Autodesk Consulting Project Management Office<br />

Meeting Minutes<br />

Customer<br />

Project<br />

Date & Time<br />

Location<br />

Angkasa Pura II<br />

BIM Implementation for APII<br />

06-March-2014<br />

AP2 office – Jakarta, Indonesia + Conf. Call AT&T<br />

Invitees Attendees Apologies<br />

Mr. Bima Boediman (Pak Bima) – AP2<br />

Mr. Herwanto Budi S (Pak Herwanto) –<br />

AP2<br />

Mr. Rohit Deshmukh – Autodesk<br />

Mr. Toshio Shoko – Autodesk<br />

Mr. Dipankar Mondal – Autodesk<br />

Mrs. Linda Tulung – Autodesk<br />

Mr. Eddie Cendana (Pak Eddie) – EDP<br />

Media<br />

Mr. Leroy N S (Roy) – EDP Media<br />

Mr. Bima Boediman (PB)<br />

Mr. Herwanto Budi S (PH)<br />

Mr. Toshio Shoko (TS)<br />

Mr. Dipankar Mondal (DM)<br />

Mr. Eddie Cendana (PE)<br />

Mr. Leroy N S (Roy)<br />

Mr. J. Weni (PW)<br />

Mrs. Linda Tulung<br />

Mr. Rohit Deshmukh<br />

1 Actions from previous meeting:<br />

S.No. Description Owner Estimated Closure Date<br />

<strong>1.</strong> Send details of the Assessment Meeting Agenda to<br />

AP2<br />

2. Advise Assessment Meeting members from AP2 side<br />

based on Item 1<br />

Toshio Shoko 21 st Feb 2014<br />

Pak Bima 26 th Feb 2014<br />

3. BUZZSAW site setup Toshio Shoko 21 st Feb 2014<br />

4. Additional hardware requirement details to AP2 Toshio Shoko 21 st Feb 2014<br />

5. Procure additional hardware for BIM Implementation<br />

based on Item 4 above<br />

Pak Bima 28 th Feb 2014<br />

6. Add Product Training dates to Phase 4: BIM for<br />

Construction and update Project Plan accordingly<br />

7. Add Project Risk for MEP Drawings and update the<br />

Steering Group presentation for next meeting<br />

Dipankar<br />

Mondal<br />

Dipankar<br />

Mondal<br />

21 st Feb 2014<br />

21 st Feb 2014<br />

8. Add Pak Weni into Steering Group Dipankar<br />

Mondal<br />

21 st Feb 2014<br />

9. Provide updated Structural Drawings Pak Bima 25 th Feb 2014<br />

2 Items for Discussion:<br />

<br />

<br />

<br />

BIM Implementation Project Summary<br />

Steering Group Announcements<br />

Project Status<br />

© Autodesk Page 1 of 3


Autodesk Consulting Project Management Office<br />

<br />

<br />

<br />

Risks<br />

Issues and Escalations<br />

Topics for Next Steering Meeting<br />

2.1 Summary of discussion<br />

DM stated the meeting, explained & discussed thought the Steering Group Slides (Refer: Appendix) to all<br />

attendees in the meeting.<br />

DM raised the “DECISION ITEM” for the Steering Group Announcement to PB. PB agreed to update on the<br />

structural drawings by 10-Mar-2014 (i.e. Monday). DM re-iterated the importance of the drawings for the<br />

progress to move ahead, also mentioned the impact of project downtime and or project schedule timelines<br />

in absence of drawings.<br />

PB agreed to the need of drawings and will send the updates as-soon-as-possible. PB confirmed that AP2<br />

team willing to stretch extra working hours to finish the project within the agreed planned time. Project<br />

schedule and end dates will remain intact (1).<br />

DM went over the Project progress, risks & issues so far and on-going activities.<br />

PB raised 2 items as below:<br />

i) Indonesia elections will be held around April-2014, exact dates are unclear as of now, project plan<br />

needs to be readjusted to accommodate the election holidays.<br />

ii) Additional new Steering Group Members will get engaged from AP2 side along with Pak Bima<br />

himself; however Pak Bima will take a back seat moving forward in the project.<br />

Below mentioned Action Items from previous discussion stands closed:<br />

S.No. Description Owner Estimated Closure<br />

Date<br />

Status<br />

<strong>1.</strong> Send details of the Assessment Meeting<br />

Agenda to AP2<br />

Toshio<br />

Shoko<br />

21 st Feb 2014 CLOSED<br />

2. Advise Assessment Meeting members<br />

from AP2 side based on Item 1<br />

Pak Bima 26 th Feb 2014 CLOSED<br />

3. BUZZSAW site setup Toshio<br />

Shoko<br />

21 st Feb 2014 CLOSED<br />

4. Additional hardware requirement details to<br />

AP2<br />

Toshio<br />

Shoko<br />

21 st Feb 2014 CLOSED<br />

5. Procure additional hardware for BIM<br />

Implementation based on Item 4 above<br />

Pak Bima 28 th Feb 2014 CLOSED<br />

6. Add Product Training dates to Phase 4:<br />

BIM for Construction and update Project<br />

Plan accordingly<br />

7. Add Project Risk for MEP Drawings and<br />

update the Steering Group presentation for<br />

next meeting<br />

Dipankar<br />

Mondal<br />

Dipankar<br />

Mondal<br />

21 st Feb 2014 CLOSED<br />

21 st Feb 2014 CLOSED<br />

8. Add Pak Weni into Steering Group Dipankar<br />

Mondal<br />

21 st Feb 2014 CLOSED<br />

2.2 Agreements<br />

The following are the list of agreements achieved during the meeting:<br />

<strong>1.</strong> All parties agreed on Project Status and its current progress<br />

© Autodesk Page 2 of 3


Autodesk Consulting Project Management Office<br />

2. All parties agreed with the existing Project Risks & Issues.<br />

3. All parties agreed with the next Steering group meeting date for 3 rd April 2014 & its topics.<br />

4. All parties agreed to the proposal and item 1 from the above section<br />

3 Actions:<br />

S.No. Description Owner Estimated Closure Date<br />

<strong>1.</strong> Provide updated Structural Drawings Pak Bima 25 th Feb 2014<br />

10 th Mar 2014<br />

2. Provide MEP Drawings Pak Bima 14 th Mar 2014<br />

3. Update the Project Schedule to incorporate<br />

Indonesia Election dates<br />

Dipankar<br />

Mondal<br />

31 st Mar 2014<br />

4 Next Meeting:<br />

Steering Group Meeting on 3 rd April 2014<br />

5 Appendix<br />

Following are the list of documents that were referenced during the meeting discussion.<br />

5.1 Steering Group Meeting presentation<br />

Steering Meeting<br />

Presentation 20140306.pdf<br />

5.2 Attendee List (signed)<br />

Attendance List<br />

20140306-onsite.pdf<br />

Attendance List<br />

20140306-onphone.pdf<br />

© Autodesk Page 3 of 3


•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />


•<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!