<strong>San</strong> <strong>Diego</strong> <strong>River</strong> <strong>WURMP</strong> <strong>Annual</strong> <strong>Report</strong> Appendix A-26<br />

<strong>FY</strong> <strong>2009</strong>–<strong>2010</strong> Water Quality Activity<br />

TITLE:<br />

ID NUMBER:<br />

Park Ridge Boulevard Bacteria Treatment Project<br />

SDR-A26<br />

ACTIVITY IMPLEMENTATION<br />

The City of <strong>San</strong> <strong>Diego</strong> will construct a new catch basin, storm drain, trash<br />

segregation unit, and bacterial treatment system at the southern terminus of Park<br />

Ridge Boulevard. A new catch basin will be placed along the western right-ofway<br />

south of the intersection with Murray Park Drive. The catch basin will be<br />

sized for the full design flow reaching that location.<br />

Flows up to an 85th percentile storm event will exit the catch basin and flow<br />

through a trash segregation unit, followed in series by the bacterial treatment<br />

system. Flows in excess of an 85th percentile storm will exit the catch basin via an<br />

overflow pipe and bypass the treatment system.<br />

A manhole will receive flows from both the treatment system and the overflow<br />

pipe. From that manhole, a new storm drain will convey flows to the outlet<br />

location for the existing storm drain system within the eastern Park Ridge<br />

Boulevard right-of-way. A new headwall sized to accommodate both outlets will<br />

be required at this location.<br />

TMDL APPLICABILITY<br />

• <strong>San</strong> <strong>Diego</strong> Region Beaches and Creeks Bacteria TMDL<br />

TIME SCHEDULE FOR IMPLEMENTATION<br />

The project was transferred to the Preliminary Engineering section of the<br />

Engineering and Capital Projects Department in September 2008 for the purpose<br />

of managing the project through final design, construction and project closeout.<br />

Design began February <strong>2010</strong> and is anticipated to continue through <strong>FY</strong> 2011.<br />

Construction is expected to be completed in <strong>FY</strong> 2013. Water quality monitoring<br />

will be conducted before and after construction to assess the effectiveness in<br />

reducing runoff volume and pollutant loading.<br />

PARTICIPATING WATERSHED COPERMITTEES<br />

• City of <strong>San</strong> <strong>Diego</strong><br />

OTHER PARTICIPATING ENTITIES<br />

• None<br />

Page 1