02.06.2014 Views

Seminar on “Tunnelling Technologies in Japan and Hong Kong”

Seminar on “Tunnelling Technologies in Japan and Hong Kong”

Seminar on “Tunnelling Technologies in Japan and Hong Kong”

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Sem<strong>in</strong>ar</str<strong>on</strong>g> <strong>on</strong> “Tunnell<strong>in</strong>g <strong>Technologies</strong> <strong>in</strong> <strong>Japan</strong> <strong>and</strong> H<strong>on</strong>g K<strong>on</strong>g” – 22 September 2010<br />

PROGRAMME<br />

08:45 – 09:00 Registrati<strong>on</strong><br />

09:00 – 09:05 Welcome Remarks<br />

Ir Albert HO, Chairman of the Organis<strong>in</strong>g Committee<br />

09:05 – 09:15 Open<strong>in</strong>g Address<br />

Ir WAI Chi-s<strong>in</strong>g, JP, Permanent Secretary for Development (Works),<br />

Development Bureau, HKSARG<br />

Sessi<strong>on</strong> Chair:<br />

Mr James Rickard, Associate Director of ARUP, Secretary of IMMM,<br />

<strong>and</strong> Member of HKIE Cavern <strong>and</strong> Tunnell<strong>in</strong>g Work<strong>in</strong>g Group<br />

09:15 – 09:40 The Latest Technology of Mounta<strong>in</strong> Tunnel<strong>in</strong>g <strong>in</strong> <strong>Japan</strong><br />

Dr Hiromichi SHIROMA, Chief Researcher for Tunnel, Road Research<br />

Department, Nipp<strong>on</strong> Expressway Research Institute Co Ltd<br />

09:40 – 10:05 The Importance of C<strong>on</strong>troll<strong>in</strong>g Over-Break <strong>in</strong> Drill <strong>and</strong> Blast Tunnell<strong>in</strong>g <strong>and</strong><br />

Suggested Mitigati<strong>on</strong> Methods<br />

Mr Tim MAGUB, Pr<strong>in</strong>cipal Blast<strong>in</strong>g Eng<strong>in</strong>eer, ARUP<br />

10:05 – 10:35 Coffee Break<br />

10:35 – 11:00 State of Affairs <strong>in</strong> <strong>Japan</strong>ese Railway Shield Tunnel<br />

Dr Sh<strong>in</strong>ji YAKITA, Senior Researcher, Tunnel Eng<strong>in</strong>eer<strong>in</strong>g Group,<br />

Railway Technical Research Institute<br />

11:00 – 11:25 The Flexible Utilizati<strong>on</strong> of a Slurry TBM <strong>in</strong> H<strong>on</strong>g K<strong>on</strong>g<br />

Mr David WESTWOOD, Operati<strong>on</strong>s Manager, Leight<strong>on</strong> C<strong>on</strong>tractors (Asia) Ltd<br />

11:25 – 11:50 Recent Shield Tunnel<strong>in</strong>g <strong>Technologies</strong> <strong>in</strong> <strong>Japan</strong> – L<strong>on</strong>ger, Faster, Deeper,<br />

Larger <strong>and</strong> N<strong>on</strong>-circler Tunnel<strong>in</strong>g by TBMs<br />

Mr Tadashi HASHIMOTO, Director, Geo-Research Institute<br />

11:50 – 12:05 Discussi<strong>on</strong><br />

12:05 – 12:20 De-brief<strong>in</strong>g Report: Technical Visit to <strong>Japan</strong> (17 -22 Jan 2010)<br />

12:20 – 14:00 Lunch Break (not <strong>in</strong>cluded)<br />

Sessi<strong>on</strong> Chair:<br />

Ir Dr Richard Pang, Deputy Head of Geotechnical Eng<strong>in</strong>eer<strong>in</strong>g Office (Plann<strong>in</strong>g &<br />

St<strong>and</strong>ards), Civil Eng<strong>in</strong>eer<strong>in</strong>g <strong>and</strong> Development Department, HKSARG<br />

14:00 – 14:25 On Site Visualizati<strong>on</strong> as a New Safety M<strong>on</strong>itor<strong>in</strong>g Strategy for C<strong>on</strong>structi<strong>on</strong><br />

<strong>and</strong> Ma<strong>in</strong>tenance <strong>in</strong> Geotechnical Eng<strong>in</strong>eer<strong>in</strong>g<br />

Professor Sh<strong>in</strong>ichi AKUTAGAWA, Department of Civil Eng<strong>in</strong>eer<strong>in</strong>g, Kobe University<br />

14:25 – 14:50 C<strong>on</strong>structi<strong>on</strong> Issues <strong>on</strong> a Design-Build Tunnel Project <strong>and</strong> Design Team Partner<strong>in</strong>g<br />

Mr Tamotsu NAKAYAMA, Senior Project Manager, Penta-Ocean C<strong>on</strong>structi<strong>on</strong> Co Ltd<br />

14:50 – 15:15 Dismantl<strong>in</strong>g of the Exist<strong>in</strong>g Overrun Tunnel<br />

Mr Emmanuel CLECH, WIL 703 General C<strong>on</strong>structi<strong>on</strong> Manager,<br />

Dragages H<strong>on</strong>g K<strong>on</strong>g Ltd<br />

15:15 – 15:45 Coffee Break<br />

15:45 – 16:10 Geotechnical <strong>and</strong> Spatial Challenges of XRL Tunnels<br />

Ir Alan MORRIS, MTR Tunnel Eng<strong>in</strong>eer<strong>in</strong>g Manager, MTR Corporati<strong>on</strong> Ltd<br />

16:10 – 16:35 Recent TBM Technology with N<strong>on</strong>-circular Tunnel<br />

Mr Sh<strong>in</strong> WADA, Deputy General Manager, Daiho Corporati<strong>on</strong><br />

16:35 – 16:50 Discussi<strong>on</strong><br />