02.06.2014 Views

Concession Models for Build Concession Models for Build

Concession Models for Build Concession Models for Build

Concession Models for Build Concession Models for Build

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Location<br />

BOT Projects<br />

Project<br />

Contract<br />

Cost (US$<br />

millions)<br />

France/United<br />

Kingdom<br />

Taiwan (China)<br />

Japan<br />

Argentina<br />

Thailand<br />

China<br />

Malaysia<br />

Mexico<br />

Thailand<br />

Channel Tunnel<br />

Taipei Mass Rapid Transit system<br />

Kansai International Airport<br />

Buenos Aires water and Sewer<br />

Services<br />

Telecom eco Asia communication<br />

cat o<br />

Network<br />

Shao Jiao B, power plant<br />

North-South Toll Expressway<br />

Petacalco Coal –fired Power<br />

Plant<br />

Bangkok Elevated Road and<br />

Train System<br />

BOT, 55 years 19,000<br />

BOT 17000<br />

BOT 15,000<br />

ROT, 30 years 4,000<br />

BTO, 25 years 4,000<br />

BOT 550<br />

BOT, 30 years 3,400<br />

BOT 3,000<br />

BOT, 30 years 2,981<br />

BOO= <strong>Build</strong>-Own-Operate: Operate: BOT=<strong>Build</strong>-Operate-Transfer: BTO=<strong>Build</strong>-Transfer<br />

Transfer-Operate:ROT=<br />

Rehabilitate-Operate-Transfer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!