28.05.2014 Views

City of Portland Technical Manual

City of Portland Technical Manual

City of Portland Technical Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Portland</strong> <strong>Technical</strong> <strong>Manual</strong><br />

Section 5 - <strong>Portland</strong> Stormwater Management and Maine DEP Ch. 500<br />

Adopted 7/19/10.<br />

NOTE: This section does not apply to license by rule approvals granted, or the need for a<br />

license pursuant to 38 M.R.S.A. §413, the Waste Discharge Law. A wastewater discharge<br />

license is required for any stormwater discharge that the department determines will<br />

contribute to a violation <strong>of</strong> a water quality standard or is a significant contributor <strong>of</strong><br />

pollutants to waters <strong>of</strong> the State. See 06-096 CMR 521(9) (a) (1) (v). For the permit<br />

shield provision applicable to the Waste Discharge Law, see 38 M.R.S.A. 414(8) "Effect<br />

<strong>of</strong> license".<br />

Nothing in this section alters or affects the liability <strong>of</strong> the permittee if a violation has<br />

occurred prior to permit issuance.<br />

15. Experimental measure. The department may, on a case-by-case basis, approve a<br />

best management practice that is experimental, as determined by the department,<br />

when requested by an applicant. However, in this case, the "permit shield" provision<br />

in Section 14 will not apply, and the department may require the applicant to collect<br />

and submit sufficient information on the performance on the best management<br />

practice to allow evaluation. If the best management practice does not perform at<br />

least as well as would have been expected from otherwise available best management<br />

practices, the department may require the permittee to replace or otherwise redesign<br />

the system.<br />

The department may only approve an experimental practice on a site where it would<br />

be possible to replace or redesign the experimental system if necessary.<br />

16. Modification. If a project has required a permit pursuant to the Stormwater<br />

Management Law or Site Law, all subsequent modifications <strong>of</strong> any size are also<br />

required to meet standards, except as allowed for redevelopment in Section 4(D).<br />

When the applicable standard depends upon an area threshold, the area <strong>of</strong> the entire<br />

licensed project, including the modification, is included. The area may be limited if<br />

the project covers more than one direct watershed, and the standards so provide.<br />

171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!