PDF Download
PDF Download
PDF Download
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Delivery and loading in Stadtoldendorf: Every train<br />
has 21 wagons and brings 1,300 tons of FGD gypsum.<br />
Up to eleven wagons can be unloaded at the same<br />
time. The whole process takes only 30 minutes thanks<br />
to state-of-the-art technology.<br />
the Marketing Division and the Railports and Rail Projects Division.<br />
After unloading, the FGD gypsum is transferred from the<br />
goods wagons to trucks and then sets off on the last leg of its journey<br />
to the gypsum processing plants in the surrounding area. The<br />
Construction Materials Team at DB Schenker Rail’s customer<br />
service centre takes care of the entire transport management process<br />
including the organisation of transport recirculation and<br />
proactive customer information. Those involved have become<br />
well-rehearsed partners over the years which is an important<br />
factor in the smooth operation of the transports and in the continuation<br />
of this success story.<br />
Photos: BBG<br />
Contact | Hans-Joachim Habermeyer<br />
Phone: +49 (0)951 407-8121 | hans-joachim.habermeyer@dbschenker.eu<br />
RAILWAYS | 21