channel<br />

Excavation<br />

$665 M


- bridges


- Inlet control structure


- west dike


% of normal soil<br />

Moisture at freeze-up<br />

5 th wettest September<br />

through February


May 2011:<br />

% of normal<br />

precipitation


June 19: major ra<strong>in</strong> storm


June 2011 Precipitation: % of normal<br />

175<br />

171<br />

165<br />

324<br />

310<br />

172<br />

191 142<br />

215


Flow (cubic feet per second)<br />

50,000<br />

45,000<br />

40,000<br />

1882<br />

Ass<strong>in</strong>ibo<strong>in</strong>e River<br />

at Br<strong>and</strong>on<br />

(330-year)<br />

2011<br />

35,000<br />

30,000<br />

1904<br />

1995<br />

25,000<br />

20,000<br />

1923<br />

1955<br />

1976<br />

15,000<br />

10,000<br />

5,000<br />

0


Flow (cubic feet per second)<br />

30,000<br />

25,000<br />

Souris River at Westhope<br />

(213-year)<br />

2011<br />

20,000<br />

1882<br />

15,000<br />

1976<br />

10,000<br />

5,000<br />

0


1961<br />

1962<br />

1963<br />

1964<br />

1965<br />

1966<br />

1967<br />

1968<br />

1969<br />

1970<br />

1971<br />

1972<br />

1973<br />

1974<br />

1975<br />

1976<br />

1977<br />

1978<br />

1979<br />

1980<br />

1981<br />

1982<br />

1983<br />

1984<br />

1985<br />

1986<br />

1987<br />

1988<br />

1989<br />

1990<br />

1991<br />

1992<br />

1993<br />

1994<br />

1995<br />

1996<br />

1997<br />

1998<br />

1999<br />

2000<br />

2001<br />

2002<br />

2003<br />

2004<br />

2005<br />

2006<br />

2007<br />

2008<br />

2009<br />

2011<br />

1961<br />

1963<br />

1965<br />

1967<br />

1969<br />

1971<br />

1973<br />

1975<br />

1977<br />

1979<br />

1981<br />

1983<br />

1985<br />

1987<br />

1989<br />

1991<br />

1993<br />

1995<br />

1997<br />

1999<br />

2001<br />

2003<br />

2005<br />

2007<br />

2009<br />

9,000,000<br />

9,000,000<br />

8,000,000<br />

8,000,000<br />

7,000,000<br />

7,000,000<br />

6,000,000<br />

Total Volume of Water Flow<strong>in</strong>g Down the Ass<strong>in</strong>ibo<strong>in</strong>e River<br />

Total Volume<br />

Between<br />

of<br />

April<br />

Water<br />

<strong>and</strong> July<br />

Flow<strong>in</strong>g<br />

AnnuallyDown the<br />

Ass<strong>in</strong>ibo<strong>in</strong>e River Between April <strong>and</strong> July<br />

2011:<br />

8.3 M ac-ft<br />

ac-ft<br />

6,000,000<br />

5,000,000<br />

5,000,000<br />

4,000,000<br />

4,000,000<br />

3,000,000<br />

3,000,000<br />

2,000,000<br />

2,000,000<br />

1,000,000<br />

1,000,000<br />

1976<br />

1995<br />

-<br />

-


cfs<br />

Upper portion of Souris River Bas<strong>in</strong> Gets Slammed


M<strong>in</strong>ot, North Dakota


Br<strong>and</strong>on


Br<strong>and</strong>on: major dike rais<strong>in</strong>g (earth <strong>and</strong> super s<strong>and</strong> bags)


Souris


Wawanesa<br />

Melita


Portage<br />

Design = 25,000 cfs<br />

2011: 34,000 cfs<br />

Capacity =<br />

18,000 cfs<br />

Br<strong>and</strong>on<br />

W<strong>in</strong>nipeg<br />

2011 peak flow<br />

near 53,000


Ass<strong>in</strong>ibo<strong>in</strong>e River Dikes – Massive Effort to Re<strong>in</strong>force


cfs<br />

Canadian Armed Forces Called <strong>in</strong> to Help


Portage Diversion: re<strong>in</strong>forc<strong>in</strong>g drop structures


Portage Diversion: rais<strong>in</strong>g dikes along channel


Portage<br />

Br<strong>and</strong>on<br />

Design = 25,000 cfs<br />

2011: 34,000 cfs<br />

2011 peak flow<br />

near 53,000<br />

Capacity =<br />

18,000 cfs<br />

Hoop <strong>and</strong> Holler<br />

release: 400 cfs<br />

W<strong>in</strong>nipeg


Controlled release at Ass<strong>in</strong>ibo<strong>in</strong>e River dikes<br />

(at Hoop <strong>and</strong> Holler)


Lake W<strong>in</strong>nipegosis<br />

Waterhen R.<br />

Dauph<strong>in</strong> Lake<br />

Whitemud<br />

Portage Diversion


May 31 st : Lake <strong>Manitoba</strong> at 815.3 ft, <strong>and</strong> major w<strong>in</strong>d storm


cfs<br />

Lake <strong>Manitoba</strong> peaked at 817.15 ft btwn July 12 - 25 (w<strong>in</strong>d<br />

elim<strong>in</strong>ated)


Peak: 817.15 ft.


cfs<br />

May 31 Storm


Waterhen R.<br />

Lake St. Marti<br />

Portage Diversion


Lake St. Mart<strong>in</strong>


Ralls Isl<strong>and</strong> dik<strong>in</strong>g<br />

Saskatchewan R.<br />

Carrot River temp dikes<br />

Souris<br />

Red<br />

W<strong>in</strong>nipeg


At height of flood<strong>in</strong>g, 840 municipal <strong>and</strong><br />

prov<strong>in</strong>cial roads closed or affected<br />

Total evacuees: 7,165<br />

Local states of emergency: 70<br />

Long flood!! Man. Emergency Coord<strong>in</strong>ation<br />

Centre was open 103 days (44 <strong>in</strong> 1997)


<strong>Flood</strong> <strong>Mitigation</strong><br />

• Individual <strong>Flood</strong> Protection – $75M <strong>in</strong> f<strong>in</strong>ancial assistance<br />

• For rais<strong>in</strong>g, dik<strong>in</strong>g, terrac<strong>in</strong>g or mov<strong>in</strong>g<br />

• Homes, <strong>and</strong> farm <strong>and</strong> bus<strong>in</strong>ess build<strong>in</strong>gs: 86%, up to $100,000 project<br />

• Cottage: 86%, up to $40,000 project<br />

• Lake <strong>Manitoba</strong>: first $20,000 is 100% grant<br />

• 1,600 applications to date<br />

• New community flood protection<br />

• 2010: 8 feasibility studies<br />

• 2011: application deadl<strong>in</strong>e is November 30 th<br />

• Construction: $30M <strong>in</strong> 90% grants<br />

• Convert<strong>in</strong>g emergency dikes <strong>in</strong>to permanent dikes<br />

• $20M for 17 projects<br />

• Communities such as Souris, Melita, Wawanesa, Lake <strong>Manitoba</strong> Narrows,<br />

Peltz Drive/St. Peter’s Road


<strong>Flood</strong> <strong>Mitigation</strong><br />

• Community dik<strong>in</strong>g<br />

• Br<strong>and</strong>on: grant for rais<strong>in</strong>g to new design level<br />

• Petersfield: grant for construction/rais<strong>in</strong>g to new design level<br />

• Shellmouth: <strong>in</strong>stall gates on the spillway ($8 M)<br />

• Portage Diversion: assessment <strong>and</strong> upgrad<strong>in</strong>g ($7.4 M)<br />

• Lake St. Mart<strong>in</strong> emergency channel - $100M<br />

• Fairford Control Bypass - $60M


Dauph<strong>in</strong> R.<br />

Lake<br />

W<strong>in</strong>nipeg<br />

<strong>Flood</strong> <strong>Mitigation</strong> Cont<strong>in</strong>ues...<br />

Emergency<br />

outlet channel<br />

Lake<br />

<strong>Manitoba</strong><br />

Fairford R.<br />

Lake<br />

St. Mart<strong>in</strong><br />

Emergency Channel<br />

from Lake St. Mart<strong>in</strong><br />

to Big Buffalo Lake<br />

Fairford Bypass<br />

N


Projected Lake <strong>Manitoba</strong> water levels


Thank You<br />

Questions?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!