31.10.2012 Views

Whiteside - Illinois Department of Transportation

Whiteside - Illinois Department of Transportation

Whiteside - Illinois Department of Transportation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FY 2010-2015 Highway Improvement Program<br />

WHITESIDE COUNTY<br />

State Highways<br />

Route/Street Location Improvements Est. Cost<br />

I 88<br />

I 88<br />

US 30<br />

CLINTON RD<br />

US 30<br />

US 30<br />

US 30<br />

US 30<br />

US 30<br />

US 30<br />

US 30<br />

US 30<br />

UNDER ALBANY RD 2 MI N OF ERIE & UNDER ILL 78 2 MI W OF<br />

LYNDON<br />

UNDER ALBANY RD 2 MI N OF ERIE & UNDER ILL 78 2 MI W OF<br />

LYNDON<br />

County<br />

MYP Years<br />

Past Current<br />

P.E. (PHASE II) $60,000 WHITESIDE 4 2011-2015<br />

BRIDGE NEW DECK $770,000 WHITESIDE 2 2011-2015<br />

MISSISSIPPI RIVER 1 MI W OF ILL 84 BRIDGE DECK REPAIRS $200,000 WHITESIDE 1 2010<br />

ILLINOIS LEAD AGENCY; ILLINOIS FUNDING 100% OF THE COST.<br />

0.4 MI E OF LINCOLN ST / DAKIN RD TO ILL 78 (N)<br />

Miles = 9.80<br />

RESURFACING $4,200,000 WHITESIDE 5 2011-2015<br />

AT ILL 136 RIGHT TURN LANE $397,000 WHITESIDE 1 2010<br />

AT ILL 136 LAND ACQUISITION $30,000 WHITESIDE 1 2010<br />

ILL 136 TO ILL 40 P.E. (PHASE I) $1,274,000 WHITESIDE 2 2011-2015<br />

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH<br />

REQUIRED<br />

0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD CULVERT REPLACEMENT<br />

CULVERT EXTENSION<br />

$550,000 WHITESIDE 2 2011-2015<br />

0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD LAND ACQUISITION $20,000 WHITESIDE 2 2011-2015<br />

0.3 MI W OF ROUND GROVE RD & 0.2 MI E OF HABBEN RD UTILITY ADJUSTMENT $20,000 WHITESIDE 2 2011-2015<br />

EMERSON RD TO GALT RD<br />

Miles = 3.34<br />

JUMP START PROJECT<br />

RESURFACING $1,300,000 WHITESIDE 1 2011-2015<br />

1


FY 2010-2015 Highway Improvement Program<br />

WHITESIDE COUNTY<br />

State Highways<br />

Route/Street Location Improvements Est. Cost<br />

ILL 2<br />

ILL 2<br />

ILL 40<br />

LUTHER RD<br />

LOCUST ST<br />

ILL 40<br />

ILL 40<br />

ILL 40<br />

LOCUST ST<br />

ILL 40<br />

LOCUST ST<br />

ILL 40<br />

LOCUST ST<br />

ILL 40<br />

ILL 40<br />

ILL 40<br />

E 4TH ST TO 45TH AVE IN STERLING<br />

Miles = 2.08<br />

JUMP START PROJECT<br />

E OF 45TH AVE IN STERLING TO 0.2 MI W OF PLOCK RD<br />

Miles = 3.76<br />

JUMP START PROJECT<br />

ADAMS ST IN MILLEDGEVILLE TO S OF 26TH ST IN STERLING<br />

Miles = 12.31<br />

County<br />

MYP Years<br />

Past Current<br />

RESURFACING $3,175,000 WHITESIDE 1 2011-2015<br />

RESURFACING $4,500,000 LEE<br />

WHITESIDE<br />

RESURFACING<br />

DRAINAGE<br />

$4,500,000<br />

WHITESIDE<br />

CARROLL<br />

3<br />

5<br />

2011-2015<br />

2011-2015<br />

ELKHORN CREEK 2 MI N OF STERLING BRIDGE REPLACEMENT<br />

SHOULDER RECONSTRUCTION<br />

$1,480,000 WHITESIDE 9 2011-2015<br />

ELKHORN CREEK 2 MI N OF STERLING UTILITY ADJUSTMENT $20,000 WHITESIDE 9 2011-2015<br />

AT MILLER RD IN STERLING TURNING LANES<br />

TRAF SIGNAL INSTALLATION<br />

$625,000 WHITESIDE 2 2011-2015<br />

AT MILLER RD IN STERLING LAND ACQUISITION $100,000 WHITESIDE 2 2011-2015<br />

AT MILLER RD IN STERLING UTILITY ADJUSTMENT $30,000 WHITESIDE 2 2011-2015<br />

ROCK RIVER BETWEEN STERLING & ROCK FALLS BRIDGE REPLACEMENT $21,600,000 WHITESIDE 3 2011-2015<br />

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />

ROCK RIVER BETWEEN STERLING & ROCK FALLS UTILITY ADJUSTMENT $20,000 WHITESIDE 3 2011-2015<br />

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />

ROCK RIVER BETWEEN STERLING & ROCK FALLS LAND ACQUISITION $30,000 WHITESIDE 3 2011-2015<br />

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />

2


FY 2010-2015 Highway Improvement Program<br />

WHITESIDE COUNTY<br />

State Highways<br />

Route/Street Location Improvements Est. Cost<br />

ILL 40<br />

ILL 40<br />

ILL 40<br />

ILL 78<br />

ILL 78<br />

ILL 78<br />

ILL 78<br />

ILL 78<br />

ILL 78<br />

ILL 92<br />

ILL 136<br />

ILL 172<br />

ILL 172<br />

County<br />

MYP Years<br />

Past Current<br />

ROCK RIVER BETWEEN STERLING & ROCK FALLS CONSTRUCTION ENGINEERING $2,080,000 WHITESIDE 3 2011-2015<br />

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />

ROCK RIVER BETWEEN STERLING & ROCK FALLS P.E. (PHASE II) $400,000 WHITESIDE 1 2010<br />

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.<br />

HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 BRIDGE REPLACEMENT<br />

BIKEWAY<br />

$1,000,000 WHITESIDE 4 2011-2015<br />

CARROLL CO LINE TO US 30 W OF MORRISON<br />

Miles = 7.49<br />

JUMP START PROJECT<br />

RESURFACING $2,800,000 WHITESIDE 1 2011-2015<br />

FRENCH CREEK S EDGE OF MORRISON BRIDGE REPLACEMENT $1,365,000 WHITESIDE 1 2011-2015<br />

FRENCH CREEK S EDGE OF MORRISON LAND ACQUISITION $100,000 WHITESIDE 1 2011-2015<br />

FRENCH CREEK S EDGE OF MORRISON UTILITY ADJUSTMENT $30,000 WHITESIDE 1 2011-2015<br />

NCL TO SCL OF PROPHETSTOWN<br />

Miles = 1.60<br />

SCL OF PROPHETSTOWN TO 0.2 MI N OF ILL 92 (W)<br />

Miles = 7.30<br />

RESURFACING $500,000 WHITESIDE 1 2011-2015<br />

RESURFACING $1,900,000 WHITESIDE<br />

HENRY<br />

1<br />

2011-2015<br />

MISSISSIPPI RIVER IN FULTON BRIDGE PAINTING<br />

LIGHTING<br />

$2,000,000 WHITESIDE 2 2011-2015<br />

IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST.<br />

COUNTY DITCH 2 MI N OF TAMPICO BRIDGE REPLACEMENT $380,000 WHITESIDE 3 2011-2015<br />

COUNTY DITCH 2 MI N OF TAMPICO P.E. (PHASE II) $60,000 WHITESIDE 2 2010<br />

3


FY 2010-2015 Highway Improvement Program<br />

WHITESIDE COUNTY<br />

State Highways<br />

Route/Street Location Improvements Est. Cost<br />

ILL 172<br />

County<br />

MYP Years<br />

Past Current<br />

COUNTY DITCH 2 MI N OF TAMPICO LAND ACQUISITION $50,000 WHITESIDE 2 2011-2015<br />

FY<br />

2010<br />

2011-2015<br />

2010-2015<br />

Projects<br />

5<br />

30<br />

35<br />

Miles<br />

0.00<br />

47.68<br />

47.68<br />

4<br />

Est. Cost<br />

$1,087,000<br />

$56,479,000<br />

$57,566,000


FY 2010-2013 Highway Improvement Program<br />

WHITESIDE COUNTY<br />

Local Highways<br />

Route/Street Location Improvements Est. Cost<br />

LYNDON RD<br />

FAS 76<br />

County<br />

MYP Years<br />

Past Current<br />

ROCK CREEK 4.2 MI N OF US 30 BRIDGE REPLACEMENT $850,000 WHITESIDE 1 2010<br />

FY<br />

2010<br />

2011-2015<br />

2010-2015<br />

Projects<br />

1<br />

0<br />

1<br />

Miles<br />

0.00<br />

0.00<br />

0.00<br />

5<br />

Est. Cost<br />

$850,000<br />

$0<br />

$850,000


FY<br />

2010<br />

2011-2015<br />

2010-2015<br />

WHITESIDE COUNTY (STATE & LOCAL) Totals<br />

Projects<br />

6<br />

30<br />

36<br />

6<br />

Miles<br />

0.00<br />

47.68<br />

47.68<br />

Est. Cost<br />

$1,937,000<br />

$56,479,000<br />

$58,416,000


Appendix A<br />

PPS#<br />

Route County<br />

City<br />

<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

Statewide Program Planning<br />

*** FY 2009 Highway Improvement Program - ARRA Projects ***<br />

Location<br />

WHITESIDE COUNTY<br />

Type <strong>of</strong> Work<br />

Estimated Cost<br />

2-27120-0100 0.2 MI E OF MOLINE RD TO LEE CO LINE 6,125,000<br />

I 88 WHITESIDE RESURFACING (INT-3RD)<br />

FAI 88 COLD MILLING<br />

Miles: 8.45<br />

** Awards: 4,382,273 (04/22/09)<br />

2-13300-0000 GALT RD TO 0.1 MI E OF PROPHET RD W OF ROCK FALLS 1,250,000<br />

US 30<br />

FAS 1198<br />

FAU 5564<br />

WHITESIDE RESURFACING (3P)<br />

ROCK FALLS<br />

Miles: 2.33<br />

** Awards: 884,511 (04/22/09)<br />

2-23380-0100 1ST ST IN ROCK FALLS TO US 30 1,300,000<br />

ILL 40<br />

FAP 646<br />

WHITESIDE RESURFACING (SMART)<br />

ROCK FALLS<br />

Miles: 1.25<br />

** Awards: 1,174,527 (04/22/09)<br />

2-12010-0000 MISSISSIPPI RIVER TO US 30 2,000,000<br />

ILL 136 WHITESIDE RESURFACING (3P)<br />

FAP 565 PATCHING<br />

COLD MILLING<br />

FULTON<br />

Miles: 3.21<br />

** Awards: 1,406,753 (04/22/09)<br />

Date:5/8/2009<br />

Time:10:00:57AM<br />

Page:127


Appendix A<br />

<strong>Illinois</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong><br />

Statewide Program Planning<br />

*** FY 2009 Highway Improvement Program - ARRA Projects ***<br />

WHITESIDE COUNTY<br />

WHITESIDE COUNTY Total: Estimated Cost: 10,675,000<br />

Awarded Cost: $7,848,063.87<br />

Low Bid Cost:<br />

Miles: 15.24<br />

Structures:<br />

0<br />

0<br />

Date:5/8/2009<br />

Time:10:00:57AM<br />

Page:128


No projects were included for this County for<br />

the FY2009 component <strong>of</strong> Jump Start.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!