Concession Models for Build Concession Models for Build
Concession Models for Build Concession Models for Build
Concession Models for Build Concession Models for Build
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Location<br />
BOT Projects<br />
Project<br />
Contract<br />
Cost (US$<br />
millions)<br />
France/United<br />
Kingdom<br />
Taiwan (China)<br />
Japan<br />
Argentina<br />
Thailand<br />
China<br />
Malaysia<br />
Mexico<br />
Thailand<br />
Channel Tunnel<br />
Taipei Mass Rapid Transit system<br />
Kansai International Airport<br />
Buenos Aires water and Sewer<br />
Services<br />
Telecom eco Asia communication<br />
cat o<br />
Network<br />
Shao Jiao B, power plant<br />
North-South Toll Expressway<br />
Petacalco Coal –fired Power<br />
Plant<br />
Bangkok Elevated Road and<br />
Train System<br />
BOT, 55 years 19,000<br />
BOT 17000<br />
BOT 15,000<br />
ROT, 30 years 4,000<br />
BTO, 25 years 4,000<br />
BOT 550<br />
BOT, 30 years 3,400<br />
BOT 3,000<br />
BOT, 30 years 2,981<br />
BOO= <strong>Build</strong>-Own-Operate: Operate: BOT=<strong>Build</strong>-Operate-Transfer: BTO=<strong>Build</strong>-Transfer<br />
Transfer-Operate:ROT=<br />
Rehabilitate-Operate-Transfer