FY 2010-2015 Highway Improvement Program<br />
WHITESIDE COUNTY<br />
State Highways<br />
Route/Street Location Improvements Est. Cost<br />
I 88<br />
I 88<br />
US 30<br />
CLINTON RD<br />
US 30<br />
US 30<br />
US 30<br />
US 30<br />
US 30<br />
US 30<br />
US 30<br />
US 30<br />
UNDER ALBANY RD 2 MI N OF ERIE & UNDER ILL 78 2 MI W OF<br />
LYNDON<br />
UNDER ALBANY RD 2 MI N OF ERIE & UNDER ILL 78 2 MI W OF<br />
LYNDON<br />
County<br />
MYP Years<br />
Past Current<br />
P.E. (PHASE II) $60,000 WHITESIDE 4 2011-2015<br />
BRIDGE NEW DECK $770,000 WHITESIDE 2 2011-2015<br />
MISSISSIPPI RIVER 1 MI W OF ILL 84 BRIDGE DECK REPAIRS $200,000 WHITESIDE 1 2010<br />
ILLINOIS LEAD AGENCY; ILLINOIS FUNDING 100% OF THE COST.<br />
0.4 MI E OF LINCOLN ST / DAKIN RD TO ILL 78 (N)<br />
Miles = 9.80<br />
RESURFACING $4,200,000 WHITESIDE 5 2011-2015<br />
AT ILL 136 RIGHT TURN LANE $397,000 WHITESIDE 1 2010<br />
AT ILL 136 LAND ACQUISITION $30,000 WHITESIDE 1 2010<br />
ILL 136 TO ILL 40 P.E. (PHASE I) $1,274,000 WHITESIDE 2 2011-2015<br />
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH<br />
REQUIRED<br />
0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD CULVERT REPLACEMENT<br />
CULVERT EXTENSION<br />
$550,000 WHITESIDE 2 2011-2015<br />
0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD LAND ACQUISITION $20,000 WHITESIDE 2 2011-2015<br />
0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD UTILITY ADJUSTMENT $20,000 WHITESIDE 2 2011-2015<br />
EMERSON RD TO GALT RD<br />
Miles = 3.34<br />
JUMP START PROJECT<br />
RESURFACING $1,300,000 WHITESIDE 1 2011-2015<br />
1
FY 2010-2015 Highway Improvement Program<br />
WHITESIDE COUNTY<br />
State Highways<br />
Route/Street Location Improvements Est. Cost<br />
ILL 2<br />
ILL 2<br />
ILL 40<br />
LUTHER RD<br />
LOCUST ST<br />
ILL 40<br />
ILL 40<br />
ILL 40<br />
LOCUST ST<br />
ILL 40<br />
LOCUST ST<br />
ILL 40<br />
LOCUST ST<br />
ILL 40<br />
ILL 40<br />
ILL 40<br />
E 4TH ST TO 45TH AVE IN STERLING<br />
Miles = 2.08<br />
JUMP START PROJECT<br />
E OF 45TH AVE IN STERLING TO 0.2 MI W OF PLOCK RD<br />
Miles = 3.76<br />
JUMP START PROJECT<br />
ADAMS ST IN MILLEDGEVILLE TO S OF 26TH ST IN STERLING<br />
Miles = 12.31<br />
County<br />
MYP Years<br />
Past Current<br />
RESURFACING $3,175,000 WHITESIDE 1 2011-2015<br />
RESURFACING $4,500,000 LEE<br />
WHITESIDE<br />
RESURFACING<br />
DRAINAGE<br />
$4,500,000<br />
WHITESIDE<br />
CARROLL<br />
3<br />
5<br />
2011-2015<br />
2011-2015<br />
ELKHORN CREEK 2 MI N OF STERLING BRIDGE REPLACEMENT<br />
SHOULDER RECONSTRUCTION<br />
$1,480,000 WHITESIDE 9 2011-2015<br />
ELKHORN CREEK 2 MI N OF STERLING UTILITY ADJUSTMENT $20,000 WHITESIDE 9 2011-2015<br />
AT MILLER RD IN STERLING TURNING LANES<br />
TRAF SIGNAL INSTALLATION<br />
$625,000 WHITESIDE 2 2011-2015<br />
AT MILLER RD IN STERLING LAND ACQUISITION $100,000 WHITESIDE 2 2011-2015<br />
AT MILLER RD IN STERLING UTILITY ADJUSTMENT $30,000 WHITESIDE 2 2011-2015<br />
ROCK RIVER BETWEEN STERLING & ROCK FALLS BRIDGE REPLACEMENT $21,600,000 WHITESIDE 3 2011-2015<br />
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />
ROCK RIVER BETWEEN STERLING & ROCK FALLS UTILITY ADJUSTMENT $20,000 WHITESIDE 3 2011-2015<br />
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />
ROCK RIVER BETWEEN STERLING & ROCK FALLS LAND ACQUISITION $30,000 WHITESIDE 3 2011-2015<br />
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />
2
FY 2010-2015 Highway Improvement Program<br />
WHITESIDE COUNTY<br />
State Highways<br />
Route/Street Location Improvements Est. Cost<br />
ILL 40<br />
ILL 40<br />
ILL 40<br />
ILL 78<br />
ILL 78<br />
ILL 78<br />
ILL 78<br />
ILL 78<br />
ILL 78<br />
ILL 92<br />
ILL 136<br />
ILL 172<br />
ILL 172<br />
County<br />
MYP Years<br />
Past Current<br />
ROCK RIVER BETWEEN STERLING & ROCK FALLS CONSTRUCTION ENGINEERING $2,080,000 WHITESIDE 3 2011-2015<br />
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />
ROCK RIVER BETWEEN STERLING & ROCK FALLS P.E. (PHASE II) $400,000 WHITESIDE 1 2010<br />
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />
HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 BRIDGE REPLACEMENT<br />
BIKEWAY<br />
$1,000,000 WHITESIDE 4 2011-2015<br />
CARROLL CO LINE TO US 30 W OF MORRISON<br />
Miles = 7.49<br />
JUMP START PROJECT<br />
RESURFACING $2,800,000 WHITESIDE 1 2011-2015<br />
FRENCH CREEK S EDGE OF MORRISON BRIDGE REPLACEMENT $1,365,000 WHITESIDE 1 2011-2015<br />
FRENCH CREEK S EDGE OF MORRISON LAND ACQUISITION $100,000 WHITESIDE 1 2011-2015<br />
FRENCH CREEK S EDGE OF MORRISON UTILITY ADJUSTMENT $30,000 WHITESIDE 1 2011-2015<br />
NCL TO SCL OF PROPHETSTOWN<br />
Miles = 1.60<br />
SCL OF PROPHETSTOWN TO 0.2 MI N OF ILL 92 (W)<br />
Miles = 7.30<br />
RESURFACING $500,000 WHITESIDE 1 2011-2015<br />
RESURFACING $1,900,000 WHITESIDE<br />
HENRY<br />
1<br />
2011-2015<br />
MISSISSIPPI RIVER IN FULTON BRIDGE PAINTING<br />
LIGHTING<br />
$2,000,000 WHITESIDE 2 2011-2015<br />
IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST.<br />
COUNTY DITCH 2 MI N OF TAMPICO BRIDGE REPLACEMENT $380,000 WHITESIDE 3 2011-2015<br />
COUNTY DITCH 2 MI N OF TAMPICO P.E. (PHASE II) $60,000 WHITESIDE 2 2010<br />
3
FY 2010-2015 Highway Improvement Program<br />
WHITESIDE COUNTY<br />
State Highways<br />
Route/Street Location Improvements Est. Cost<br />
ILL 172<br />
County<br />
MYP Years<br />
Past Current<br />
COUNTY DITCH 2 MI N OF TAMPICO LAND ACQUISITION $50,000 WHITESIDE 2 2011-2015<br />
FY<br />
2010<br />
2011-2015<br />
2010-2015<br />
Projects<br />
5<br />
30<br />
35<br />
Miles<br />
0.00<br />
47.68<br />
47.68<br />
4<br />
Est. Cost<br />
$1,087,000<br />
$56,479,000<br />
$57,566,000
FY 2010-2013 Highway Improvement Program<br />
WHITESIDE COUNTY<br />
Local Highways<br />
Route/Street Location Improvements Est. Cost<br />
LYNDON RD<br />
FAS 76<br />
County<br />
MYP Years<br />
Past Current<br />
ROCK CREEK 4.2 MI N OF US 30 BRIDGE REPLACEMENT $850,000 WHITESIDE 1 2010<br />
FY<br />
2010<br />
2011-2015<br />
2010-2015<br />
Projects<br />
1<br />
0<br />
1<br />
Miles<br />
0.00<br />
0.00<br />
0.00<br />
5<br />
Est. Cost<br />
$850,000<br />
$0<br />
$850,000
FY<br />
2010<br />
2011-2015<br />
2010-2015<br />
WHITESIDE COUNTY (STATE & LOCAL) Totals<br />
Projects<br />
6<br />
30<br />
36<br />
6<br />
Miles<br />
0.00<br />
47.68<br />
47.68<br />
Est. Cost<br />
$1,937,000<br />
$56,479,000<br />
$58,416,000
Appendix A<br />
PPS#<br />
Route County<br />
City<br />
<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />
Statewide Program Planning<br />
*** FY 2009 Highway Improvement Program - ARRA Projects ***<br />
Location<br />
WHITESIDE COUNTY<br />
Type <strong>of</strong> Work<br />
Estimated Cost<br />
2-27120-0100 0.2 MI E OF MOLINE RD TO LEE CO LINE 6,125,000<br />
I 88 WHITESIDE RESURFACING (INT-3RD)<br />
FAI 88 COLD MILLING<br />
Miles: 8.45<br />
** Awards: 4,382,273 (04/22/09)<br />
2-13300-0000 GALT RD TO 0.1 MI E OF PROPHET RD W OF ROCK FALLS 1,250,000<br />
US 30<br />
FAS 1198<br />
FAU 5564<br />
WHITESIDE RESURFACING (3P)<br />
ROCK FALLS<br />
Miles: 2.33<br />
** Awards: 884,511 (04/22/09)<br />
2-23380-0100 1ST ST IN ROCK FALLS TO US 30 1,300,000<br />
ILL 40<br />
FAP 646<br />
WHITESIDE RESURFACING (SMART)<br />
ROCK FALLS<br />
Miles: 1.25<br />
** Awards: 1,174,527 (04/22/09)<br />
2-12010-0000 MISSISSIPPI RIVER TO US 30 2,000,000<br />
ILL 136 WHITESIDE RESURFACING (3P)<br />
FAP 565 PATCHING<br />
COLD MILLING<br />
FULTON<br />
Miles: 3.21<br />
** Awards: 1,406,753 (04/22/09)<br />
Date:5/8/2009<br />
Time:10:00:57AM<br />
Page:127
Appendix A<br />
<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />
Statewide Program Planning<br />
*** FY 2009 Highway Improvement Program - ARRA Projects ***<br />
WHITESIDE COUNTY<br />
WHITESIDE COUNTY Total: Estimated Cost: 10,675,000<br />
Awarded Cost: $7,848,063.87<br />
Low Bid Cost:<br />
Miles: 15.24<br />
Structures:<br />
0<br />
0<br />
Date:5/8/2009<br />
Time:10:00:57AM<br />
Page:128
No projects were included for this County for<br />
the FY2009 component <strong>of</strong> Jump Start.