ELECTRIC RULE NO. 22.1 - Pacific Gas and Electric Company

ELECTRIC RULE NO. 22.1 - Pacific Gas and Electric Company

ELECTRIC RULE NO. 22.1 - Pacific Gas and Electric Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Gas</strong> <strong>and</strong> <strong>Electric</strong> <strong>Company</strong><br />

<strong>Pacific</strong><br />

Francisco, California<br />

San<br />

<strong>RULE</strong> <strong>NO</strong>. <strong>22.1</strong> Sheet 2<br />

<strong>ELECTRIC</strong><br />

ACCESS SERVICE SWITCHING EXEMPTION <strong>RULE</strong>S<br />

DIRECT<br />

Accepted DASRs that do not require a meter change will be processed<br />

a.<br />

on normal DASR processing timeframes as defined in Rule 22,<br />

based<br />

E. PG&E will include the TBS requirements with the DASR status<br />

Section<br />

that is sent to the customer as provided for in Rule 22,<br />

notification<br />

E.7. The customer is responsible for providing its new ESP with this<br />

Section<br />

information.<br />

Rejected DASRs must be corrected <strong>and</strong> resubmitted by the ESP <strong>and</strong> be<br />

b.<br />

to PG&E no later than twenty (20) days following the conclusion<br />

acceptable<br />

the TBS period (Day 80 of PG&E supplying power). DASRs not corrected<br />

of<br />

the ESP within this time period will be cancelled by PG&E.<br />

by<br />

For accepted DASRs that require a meter change, the meter change must<br />

c.<br />

completed no later than sixty (60) days following the conclusion of the<br />

be<br />

period, or the corrected DASR timing established in Section A.2.b. If a<br />

TBS<br />

change is not completed within sixty (60) days, PG&E will switch the<br />

meter<br />

account to DA service on the customer’s next scheduled meter read<br />

service<br />

with notification to the ESP <strong>and</strong> customer at the conclusion of the<br />

date<br />

(60) day period. If special metering services are required, such<br />

sixty<br />

services will be done in accordance with rate Schedules E-ESP<br />

metering<br />

Services accounts failing to meet the time limitations <strong>and</strong> DASR requirements as<br />

3.<br />

forth in Section A.2, above will be in default of the TBS provisions <strong>and</strong><br />

set<br />

to Bundled Portfolio Service for a eighteen (18) month minimum period,<br />

returned<br />

to the conditions set forth in Section B of this tariff. Such a default<br />

subject<br />

the six (6) month notice of return to Bundled Portfolio Service, which is<br />

initiates<br />

subject to cancellation. During this six (6) month period, the service account<br />

not<br />

be subject to the pricing conditions established in Section A.4, below. PG&E<br />

will<br />

notify the customer within ten (10) business days of the default, providing an<br />

will<br />

of the default situation, actions being taken <strong>and</strong> the customer’s new<br />

explanation<br />

Portfolio Service requirements.<br />

Bundled<br />

Customers electing the TBS option will: (1) be subject to Transitional Bundled<br />

4.<br />

pricing, as defined in rate Schedule TBCC; (2) be subject to the<br />

Commodity<br />

<strong>and</strong> applicable charges of the Direct Access Cost Responsibility<br />

provisions<br />

(DA CRS) as defined in rate Schedule DA-CRS; <strong>and</strong> (3) be ineligible<br />

Surcharge<br />

receive Revenue Cycle Services Credits as defined in rate Schedule<br />

to<br />

E-CREDIT.<br />

Letter No: 4178-E Issued by Date Filed January 18, 2013<br />

Advice<br />

No. 12-12-026 Brian K. Cherry Effective February 1, 2013<br />

Decision<br />

(L)<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

Revised Cal. P.U.C. Sheet No. 32404-E<br />

Cancelling Revised Cal. P.U.C. Sheet No. 31146-E<br />

U 39<br />

A. Transitional Bundled Service (Cont’d.)<br />

2. (Cont’d.)<br />

<strong>and</strong> E-EUS.<br />

(L)<br />

(Continued)<br />

Vice President<br />

Resolution No.<br />

2C13<br />

Regulatory Relations