- Page 1: THEMATIC EVALUATION OF THE WATER AN
- Page 5 and 6: III VOLUME 2 - TABLE OF CONTENTS AN
- Page 7 and 8: TABLE OF CONTENTS EXECUTIVE SUMMARY
- Page 9 and 10: 0 EXECUTIVE SUMMARY The field visit
- Page 11 and 12: 2 6.5). One of the first tasks of t
- Page 13 and 14: 4 At the end of the mission a debri
- Page 15 and 16: 6 3 BRIEF SECTOR PROFILE 3.1 Laws,
- Page 17 and 18: 8 Public awareness - rural water su
- Page 19 and 20: 10 4 PRELIMINARY FINDINGS 4.1 Suppo
- Page 21 and 22: 12 • The ongoing national typhoid
- Page 23 and 24: 14 4.3 Cross Cutting Issues How far
- Page 25 and 26: 16 Republic of Germany who is inves
- Page 27 and 28: 18 • Lack of baseline, and post p
- Page 29 and 30: 20 6.1 List of Documents Consulted
- Page 31 and 32: 22 6.2 Activity Schedule Wednesday
- Page 33 and 34: 24 6.4 List of water and sanitation
- Page 35 and 36: EVALUATION OF THE WATER AND SANITAT
- Page 37 and 38: ABBREVIATIONS AND ACRONYMS ACP AEP
- Page 39 and 40: 1 evaluation could also contribute
- Page 41 and 42: 3 • Promoting joint donor-support
- Page 43 and 44: 5 shows that (amongst other causes)
- Page 45 and 46: 7 basis for the legal status of own
- Page 47 and 48: 9 In September 2004, the Government
- Page 49 and 50: 11 Daily water availability - A 200
- Page 51 and 52: 13 Pricing policy - The CNAG and th
- Page 53 and 54:
15 4.4 Support in accordance with t
- Page 55 and 56:
17 - Coherent logical frameworks 18
- Page 57 and 58:
19 Degree to which synergies and co
- Page 59 and 60:
21 are bearing so the witness of th
- Page 61 and 62:
23 4 Republica de Cabo Verde Contra
- Page 63 and 64:
25 6.3 Activity Schedule 29/05/2005
- Page 65 and 66:
27 6.5 List of Specific Programmes
- Page 67 and 68:
29 MATRICE DES DONNATEURS AU CAP VE
- Page 69 and 70:
31 CADRE D’INTERVENTION POUR LE V
- Page 71 and 72:
33 Cadre d’Intervention pour le V
- Page 73 and 74:
Objectif Global Objectif Spécifiq
- Page 75 and 76:
TABLE OF CONTENTS EXECUTIVE SUMMARY
- Page 77 and 78:
0 EXECUTIVE SUMMARY The field visit
- Page 79 and 80:
2 1.2 Reasons for case study countr
- Page 81 and 82:
4 2.3 Structured and unstructured i
- Page 83 and 84:
6 delivered 10 . It sets out the re
- Page 85 and 86:
8 replaces the old infrastructure g
- Page 87 and 88:
10 Reference Detail Allocated Amoun
- Page 89 and 90:
12 4 PRELIMINARY FINDINGS 4.1 Suppo
- Page 91 and 92:
14 4.2 Water Resources Management H
- Page 93 and 94:
16 4.4 Water Supply and Sanitation
- Page 95 and 96:
18 trading as a result of local gov
- Page 97 and 98:
20 Although the above sectoral issu
- Page 99 and 100:
22 6.1 List of Documents Consulted
- Page 101 and 102:
24 6.2 Activity Schedule 26 th July
- Page 103 and 104:
26 6.4 List of water and sanitation
- Page 105 and 106:
28 Year Status CRIS Code Title 1996
- Page 107 and 108:
TABLE OF CONTENTS EXECUTIVE SUMMARY
- Page 109 and 110:
0 EXECUTIVE SUMMARY This note summa
- Page 111 and 112:
2 2. DATA COLLECTION 2.1 Methods us
- Page 113 and 114:
4 and World Bank overview 5 , water
- Page 115 and 116:
6 over under a lease, rent or conce
- Page 117 and 118:
8 environmental projects will be la
- Page 119 and 120:
10 3.4.4. Others Member States inte
- Page 121 and 122:
12 4. PRELIMINARY FINDINGS 4.1 EQ1:
- Page 123 and 124:
14 4.4 EQ 4: Support in accordance
- Page 125 and 126:
16 4.8 EQ8: Internal consistency an
- Page 127 and 128:
18 5. CONCLUSIONS 5.1 Main country
- Page 129 and 130:
20 6. ANNEXES 6.1 List of Documents
- Page 131 and 132:
22 Ref Generated Title and Subject
- Page 133 and 134:
24 6.4 List of Specific Programmes
- Page 135 and 136:
26 Year Status (2/2004) Project nam
- Page 137 and 138:
EVALUATION OF THE WATER AND SANITAT
- Page 139 and 140:
ABBREVIATIONS AND ACRONYMS ADB AIDC
- Page 141 and 142:
1 1 INTRODUCTION 1.1 Evaluation ove
- Page 143 and 144:
3 requirements) in the CSP itself.
- Page 145 and 146:
5 office for South Asia. A detailed
- Page 147 and 148:
7 3 BRIEF SECTOR PROFILE 3.1 Laws,
- Page 149 and 150:
9 of collective rewards (for exampl
- Page 151 and 152:
11 4 PRELIMINARY FINDINGS 4.1 Suppo
- Page 153 and 154:
13 and some quantifiable data linki
- Page 155 and 156:
15 • The sanitary education at sc
- Page 157 and 158:
17 line of demarcation or responsib
- Page 159 and 160:
19 juncture it has been possible to
- Page 161 and 162:
21 6.1 List of Documents Consulted
- Page 163 and 164:
23 6.2 Activity Schedule Tuesday, 2
- Page 165 and 166:
25 • Mrs. Giulia Buscosi, Advisor
- Page 167 and 168:
27 6.4 List of water and sanitation
- Page 169 and 170:
29 6.5 Laws Relating to the Use and
- Page 171 and 172:
31 • Madras Land Improvement Sche
- Page 173 and 174:
EVALUATION SECTORIELLE EAU ET ASSAI
- Page 175 and 176:
7. ANNEXES ........................
- Page 177 and 178:
1 RESUME Cette note résume les él
- Page 179 and 180:
3 Les priorités pour l'action de l
- Page 181 and 182:
5 3%. On note cependant des taux de
- Page 183 and 184:
7 3.6 Eau potable Les intervenants
- Page 185 and 186:
9 Mellal, El Jedida, Kenitra, Nador
- Page 187 and 188:
11 FAS de l’UE 13 . Ce n’est pa
- Page 189 and 190:
13 validation du rapport provisoire
- Page 191 and 192:
15 5.6 Aspects genre (EQ 6) Un prog
- Page 193 and 194:
17 5.9 Support et complémentarité
- Page 195 and 196:
19 participation initiale n’est p
- Page 197 and 198:
21 7.1 Liste des documents consult
- Page 199 and 200:
23 7.2 Programme d’activités 18/
- Page 201 and 202:
25 la Commission, du respect des co
- Page 203 and 204:
27 7.4.4 Gestion des déchets solid
- Page 205 and 206:
29 7.4.6 Aménagement hydro-agricol
- Page 207 and 208:
31 Secteur de l'eau au Maroc : Mont
- Page 209 and 210:
33 Les quatre principaux thèmes du
- Page 211 and 212:
35 Répartition des financements ON
- Page 213 and 214:
TABLE OF CONTENTS EXECUTIVE SUMMARY
- Page 215 and 216:
0 EXECUTIVE SUMMARY The field visit
- Page 217 and 218:
2 The Team were given the opportuni
- Page 219 and 220:
4 from the EC funded Proyecto PRAS,
- Page 221 and 222:
6 The 9 evaluation questions formed
- Page 223 and 224:
8 sanctions and infractions, and es
- Page 225 and 226:
10 administrative arrangements. The
- Page 227 and 228:
12 mainstreaming thematic issues, t
- Page 229 and 230:
14 The PROAPAC programme supports t
- Page 231 and 232:
16 In terms of providing improved s
- Page 233 and 234:
18 project documents indicates that
- Page 235 and 236:
20 In terms of sanitation the proje
- Page 237 and 238:
22 5 CONCLUSIONS 5.1 Main country s
- Page 239 and 240:
24 6 ANNEXES Evaluation of the Wate
- Page 241 and 242:
26 Ref Generated Title and Subject
- Page 243 and 244:
28 Ref Generated Title and Subject
- Page 245 and 246:
30 Ref Generated Title and Subject
- Page 247 and 248:
32 Ref Generated Title and Subject
- Page 249 and 250:
34 Afternoon • Mrs. Maribel Guti
- Page 251 and 252:
36 6.4 List of water and sanitation
- Page 253 and 254:
38 6.6 List of water and sanitation
- Page 255 and 256:
40 6.7 Moderator’s guide for nati