District Heating/Cooling System Optimization - The PERTAN Group
District Heating/Cooling System Optimization - The PERTAN Group
District Heating/Cooling System Optimization - The PERTAN Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
New <strong>Cooling</strong> Pipes Required to add Bldg. to the Central <strong>Cooling</strong><br />
<strong>System</strong> and Locations where larger Pipe Diameters are Needed<br />
‣ To interconnect the heating<br />
systems, the green pipes are<br />
additionally required<br />
‣ <strong>The</strong> pipes in blue must have<br />
larger diameters to interconnect<br />
the systems<br />
‣ Pipes that need to have larger<br />
sizes are required due to the<br />
growth of the system in red<br />
27