Qatar: Solid Waste Management Phase 1 Assessment
Qatar: Solid Waste Management Phase 1 Assessment
Qatar: Solid Waste Management Phase 1 Assessment
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
91% of commercial waste is landfilled, remainder is treated<br />
at Domestic <strong>Solid</strong> <strong>Waste</strong> <strong>Management</strong> Center (DSWMC)<br />
All figures inT/day<br />
Commercial<br />
Transfer Station: Located<br />
around Doha and industrial<br />
areas, see backup<br />
Disposal<br />
Domestic<br />
MMUP<br />
collected<br />
Transportation from TS<br />
to DSWMC and landfill<br />
done by MoE<br />
590 380 2 210<br />
334 1<br />
27<br />
19<br />
Incinerator 1<br />
Compost<br />
Recyclables<br />
Electricity<br />
8%<br />
Market<br />
1%<br />
Privately<br />
collected<br />
250<br />
91%<br />
Bulky<br />
Mesaieed<br />
Landfill<br />
Privately<br />
collected<br />
3,200<br />
Landfill owned<br />
by MoE, is not engineered<br />
1. ~5% of this figure ends as ash in landfill. 2. Total domestic collected by MMUP taken to DSWMC is 1400 .<br />
Source: DSWMC, MoE, MMUP, BCG analysis