20.05.2014 Views

District Heating/Cooling System Optimization - The PERTAN Group

District Heating/Cooling System Optimization - The PERTAN Group

District Heating/Cooling System Optimization - The PERTAN Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

New <strong>Cooling</strong> Pipes Required to add Bldg. to the Central <strong>Cooling</strong><br />

<strong>System</strong> and Locations where larger Pipe Diameters are Needed<br />

‣ To interconnect the heating<br />

systems, the green pipes are<br />

additionally required<br />

‣ <strong>The</strong> pipes in blue must have<br />

larger diameters to interconnect<br />

the systems<br />

‣ Pipes that need to have larger<br />

sizes are required due to the<br />

growth of the system in red<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!