IMBEWU 2 Programme<br />
<strong>of</strong> the Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong><br />
OUTPUT <strong>to</strong> PURPOSE ANNUAL REVIEW REPORTS 2003-7<br />
incorporating Aide Memoires and Prisms<br />
November 2007<br />
The documents compiled in this report provide a cumulative record <strong>of</strong> the<br />
annual reviews undertaken during the course <strong>of</strong> the DFID funded ECDoE<br />
Imbewu 2 Programme from 2002-2007<br />
Province <strong>of</strong> the<br />
EASTERN CAPE<br />
DEPARTMENT OF EDUCATION
CONTENTS<br />
OUTPUT <strong>to</strong> PURPOSE ANNUAL REVIEW REPORTS 2003 – 7<br />
incorporating Aide Memoires and Prism <strong>Report</strong>s<br />
A (i) Aide Memoire for the First <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> <strong>Review</strong> (OPR) <strong>of</strong> Imbewu 2<br />
3 – 14 March 2003<br />
(ii) OPR PRISM, March 2003<br />
B (i) Aide Memoire for the Second OPR, 23 March – 2 April 2004<br />
(ii) OPR PRISM, April 2004<br />
C (i) Aide Memoire for the Third OPR, 17 – 22 April 2005<br />
(ii) OPR PRISM, April 2005<br />
D (i) Follow Up: Imbewu 2005 Annual <strong>Review</strong>, 21 - 22 June 2005<br />
E (i) Aide Memoire for the Fourth OPR, 9 – 11 Oc<strong>to</strong>ber 2006<br />
(ii) OPR PRISM, Oc<strong>to</strong>ber 2006<br />
F (i) Aide Memoire for the Project Completion <strong>Report</strong> (PCR), 2 – 5 Oc<strong>to</strong>ber<br />
2007<br />
(ii) OPR PRISM, Oc<strong>to</strong>ber 2007
DRAFT-Aide Memoire for the First <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> <strong>Review</strong><br />
<strong>of</strong> Imbewu 2 March 3-14th 2003<br />
( this document should be read in conjunction with the OPR PRISM<br />
document)<br />
EXECUTIVE SUMMARY<br />
The OPR review <strong>to</strong>ok place at a particularly challenging time for the province<br />
when the President had sent an Interim Management Team <strong>to</strong> Eastern Cape<br />
<strong>to</strong> assist the province resolve some fundamental delivery constraints in the<br />
social cluster. Despite the fractured context in which Imbewu has been<br />
operating, the <strong>Review</strong> found significant progress was being made.<br />
This OPR report, and the related PRISM document, will need <strong>to</strong> be<br />
considered by the <strong>Education</strong> <strong>Department</strong> alongside the findings and action<br />
plan <strong>of</strong> the Joint Management Team which has been set up <strong>to</strong> improve the<br />
management <strong>of</strong> <strong>Education</strong> services in the province.<br />
The consensus at the moment is that while the Joint Management team<br />
concentrate on finance and governance issues at the macro/ strategic level,<br />
the Imbewu focus for the year ahead should concentrate on “bot<strong>to</strong>m up”<br />
approaches , particularly those which involve learners, educa<strong>to</strong>rs, support<br />
systems <strong>to</strong> schools at the district level, School Governing Bodies and cross<br />
sec<strong>to</strong>r activity eg HIV/Aids Strategies and Community-run feeding<br />
programmes.<br />
It will be important over the next six months <strong>to</strong> work closely with the JMT<br />
and, if necessary, revisit Imbewu priorities.<br />
The <strong>Education</strong> <strong>Department</strong> needs <strong>to</strong> include in the budgetary process the<br />
Imbewu funding contribution <strong>to</strong> the implementation <strong>of</strong> their Strategic plan.<br />
A successful school transformation has been developed. This is owned by the<br />
<strong>Department</strong>. It has been tested, deepened and it works. It is now being<br />
rolled out <strong>to</strong> a new 1500 school group and it will continue <strong>to</strong> evolve, iteratively,<br />
on the basis <strong>of</strong> experience.<br />
At Imbewu’s instigation a Policy Planning and Research Unit is being put in<br />
place in the <strong>Department</strong> which will assist with more evidence- based policy<br />
planning and moni<strong>to</strong>ring, utilising more fully the well developed and<br />
accessible EMIS system.<br />
A comprehensive Evaluation Framework has been developed which will be<br />
tracking public perceptions <strong>of</strong> the education service delivery as well as<br />
learning outcomes and completion rates.<br />
1
There has been significant progress in developing a <strong>Department</strong>al<br />
Infrastructure and Asset Management strategy which is directly attributable <strong>to</strong><br />
Imbewu inputs.<br />
A Curriculum Direc<strong>to</strong>rate has been established and a framework developed<br />
for delivering training and capacity building on an ambitious time table, by the<br />
National <strong>Department</strong> <strong>of</strong> <strong>Education</strong>. Imbewu is playing a supportive role.<br />
District development has not yet taken <strong>of</strong>f significantly. Due <strong>to</strong> many<br />
constraints, Districts are not yet in a position <strong>to</strong> provide effective education<br />
support processes. This needs <strong>to</strong> be a major focus in the year ahead.<br />
The <strong>Education</strong> <strong>Department</strong> needs <strong>to</strong> play a more proactive role in social<br />
cluster planning, especially around cross sec<strong>to</strong>ral issues like HIV/Aids and the<br />
Community run feeding programme.<br />
There is little evidence <strong>of</strong> development partner integration around educational<br />
issues and much is still <strong>to</strong> be done <strong>to</strong> integrate DFID’s interventions in the<br />
Eastern Cape.<br />
The Programme Management <strong>of</strong> Imbewu, in a complex and volatile context,<br />
has been sound and effective.<br />
Expenditure against programme budget up till the end <strong>of</strong> March is £1.75<br />
million with 38% having been spent against <strong>Output</strong> One.<br />
The Recommendations <strong>of</strong> the <strong>Review</strong> team are as follows<br />
i) That the Direc<strong>to</strong>rate for Corporate Services includes Imbewu<br />
funding in an integrated budgetary process so that there is<br />
transparency and understanding <strong>of</strong> the purpose and additionality <strong>of</strong><br />
Imbewu funds. (This will enable the <strong>Department</strong> <strong>to</strong> moni<strong>to</strong>r how<br />
Imbewu is assisting in delivering their strategic plan)<br />
ii)<br />
That the Imbewu programme concentrates on district development<br />
in the year ahead and particularly the following activities;<br />
‣ vision crafting for districts within the whole district development<br />
framework, involving staff and school principals within their<br />
jurisdiction.<br />
‣ An intensive capacity building for <strong>Education</strong> Development<br />
Officers ( EDOS) <strong>to</strong> enhance their competencies and capabilities<br />
in terms <strong>of</strong> supporting and developing schools<br />
‣ mobile resource packs <strong>to</strong> enable EDOs <strong>to</strong> provide outreach for<br />
their schools.<br />
‣ Emphasis on the development <strong>of</strong> a core team <strong>to</strong> facilitate the<br />
process <strong>of</strong> support <strong>to</strong> teaching and learning<br />
2
iii)<br />
iv)<br />
That the roll out <strong>of</strong> the school transformation model <strong>to</strong> schools be<br />
given <strong>to</strong>p priority in terms <strong>of</strong> resources and attention during the next<br />
year with an emphasis on providing resources <strong>to</strong> the poorest<br />
schools. This should happen in parallel <strong>to</strong> the move <strong>to</strong> section 21<br />
status but not at the same pace<br />
That the teacher development strategy gives attention <strong>to</strong> the need<br />
<strong>to</strong> focus more on how learning takes place and on the learning<br />
process (see Annex Four)<br />
v) The <strong>Review</strong> team fully endorse the priority being, following<br />
completion <strong>of</strong> the planning and design cycle, <strong>to</strong> the building <strong>of</strong> eight<br />
pro<strong>to</strong>type constructions.<br />
vi)<br />
vii)<br />
viii)<br />
ix)<br />
The <strong>Education</strong> <strong>Department</strong> should make every effort at all levels <strong>of</strong><br />
the system <strong>to</strong> engage in social cluster activities and planning and<br />
that in this context Imbewu focus on assisting the integrated<br />
planning and implementation <strong>of</strong> school based HIV/Aids Strategies<br />
and SGB/Community run feeding programmes.<br />
The TA strategy for Imbewu should include an affirmative action<br />
policy that actively seeks <strong>to</strong> ensure gender and racial diversity.<br />
Letters <strong>of</strong> appointment for the members <strong>of</strong> the PSC <strong>to</strong> be issued by<br />
the <strong>Department</strong> before the end <strong>of</strong> the first quarter <strong>of</strong> next year.<br />
Plans for the formation <strong>of</strong> the Executive Management Committee<br />
and the Advisory Board should be included in the activity plans for<br />
the coming year.<br />
1.Introduction<br />
1. 1. The <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> <strong>Review</strong> ( OPR) <strong>of</strong> Imbewu 2 <strong>to</strong>ok place from<br />
March 3-14th. Terms <strong>of</strong> Reference for this <strong>Review</strong> are at Annex One. The<br />
<strong>Review</strong> involved an initial briefing by the Eastern Cape <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong> against the programme outputs, visits <strong>to</strong> eight <strong>of</strong> the twenty four<br />
districts, (see Programme at Annex Two ) meetings with a comprehensive<br />
range <strong>of</strong> stakeholders, including the MECs <strong>Education</strong> and Arts and Culture,<br />
the Speaker <strong>of</strong> the Legislature and the Direc<strong>to</strong>r General in the Premier’s<br />
<strong>of</strong>fice, The Direc<strong>to</strong>r General DPSA, The Vice Chancellor Fort Hare and other<br />
University representatives from Rhodes and Fort Hare.<br />
( see PRISM document for details).<br />
1.2. The <strong>Review</strong> was undertaken in as fully participative and consultative<br />
fashion as was possible, during a period when the DPSA led Task Team was<br />
completing their Interim work plan with the <strong>Department</strong>, the MECs Finance<br />
and <strong>Education</strong> were presenting their Budgets <strong>to</strong> the Legislature, delegations<br />
3
from USAID and Sida were visiting and DFID Nigeria, (unknown <strong>to</strong><br />
DFIDSA!) had sent a large team <strong>of</strong> Nigerian teachers <strong>to</strong> look at schools in<br />
the province on a study <strong>to</strong>ur arranged by British Council.<br />
1.3. The team comprised; Barbara Payne, DFIDSA Senior <strong>Education</strong> Adviser<br />
and <strong>Review</strong> coordina<strong>to</strong>r, Lusungu Kanchenche DFIDSA Deputy Programme<br />
Manager and Project Officer, Mokgapi Maleka, DFIDSA <strong>Education</strong> Adviser,<br />
Heather Garner, social development consultant, Chris Heymans, governance<br />
consultant, Rosaline Ntshingila-Khosa, planning and management<br />
consultant, Mareka Monyokolo evaluation consultant, Trevor Taft,<br />
decentralisation consultant, Nick Smart financial consultant, Brigid Smith,<br />
teaching and learning consultant. Bob Blakelock DFIDSA engineering adviser<br />
and Richard Thomas DFIDSA Senior Governance adviser, Bas Kotterink<br />
Imfundo spent some time contributing <strong>to</strong> the review. Paul Barbour DFIDSA<br />
economist and Brigid Dillon, Senior Social Development Adviser and Jim<br />
McAlpine, DFIDSA programme manager briefed the team before departure <strong>to</strong><br />
Eastern Cape. The <strong>Review</strong> team would like <strong>to</strong> thank the <strong>Education</strong><br />
<strong>Department</strong>, the Imbewu team and key stakeholders in the Eastern Cape for<br />
giving <strong>of</strong> their time and hospitality which made the review process such an<br />
enjoyable learning experience.<br />
1.4. This is a particularly challenging and critical time in Eastern Cape. There<br />
are serious capacity, governance and delivery problems in the province,<br />
especially in the <strong>Education</strong> department. It is also estimated that 64% <strong>of</strong><br />
middle management posts are vacant.<br />
1.5. The President in late 2002 appointed an Interim Management Team<br />
( IMT) supported by technical Joint Management Teams (JMT) <strong>to</strong> analyse and<br />
investigate the problems in the Eastern Cape and recommend interventions<br />
<strong>to</strong> deal with issues <strong>of</strong> operational and financial management, service delivery,<br />
human resource management and reform <strong>of</strong> the organisational culture,<br />
especially in the social cluster <strong>of</strong> Health, <strong>Education</strong> and Welfare.<br />
1.6 . In <strong>Education</strong>, there is an overspend on the personnel budget <strong>of</strong> R750<br />
million and a consequent freeze on posts. This overspend will effectively<br />
reduce the availability <strong>of</strong> the recently announced R9.9 billion for education<br />
(MEC’s Budget speech March 13 th 2003).<br />
1.7. The OPR team decided therefore, because <strong>of</strong> the fractured context in<br />
which the <strong>Review</strong> was carried out that it would be wise <strong>to</strong> defer making any<br />
firm decisions concerning the strategic thrust <strong>of</strong> the programme until the full<br />
IMT Assessment and Plan <strong>of</strong> action is fully known. It is however unlikely, in<br />
view <strong>of</strong> the focus areas <strong>of</strong> the Imbewu programme, that outputs related <strong>to</strong><br />
district and school development will be substantially affected by the JMT<br />
action plans and therefore the Team makes a number <strong>of</strong> recommendations<br />
regarding these outputs now. It may however be necessary <strong>to</strong> revisit all the<br />
recommendations <strong>of</strong> this OPR in six months time <strong>to</strong> ensure that they<br />
synergise with the action plan <strong>of</strong> the JMT.<br />
4
1.8. Another fac<strong>to</strong>r which might impact upon the priorities within the Imbewu<br />
planning framework is the imminent appointment <strong>of</strong> a new SG <strong>to</strong> act for the<br />
next six months while a long term SG is selected. Both will have their own<br />
perceptions about priorities. So there will be a need for the Programme <strong>to</strong> be<br />
flexible within the clear policy framework for Imbewu.<br />
1.9. This OPR is recommending that the year ahead is spent concentrating on<br />
building capacity which impacts directly and favourably on schools,<br />
especially the poorest schools. In effect, while <strong>to</strong>p down problems are being<br />
addressed by <strong>to</strong>p down solutions, the Imbewu programme will concentrate on<br />
“bot<strong>to</strong>m up” approaches , particularly those that involve learners, educa<strong>to</strong>rs,<br />
support systems for schools and cross social sec<strong>to</strong>r activities.<br />
2. Programme achievement<br />
2.1. In spite <strong>of</strong> the tensions and apprehension caused in a <strong>Department</strong><br />
braced for radical changes, there are some positive things <strong>to</strong> report. As one <strong>of</strong><br />
the short term consultants working for Imbewu has already said; “ The<br />
atmosphere <strong>of</strong> siege and crisis needs <strong>to</strong> be tempered through an<br />
understanding both <strong>of</strong> the complexities <strong>of</strong> the policy environment and the<br />
progress being achieved”.<br />
2.2. The <strong>Review</strong> team were impressed with the well developed and<br />
accessible <strong>Education</strong> Management System (EMIS) which provides rich<br />
potential for more evidence-based planning. The EMIS makes it possible <strong>to</strong><br />
track aspects <strong>of</strong> poverty in local schools according <strong>to</strong> the social dependency<br />
indica<strong>to</strong>r. This calculates average family income and numbers <strong>of</strong> people<br />
dependent on that income. Random examples shown, ranged from R3300 for<br />
1.4 people <strong>to</strong> R104 for 47 people) which clearly demonstrates the unequal<br />
nature <strong>of</strong> Eastern Cape society. EMIS makes it possible <strong>to</strong> ensure that<br />
Imbewu targets the poorest schools and communities. The OPR team has<br />
concluded that the focus for the year ahead should be on these schools and<br />
districts and on support systems and capacity building <strong>to</strong> improve the quality<br />
<strong>of</strong> teaching and learning.<br />
2.3. At the end <strong>of</strong> the first year <strong>of</strong> Imbewu 2 the impact <strong>of</strong> the programme<br />
appears, as one would expect, <strong>to</strong> be most apparent at the school level. The<br />
visits <strong>to</strong> 8 <strong>of</strong> the 24 districts confirmed the view that there is a striking<br />
difference between Imbewu and non Imbewu schools. People in the original<br />
Imbewu schools have been empowered and energised in<strong>to</strong> helping<br />
themselves resolve the issues and challenges with which they are faced.<br />
Non Imbewu schools also recognise that something desirable has happened<br />
in those schools who have <strong>to</strong> date benefited from the programme and<br />
therefore there is a growing demand <strong>to</strong> be involved in Imbewu. There is<br />
evidence <strong>of</strong> Community mobilisation around schools and generally recognition<br />
that this is a key fac<strong>to</strong>r in the transformation process. There was also<br />
evidence from the three vision crafting training sessions observed, that some<br />
key district and provincial <strong>of</strong>ficials have been well capacitated <strong>to</strong> deliver the<br />
training programme. There is a general understanding <strong>of</strong> the philosophy and<br />
methodology <strong>of</strong> transformation <strong>to</strong> be used. Vision crafting (which is the first <strong>of</strong><br />
5
the five transformation modules) will have been completed in 1500 schools in<br />
the province by the end <strong>of</strong> April 2003 which is an enormous achievement,<br />
given the context in which the programme has been working.<br />
2.4. Another important achievement is the <strong>Department</strong>’s agreement <strong>to</strong> the<br />
establishment <strong>of</strong> the Policy Planning and Research Unit (PPRU) within the<br />
<strong>Education</strong> <strong>Department</strong>. The proposition and rationale for the Unit has evolved<br />
as a result <strong>of</strong> a collaborative dialogue with many stakeholders within and<br />
outside the <strong>Department</strong> who are committed <strong>to</strong> the development <strong>of</strong> better,<br />
evidence planning methods and recognise the many benefits this will bring <strong>to</strong><br />
the policy work <strong>of</strong> ECED. It is also accepted that this unit will have a finite life<br />
as the management culture and ethos <strong>of</strong> ECED evolves and changes over the<br />
next few years. It is therefore perceived as a product <strong>of</strong> and response <strong>to</strong>, the<br />
existing context.<br />
2.5. The establishment <strong>of</strong> a Curriculum Direc<strong>to</strong>rate and a clear framework for<br />
advocacy and training delivery ( though there are some questions around<br />
whether the <strong>Department</strong> is in a position <strong>to</strong> fund full roll out training <strong>to</strong> all,) is<br />
also a key step forward.<br />
2.6. The development <strong>of</strong> a fully formative and summative, quantitative and<br />
qualitative evaluation framework, <strong>to</strong> be the responsibility <strong>of</strong> the Quality<br />
Assurance Direc<strong>to</strong>rate is a further substantial achievement, which will<br />
enable the programme <strong>to</strong> track public perceptions <strong>of</strong> the education system,<br />
as well as tracking learning outcomes and completion rates.<br />
2.7. There has also been significant progress in setting up a <strong>Department</strong>al<br />
system for infrastructure and asset management which will enable the<br />
development, in the next financial year, <strong>of</strong> a community -involved low cost<br />
technology system for school building, demonstrated through eight pro<strong>to</strong>type<br />
construction activities in the different geo-physical climate areas <strong>of</strong> the<br />
Eastern Cape.( this is fully outlined in a report which became available on the<br />
last day <strong>of</strong> the <strong>Review</strong>) This system will become the basis for the ECED<br />
infrastructure strategy, which has been widely discussed with a range <strong>of</strong><br />
stakeholders, including Public Works, The National Business Initiative( NBI,)<br />
Border Technikon, and a range <strong>of</strong> service providers and is already being<br />
institutionalised in<strong>to</strong> the appropriate direc<strong>to</strong>r’s performance agreement.<br />
2.8. Another key achievements <strong>of</strong> the programme so far, is its ability <strong>to</strong><br />
market itself among the various stakeholders within the education sec<strong>to</strong>r in<br />
the province. One can cite the example <strong>of</strong> the role that the programme played<br />
in setting up the Provincial <strong>Education</strong> and Training Council in 2002, and also<br />
the District <strong>Education</strong> forums. These are critical social formations which are<br />
central <strong>to</strong> community mobilisation and participation, as all forms <strong>of</strong> social<br />
groupings are represented in these structures.<br />
2.9. However regular feedback and exchanges <strong>of</strong> ideas sessions with<br />
stakeholders need <strong>to</strong> be held <strong>to</strong> ensure that they remain informed as far as<br />
programme activities are concerned. It is certainly not enough <strong>to</strong> leave this<br />
issue <strong>to</strong> programme launches and orientation only. The launch <strong>of</strong> the new<br />
6
<strong>Education</strong> department newsletter is a step in the right direction but there is<br />
need for a forum for wider “outside” stakeholder participation.<br />
2.10. Communication within the programme appears not <strong>to</strong> be as effective as<br />
would be expected in a programme <strong>of</strong> this magnitude. While many <strong>of</strong>ficials<br />
within the provincial department, district <strong>of</strong>fices and educa<strong>to</strong>rs in schools<br />
know about the programme, not all <strong>of</strong> them know that it is now a departmental<br />
programme. This raises critical questions about ownership.<br />
2.11. The programme has done well in assisting the department establish the<br />
Communications Direc<strong>to</strong>rate. However, there seems <strong>to</strong> be an impression that<br />
this direc<strong>to</strong>rate has a narrow focus in terms <strong>of</strong> its mission. That is, paying<br />
more attention <strong>to</strong> Head Office matters, at the expense <strong>of</strong> much broader and<br />
interesting issues like school and district achievement etc. The<br />
communication’s direc<strong>to</strong>rate has a crucial role <strong>to</strong> play in assisting a smooth<br />
transition from project <strong>to</strong> programme.<br />
2.12. The challenges for the Provincial <strong>Department</strong> have been outlined above<br />
and will be addressed by the Interim Management Team over the next six<br />
months.<br />
2.13. In the <strong>Review</strong> Team’s view, District development needs more support<br />
and focus. The District Improvement Office is severely under capacitated and<br />
yet is responsible for simultaneous roll out <strong>of</strong> decentralisation <strong>to</strong> districts.<br />
District managers were appointed some time ago but the development and<br />
resourcing <strong>of</strong> their <strong>of</strong>fices is not yet visible. This appears <strong>to</strong> be in part due <strong>to</strong><br />
constraints around the flow <strong>of</strong> funds. It is unders<strong>to</strong>od that after problems<br />
loading the <strong>Education</strong> budget in May 2002, Districts only actually received<br />
their budgets for 2002-2003 in February 2003 and then were required <strong>to</strong><br />
spend their allocations by the end <strong>of</strong> February. However the Team was<br />
surprised that even in the more advantaged districts where infrastructure,<br />
electricity and sanitation are not in question, there seems <strong>to</strong> be no greater<br />
level <strong>of</strong> resources and activity than in districts where there are manifest<br />
infrastructural challenges. This bears out the theory that districts have not yet<br />
been allocated the funds <strong>to</strong> develop their systems and capacities.<br />
2.14. Another key area for future development is the harmonisation <strong>of</strong><br />
Imbewu with other programmes. The different education programmes have<br />
regular meetings but this has not really brought about integration. Other<br />
projects see themselves as separate, with their own identity and impetus.<br />
There is no sense either in which Imbewu and IPSP have more than<br />
occasional informal contact. Relationships with other DFID funded<br />
programmes is tenuous or non existent. This may improve with the<br />
appointment <strong>of</strong> the DFID representative in the Premier’s <strong>of</strong>fice but requires<br />
substantial rethinking.<br />
2.15. It is very early <strong>to</strong> assess the extent <strong>to</strong> which there has been general<br />
progress <strong>to</strong>wards achieving outputs, purpose and goal as much <strong>of</strong> this first<br />
year has been at the activity level <strong>of</strong> the log frame and taken up in<br />
establishing an iterative, integrated work plan and planning framework.<br />
7
However it is generally felt that after something <strong>of</strong> a slow start, in complex<br />
and volatile circumstances, the programme is now on track. There are some<br />
changes <strong>to</strong> the logframe in terms <strong>of</strong> assumptions and OVIs which are<br />
reflected in the PRISM document. These will be considered by the Project<br />
Steering Committee (PSC) on the 26 th March 2003.<br />
2.16. Expenditure <strong>to</strong> date against programme budget is estimated, up until<br />
the end <strong>of</strong> March 2003 as £1.75million. Of this 38 % has been disbursed<br />
against output 1, 9% against output 2, 23% against output 3, 5% against<br />
output 4 and less than 2% against output 5. A further 3% has been provided<br />
as budgetary support for the ECED. Overheads including long term<br />
management support, <strong>of</strong>fice costs and utilities accounts for 23% <strong>of</strong> the<br />
expenditure. The strong weighting <strong>to</strong>wards <strong>Output</strong> 1 can be expected in<br />
Programme Year 1 but this needs <strong>to</strong> be moni<strong>to</strong>red carefully in relation <strong>to</strong> the<br />
anticipated ratio <strong>of</strong> expenditure in the <strong>to</strong>tal programme budget.<br />
3. Programme progress by output<br />
3.1. <strong>Output</strong> one – Provincial <strong>Department</strong><br />
(The caveat here is that the IMT will be dealing with a wide range <strong>of</strong> issues affecting the<br />
provincial department and their recommendations will take precedence. However the one<br />
recommendation this OPR is making in relation <strong>to</strong> <strong>Output</strong> one is one the IMT is likely <strong>to</strong><br />
endorse.)<br />
3.1.1. <strong>Education</strong> is the major provincial budget item accounting for 40% <strong>of</strong><br />
<strong>to</strong>tal expenditure. The ratio <strong>of</strong> expenditure on education is declining but still<br />
remains about the national average.<br />
3.1.2. In 2002/2003 the pattern <strong>of</strong> recent years with over-expenditure against<br />
personnel (R750 million) and under-expenditure against non-personnel items<br />
(R200 million) is anticipated.<br />
3.1.3. It is against this background <strong>of</strong> continuing pressure on the provincial<br />
budget, and the need for more accurate forecasting <strong>of</strong> budgetary<br />
requirements that the macro budget for the <strong>Education</strong> <strong>Department</strong> is being<br />
negotiated. Until systemic errors in the provincial PERSAL system are<br />
corrected the patterns <strong>of</strong> expenditure will continue <strong>to</strong> inhibit effective<br />
mobilisation and planning for operational budgets.<br />
3.1.4. At present the budgetary planning process for the education<br />
<strong>Department</strong> does not reflect Imbewu expenditure. It is therefore seen as an<br />
add-on. This may also contribute <strong>to</strong> the misunderstanding in some<br />
direc<strong>to</strong>rates <strong>of</strong> the nature <strong>of</strong> the Imbewu funding framework.<br />
Recommendation<br />
That the Direc<strong>to</strong>rate for Corporate services includes and acknowledges<br />
Imbewu funding in an integrated budgetary process so that there is<br />
transparency and understanding <strong>of</strong> the purpose and additionality <strong>of</strong><br />
8
Imbewu funds . This will enable the <strong>Department</strong> <strong>to</strong> moni<strong>to</strong>r how Imbewu<br />
is assisting in delivering their Strategic plan.<br />
3.1.5. At the strategic level, linkages between the <strong>Education</strong> <strong>Department</strong> (ED)<br />
and provincial initiatives, especially around the social clusters, are variable.<br />
The ED representation on the provincial task teams considering critical issues<br />
for district development such as infrastructure, HR and finance has been<br />
inconsistent and unpredictable. The <strong>Department</strong> should be encouraged <strong>to</strong><br />
take a more active role in the social cluster.<br />
3.1.6. Operationally the ECED has chosen not <strong>to</strong> participate in provincial<br />
initiatives such as “Getting the Records Straight” which is aimed at cleaning<br />
personnel registry files. It has also adopted its own model for performance<br />
management rather than the provincial model.<br />
3.1.7. The reasons for this lack <strong>of</strong> active participation are understandable and<br />
relate, in some part, <strong>to</strong> the ECED’s desire <strong>to</strong> move ahead with delivery<br />
quickly. In the long term, however, this may have a negative impact on<br />
interaction with provincial plans around provincial growth and poverty<br />
alleviation.<br />
3.1.8. Whilst the ECED is no longer subject <strong>to</strong> the conditions <strong>of</strong> Section 100,<br />
the Treasury still requires that all expenditure receives pre-audit approval.<br />
This slows down systems <strong>of</strong> payment and introduces delays in the application<br />
<strong>of</strong> resources. This creates additional barriers <strong>to</strong> ensuring planned expenditure<br />
against non-personnel budgets and conditional grant funds.<br />
3.1.9. In relation <strong>to</strong> achieving the programme purpose, the ECED has made<br />
progress with the introduction <strong>of</strong> critical systems and processes in respect <strong>of</strong><br />
financial management. The department recognises that the lack <strong>of</strong> planning,<br />
analytical and implementation capacity still inhibits the closer integration <strong>of</strong><br />
planning and budgeting with expenditure.<br />
3.1.10. Technical assistance has supported improved functioning <strong>of</strong> finance<br />
systems, addressing some <strong>of</strong> the critical issues such as preparing end <strong>of</strong> year<br />
financial statements and assisting with the payments backlogs.<br />
3.1.11. Whilst many <strong>of</strong> the systemic issues in budgeting, financial planning<br />
and accounting have not been addressed, there is evidence that managers<br />
are more readily identifying challenges and the programme has probably had<br />
a positive impact in this regard by focusing attention on some <strong>of</strong> the key<br />
problem areas.<br />
3.1.12. The assessment <strong>of</strong> the extent and size <strong>of</strong> the financial backlogs is an<br />
ongoing problem that has a deleterious impact on financial planning and<br />
budgeting. Since the September 2002 mora<strong>to</strong>rium on personnel payments<br />
against leave, bonuses, promotion payments and new appointments the<br />
backlog has probably grown.<br />
9
3.1.13. The cleaning <strong>of</strong> personnel files and files for other credi<strong>to</strong>rs is<br />
essential. This has included the preparation <strong>of</strong> essential accounting and<br />
financial returns such as the annual financial statements and the monthly<br />
reconciliation <strong>of</strong> the bank account. There is evidence that this is building<br />
capacity, especially in the Direc<strong>to</strong>rate for Accounting Services.<br />
3.1.14. Five projects are now in the planning stages <strong>to</strong> support the<br />
preparation <strong>of</strong> the end <strong>of</strong> year statements for 2002/2003 and <strong>to</strong> improve<br />
financial management systems and personnel payment records. This is<br />
aligned with the provincial Treasury intervention programme.<br />
3.1.15. Many <strong>of</strong> the initiatives supported have had an impact but are not<br />
being delivered as part <strong>of</strong> a strategic systemic intervention. They are reactive<br />
<strong>to</strong> meet imperatives such as the provision <strong>of</strong> the skills for the Chief Financial<br />
Officer (CFO) oversight function and the outsourcing contract for delivery <strong>of</strong><br />
Learning Support Materials (LSM) materials in 2002. In many instances the<br />
planning <strong>of</strong> activities has not allowed a sufficient timeframe <strong>to</strong> access<br />
departmental resources. This is <strong>of</strong>ten because <strong>of</strong> limitations imposed by<br />
procurement timeframes.<br />
3.1.16. The overspend against personnel budgets is a characteristic <strong>of</strong> all<br />
departments in the province. It relates from systematic errors in the way that<br />
the personnel budget is set based on the main PERSAL run in November<br />
each year. The main PERSAL run omits many staff related payments which<br />
are held on sub-systems <strong>of</strong> PERSAL. These include gratuities, grants, leave<br />
allowances, subsistence, training allowances, temporary staff etc. As a result<br />
underestimates <strong>of</strong> personnel expenditure are introduced year on year. This<br />
has two main budgetary impacts. Firstly the over expenditure runs over <strong>to</strong> the<br />
next financial year and secondly in order <strong>to</strong> meet the additional monthly needs<br />
for personnel, departments have <strong>to</strong> use allocations budgeted for operational<br />
activity. This budgeting anomaly is impacting directly on operational<br />
effectiveness and can only be addressed at the provincial level.<br />
3.1.17. The DPSA IMT intervention in the province seeks <strong>to</strong> address all these<br />
issues.<br />
3.2. <strong>Output</strong> two- District Development<br />
3.2.1. The Chief Direc<strong>to</strong>rate District Improvement has received a directive <strong>to</strong><br />
rollout the district development model <strong>to</strong> all 24 districts simultaneously. (This<br />
was a Cabinet decision which now seems under renewed discussion within<br />
the JMT) Currently the Chief Direc<strong>to</strong>rate does not have the capacity in terms<br />
<strong>of</strong> staff and other resources <strong>to</strong> rollout such a huge task. The Chief Direc<strong>to</strong>r<br />
charged with driving and championing this task also seems quite snowed<br />
under by a number <strong>of</strong> other responsibilities ( He is also Imbewu Programme<br />
Manager, in charge <strong>of</strong> other external programmes, on the Tender Board and<br />
member <strong>of</strong> the JMT). This is an impossible position for him. He urgently<br />
needs more staff <strong>to</strong> support him. It is quite clear also that this Direc<strong>to</strong>rate is<br />
going <strong>to</strong> need the support <strong>of</strong> other components within the <strong>Department</strong> <strong>to</strong><br />
successfully implement the decentralisation initiative.<br />
10
3.2.2. There is a need <strong>to</strong> develop a comprehensive framework for the<br />
delegation, in terms <strong>of</strong> allocation <strong>of</strong> management, functions, organisational<br />
structuring arrangements, roles and relationship arrangements, responsibility<br />
and accountability arrangements etc<br />
3.2.3. There is also a need <strong>to</strong> develop a platform <strong>to</strong> share problems and<br />
experiences associated with the decentralisation initiative. That is, an<br />
effective two-way communication strategy which will build cooperation and<br />
commitment. Within the new evaluation framework there will be a need <strong>to</strong><br />
develop appropriate instruments <strong>to</strong> track the decentralisation process.<br />
3.2.4. Currently a large number <strong>of</strong> districts are under-capacitated in terms <strong>of</strong><br />
staffing, infrastructure, systems and resources. Districts at this stage feel<br />
quite over loaded and overwhelmed, with sparse technological support and<br />
few resources for outreach <strong>to</strong> schools, limited transport <strong>to</strong> visit schools,<br />
critical posts (pr<strong>of</strong>essional and administrative) still remain largely unfilled etc.<br />
The lack <strong>of</strong> pr<strong>of</strong>essional skills, knowledge and expertise has also impacted<br />
negatively on support and develop schools. This situation has particular<br />
implications for the Imbewu programme in terms <strong>of</strong> integration and ownership,<br />
capacity building initiatives and the overall impact and sustainability <strong>of</strong> the<br />
programme especially in relation <strong>to</strong> output four.<br />
3.2.5. The team have recorded comments and impressions from the specific<br />
district and school visits (which are detailed at Annex Four)<br />
3.2.6. District Managers agree that the establishment <strong>of</strong> <strong>Education</strong><br />
Development Centres( EDC) – which will house, in some cases, The<br />
<strong>Education</strong> Resource Centres (ERC) will greatly reinforce schools access <strong>to</strong><br />
education resources, provided that these centres are well managed and that<br />
the necessary security arrangements are in place. (In some cases where<br />
infrastructure is a challenge, some ERCs may well be attached <strong>to</strong> schools in<br />
key positions in clusters.) Imbewu can help with this development.<br />
3.2.7. Generally, District managers, EDOs and Subject Advisors who were<br />
involved in the Imbewu initiatives feel very positive about the training<br />
intervention and the resources provided by Imbewu. District managers also<br />
see the need <strong>to</strong> develop a more comprehensive capacity building programme<br />
for themselves, which will develop their own competencies and capability <strong>of</strong><br />
managing their districts more effectively, and support schools. Both districts<br />
<strong>of</strong>ficials and schools principals acknowledged the positive impact <strong>of</strong> the<br />
Imbewu training on their schools. Schools who were not involved in the<br />
training also acknowledge that they could clearly see the positive effect <strong>of</strong> the<br />
training was having on “Imbewu schools”. However, there was a need<br />
expressed <strong>to</strong> develop training that was sustainable and not just once <strong>of</strong>f.<br />
There is also a need <strong>to</strong> develop a sharing culture amongst those who have<br />
undergone the training with their colleagues and neighbouring schools.<br />
3.2.8. Advisors, with solid intensive training and access <strong>to</strong> appropriate<br />
resources, can act as critical agents for transforming schools. Investment in<br />
11
developing the capacity <strong>of</strong> these district <strong>of</strong>ficials with cross social<br />
responsibility and resourcing <strong>to</strong> do their jobs, will go a long way <strong>to</strong>wards<br />
providing qualitative, consistent support <strong>to</strong> schools.<br />
3.2.9. There are more EDOs in the system than there are subject advisors<br />
and other categories <strong>of</strong> pr<strong>of</strong>essional district <strong>of</strong>ficials. Generally, these <strong>of</strong>ficials<br />
come in<strong>to</strong> districts at different times, given the (unsystematic) nature <strong>of</strong> the<br />
migration process. This has the potential <strong>of</strong> having a negative effect on the<br />
coherence <strong>of</strong> the programme. Induction needs <strong>to</strong> take place in a vigorous,<br />
iterative and intensive way. It is suggested that capacity building should<br />
target all the district <strong>of</strong>ficials eventually, but concentration on the EDOs<br />
Subject advisers and cross social specialist in the District <strong>of</strong>fice is an<br />
important first step.<br />
3.2.10. Currently the various districts are at various levels <strong>of</strong> development,<br />
capacity, resourcing and infrastructure. Rollout <strong>to</strong> all 24 districts will need a<br />
comprehensive incremental action plan.<br />
3.2.11. Districts are operating on paper budgets at the present time. The full<br />
devolution <strong>of</strong> funding is inhibited by; the lack <strong>of</strong> capacity, both in terms <strong>of</strong> skills<br />
and posts vacant; the inadequate access <strong>to</strong> management information,<br />
especially the PERSAL system; and poor communications with the provincial<br />
<strong>of</strong>fice.<br />
3.2.12. Assistance has been provided <strong>to</strong> improve basic <strong>of</strong>fice systems and<br />
procedures. Currently staff from the district <strong>of</strong>fices are undergoing training in<br />
finance and ICT as part <strong>of</strong> devolving responsibilities <strong>to</strong> the district level.<br />
However, it appears that this is not being undertaken as part <strong>of</strong> a broader, coordinated<br />
training programme for departmental staff, either at the functional<br />
skills level or as part <strong>of</strong> wider pr<strong>of</strong>essional development. The Imbewu<br />
programme has been supporting work in Human Resource management and<br />
development which will address some <strong>of</strong> these concerns.<br />
3..2.13. The <strong>Review</strong> team have concluded that this output should be a key<br />
focus in Year two <strong>of</strong> the programme and this should be reflected in budgetary<br />
allocations and the following activities;<br />
I<br />
Recommendations<br />
‣ Vision drafting for districts within the whole district development<br />
framework involving all staff and school principals within their<br />
jurisdiction.<br />
‣ An intensive capacity building programme for <strong>Education</strong><br />
Development Officers (EDOs) <strong>to</strong> enhance their competencies and<br />
capabilities in terms <strong>of</strong> supporting and developing schools.<br />
‣ “mobile” resource packs <strong>to</strong> be developed for the EDOs in terms<br />
<strong>of</strong> their outreach <strong>to</strong> schools.<br />
‣ Emphasis <strong>to</strong> be placed on the development <strong>of</strong> a core team <strong>of</strong><br />
pr<strong>of</strong>essionals (EDOs and Subject Advisors) <strong>to</strong> facilitate the<br />
12
process <strong>of</strong> support and development in terms <strong>of</strong> teaching and<br />
learning.<br />
3.3. <strong>Output</strong> Three - Schools<br />
3.3.1. The school transformation model was developed during Imbewu1 and<br />
proved <strong>to</strong> be very successful. It involves fundamental elements <strong>of</strong> vision<br />
crafting, community involvement, reflective practice, management and<br />
Inservice training and institutional self management capability. The conceptual<br />
framework, has evolved and deepened. It has now been adopted by the<br />
<strong>Department</strong> as the Eastern Cape model.<br />
3.3.2. Schools are encouraged <strong>to</strong> be innovative. The new emphasis is <strong>to</strong><br />
create an enabling environment for schools <strong>to</strong> adapt the model <strong>to</strong> meet their<br />
needs. The schools are thus given necessary training and materials <strong>to</strong><br />
support their transformation process. It is also envisaged that the district<br />
<strong>of</strong>fices will play a critical role in providing ongoing support <strong>to</strong> and moni<strong>to</strong>ring<br />
<strong>of</strong>, the schools as they transform themselves.<br />
3.3.3. Within Imbewu, schools clusters are formed and the schools<br />
themselves run the cluster activities. These clusters bring a number <strong>of</strong><br />
schools in the same area <strong>to</strong>gether <strong>to</strong> identify issues affecting them, share<br />
experiences and find common solutions. School clusters have the potential<br />
<strong>to</strong> be critical entry points for interventions aimed at providing schools with<br />
ongoing support, particularly in the context <strong>of</strong> the enormous staff shortages <strong>of</strong><br />
EDOs and Subject Advisors, and the inability <strong>of</strong> existing EDOs <strong>to</strong> reach (all)<br />
the schools and provide them with ongoing and qualitative support.<br />
3.3.4. Imbewu trains provincial trainers located in various affected<br />
direc<strong>to</strong>rates, namely Curriculum, Adult Basic <strong>Education</strong> and Training(ABET),<br />
Human Resource Development(HRD), General <strong>Education</strong> and Training<br />
(GET) and Further <strong>Education</strong> and training( FET). These <strong>of</strong>ficials play a critical<br />
role in cascading the training down <strong>to</strong> district <strong>of</strong>ficials. The ability for Imbewu<br />
<strong>to</strong> draw on these resources for purposes <strong>of</strong> taking forward the training<br />
initiative is a positive development and a significant step <strong>to</strong>wards the<br />
integration <strong>of</strong> the programme in<strong>to</strong> the department. Evidence seems <strong>to</strong> suggest<br />
that this aspect <strong>of</strong> capacity building has been quite successful. There are still<br />
some challenges around filling <strong>of</strong> posts and thus the availability <strong>of</strong> more<br />
<strong>of</strong>ficials <strong>to</strong> undertake this critical work.<br />
3.3.5. There are a number <strong>of</strong> other challenges facing this component <strong>of</strong> the<br />
programme: Imbewu is still seen by some as a project, separate from<br />
departmental initiatives. In instances where people are aware that it is<br />
supposed <strong>to</strong> be the programme <strong>of</strong> the department, there is lack <strong>of</strong> clarity<br />
about how <strong>to</strong> go about integrating (aspects <strong>of</strong>) the programme in<strong>to</strong> the district<br />
initiatives and activities.<br />
3.3.6. Districts seem <strong>to</strong> be waiting for either guidelines or a directive from<br />
head <strong>of</strong>fice about integration <strong>of</strong> the Imbewu programme. Also, strategies<br />
need <strong>to</strong> be put in<strong>to</strong> place <strong>to</strong> get all EDOs and subject advisors, not only the<br />
13
Imbewu coordina<strong>to</strong>rs, <strong>to</strong> buy in<strong>to</strong> and develop a sense <strong>of</strong> ownership <strong>of</strong> the<br />
Imbewu programme. The challenge is <strong>to</strong> help them <strong>to</strong> make the mind shift <strong>to</strong><br />
school development and support.<br />
3.3.7. The training received by district <strong>of</strong>ficials is relatively generic, theoretical<br />
and inadequate. This is particularly the case with the OBE training that subject<br />
advisors receive. The Imbewu focus on methodology is seen as invaluable.<br />
However, it only addresses one part <strong>of</strong> a bigger problem. They express a<br />
desperate need for more practical, in-depth, and learning area-specific<br />
training.<br />
3.3.8. This will go a long way in terms <strong>of</strong> enabling them <strong>to</strong> provide qualitative<br />
classroom support <strong>to</strong> teachers who have <strong>to</strong> grapple with the complex<br />
curriculum changes in the context <strong>of</strong> a dearth <strong>of</strong> basic educational resources.<br />
In interviews with teachers, they concur with this. They also feel district<br />
<strong>of</strong>ficials need more training aimed at improving their conceptual<br />
understanding <strong>of</strong> the learning areas for which they are responsible.<br />
( Learning and learning process issues are detailed at Annex Five)<br />
3.3.9. Through the school transformation model, Imbewu has made good inroads<br />
concerning community awareness and involvement in education. The<br />
training <strong>of</strong> School Management Teams (SMTs) and School Governing<br />
Bodies (SGBs) has gone a long way in improving the relationship between<br />
the schools and the parent community and in getting parents involved in the<br />
running <strong>of</strong> the schools. Consequently, Imbewu training has added value <strong>to</strong> the<br />
improved functioning <strong>of</strong> the schools. The school visited indicated that since<br />
participating in the Imbewu project, the school managers, teachers, parents<br />
have worked <strong>to</strong>gether <strong>to</strong> undertake the crafting <strong>of</strong> their vision development<br />
plans, and are confident that they now know where they are heading.<br />
3.3.10. Various fac<strong>to</strong>rs were identified by schools as barriers <strong>to</strong> the<br />
realization <strong>of</strong> their visions, including the dearth <strong>of</strong> basic educational resources<br />
such as LSMs, poor infrastructure such as classrooms, and high levels <strong>of</strong><br />
illiteracy within school communities.<br />
3.3.11. Further and more targeted training aimed at deepening levels <strong>of</strong><br />
understanding and the strengthening <strong>of</strong> the capacity <strong>of</strong> SMTs and SGBs <strong>to</strong> be<br />
able <strong>to</strong> run their schools effectively is critical and should be a key Imbewu<br />
focus area.<br />
3.3.12. His<strong>to</strong>rically, these two layers have been the most neglected when<br />
educational changes are introduced. International evidence suggests that<br />
strong leadership and governance (community involvement) are amongst the<br />
critical determining fac<strong>to</strong>rs for school effectiveness.<br />
3.3.13. The provision <strong>of</strong> basic educational resources is another key area<br />
where Imbewu will provide tangible support.<br />
3.3.14. The schools could be given these resources directly and not through<br />
department channels. Also, the establishment <strong>of</strong> ERCs which should be<br />
14
accessible <strong>to</strong> a cluster <strong>of</strong> schools, could be a cost effective way <strong>of</strong> going about<br />
dealing with this. They could also act as hubs for a whole range <strong>of</strong> activity<br />
such a pr<strong>of</strong>essional development initiatives, as well as provide the space for<br />
teachers from various schools <strong>to</strong> share resources, experiences and find ways<br />
<strong>of</strong> collaborating amongst each other.<br />
3.3.15. South African national curriculum initiatives are exciting, ambitious<br />
challenges, not just in terms <strong>of</strong> the redressing <strong>of</strong> social balance but also in<br />
educational terms, especially in the way they have addressed curriculum<br />
development as a coherent philosophical and sociological framework for the<br />
development <strong>of</strong> pedagogy. This rarely occurs in systems <strong>of</strong> developing<br />
education where most frequently the rhe<strong>to</strong>ric <strong>of</strong> ‘child centred’ and ‘joyful<br />
learning’ replaces the intellectual effort <strong>of</strong> situating the school practices in a<br />
proper context. As more schools become involved in the transformation<br />
process and whole school management initiatives gain ground and<br />
communities become involved with their children’s education, the seedbed for<br />
learning improvement becomes more viable.<br />
3.3.16. <strong>Report</strong>s and reflections on IMBEWU I indicate how important<br />
concentration on this area is going <strong>to</strong> be if the outputs <strong>of</strong> the programme are<br />
<strong>to</strong> go any way <strong>to</strong>wards their ultimate goal. There are many indications that<br />
insufficient training, confused agendas and time constraints have so far<br />
militated against learning improvement <strong>to</strong> any distinctive extent. It may be that<br />
both the project <strong>to</strong>ok <strong>to</strong>o wide a view <strong>of</strong> learning and need now <strong>to</strong> focus down<br />
on specific areas <strong>of</strong> classroom practice that will impact on the learners’<br />
achievements. This was clearly stated by a senior manager, ”the debate<br />
about the place <strong>of</strong> content in the curriculum needs <strong>to</strong> be reopened on the<br />
basis <strong>of</strong> the notion that ‘competence precedes commitment’. This access <strong>to</strong><br />
content knowledge will need <strong>to</strong> be integrated through workshops with<br />
appropriate facilitation and materials.<br />
3.3.17. Imbewu is clearly focused on issues related <strong>to</strong> poverty alleviation and<br />
the empowering <strong>of</strong> a previously dispossessed and uneducated population.<br />
His<strong>to</strong>rically, across the world, access <strong>to</strong> literacy has been the means by which<br />
the oppressed have liberated themselves and taken control <strong>of</strong> their own lives.<br />
Competence in literacy allows people <strong>to</strong> make choices, <strong>to</strong> solve problems and<br />
<strong>to</strong> be free from manipulation and bias. This fact is acknowledged in all the<br />
documents but the means <strong>of</strong> achieving it is not clearly spelled out. Without<br />
such clarity it will be difficult <strong>to</strong> plan effective interventions <strong>to</strong> bring about the<br />
required change in the learners.<br />
3.3.18. However, the improved access <strong>to</strong> schooling and the optimism <strong>of</strong><br />
policy makers is not matched by the local capacity <strong>to</strong> plan, train for and<br />
implement quality learning in the Early Years <strong>of</strong> education. The Foundation<br />
Years, particularly Grade 1 and 2 are the critical years for ensuring the<br />
poorest and neediest children are included in the education process. Yet in<br />
many schools these grades are placed in the largest classes, with the least<br />
experienced or qualified teachers, with few resources and little space in<br />
overcrowded classrooms for the active and participa<strong>to</strong>ry learning that is<br />
necessary as a foundation for the rest <strong>of</strong> their education. It is in Grade 1 and<br />
15
2 that they should learn <strong>to</strong> read and write, <strong>to</strong> problem solve and interact, <strong>to</strong><br />
become confident and independent learners. Concentrating resources and<br />
training on initial literacy provides the foundation for later learning. Such<br />
resources and training need <strong>to</strong> be based on practical and experiential learning<br />
by the educa<strong>to</strong>r so that they can confidently implement sound literacy learning<br />
in their classroom.<br />
3.3.19. Educa<strong>to</strong>rs are being moved, from rote learning, textbook based<br />
content and factual recall tests that have mainly been their practice <strong>to</strong> date.<br />
There remains still however a confused and empty ‘gap’ which is framed by<br />
the excellent intentions and sound theory <strong>of</strong> OBE but where actual learning<br />
and learning processes have not yet been addressed. In this gap the<br />
educa<strong>to</strong>rs flounder with poorly assimilated ideas <strong>of</strong> an ideal education – many<br />
<strong>of</strong> which require highly competent educa<strong>to</strong>rs, excellent resources and<br />
frequent classroom support and supervision. The acquisition <strong>of</strong> sound literacy<br />
can be framed by these methodologies but needs a clearly articulated<br />
learning continuum, clearly stated learning outcomes and an understanding <strong>of</strong><br />
the processes and strategies necessary for acquiring literacy. These very<br />
specific understandings need <strong>to</strong> be embedded in the school transformation<br />
process.<br />
3.3.20. The problem could be briefly summarized as; insufficient<br />
understanding <strong>of</strong> how children learn; insufficient understanding <strong>of</strong> the<br />
processes involved in learning <strong>to</strong> read and write; the need for educa<strong>to</strong>rs <strong>to</strong><br />
have a reper<strong>to</strong>ire <strong>of</strong> methodologies and classroom management strategies<br />
that relate <strong>to</strong> learning outcomes; the need <strong>to</strong> understand that starting where<br />
the learner is, using the previous experience <strong>of</strong> the learner and helping the<br />
learner <strong>to</strong> be independent and enquiring, requires careful planning, sequential<br />
and incremental learning and plenty <strong>of</strong> practice <strong>of</strong> reading and writing for real<br />
purposes.<br />
3.3.21. In order <strong>to</strong> achieve success in these areas carefully planned training,<br />
using the materials that will be used in the classroom, and delivered by<br />
trainers who have a good theoretical and practical understanding <strong>of</strong> literacy is<br />
necessary. Teachers further need <strong>to</strong> be helped <strong>to</strong>wards becoming reflective<br />
practitioners by involving them in the action research process focused on their<br />
own classrooms and learners and men<strong>to</strong>red and supported by trainers and<br />
supervisors who make regular classroom follow-up visits. The expenditure <strong>of</strong><br />
time and resources on achieving quality education in the early years, focused<br />
on literacy and numeracy pays <strong>of</strong>f later when learners develop the ability <strong>to</strong><br />
learn for themselves and learn faster and more efficiently because they are<br />
good readers and writers. It needs <strong>to</strong> be stressed that just the delivery <strong>of</strong> a<br />
short training and putting resources in the classroom will not result in<br />
improvement in learning quality.<br />
3.3.22. The 1500 schools initiative is the <strong>Department</strong>’s response <strong>to</strong> the fact<br />
it is lagging behind with regards <strong>to</strong> the implementation <strong>of</strong> the two major<br />
education pieces <strong>of</strong> legislation, the SASA (South African Schools Act) and the<br />
Norms and Standard for Funding. These two laws aim <strong>to</strong> achieve, among<br />
other things, the realization <strong>of</strong> self-managed schools. Part <strong>of</strong> the context <strong>of</strong><br />
16
these (sudden) developments is that in recent months some <strong>of</strong> the provincial<br />
education departments have been giving schools, en masse, a section 21<br />
status. The <strong>Department</strong> <strong>of</strong> <strong>Education</strong> in Mpumalanga, which recent declared<br />
all its schools as section 21 schools, is a case in point. The rationale or<br />
benefits <strong>of</strong> these sudden developments are not entirely clear.<br />
3.3.23. Schools on the other hand view this as the opportunity <strong>to</strong> have<br />
control <strong>of</strong> their own resources. They feel they will be able <strong>to</strong> undertake a wide<br />
range <strong>of</strong> projects and initiate activities that they would not otherwise be able <strong>to</strong><br />
do as section 20 schools. They also feel section 21 status epi<strong>to</strong>mizes growth<br />
on their part. Schools that haven’t been identified are unhappy about this<br />
because they feel they also deserve <strong>to</strong> enjoy the benefits <strong>of</strong> self-management.<br />
3.3.24. In Eastern Cape, as part <strong>of</strong> its endeavour <strong>to</strong> speed up the<br />
implementation <strong>of</strong> two above-mentioned laws, the department has identified<br />
1500 schools (plus the 750 project schools which were originally omitted by<br />
district <strong>of</strong>fices) for possible self-management. The same number <strong>of</strong> schools<br />
will be identified annually until all the 6500 school in the province become selfmanaging.<br />
They include all the secondary schools in the province and the<br />
project schools, and others, which have no intervention. The quintile ranking<br />
<strong>of</strong> these schools varies. It was suggested by many people interviewed that<br />
most <strong>of</strong> them fall within the quintile 1,2 and 3 ranking, namely the poorer and<br />
needy schools. There are even suggestions that 90% <strong>of</strong> the current tranche <strong>of</strong><br />
schools fall within this category or quintile. However, it is clear that there were<br />
not clear and systematic criteria used <strong>to</strong> identify the schools. Also the schools<br />
could not apply in their own right. They were simply <strong>to</strong>ld they are part <strong>of</strong> the<br />
1500 that the department had identified, and therefore needed <strong>to</strong> go through<br />
the motions <strong>of</strong> preparing <strong>to</strong> be declared section 21 schools. There is indeed<br />
clearly a need for a systematic and conscious focus on poorer schools in the<br />
future for this process <strong>to</strong> be strategic.<br />
3.3.25. In terms <strong>of</strong> the law the pre-requisite for the section 21 status is that<br />
the school should demonstrate its financial management capacity. The other,<br />
more pr<strong>of</strong>essional development related aspects that are embodied in the<br />
Imbewu school management model are seen as secondary or additional<br />
requirements. Actually, <strong>Department</strong>al <strong>of</strong>ficials described them as ‘add-ons’. All<br />
schools need <strong>to</strong> demonstrate is its school management capacity.<br />
3.3.26. In contrast, the Imbewu model is based on the assumption that the<br />
schools need <strong>to</strong> go through the programme first before they become selfmanaging<br />
schools. There is no doubt that the recent and sudden<br />
developments have overtaken the Imbewu model. Actually they have turned<br />
the model ‘up-side-down’. The <strong>Department</strong>’s expectation, as articulated by<br />
many senior <strong>of</strong>ficials interviewed, is that Imbewu should play a critical role in<br />
supporting the 1500 before and after their declaration. Some people even<br />
suggest that the 1500 schools are providing Imbewu with the vehicle <strong>to</strong><br />
achieve its objective <strong>of</strong> supporting poorer schools and that <strong>of</strong> going <strong>to</strong> scale.<br />
3.3.27. However, the other view is that this development will have a negative<br />
effect on the rollout <strong>of</strong> the Imbewu school transformation model, partly due <strong>to</strong><br />
17
the ‘rough and tumble’ manner in which it is managed. One <strong>of</strong> the key<br />
concerns is that the department does not have a clear plan <strong>of</strong> action in terms<br />
<strong>of</strong> how these schools are going <strong>to</strong> be supported, post declaration.<br />
3.3.28. The 1500 schools have apparently been going through typical once<strong>of</strong>f<br />
financial management training plus Imbewu’s vision crafting. Evidence<br />
seems <strong>to</strong> suggest that the rollout <strong>of</strong> the training was not closely moni<strong>to</strong>red or<br />
followed up. The schools are being evaluated, through use <strong>of</strong> an instrument,<br />
<strong>to</strong> assess whether or not they are ready <strong>to</strong> be declared section 21 schools.<br />
3.3.29. The <strong>Education</strong> <strong>Department</strong> appears confident that most if not all<br />
these schools will qualify <strong>to</strong> be declared section 21 schools. There is no<br />
evidence <strong>of</strong> a plan for schools that do not qualify. What is likely <strong>to</strong> happen is<br />
that the department will declare most schools and others will be give declared<br />
conditional section 21 status. This distinction would make very little difference<br />
post the declaration given that there is no plan <strong>to</strong> support the schools on an<br />
ongoing basis. The next pre-occupation will be the next 1500 schools that<br />
also need <strong>to</strong> be identified for this self-management.<br />
3.3.29. Imbewu’s response <strong>to</strong> this development is critical and closely<br />
watched. Its ability <strong>to</strong> respond positively <strong>to</strong> the expectations <strong>of</strong> the<br />
<strong>Department</strong> could be the test case for the integration <strong>of</strong> the programme.<br />
There are various possible scenarios. The preferred option for the <strong>Review</strong><br />
team is <strong>to</strong> run the transformation model along side self managing school<br />
initiative at a slower, more developmental pace.<br />
3.3.30. It is critical <strong>to</strong> note the sense <strong>of</strong> doubt, amongst some senior<br />
managers, about the success <strong>of</strong> this 1500 schools per year rollout plan <strong>of</strong> the<br />
<strong>Department</strong>. It is seen as a simply a legal exercise that is driven by political<br />
imperatives, and may not make any significant changes <strong>to</strong> the schools. In this<br />
context the Transformation model is key <strong>to</strong> bringing about systematic and<br />
fundamental change.<br />
3.3.31. The 1500 schools per year Section 21 initiative could impact<br />
negatively on Imbewu’s programme rollout. Some careful, realistic and<br />
collaborative planning has <strong>to</strong> take place around this matter. It is critical that<br />
this dialogue and planning starts soon. The options available <strong>to</strong> Imbewu are<br />
limited and may have serious implications about its integration in<strong>to</strong> the<br />
<strong>Department</strong>. It is also clear that Imbewu will have <strong>to</strong> support either some or all<br />
<strong>of</strong> these schools both before and after their declaration.<br />
Recommendations<br />
‣ That the roll out <strong>of</strong> the Transformation Model <strong>to</strong> schools is given<br />
<strong>to</strong>p priority in terms <strong>of</strong> resources and attention during the next<br />
year <strong>of</strong> the programme with an emphasis also in providing<br />
resources <strong>to</strong> schools but that this should happen at a slower pace<br />
and in parallel <strong>to</strong> plans <strong>to</strong> give section 21 status <strong>to</strong> schools, with<br />
the criteria for selection <strong>of</strong> Imbewu schools being more<br />
transparent and addressing the poorest schools first.<br />
18
‣ That the teacher development strategy and the roll out <strong>of</strong> training<br />
<strong>to</strong> teachers give attention <strong>to</strong> the need <strong>to</strong> focus more on how<br />
children learn and on the learning processes. ( see Annex Four)<br />
<strong>Output</strong> four - Asset Management , Infrastructure development,<br />
3.4.1.There has been very positive progress in relation <strong>to</strong> <strong>Output</strong> four. The<br />
relevant direc<strong>to</strong>rate are confident that they have a clear plan ”and know<br />
where they are going “with their Strategy for asset management and<br />
Infrastructure development. This is fully laid out in the consultants report<br />
“Community-Centred Cost Effective, Environment Friendly Approaches <strong>to</strong><br />
infrastructure which Creates High Quality learning Environments,” and is not<br />
repeated here.<br />
3.4.2. The success <strong>of</strong> the strategy has been built in <strong>to</strong> the Direc<strong>to</strong>rates own<br />
performance agreements. The Imbewu intervention has already been subject<br />
<strong>to</strong> wide consultation and will impact upon the whole infrastructure system for<br />
the <strong>Education</strong> <strong>Department</strong>.( It may well have influence on housing etc. )<br />
Discussions are underway not only with Public Works and the National<br />
Business Initiative but with a range <strong>of</strong> service providers who will be<br />
undertaking the resource mapping and skills audit which is an essential part<br />
<strong>of</strong> the design cycle.<br />
3.4.3. A key fac<strong>to</strong>r which should have an influential role on planning in other<br />
direc<strong>to</strong>rates, is the way that this Direc<strong>to</strong>rate is using key EMIS data and<br />
already have a significant amount <strong>of</strong> information concerning schools and their<br />
localities which is now being grown and elaborated and will be available <strong>to</strong><br />
other direc<strong>to</strong>rates <strong>to</strong> inform more integrated planning.<br />
3.4.4. The additional information generated will be added <strong>to</strong> the GIS platform<br />
developed by Africon, which will allow for accurate physical planning in the<br />
eight identified geophysical climate areas <strong>of</strong> the province. It is the intention <strong>of</strong><br />
the department <strong>to</strong> involve other departments ( economic and labour) as the<br />
results <strong>of</strong> this mapping process and the related skills audit will provide the<br />
basis for small scale economic opportunities.( brick building etc).<br />
Recommendation<br />
The <strong>Review</strong> team fully endorse the priority that is being given <strong>to</strong><br />
expedite, following completion <strong>of</strong> the planning and design cycle, the<br />
building <strong>of</strong> the eight pro<strong>to</strong>type constructions, as soon as practicable.<br />
3.5. <strong>Output</strong> five- community mobilisation<br />
:<br />
3.5.1. This <strong>Output</strong> should ideally reflect the <strong>Department</strong> <strong>of</strong> <strong>Education</strong>’s<br />
integration <strong>of</strong> delivery <strong>to</strong> the community with the Social Needs Cluster<br />
partners, ensuring a systemic approach from community ownership and<br />
access <strong>to</strong> resources through <strong>to</strong> effective “one s<strong>to</strong>p” centres at the district level<br />
19
and joint planning for social needs and poverty targeting from the Provincial<br />
level. The current plan is for this <strong>to</strong> happen in ten <strong>of</strong> the districts where the<br />
infrastructure <strong>to</strong> do so exists ( former Colleges <strong>of</strong> education). However this is<br />
a major challenge elsewhere, especially in six districts where infrastructure is<br />
non existent.<br />
3.5.2. There is in existence a somewhat unrealistic plan <strong>to</strong> build one s<strong>to</strong>p<br />
centres in the remaining fourteen districts at the cost <strong>of</strong> R 50million each .<br />
<strong>Education</strong>alists are cynical about this ever happening and anxious <strong>to</strong> find<br />
solutions now, rather than wait up <strong>to</strong> ten years for the plan <strong>to</strong> materialise,<br />
given the pressure the <strong>Department</strong> is under <strong>to</strong> improve service delivery,<br />
especially in the rural areas<br />
3.5.3. Imbewu has plans for a pilot community development scheme in 30<br />
schools which will test a wider development model than the orthodox school<br />
transformation model but this is yet <strong>to</strong> start. Schools have been identified and<br />
this may well provide convergence with similar plans being conceptualised by<br />
the Nelson Mandela Foundation, with a proposed Centre for Rural Schools at<br />
Fort Hare <strong>to</strong> act as a resource support. This development envisages far wider<br />
community mobilisation than the empowerment <strong>of</strong> School Governing Bodies<br />
(SGBs) around schools and should involve much more integrated planning<br />
than is so far visible at the provincial or district level, centre in the community<br />
around schools. This proposal will develop and implement school HIV/Aids<br />
Strategies, take responsibility for the school feeding programme, develop<br />
support systems for orphans and vulnerable children and start some<br />
economic activities within communities.<br />
3.5.4. The <strong>Review</strong> team thought this was a vital development which should<br />
influence how schools transform them selves in<strong>to</strong> hubs for the social cluster.<br />
Next years OPR should take a close look at how this pilot develops.<br />
3.5.5. Although there is clear government commitment in Eastern Cape <strong>to</strong><br />
poverty eradication, ( see Premier’s speech <strong>to</strong> the Legislature etc) Neither the<br />
Province nor the <strong>Education</strong> <strong>Department</strong> appear <strong>to</strong> have yet a Poverty<br />
Targeting Strategy. Provincially this is being developed through work in<br />
progress on the Provincial Growth and Development Plan with the assistance<br />
<strong>of</strong> ECCSEC and the RDP Standing Committee work on developing a Poverty<br />
Index. It is anticipated that these processes will further inform the targeting <strong>of</strong><br />
poverty over and above the previously selected 4 Integrated Sustainable<br />
Rural Development Strategy (ISRDS) rural nodes in the Eastern<br />
municipalities. Key issues that are arising are the social protection strategy <strong>of</strong><br />
targeting poor households with child support grants, maintenance grants for<br />
orphans, pensions and food parcels complimented with agricultural livelihoods<br />
projects. These are all issues that genuine community schools would want <strong>to</strong><br />
take an interest in. Unfortunately the schools pilot will not directly benefit from<br />
integrating their planning with the economic growth strategy as they have<br />
different time frames. It will be important however <strong>to</strong> keep communications<br />
lines open <strong>to</strong> see how the two activities can influence each other.<br />
20
3.5.6. The Community – School Pilot Project is currently being designed and<br />
is intended <strong>to</strong> be implemented during 2003. The pilot is designed from the<br />
level <strong>of</strong> needs identified at the community level. This provides the opportunity<br />
however <strong>to</strong> demonstrate the linkages from micro through meso <strong>to</strong> macro level<br />
planning, integration and delivery. This will be a challenge <strong>to</strong> all line<br />
departments.<br />
3.5.7. It will be important <strong>to</strong> target the right level and interest <strong>of</strong> staff <strong>to</strong><br />
participate and <strong>to</strong> integrate planning . One suggestions is that there could be<br />
a design advisory group <strong>to</strong> include the involvement <strong>of</strong> Social Needs Cluster<br />
partners and Economic Development and Agriculture <strong>Department</strong>, NGOs . It<br />
could also be beneficial <strong>to</strong> formalise linkage with a Tertiary Institution and <strong>to</strong><br />
explore the possibility <strong>of</strong> the pilot being a ‘Service Level Agreement’ type<br />
programme so that integration is built in from the outset.<br />
3.5.8. This community pilot programme, like all others in the <strong>Department</strong><br />
(selection <strong>of</strong> schools for introduction <strong>of</strong> Grade R), claim <strong>to</strong> use poverty<br />
targeting as a key criteria for selection. However, the application and design<br />
<strong>of</strong> criteria is inconsistent, there is no framework for poverty indica<strong>to</strong>rs across<br />
the department, and no moni<strong>to</strong>ring and evaluation framework that reveals and<br />
assesses the assumptions behind the poverty targeting.<br />
3.5.9. The EMIS system analyses poverty using 6 indica<strong>to</strong>rs, including social<br />
dependence indica<strong>to</strong>rs which enable poverty analysis and targeting. It would<br />
be important <strong>to</strong> ensure that the indica<strong>to</strong>rs and data collection enable an<br />
analysis <strong>of</strong> the impact <strong>of</strong> the social grants on children and the correlation <strong>to</strong><br />
attendance and performance. This will also need <strong>to</strong> be linked <strong>to</strong> the School<br />
Nutrition programme, as when the <strong>Education</strong> takes the scheme over from the<br />
<strong>Department</strong> <strong>of</strong> Health it will not inherit a database, as there is no collated<br />
information, post 2000.<br />
3.5.10. The EMIS information is disaggregated according <strong>to</strong> gender and there<br />
is a significant trend <strong>of</strong> higher dropout <strong>of</strong> girls than boys at all age groups, this<br />
requires some careful analysis <strong>to</strong> understand the causes.<br />
3.5.11. The proposed Policy Planning and Research Unit will be tasked with<br />
issues like: investigating the implications <strong>of</strong> the PGDP for the <strong>Department</strong>; <strong>to</strong><br />
assess the trends identified in the EMIS data and <strong>to</strong> create systems in the<br />
department for informing poverty targeting.<br />
3.5.12. The Team concluded that Social development issues are best located<br />
within the Social Needs Cluster. The clusters are the strategy used by<br />
government <strong>to</strong> enable planning and linkages across departments with a view<br />
<strong>to</strong> integrating delivery. All departments are expected <strong>to</strong> work <strong>to</strong>gether in<br />
clusters planning structures and processes and <strong>to</strong> implement social<br />
programmes agreed <strong>to</strong>, through service level agreements.<br />
3.5.13. The Social Cluster programmes include: HIV/AIDS, Poverty<br />
Eradication (includes the School Nutrition Programme), District Development,<br />
Victim Empowerment, and Social Infrastructure. The <strong>Department</strong> addresses<br />
21
each <strong>of</strong> these programmes and plans range from detailed business plans with<br />
budgets eg HIV/AIDS and District Development <strong>to</strong> minimal engagement.<br />
3.5.14. As has already been mentioned, The <strong>Education</strong> <strong>Department</strong>’s<br />
participation in the cluster planning and implementation processes are<br />
reportedly limited and inconsistent and vary from implementation plans<br />
complying with the agreed provincial strategy eg. the current need for the<br />
department <strong>to</strong> take over the school nutrition scheme from Health; no inputs<br />
eg. development <strong>of</strong> the frameworks for the ‘HIV/AIDS Workplace programme’,<br />
<strong>to</strong> non compliance or developing a different strategy or response because <strong>of</strong><br />
access <strong>to</strong> resources outside <strong>of</strong> provincial allocations eg. District Development<br />
plan, especially in relation <strong>to</strong> infrastructure roll out.<br />
3.5.15. The <strong>Department</strong> is aware <strong>of</strong> its roles and responsibilities and has<br />
appointed a Chief Direc<strong>to</strong>r <strong>to</strong> be responsible for participation in cluster<br />
activities and staff are appointed at different levels <strong>of</strong> cluster planning,<br />
however current staff shortage results in inconsistent participation.<br />
3.5.16. The Provincial Growth and Development Plan (PGDP) process is<br />
underway and there is a Social Needs sub-group that is undertaking a Social<br />
Needs assessment, funded by UNDP and DFID. Among other things it will<br />
inform the setting <strong>of</strong> priorities and strategies for social protection strategies<br />
including social grants and stimulating local economy. The <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong> <strong>to</strong>gether with other social cluster departments, NGOs(civil society)<br />
and business, is required <strong>to</strong> participate, <strong>to</strong> inform the process. In turn, the plan<br />
will inform the <strong>Department</strong>’s plans. The <strong>Department</strong> is reportedly not<br />
participating fully in the reference group. The outcome will require an<br />
engagement on issues <strong>of</strong> joint planning for targeting <strong>of</strong> the poorest<br />
communities, implications for infrastructure, health and other economic<br />
strategies and service level agreements.<br />
3.5.17. The Social Needs Cluster departments will, by the end <strong>of</strong> March, have<br />
developed an integrated plan for the role out <strong>of</strong> the provincial HIV/AIDS<br />
strategy. The development <strong>of</strong> integrated HIV/AIDS programmes plans has<br />
been slow, however the process is now receiving strong political backing in<br />
the province.<br />
3.5.18. Currently the Senior Management Team (SMT) has an appointed<br />
arepresentative <strong>to</strong> represent them in the Social Cluster, however it needs <strong>to</strong><br />
take a proactive leadership role. This would require the development <strong>of</strong> a<br />
framework and strategy for its participation in the Cluster processes, <strong>to</strong>gether<br />
with systems for integration and adaptation <strong>of</strong> plans and budgets.<br />
Representation <strong>of</strong> key Social Cluster members and the IPSP on the Imbewu<br />
PSC would enable synergy between the departmental planning priorities and<br />
the provincial cluster agendas.<br />
3.5.19.. Somehow The <strong>Department</strong> will need <strong>to</strong> be supported ( By the JMT?)<br />
<strong>to</strong> ensure it has staff capacity at the management level <strong>to</strong> provide the<br />
leadership for both engagement in planning at the Provincial level and <strong>to</strong><br />
inform and adjust <strong>Education</strong> <strong>Department</strong> plans <strong>to</strong> ensure full cooperation and<br />
22
participation. If this requires providing capacity at other levels <strong>to</strong> release a<br />
senior manager <strong>to</strong> take these responsibilities on, this should be considered.<br />
3.5.20. Social issues and programmes in the <strong>Department</strong> are located in<br />
different direc<strong>to</strong>rates according <strong>to</strong> areas <strong>of</strong> responsibility and accountability.<br />
The Social Programmes Unit focuses on the cross cutting issues located in<br />
the DGs <strong>of</strong>fice viz HIV/AIDS, disability, gender and equity and is responsible<br />
for the oversight <strong>of</strong> the social transformation agenda in the department. No<br />
detailed information was made available <strong>to</strong> the <strong>Review</strong> team, therefore there<br />
are gaps in information on equity and disability targeting, integration <strong>of</strong> the<br />
HIV/AIDS planning facilitated by HEARD.<br />
3.5.21. The unit is responsible for the oversight <strong>of</strong> the implementation <strong>of</strong> the<br />
DPSA Workplace programme. A strategic plan for role out <strong>of</strong> the HIV/AIDS<br />
Workplace programme is being developed in conjunction with HEARD.<br />
It was noted by the <strong>Review</strong> team that individual staff members in the District<br />
Offices, when asked, were not aware <strong>of</strong> any programme for themselves as<br />
employees. This is a serious indictment, given the growing number <strong>of</strong> deaths<br />
and illness in the <strong>Department</strong>.<br />
3.5.22. The Special Needs <strong>Department</strong> has run two successful ‘Inclusive<br />
<strong>Education</strong>’ pilot projects funded by national and the Danish Government.<br />
Both have been completed and the department is meant <strong>to</strong> implement White<br />
Paper 6. The framework, strategy, business plan for the integration <strong>of</strong><br />
Inclusive <strong>Education</strong>, drawing on the lessons from the pilot, needs <strong>to</strong> take<br />
place.<br />
3.5.23. The process <strong>of</strong> planning and designing for this is a requirement for<br />
the <strong>Department</strong> and it would be an appropriate use <strong>of</strong> Imbewu funding <strong>to</strong><br />
support the development <strong>of</strong> the strategy and medium <strong>to</strong> long term plans.<br />
3.5.24. The <strong>Education</strong> <strong>Department</strong> is due <strong>to</strong> take over responsibility for the<br />
programme in 2004 and has set up joint planning process with the<br />
<strong>Department</strong> <strong>of</strong> Health during 2003. The management <strong>of</strong> the scheme is<br />
targeted at SGBs which will require a major training roll-out.<br />
3.5.25. Given the importance <strong>of</strong> this programme in targeting poverty, the<br />
structuring <strong>of</strong> the programme, the training <strong>of</strong> SGBs and planning for takeover<br />
during 2003, should be a high, immediate priority for Imbewu support.<br />
3.5.26. The Life Orientation programme for Schools is essential for the<br />
reduction <strong>of</strong> HIV /Aids. This programme has a detailed plan for 2003 with<br />
budget. The main concern and need is competence and capacity <strong>of</strong> the<br />
District Offices <strong>to</strong> implement the programme.<br />
3.5.27. It is recommended that Imbewu can play a key role here in<br />
providing support, utilising experience in rollout <strong>of</strong> programmes in the<br />
department and ensuring that the plan is synchronised and integrated in<strong>to</strong> the<br />
EDO training and the Vision Crafting training and manuals.<br />
23
3.5.28. There are 3 programmes in Early Childhood Development (ECD).<br />
There are 3 Chief <strong>Education</strong> Specialists in the Provincial Office and an ECD<br />
coordina<strong>to</strong>r in every district with an anticipated 2 First <strong>Education</strong> Specialist <strong>to</strong><br />
be appointed in each district, in the future. The programmes are:The<br />
Conditional Grant support <strong>to</strong> 825 Community Based Centres in informal<br />
settlements in the poverty nodal points - Motherwell, Mdantsane and<br />
Lusikisiki due <strong>to</strong> be taken over by the department in March 2004.<br />
3.5.29. The Grade R attachment <strong>to</strong> schools 475 selected in 2002 and 500 in<br />
2003, (delivery <strong>to</strong> be comprehensive by 2010). The training has been put out<br />
<strong>to</strong> tender. (Note: The <strong>Department</strong>al budget will not cover the package:<br />
subsidy for practitioners, learner nutrition, practitioner training, site<br />
management training (parent committees), furniture, learner packs.)<br />
3.5.30. The 0-5 National Skills pilot is intended <strong>to</strong> be implemented as a<br />
Social Needs Cluster ‘Service Level Agreement’ programme intended <strong>to</strong><br />
involve Health, Public Works, Water Affairs, Social Development and<br />
<strong>Education</strong>. The pilot <strong>of</strong> the National Skills Fund training will be in Qumbu for<br />
20 learnerships.<br />
3.5.31. It would be helpful if Imbewu their training modules with the ECD<br />
training modules in terms <strong>of</strong> additional modules and integration in<strong>to</strong> the Vision<br />
Crafting and SGB training. (Note the tender has already gone out for the<br />
Grade R training and therefore assessment <strong>of</strong> the need and level <strong>of</strong><br />
integration required is urgent.)<br />
3.5.32. Imbewu’s Vision Crafting is the key <strong>to</strong> community involvement. All<br />
Imbewu 1 schools that went through the Vision Crafting process have<br />
achieved active community involvement and ownership <strong>of</strong> the school. This<br />
ownership is being affirmed by the department, by inviting the schools <strong>to</strong><br />
apply for Self Governing Section 21 status. To deepen and strengthen the<br />
SGBs through this process, will take an estimated two years. However The<br />
budgeting and planning for this process is not in place and should be<br />
structured and built in<strong>to</strong> the forward plan.<br />
3.5.33. The Adult Basic <strong>Education</strong> and Training (ABET) department have<br />
limited capacity <strong>to</strong> support the progression <strong>of</strong> the UNISA ABET level 1<br />
programme which is reaching 40 000 learners in the Eastern Cape. The<br />
ABET departmental team have not facilitated the process, however educa<strong>to</strong>rs<br />
and EDOs at the District level have provided training support. The UNISA<br />
/SANLI ABET programme was not designed <strong>to</strong> move beyond Level One. It<br />
was envisaged that Provincial departments would take learners through ABET<br />
level Two- level Four. To date Provincial <strong>Department</strong>s have shrunk ABET<br />
budgets throughout South Africa in favour <strong>of</strong> schools. The <strong>Department</strong> needs<br />
<strong>to</strong> be aware <strong>of</strong> the extent <strong>of</strong> the ground swell <strong>of</strong> demand which will inevitably<br />
come from those 40,000 adult learners currently completing Level One.<br />
3.5.34. Currently only a limited numbers <strong>of</strong> ABET classes are in Schools;<br />
they are making do in all kinds <strong>of</strong> premises. One problem is schools<br />
requesting payment for use <strong>of</strong> the school premises. If schools genuinely<br />
24
want <strong>to</strong> develop as community resources this policy will need revisiting. The<br />
<strong>Department</strong> could take the lead on this..<br />
Recommendation<br />
That the <strong>Department</strong> make every effort at all levels in the system <strong>to</strong><br />
engage in social cluster activities and planning and that in this context<br />
Imbewu focus on assisting the integrated planning and implementation<br />
<strong>of</strong> school based HIV/Aids strategies and the SGB/community run<br />
feeding programme<br />
4. The Impact <strong>of</strong> technical assistance on the Imbewu Programme<br />
4.1.The Imbewu programme was designed <strong>to</strong> build capacity. One <strong>of</strong> the<br />
techniques <strong>to</strong> be used <strong>to</strong> achieve this was through a technical assistance<br />
strategy. Due in part <strong>to</strong> design but also <strong>to</strong> increased demand for assistance <strong>to</strong><br />
assist with staff shortages and lack <strong>of</strong> capacity technical assistance is being<br />
used assist the key direc<strong>to</strong>rates.<br />
4.2. The need for TAs is first identified by direc<strong>to</strong>rates who then approach<br />
Arcadis, <strong>to</strong> assist with TORS, advertisements and recruitment. Individual<br />
<strong>Department</strong> representatives are involved in short-listing candidates,<br />
interviewing and selecting the suitable candidates. Arcadis is responsible for<br />
contracting. TAs are where possible matched with relevant counterparts. The<br />
net effect <strong>of</strong> current policy for recruitment is that TAs are predominantly white<br />
and male. There are few TAs from other groups, particularly the previously<br />
disadvantaged groups. The response <strong>to</strong> adverts is very small and largely from<br />
white TAs. This may be more perception than fact, but it is still an important<br />
issue when trying <strong>to</strong> integrate a programme like Imbewu in<strong>to</strong> the culture <strong>of</strong> the<br />
Eastern cape.<br />
4.3. Fac<strong>to</strong>rs which appear <strong>to</strong> have contributed <strong>to</strong> poor response or<br />
recruitment <strong>of</strong> non-white TAs seem <strong>to</strong> include; the short-term nature <strong>of</strong><br />
contracts,the lack <strong>of</strong> relevant expertise in province and local HEI, previous<br />
experiences (possibly negative) within the <strong>Department</strong>..<br />
4.4 . However it is felt by the <strong>Review</strong> team that there needs <strong>to</strong> be a more<br />
holistic recruitment strategy which makes a conscious effort <strong>to</strong> create<br />
opportunities for a more diverse range <strong>of</strong> people <strong>to</strong> be brought in<strong>to</strong> the<br />
programme. Other possibilities which act as constraints may be; specifications<br />
on adverts which act as a deterrent by raising barriers/requirements <strong>of</strong> entry.<br />
It is suggested that Imbewu needs a more “nuanced” policy on<br />
Technicalassistance.<br />
4.5. It is also clear that Direc<strong>to</strong>rates’ focus on urgent delivery and solutions<br />
as opposed <strong>to</strong> long-term and ‘big picture’ goal <strong>of</strong> developing provincial<br />
capacity<br />
25
Recommendation<br />
Continue the development <strong>of</strong> a TA strategy for Imbewu but ensure it<br />
includes an affirmative action policy that actively seek <strong>to</strong> ensure<br />
gender and racial diversity .<br />
5. Relationship with other programmes<br />
5.1. There are a number <strong>of</strong> much smaller, somewhat similar, education<br />
projects in Eastern Cape, funded by other donors and there have been efforts<br />
by the <strong>Department</strong> <strong>to</strong> coordinate them.<br />
5.2. Ikhwezi is funded by the Swiss and managed by Media in <strong>Education</strong><br />
Trust (MIET) . This is located in Kokstad and Lusikisiki. Isithole is funded by<br />
USAID ( due <strong>to</strong> end December 2003) and operates through a variety <strong>of</strong><br />
service providers mainly in the Queens<strong>to</strong>wn area. The Quality learning project<br />
(QLP) is funded by the National Business Trust and managed by the Joint<br />
education Trust (JET) This promotes a transformation model in 85 targetted<br />
Secondary schools.Phakama is based in the Umtata area and implemented<br />
by Link Community Development.(LCD)<br />
5.3 . Coordination <strong>of</strong> these projects is managed by the District Development<br />
Direc<strong>to</strong>rate. There is a Project Coordination Committee/Forum which acts as<br />
a forum for donors, service providers, managing agents and representatives<br />
from the department <strong>to</strong> share ideas. The MEC, Head <strong>of</strong> <strong>Department</strong> and two<br />
direc<strong>to</strong>r generals attend the meeting. The PCF meets once per quarter. The<br />
purpose <strong>of</strong> the Forum is <strong>to</strong> allow partners <strong>to</strong> share information, ideas, and<br />
modules. The <strong>Department</strong> is also able <strong>to</strong> coordinate ongoing activities in order<br />
<strong>to</strong> avoid duplication and waste <strong>of</strong> resources. The Forum has been successful<br />
in terms <strong>of</strong> information sharing, guidance and coordination. However, <strong>to</strong>o<br />
much time is spent on reporting past activity. Very little time is dedicated<br />
<strong>to</strong>wards strengthening cooperation or coordination <strong>of</strong> activities.<br />
5.4. The timing and phasing <strong>of</strong> projects or programmes in the province is a<br />
major contributing fac<strong>to</strong>r <strong>to</strong>wards the lack <strong>of</strong> coordination among projects. Not<br />
all projects are introduced at the same time. As such, projects are at different<br />
phases <strong>of</strong> development. For example, Ikhwezi will be phased out at the end<br />
<strong>of</strong> 2004. The Imbewu 2 programme has just been introduced and will<br />
continue for the next seven years. It is thus challenging for various projects <strong>to</strong><br />
coordinate their activities and align their programmes with the department’s<br />
newly adopted school transformation model.<br />
5.5. The <strong>Department</strong> held a Stakeholders/Service Provider conference: (July<br />
2002) Building partnerships for <strong>Education</strong> tTansformation. The purpose <strong>of</strong> this<br />
conference was <strong>to</strong> allow the <strong>Department</strong> <strong>to</strong> provide its strategy and approach<br />
<strong>to</strong> partners and allow for sharing <strong>of</strong> ideas. A database <strong>of</strong> all service providers<br />
was developed.<br />
26
5.7. The fact that Sida wants <strong>to</strong> start a new programme in the Eastern Cape<br />
<strong>of</strong>fers an opportunity <strong>to</strong> bring a new donor in<strong>to</strong> co-operation around the<br />
<strong>Department</strong> Strategic plan in collaboration with Imbewu.<br />
5.8. The project which has worked most closely with Imbewu is Ikhwezi.<br />
Ikhwezi focuses on supporting primary schools in four districts. The focus is<br />
on schools and not the districts. By the end <strong>of</strong> 2004, Ikhwezi would have<br />
reached 180 schools. Ikhwezi’s understanding is that Imbewu will incorporate<br />
district training in its school transformation model. The district training will<br />
overlap with the school based training in the districts serviced by Ikhwezi.<br />
Their concern is that Imbewu has not started providing training at district level.<br />
5.9. Ikhwezi uses the Imbewu module for school training. Ikhwezi also<br />
contracts the same service provider <strong>to</strong> provide training for Imbewu.. Ikhwezi<br />
has adapted the Imbewu modules by providing additional supplementary<br />
materials <strong>to</strong> schools. Ikhwezi personnel feel that the Imbewu modules are<br />
inadequate in terms <strong>of</strong> guiding teachers about how <strong>to</strong> implement ideas in the<br />
classrooms and lacked exemplars. They provide supplementary materials<br />
provided include readers, newspaper supplements. Ikhwezi also claims <strong>to</strong><br />
provide 3 support visits per month and the Imbewu model only provides one<br />
support visit per year.<br />
5.10. Ikhwezi planning meetings with districts for 2003 have been postponed<br />
due <strong>to</strong> confusion around the 1500 schools. Ikhwezi was informed by district<br />
coordina<strong>to</strong>rs that all the Ikhwezi schools will fall under Imbewu as <strong>of</strong> 2003<br />
(under the new Section 21 schools). The District Development Direc<strong>to</strong>rate had<br />
no knowledge <strong>of</strong> such information while district coordina<strong>to</strong>rs insist that Ikhwezi<br />
schools will fall under Imbewu. So there is clearly a specific policy and<br />
communications challenge <strong>to</strong> be resolved here.<br />
5.11. the DFID funded Open Systems <strong>Education</strong> Trust (OLSET) works in<br />
certain districts in the Eastern Cape <strong>to</strong> develop educa<strong>to</strong>r capacity through<br />
radio, but is not yet integrated in<strong>to</strong> Imbewu programme. There were attempts<br />
by the TA in the curriculum direc<strong>to</strong>rate <strong>to</strong> incorporate OLSET in<strong>to</strong> the<br />
Curriculum Development Strategy. Discussions were held with OLSET which<br />
gave input in<strong>to</strong> the distance education strategy but the outcome was not<br />
conclusive.<br />
5.12.It has not been possible for the <strong>Review</strong> Team <strong>to</strong> ascertain the state <strong>of</strong><br />
the ABET strategy in Eastern Cape. The ABET direc<strong>to</strong>rate has not appeared<br />
<strong>to</strong> collaborate or coordinate with the SANLI partnership with UNISA/ABET<br />
which has 40,000 learners in the province, despite several overtures from<br />
Unisa. However there is co-operation at the district and sub district level and<br />
the UNISA/ABET facilita<strong>to</strong>rs have agreed <strong>to</strong> participate in generating the<br />
Imbewu Evaluation Framework.<br />
5.13. There is clearly a pressing need for more dialogue, clear communication<br />
pathways and coordination around the education development partner<br />
activities and this is a critical issue as another donor Sida, comes in<strong>to</strong> the<br />
arena.<br />
27
5.14. The other major DFID funded initiative in Eastern Cape is the Integrated<br />
Provincial Support Programme.(IPSP) There appears <strong>to</strong> be no way yet where<br />
their agendas and activities converge meaning full<br />
5.15. IPSP meets with Imbewu through the donor-initiated breakfast meetings<br />
where different donor representatives discuss their projects and explore<br />
possibilities <strong>of</strong> collaboration.<br />
5.16. SIPU: the Swedish Institute for Public Administration has collaborated<br />
with IPSP and was provided funding by IPSP for TAs in the Getting the<br />
Record Straight project. The collaboration was successful. The only<br />
constraining fac<strong>to</strong>r was the reporting requirements given by IPSP <strong>to</strong> SIPU.<br />
SIPU conveyed the fact they found the report requirements as time<br />
consuming, complicated and rigid.<br />
5.17. The <strong>Review</strong> team felt that it was a matter for DFID Southern Africa <strong>to</strong><br />
explore possibilities <strong>of</strong> fast tracking better collaboration <strong>of</strong> DFID funded<br />
projects in the Eastern Cape. The appointment <strong>of</strong> the local DFID<br />
representative in the Eastern Cape will assist but there needs <strong>to</strong> be more<br />
clarity about an integration strategy which would work at a systemic and<br />
fundamental level.<br />
6. Programme management issues<br />
6.1. Given the fractured and volatile context in which the Managing<br />
Consultants have been working since the start <strong>of</strong> the programme in January<br />
2002, the general impression <strong>of</strong> the <strong>Review</strong> team is that programme<br />
management has been sound and effective.<br />
6.2. The Managing Consultants, Arcadis BMB, who commenced work in<br />
January 2002, have performed their duties satisfac<strong>to</strong>rily and in accordance<br />
with their terms <strong>of</strong> reference. Financial and progress reports have been<br />
provided <strong>to</strong> both the PSC and <strong>to</strong> DFID in accordance with requirements. The<br />
secondment <strong>of</strong> two departmental members <strong>of</strong> staff <strong>to</strong> the Imbewu programme<br />
<strong>of</strong>fice has enhanced the overall management and implementation <strong>of</strong> the<br />
programme.<br />
6.3.Programme management arrangements are set out in the Imbewu Project<br />
Memorandum and outlined further, in more detail, in a Programme<br />
Management Manual (PMM). A Project Steering Committee (PSC), that<br />
meets on a monthly basis, is in place. Formal appointment <strong>of</strong> departmental<br />
members <strong>of</strong> the PSC is yet <strong>to</strong> be made.<br />
Action required: letters <strong>of</strong> appointment be issued by the end <strong>of</strong> the first<br />
quarter <strong>of</strong> the year ahead.<br />
6.4. It was formally agreed in the Project Memorandum that programme<br />
management arrangements would include the formation <strong>of</strong> an Executive<br />
28
Management Committee and an Advisory Board. These two structures are<br />
yet <strong>to</strong> be formed.<br />
Recommendation<br />
That plans for formation <strong>of</strong> the Advisory Board and the Executive<br />
Management Committee be included in the activity plans for coming<br />
project year.<br />
6.5. The Imbewu extranet <strong>of</strong>fers a highly effective information sharing<br />
platform for planning and coordination. This was demonstrated by its recent<br />
use in providing briefing and documentation for the <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong><br />
<strong>Review</strong>. The extranet should continue <strong>to</strong> be used for information sharing and<br />
planning and coordination and general documentation <strong>of</strong> key programme and<br />
other documentation. It should also provide a source <strong>of</strong> information for all<br />
stakeholder, regarding the progress on work in progress such as the<br />
evaluation framework.<br />
6.6. Guidelines and principles for procurement <strong>of</strong> both goods and services<br />
have been agreed by the programme partners and are being implemented by<br />
the Managing Consultants satisfac<strong>to</strong>rily. These are outlined in the PMM.<br />
6.7. The Programme Management Manual (PMM) sets out principles,<br />
systems, procedures for managing the programme. It also includes roles and<br />
responsibilities <strong>of</strong> structures and individuals. It will be important that the PMM<br />
is formally owned by the PSC and other managers and disseminated as<br />
necessary. The PMM is however still in draft and has not been formally<br />
endorsed and agreed by the partnership. The <strong>Review</strong> recommends that the<br />
PMM be formally approved at the next PSC meeting whilst recognizing that<br />
the PMM be seen as a living document. Refinements and amendments <strong>to</strong> the<br />
PMM will be made as necessary over the duration <strong>of</strong> the programme and<br />
agreed by the PSC.<br />
6.8. The following specific additions and inclusions <strong>to</strong> the PMM are proposed:<br />
Clarify further parameters and any necessary exceptions and/or eligibility<br />
regarding access <strong>to</strong> Imbewu funds; Include DFID financial reporting<br />
arrangements; Agree and include auditing arrangements;Include progress<br />
reporting arrangements <strong>to</strong> PSC and <strong>to</strong> DFID; A statement needs <strong>to</strong> be<br />
included on affirmative action policy and promoting access by previously<br />
disadvantaged individuals and black owned companies <strong>to</strong> contracts,<br />
consultancies and outsourcing opportunities provided through the programme.<br />
6.9. It is also proposed that a summarized, more accessible version <strong>of</strong> the<br />
PMM be prepared for dissemination <strong>to</strong> all key stakeholders.<br />
6.10. In terms <strong>of</strong> moni<strong>to</strong>ring and reporting, the financial information on<br />
expenditure and disbursements is flexible and detailed allowing extremely<br />
accurate reporting that suits programme requirements. The first audit <strong>of</strong><br />
programme funds is now due.<br />
29
6.11. the <strong>Review</strong> team felt that the application <strong>of</strong> the Imbewu programme<br />
resources need <strong>to</strong> be brought closer <strong>to</strong> planning decisions around the<br />
application <strong>of</strong> the departmental budget. At present the Imbewu programme<br />
funds do not appear on the <strong>Department</strong>al Budget. This means that funding<br />
decisions are made in isolation from the wider financial planning exercises <strong>of</strong><br />
the department.<br />
6.12. Consideration could be given <strong>to</strong> more closely integrating Imbewu<br />
funding decisions with departmental financial planning. Imbewu can be<br />
treated as an above the line resource which can be applied in specified<br />
programmes against agreed priorities and criteria.<br />
6.13. Planning <strong>of</strong> activity under the programme has been driven in some<br />
instances by immediate needs or delivering against perceived imperatives for<br />
support.<br />
6.14. To promote more strategic planning the membership <strong>of</strong> the PSC needs<br />
<strong>to</strong> be consolidated, and the proposed Executive Management Team brought<br />
in<strong>to</strong> operation. This will assist in the development <strong>of</strong> frameworks for deciding<br />
the broad priorities for funding. Using this framework the PSC can then<br />
consider proposals for approval on a more informed basis and in relation <strong>to</strong><br />
the ECED’s strategic objectives.<br />
6.15. It is clear that the <strong>Department</strong>al programme manager for Imbewu is<br />
<strong>to</strong>tally overloaded and is unable <strong>to</strong> give the time <strong>to</strong> Imbewu he would like. This<br />
situation has been alleviated by the use <strong>of</strong> <strong>Department</strong> secondments which<br />
have also assisted in deepening the understanding <strong>of</strong> the Imbewu team <strong>of</strong> the<br />
complexity <strong>of</strong> challenges and imperatives which the department face.<br />
7.Conclusions and the way forward.<br />
7.1. The OPR <strong>Review</strong> team have tried <strong>to</strong> concentrate on a few key<br />
recommendations. In some cases these represent endorsement <strong>of</strong> what is<br />
already planned, but in others new effort and action are required.<br />
7.2. A report back session <strong>to</strong> DFIDSA arranged for the 17 th March 2003 has<br />
been deferred. . The document will be circulated within DFIDSA for<br />
information and comment and may be discussed by the DFIDSA Policy<br />
Board.<br />
7.3.The draft Aide Memoire and the related PRISM document will be<br />
presented <strong>to</strong> the Project Steering Committee on the 26 th March. It will also be<br />
presented <strong>to</strong> the MEC for her consideration. Additionally its findings will be<br />
disseminated widely among stakeholders. It will also be discussed around<br />
that date <strong>of</strong> the PSC with key <strong>of</strong>ficials in the Eastern Cape who assisted with<br />
its development and findings.<br />
30
7.4 . The Aide Memoire also needs <strong>to</strong> be shared and discussed with the JMT<br />
working within the <strong>Education</strong> <strong>Department</strong> and the National <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong>.<br />
7.5. It is suggested that there will need <strong>to</strong> be a special planning workshop <strong>to</strong><br />
see how best the recommendations <strong>of</strong> this OPR review can be implemented<br />
Barbara Payne<br />
Senior <strong>Education</strong> Adviser<br />
March 18th 2003<br />
31
Annex 1<br />
TERMS OF REFERENCE FOR THE FIRST OUTPUT TO PURPOSE<br />
REVIEW (OPR) OF IMBEWU 2, SCHEDULED TO TAKE PLACE MARCH<br />
3-14 TH 2003<br />
Background<br />
Imbewu (meaning seeds in Xhosa ) was a significant project which ran for<br />
three years in the Eastern Cape and which developed a successful model for<br />
school transformation which was implemented in 523 schools.<br />
When an extension <strong>of</strong> the project was envisaged, it was jointly determined,<br />
by the Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> and DFID, that it would be<br />
more appropriate <strong>to</strong> develop a longer term, more systemic programme, which<br />
would keep school transformation at the heart <strong>of</strong> the design but would also<br />
assist the transformation <strong>of</strong> the entire education system. It would be based<br />
within the Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> and would enable the<br />
department <strong>to</strong> roll out its strategic plan. The design <strong>of</strong> the programme was<br />
developed collaboratively <strong>to</strong> encompass five outputs. ( see Programme<br />
Memorandum)<br />
Imbewu 2 (£22million over seven years) was approved by the Development<br />
Committee in (?) Interim arrangements were made so that impetus<br />
generated in Phase one was not lost. There was in effect a Transition year<br />
during which a considerable number <strong>of</strong> activities were carried out. The<br />
selected Managing Agent, Arcadis BMB was appointed in November 2001<br />
and the Programme Co-ordina<strong>to</strong>r and Financial Officer <strong>to</strong>ok up post on the<br />
14 th January 2002.<br />
Terms <strong>of</strong> reference<br />
The overall purpose <strong>of</strong> the review will be <strong>to</strong> report on and make<br />
recommendations on the following issues:<br />
Wider strategic issues;<br />
1. How budgeting and public service management issues are working.<br />
2. What the implications <strong>of</strong> the politics <strong>of</strong> the province on public services<br />
and the poverty agenda<br />
3. What is happening <strong>to</strong> poor people in the province? Where are children<br />
turning up hungry <strong>to</strong> school? How do social problems vary across the<br />
province?<br />
4. What is HIV/Aids doing <strong>to</strong> the education system?<br />
Specific programme issues<br />
5. To assess progress <strong>to</strong>wards achieving programme <strong>Output</strong>s, <strong>Purpose</strong> and<br />
Goal. And <strong>to</strong> consider the validity <strong>of</strong> assumptions made in the Logical<br />
Framework.
6. To assess the efficiency and effectiveness <strong>of</strong> the management <strong>of</strong> Imbewu<br />
2 by the Management Consultants Arcadis.<br />
7. To assess the quality <strong>of</strong> the programme in all its aspects, especially its<br />
governance and social aspects and <strong>to</strong> establish what lessons can be learned<br />
from the first year <strong>of</strong> implementation.<br />
8. To assess the extent <strong>to</strong> which this programme has linked with other DFID<br />
funded and other donor initiatives in the Province.<br />
9. Programme achievements<br />
Assess progress <strong>to</strong>wards individual <strong>Output</strong>s against stated<br />
OVIs.<br />
Assess progress <strong>to</strong>wards Programme <strong>Purpose</strong>. Consider the<br />
extent <strong>to</strong> which planned programme <strong>Output</strong>s are contributing <strong>to</strong><br />
the <strong>Purpose</strong> and whether they are still relevant and realistic.<br />
Consider the validity <strong>of</strong> Risks/Assumptions identified during the<br />
design phase, how they are impacting on the programme<br />
<strong>Purpose</strong>, how they are being managed and whether any new<br />
risks or assumptions have been identified.<br />
Even though this is only the first year <strong>of</strong> a seven year<br />
programme, assess the likelihood <strong>of</strong> the programme achieving<br />
its objective and make recommendations accordingly.<br />
10. Programme management<br />
<strong>Review</strong> the effectiveness <strong>of</strong> programme moni<strong>to</strong>ring and<br />
reporting.<br />
<strong>Review</strong> the arrangements for the control <strong>of</strong> expenditure and<br />
procurement.<br />
<strong>Review</strong> expenditure <strong>to</strong> date against the programme budget.<br />
<strong>Review</strong> programme management arrangements and<br />
effectiveness.<br />
<strong>Review</strong> individual’s roles and responsibilities and strategic<br />
effectiveness.<br />
<strong>Review</strong> the level <strong>of</strong> co-ordination within the programme team.<br />
Assess the extent <strong>to</strong> which the programme management has<br />
become integral <strong>to</strong>/ or harmonised with, the management<br />
arrangements <strong>of</strong> the Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong><br />
and make recommendations accordingly.
11. Quality assurance<br />
Assess the extent <strong>to</strong> which the quality achieved in Imbewu 1 has<br />
been replicated and maintained in Imbewu 2, in relation <strong>to</strong><br />
philosophy, materials development , training and relationships.<br />
<strong>Review</strong> the extent <strong>to</strong> which the school transformation model “at<br />
the heart <strong>of</strong>” Imbewu 1 has deepened and still remains at the<br />
heart <strong>of</strong> Imbewu 2.<br />
Assess the extent <strong>to</strong> which integrated, evidenced based<br />
planning has been introduced within the <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong>, based on information generating from the EMIS<br />
system.<br />
Comment on the use <strong>of</strong> Technical Assistance <strong>to</strong> date and the<br />
extent <strong>to</strong> which TA’s recommendations have been implemented.<br />
Indicate what lessons have been learned which have application<br />
in Year two <strong>of</strong> the programme and which might have wider<br />
applicability.<br />
Comment on the challenges the programme has faced moving<br />
from project <strong>to</strong> programme and how these are being addressed .<br />
12. Integration with other programmes<br />
The Integrated Provincial Support Programme ( IPSP) is a key<br />
DFID funded initiative in Eastern Cape <strong>to</strong> which Imbewu needs<br />
<strong>to</strong> be closely allied. Also OLSET and the UNISA/SANLI/ABET<br />
projects are highly visible in Eastern Cape. The <strong>Review</strong> team<br />
will need <strong>to</strong> assess the extent <strong>to</strong> which there is linkage and<br />
coordination between these projects .<br />
It will also be important for Imbewu <strong>to</strong> work closely with other<br />
donor funded initiatives <strong>to</strong> ensure harmonisation. The review<br />
team will need <strong>to</strong> assess the extent <strong>to</strong> which this is happening.<br />
13. Timing and Programme for the <strong>Review</strong><br />
The review will take place during the two weeks March 3-14 th 2003<br />
The <strong>Review</strong> Team will comprise the following people ( the <strong>Review</strong> team<br />
represents a mix <strong>of</strong> international and South African experience)<br />
Barbara Payne DFIDSA Senior <strong>Education</strong> Adviser; will facilitate team<br />
conclusions and recommendations and co-ordinate the Aide Memoire.
1. Lusungu Kanchenche DFIDSA Deputy Programme Manager; will<br />
provide advice on administrative issues and co-ordinate and complete<br />
the PRISM documentation.<br />
2. Brigid Dillon DFIDSA Senior Social Development Adviser: will provide<br />
strategic advice and briefing at key points <strong>of</strong> the review<br />
3. Heather Garner ; Social Development Consultant will cover social<br />
issues, HIV/Aids , Community Involvement, Early childhood, Farm<br />
Schools feeding schemes and the poverty agenda etc<br />
4. Richard Thomas DFIDSA Senior Governance Adviser will provide<br />
strategic inputs and recommendations on Programme Management<br />
issues and input on public service management issues (see TORs 1.)<br />
5. Chris Heymans Former DFIDSA governance adviser and now<br />
consultant; will cover the governance issues and the relationship<br />
between Imbewu and IPSP and other key DFID initiatives in the<br />
Eastern Cape. And comment on the politics issue( see TORS 2)<br />
6. Bob Blakelock DIFDSA Engineering Adviser; will cover Asset<br />
Management and Infrastructural issues.<br />
7. Rosaline Ntshingila- Khosa; consultant, will cover relationships with<br />
other donor projects , the use <strong>of</strong> consultants <strong>to</strong> date and their<br />
effectiveness, the development <strong>of</strong> the PPRU.<br />
8. Mareka Monyokolo; consultant will cover The school transformation<br />
model and its planned roll out including closer working with the Nelson<br />
Mandela Foundation, the Evaluation Framework and the<br />
Communications strategy.<br />
9. Trevor Taft; consultant, will look at decentralisation and district<br />
development issues.<br />
10. Bas Kotterink ( <strong>to</strong> be confirmed) Imfundo specialist, will advise on<br />
ICT/EMIS issues<br />
11. Nick Smart ( <strong>to</strong> be confirmed) consultant, will look at the relationship<br />
between the Imbewu budget and the Eastern Cape <strong>Education</strong> Budget<br />
and procedures for decision making around disbursement and<br />
contribute re TORS 1.<br />
12. Brigid Smith consultant; will cover teaching and learning- training and<br />
materials ( she will also look at READ and other project materials and<br />
methodology and assess how READ and other development partners<br />
and Imbewu could work more closely <strong>to</strong>gether in the area <strong>of</strong><br />
pedagogy.) )<br />
13. <strong>Report</strong>ing<br />
The main output <strong>of</strong> the review will be the completion <strong>of</strong> the <strong>Output</strong> <strong>to</strong><br />
<strong>Purpose</strong> review report in the PRISM format and an Aide Memoire.<br />
Barbara Payne<br />
Senior <strong>Education</strong> Adviser.<br />
DFIDSA<br />
February 24 th 2003
ANNEX TWO : PROGRAMME SCHEDULE FOR THE IMBEWU OPR<br />
Monday March 3 rd - briefing Meeting at DFIDSA<br />
Travel <strong>to</strong> Eastern Cape<br />
Booked in<strong>to</strong> Regent Hotel<br />
Tuesday March 4 th<br />
Meeting with MEC. Presentations by the Deaprtment <strong>of</strong> <strong>Education</strong>. Extranet<br />
interrogations<br />
Wednesday March 5 th<br />
Individual meetings and appojntments<br />
Team split in<strong>to</strong> four groups <strong>to</strong> travel <strong>to</strong> districts, one group <strong>to</strong> PE and Grahams<strong>to</strong>wn, one group<br />
<strong>to</strong> Encobo and C<strong>of</strong>imvaba, one group <strong>to</strong> Umtata and Libode, one group <strong>to</strong> Idutwa and Maluti<br />
Thursday March 6 th<br />
District <strong>of</strong>fice and schools visits<br />
Friday March 7th<br />
Continued district visits and return <strong>to</strong> Regent hotel East London<br />
Saturday March 8th<br />
Team debriefing from district visits<br />
Sunday March 9 th<br />
Individual reading and reflection<br />
Monday March 10 th<br />
Individual meetings on focus areas<br />
Tuesday March 11 th<br />
Continued meetings<br />
Wednesday March 12 th<br />
Team meeting <strong>to</strong> discuss findings recommendations and drafting for the Aide Memoire<br />
Thursday March 13 th<br />
Meeting with the <strong>Department</strong> and PSc <strong>to</strong> discuss logframe modifications,PRISM scoring and<br />
lessons learned<br />
Friday March 14 th<br />
Final team meeting, writing, debrief and return <strong>to</strong> Johannesburg
ANNEX THREE<br />
Decentralisation and District Development.<br />
Introduction<br />
This brief paper seeks <strong>to</strong> reflect on the visits and interviews conducted at head<br />
<strong>of</strong>fice and districts. When faced with major challenges <strong>of</strong> resource shortages,<br />
poor performance and capacity problems coupled with high expectations and<br />
external pressure for change many organisations move <strong>to</strong>o quickly <strong>to</strong> change the<br />
structure <strong>of</strong> the organisation. Organisational change needs <strong>to</strong> solve problems<br />
not symp<strong>to</strong>ms. It is far <strong>to</strong>o easy, it seems, <strong>to</strong> purchase wholesale a notion like<br />
decentralisation and fall in<strong>to</strong> the false dicho<strong>to</strong>my <strong>of</strong> central versus de-central<br />
decision making, rather than going ‘deeper’ regarding the analysis <strong>of</strong> all the<br />
complicated issues <strong>of</strong> moving power closer <strong>to</strong> the ultimate client, in this case, the<br />
learners. Doing change poorly leaves the organisation with change fatigue, less<br />
able <strong>to</strong> respond even when the leadership finally get it right. Moving power<br />
closer <strong>to</strong> the client and effectively decentralising key decisions directly affecting<br />
learners, and those who directly serve learners, is a desirable objective.<br />
Generic Issues:<br />
District Managers are located in a variety <strong>of</strong> different <strong>of</strong>fices, some are adequate<br />
spaces but some are in very overcrowded and unsuitable buildings. Offices have<br />
not developed a positive and attractive ‘face’ <strong>of</strong> education <strong>to</strong> attract the educa<strong>to</strong>rs<br />
and public although there is potential in some premises.<br />
The decentralisation process is starting <strong>to</strong> settle down but the change from<br />
having a regional <strong>of</strong>fice has created some instability – chasing up issues, salaries<br />
etc. This is particularly so in more remote areas.<br />
The decentralization <strong>of</strong> funds, decision making and locally defined priorities has<br />
yet <strong>to</strong> take place and there is a sense that Districts are being micro-managed<br />
from the centre and that Districts have <strong>to</strong> respond <strong>to</strong> downward pressures and<br />
urgent demands from both centre and national imperatives. District Managers<br />
are <strong>of</strong>ten called <strong>to</strong> the Centre for meetings, some <strong>of</strong> which could be dealt with by<br />
efficient email communications. Meetings <strong>of</strong>ten clash because <strong>of</strong> lack <strong>of</strong> coordination<br />
between different departments.<br />
Decentralisation also implies that more resources and infrastructure may be<br />
needed in some Districts <strong>to</strong> support the schooling, health expectations and<br />
general living standards <strong>of</strong> sec<strong>to</strong>r managers who have been moved out <strong>to</strong><br />
Districts. Particularly in remote districts it is problematical that District Managers<br />
do not live in the location and this maybe should be a condition <strong>of</strong> service;<br />
however since movement <strong>of</strong> managers has already taken place since the recent<br />
appointments more stability will need <strong>to</strong> be created if they are <strong>to</strong> feel committed<br />
<strong>to</strong> their task and their Districts.<br />
District Managers and District Teams.
A general picture has emerged from all the Districts <strong>of</strong> harassed and overloaded<br />
managers who are struggling <strong>to</strong> come <strong>to</strong> terms with their important jobs without<br />
adequate resources, training or support. Many managers do not have<br />
experience or expertise in administration or <strong>of</strong>fice management skills, they do<br />
not necessarily train and delegate <strong>to</strong> their administrative team, if they have one,<br />
their filing and documentation systems are confused and most <strong>of</strong> them do not<br />
have the ability <strong>to</strong> use their ICT equipment this increases the load <strong>of</strong> demands<br />
and decreases their efficiency. The Development Plan largely remains a paper<br />
exercise. They have received training in Financial Management using<br />
Management Training Materials (updating needs <strong>to</strong> be done).<br />
The appointment <strong>of</strong> the CES should help alleviate some <strong>of</strong> these pressures but<br />
only if they take up the challenge <strong>of</strong> managing the educational inputs in the<br />
District rather than becoming another administrative assistant. This will be a<br />
good opportunity <strong>to</strong> initiate one <strong>of</strong> the critical functions <strong>of</strong> District Managers; <strong>to</strong><br />
build teams in which there are designated roles and responsibilities for all<br />
players. Team building needs <strong>to</strong> be included in the management training. At<br />
present difficulties in functioning in schools and communities are seen as the<br />
result <strong>of</strong> unfilled posts. In fact if teams are well chosen and trained the number<br />
question is much less relevant. EDO’s do not seem <strong>to</strong> be taking on the role <strong>of</strong><br />
educational experts leading innovation and planning for educational inputs.<br />
EDOs are rarely in school and when they do visit it is for administrative rather<br />
than support purposes. They mostly seem <strong>to</strong> function as an extension <strong>of</strong> the<br />
DM’s administrative needs. Subject Advisors and Special <strong>Education</strong>al Needs<br />
teams remain problematical in many districts; working in a new context and<br />
dealing with different demands they remain an unused potential in the districts.<br />
They do remain a potential source <strong>of</strong> strength for developing quality education<br />
through training, classroom support and moni<strong>to</strong>ring in the field. In order <strong>to</strong> fulfil<br />
these important functions they require specialist training, particularly in how <strong>to</strong> be<br />
a good trainer, in modern primary methodology, in curriculum development. At<br />
present schools do not receive in-school support from them, largely due <strong>to</strong> lack <strong>of</strong><br />
funds for transport, and teachers are critical <strong>of</strong> the training because it is not<br />
grounded in the reality <strong>of</strong> the classroom. Where training has been effective<br />
teachers are highly appreciative. Building a team with particular educational<br />
specialisms would create a dynamic District educational resource.<br />
For the District Managers there is little time for reflection or sustained planning as<br />
they are constantly responding <strong>to</strong> the urgent but unimportant and having <strong>to</strong><br />
shelve the less urgent long term development. The dicho<strong>to</strong>my between central<br />
and district decision making inculcates a culture <strong>of</strong> distrust and a fear <strong>of</strong> real<br />
delegation and real communication. District Managers appear energetic and<br />
keen <strong>to</strong> do well but they need training and support <strong>to</strong> enable them <strong>to</strong> take up their<br />
critical role as head <strong>of</strong> a dynamic and innovative district education team. In such<br />
a new situation it is likely that occasional mistakes will be made but this is part <strong>of</strong><br />
development and learning and adequate support from the centre and high quality
management training will minimise the risks. The District Forum/Monthly Meeting<br />
is a possible source <strong>of</strong> sustained communication and quality interaction and<br />
should not degenerate in<strong>to</strong> responses <strong>to</strong> urgent directives. Planned Agendas,<br />
planned document reading and planned quality external inputs would give<br />
continued support and capacity building. As educational improvement will be<br />
largely up <strong>to</strong> the District team it might be good <strong>to</strong> have some kind <strong>of</strong> incentive or<br />
celebration <strong>of</strong> excellence that would acknowledge the work done at District level.<br />
Increased communication between sec<strong>to</strong>rs at District level would enable joint<br />
functions such as HIV Aids education and the feeding programme <strong>to</strong> be better<br />
co-ordinated.<br />
IMBEWU II might consider supporting the development <strong>of</strong> the District by<br />
enabling high quality training <strong>of</strong> District teams <strong>to</strong> take place. Having some kind <strong>of</strong><br />
accreditation for such training would motivate district staff and also ensure that<br />
the training was good.<br />
The <strong>Department</strong> needs <strong>to</strong> constantly ask itself key questions and attempt <strong>to</strong><br />
justify their importance. Some <strong>of</strong> these are:<br />
• What are the desired outcomes for the District?<br />
• How will the proposed changes improve learner success?<br />
• How will this success be measured?<br />
It is easy <strong>to</strong> say ‘lets decentralise power <strong>to</strong> the classroom’. But what new skills<br />
will be required? What kind <strong>of</strong> people do we need if there are 24 Districts? What<br />
does this mean for skills sets <strong>of</strong> principals, district managers, education<br />
development <strong>of</strong>ficers, subject advisors and head <strong>of</strong>fice personnel? What are the<br />
new roles and skills <strong>of</strong> senior managers?<br />
Undertaking major structural change can be done well and indeed, it is a tall<br />
order. But asking and answering the right questions and doing it through a<br />
systemic and integrated approach will get the job done.
Notes from particular Districts<br />
MALUTI<br />
5 schools are self managing<br />
53 included in the 1500 schools<br />
48 schools <strong>to</strong> be declared Section 21 schools<br />
Consider the setting up <strong>of</strong> School Governing Bodies a key issue.<br />
53 schools have used the school transformation model. Almost all had contact<br />
with Imbewu I or with Sakizizwe<br />
School A:<br />
Environment: about 35km <strong>of</strong>f road. Large village – very poor houses, no<br />
agricultural or economic activity apparent. Children largely in care <strong>of</strong><br />
grandparents. Small pre-school in a hut near the school.<br />
983 children from Grade 1-9<br />
26 educa<strong>to</strong>rs<br />
No administrative or support staff.<br />
2 language streams from Grade 1-4<br />
Accommodation:<br />
5 permanent classrooms – solar paneling (Imbewu)<br />
5 prefabricated classrooms<br />
8 self made (crumbling) mud brick rooms.<br />
No furniture provision for Grades 1-3<br />
Some children have been <strong>to</strong> pre-school. No way <strong>of</strong> sorting out children in terms<br />
<strong>of</strong> whether they have learned anything before they come <strong>to</strong> school.<br />
Feeding Programme (has s<strong>to</strong>pped drop out from Grade 1,2).<br />
Administered by Health <strong>Department</strong> – school doesn’t know anything about it.<br />
Food is made up in the corner <strong>of</strong> a classroom (this room accommodates Class<br />
1,2 children 110 plus as well as the principal’s <strong>of</strong>fice and the s<strong>to</strong>re for stationery<br />
etc.)<br />
Imbewu was very helpful.<br />
Benefits:<br />
Resources<br />
Training for SMT<br />
Improved communication with parents<br />
Teachers helping each other<br />
Cluster Forum for Principals and teachers is helpful.<br />
School Management Team – articulate<br />
Comments on training: ‘Teachers could do this better because the trainers don’t<br />
know anything about the schools or the problems.’ Learn from each other in the<br />
cluster group meetings. Trainers they ‘don’t know a thing about it!’
Try <strong>to</strong> be involved in welfare, counseling. Visit parents and sometimes support<br />
children with clothes.’<br />
School Governing Board:<br />
Has helped a lot in bringing the community in. e.g. ‘A wall fell down and I called<br />
the parents. Next day they put the wall back up again. Now they own the<br />
school.’ (Principal)<br />
Mostly they are illiterate. There were problems communicating with them but<br />
now they are co-operative.<br />
School has had a Parent’s Day <strong>to</strong> tell the parents about how they are teaching<br />
now.<br />
Going <strong>to</strong> have a day event about HIV Aids.<br />
Comment:<br />
Impossible conditions for teaching and learning in Class 1 and 2. All in one<br />
room. Blackboard propped up at side. Room used for lots <strong>of</strong> other things. 7<br />
children <strong>to</strong> one fixed desk. No space for moving. No space for sitting on the<br />
ground and listening <strong>to</strong> s<strong>to</strong>ries or talking and listening activities. No display work<br />
on the wall.<br />
Children sang an English song about days <strong>of</strong> the week enthusiastically and<br />
beautifully.<br />
Lesson content : Class 1 – copying picture <strong>of</strong> bucket and word <strong>of</strong>f the board.<br />
Lots <strong>of</strong> children without pencils.<br />
Class 5 using English book for Geography lesson. Copying maps and names out<br />
<strong>of</strong> the book. Couldn’t read any <strong>of</strong> the names.<br />
Older classes children couldn’t communicate in English.<br />
Self made buildings very bleak.<br />
Classes seemed small compared <strong>to</strong> the roll numbers higher up the school.<br />
Educa<strong>to</strong>rs <strong>of</strong> Foundation Year finding OBE difficult. Not time for entrepreneurial<br />
activities. Teacher wanted <strong>to</strong> know ‘how <strong>to</strong> teach reading’. Educa<strong>to</strong>rs need help<br />
<strong>to</strong> know how <strong>to</strong> raise issues, suggest subjects.<br />
Need a scheme <strong>of</strong> work that tells them what they need <strong>to</strong> teach – there is no<br />
uniformity in the books.<br />
Need <strong>to</strong> know how <strong>to</strong> do assessment – what are they supposed <strong>to</strong> assess?<br />
Need <strong>to</strong> know how <strong>to</strong> make teaching learning materials.<br />
School very limited by material resources, parents can’t contribute.<br />
All classes being taught from the front, in silence, teacher sitting at table.<br />
Copying work from books or blackboard.<br />
School B: (no intervention)<br />
519 learners and 15 educa<strong>to</strong>rs. Some classes 65, all over 50. Grades 1-12<br />
SMT functioning
SGB functiong – 2 days training. No follow up.<br />
Need for development particularly in financial matters.<br />
School <strong>to</strong> achieve Section 21 status – no discussion about this with anyone.<br />
School needs more capacity and resources.<br />
Poor learners and parents who cannot contribute.<br />
Educa<strong>to</strong>rs need <strong>to</strong> know how <strong>to</strong> develop TLM<br />
Hard <strong>to</strong> get parents involved ‘they are illiterate’.<br />
Comment:<br />
Staff room board well organized and some targets and ideas related <strong>to</strong> OBE and<br />
school transformation model in the posters etc.<br />
School looking <strong>to</strong> be part <strong>of</strong> a project so it can access resources. Some implicit<br />
resentment <strong>of</strong> Imbewu schools.<br />
Environment closer <strong>to</strong> road, not so poor looking.<br />
IDUTWYA DISTRICT:<br />
School A.<br />
20 km <strong>of</strong>f road (1 hour plus journey)<br />
Although remote there are many nearby communities which also have schools.<br />
Several <strong>of</strong> the nearby communities have newly built schools – some children<br />
leave <strong>to</strong> attend school therefore the attendance is patchy. Poor community 95%<br />
unemployed or retired. Many children live with grandparents. HIV Aids is a<br />
‘hidden’ problem.<br />
The school had just received the learning materials ordered for start <strong>of</strong> school in<br />
January. There were not enough copies <strong>of</strong> the books.<br />
Accommodation<br />
The school is spread over three sites.<br />
Site 1, self built mud brick building built by the community when the concrete<br />
block construction ‘fell down’. Ro<strong>of</strong> and windows incorporated. Half built mud<br />
brick construction attached. Already huge split in the wall caused by the rain –<br />
community tried <strong>to</strong> use some <strong>of</strong> the concrete blocks <strong>to</strong> tie it <strong>to</strong>gether.<br />
Second building, windowless and doorless roundeval – cool and quite good size<br />
but dark inside. Belongs <strong>to</strong> a community member who is not using it at the<br />
moment.<br />
Two rooms about 11feet square. Doors but inadequate light. Belongs <strong>to</strong> the<br />
community who may want it back any time. Community have become<br />
disheartened after their efforts have failed <strong>to</strong> provide the children with an<br />
adequate learning space. Members <strong>of</strong> the community visit the school regularly<br />
and SG leader says teachers are dedicated and work hard. Theft is a problem in<br />
the community. On day <strong>of</strong> visit (Friday) all the children have brought cans <strong>of</strong><br />
water and bags <strong>of</strong> cow dung. Furniture is put outside and the children are going<br />
<strong>to</strong> re-floor the classrooms. This is a weekly routine. Total children enrolled 163
(discrepancy in numbers explained by absenteeism and migration <strong>to</strong> other<br />
schools)<br />
Number <strong>of</strong> educa<strong>to</strong>rs 5.<br />
Lesson <strong>of</strong> Grade One observed.<br />
Children are sitting in groups at tables. Two classes share the room. Maybe<br />
there would not be enough chairs when the other class is also there. About 24<br />
children present. Many look much younger than seven.<br />
Counting lesson. Done by teacher questions and children answering <strong>to</strong> show<br />
‘how many fingers’.<br />
Board used <strong>to</strong> draw the numbers as sets.<br />
Then children wrote on a piece <strong>of</strong> paper.<br />
Positive points: Active, children enjoyed, teacher enthusiastic. All children <strong>to</strong>ok<br />
part. Teacher moved from concrete <strong>to</strong> ‘doing’ <strong>to</strong> individual work.<br />
Potential development points: could have led <strong>to</strong> computation if linked <strong>to</strong> how<br />
many objects. Feeling this was a demonstration lesson!<br />
Paper used for writing down was large – what was it going <strong>to</strong> be used for in a<br />
resource short school?<br />
Portfolios were on the wall for the older class – rather dusty envelopes with very<br />
little in them. There were shoe boxes for collecting activity and work but they<br />
were just named so far.<br />
Some nice pictures <strong>of</strong> children with their names on the wall.<br />
No opportunity <strong>to</strong> try out any reading assessment.<br />
All the other children were just sitting outside in the sun not doing anything<br />
waiting for the cow dunging <strong>of</strong> the floor <strong>to</strong> begin. Teachers were not visible – in<br />
another room?<br />
The Principal found the cluster forum useful.<br />
Dedicated <strong>to</strong> the school and the children.<br />
It was very hard <strong>to</strong> get a sense <strong>of</strong> learning going on.<br />
Children were a bit squabbly and undisciplined but maybe that was because <strong>of</strong><br />
our interruption. They sang beautifully.<br />
They knew in advance <strong>of</strong> our visit. What was the purpose <strong>of</strong> the cow dung?<br />
They were maybe more concerned <strong>to</strong> show the appalling state <strong>of</strong> the school than<br />
the learning going on. Feeding was done by the woman from the village going <strong>to</strong><br />
the <strong>to</strong>wn three times a week in a buggie <strong>to</strong> fetch the bread. This was also<br />
happening individually in all the close by schools. On the way she probably<br />
passed at least a dozen schools.<br />
Comment:<br />
• There are minimal levels <strong>of</strong> human and physical resources that are<br />
needed before a school can function as a learning institution. Here the<br />
class sizes were very favourable but the learning environment seemed <strong>to</strong><br />
have overwhelmed educa<strong>to</strong>rs and the community.
• What is a viable unit for a school? If there are better resources close by is<br />
there more sense in consolidating resources? However if this happened it<br />
would <strong>of</strong> course be the poorest children who had <strong>to</strong> walk a long way.<br />
• How can educa<strong>to</strong>rs be helped <strong>to</strong> see that learning is the central fact <strong>of</strong><br />
schooling?
SCHOOL B: 10 –12 Grade SS.<br />
35 km <strong>of</strong>f road. One <strong>of</strong> the 1500 schools.<br />
410 students and 20 educa<strong>to</strong>rs. 1 administra<strong>to</strong>r.<br />
5 classrooms being refurbished so not usable on the day <strong>of</strong> visit.<br />
5 prefabricated classrooms also being prefabricated.<br />
Solar panels (4 s<strong>to</strong>len that week)<br />
No staff room, <strong>of</strong>fice. (Teachers sat under shadow <strong>of</strong> solar panels)<br />
TV given by another project.<br />
Watchman employed and paid for by school.<br />
Staff hostile and unfriendly.<br />
Turned children out <strong>of</strong> the room when we asked for somewhere <strong>to</strong> meet with<br />
the Principal.<br />
All the school milling around outside in the sun until 3pm.<br />
Appalling furniture – graffiti everywhere, broken and cut chairs.<br />
110 children taught in one room without a blackboard.<br />
EDO visits 4 or 5 times a year.<br />
Have been allocated 26,000 rand for renovation. A consultant had visited<br />
them.<br />
Trained in May in financial management <strong>of</strong> school.<br />
Didn’t seem very clear about what the money was going <strong>to</strong> be used for.<br />
Didn’t know anything much about being one <strong>of</strong> the 1500 schools.<br />
Claimed that the learners achieved well, almost 100% pass this year<br />
anticipated and many at a high enough level <strong>to</strong> gain a place in higher<br />
education but the resources for this not possible in this poverty area.<br />
Learners almost all migrated <strong>to</strong> the city on completion <strong>of</strong> their schooling <strong>to</strong><br />
look for jobs.<br />
Parents, mostly grandparents, made sacrifices for children <strong>to</strong> attend school –<br />
sometimes children didn’t even have shoes. Staff tried <strong>to</strong> help where<br />
possible.<br />
One teacher has been <strong>to</strong> training.<br />
HIUV Aids – clinic has promised <strong>to</strong> visit with a programme.<br />
Not possible <strong>to</strong> see any teaching because <strong>of</strong> the renovations.<br />
Comparison with EMIS data shows that the situation is not nearly as dire as it<br />
was presented <strong>to</strong> us.<br />
Grahams<strong>to</strong>wn:<br />
School A IMBEWU<br />
In fifth year. Impressive school. Has a strategy on HIV Aids. Health worker<br />
is a parent who is also on the SGB. IMBEWU ‘taught them <strong>to</strong> properly!’ it
added value <strong>to</strong> what they had already done. Parental involvement in school<br />
improved after vision crafting workshop. They have now got partnership with<br />
other organisations.<br />
There are improved relationships with the staff.<br />
The school is developing links with other schools,<br />
There is now a more democratic leadership in the school.<br />
Working well at the school level.<br />
Umtata:<br />
3 schools visited.<br />
2 out <strong>of</strong> the 3 had experienced significant transformation. One had a<br />
problematic principal.<br />
Being part <strong>of</strong> IMBEWU II was sensed as an imposition. The schools had no<br />
say, it was not a personal selection. It was seen as part <strong>of</strong> the Section 21<br />
exercise. There was no transparency in the selection procedure.<br />
HIV Aids education varied considerably. One head was anti the idea. The<br />
others want a strategy. There was a sense <strong>of</strong> nervousness around the issue.<br />
SGB present.<br />
Teachers had received an input from union SADTU in 2001 a pamphlet and a<br />
meeting. Selective involvement in the HIV Aids programme.<br />
Delivery <strong>of</strong> learning materials is much improved but the numbers are wrong<br />
(e.g. 70 maths books for 105 learners).<br />
EMIS form <strong>to</strong>ok two full working days <strong>to</strong> complete but it was manageable. No<br />
feedback was given about he information and they did not know how it was<br />
used. There had not been a validity check.<br />
In the IBEWU 1 school there was management capacity. They could talk<br />
confidently. There is a high level <strong>of</strong> expectation about IMBEWU II.<br />
The attitude <strong>of</strong> the community <strong>to</strong> the school; need <strong>to</strong> have an admissions<br />
policy because <strong>of</strong> severe overcrowding and also <strong>to</strong> plan for how many<br />
classrooms are needed.<br />
Difference between IMBEWU and non IMBEWU schools was startling – the<br />
room was full <strong>of</strong> things.<br />
Section 21 Status. Regarded as a ‘magic wand’ without understanding what<br />
powers would be delegated.<br />
Policy on exemption <strong>of</strong> school fees was not clear.
IMBEWU II OPR Annexe 4 March 2003<br />
ANNEX FOUR<br />
REFLECTIONS ON LEARNING ACHIEVEMENT AND IMBEWU II<br />
This short report might be considered a possible working paper for consideration<br />
for the coming months in IMBEWU II. It is focused on the goal <strong>of</strong> IMBEWU II<br />
‘To significantly increase the learning achievement <strong>of</strong> children from the Eastern<br />
Cape Province’<br />
and <strong>Output</strong> 3 <strong>of</strong> the Logical Framework ‘Schools which having undergone a<br />
whole school effectiveness process are better able <strong>to</strong> provide improved learning<br />
opportunities for their learners.’<br />
The context for the current OPR indicates a number <strong>of</strong> constraints and pressures<br />
on both administra<strong>to</strong>rs and practitioners. These include multiple changes<br />
through the restructuring process and decentralization procedures, executive<br />
directives from National level requiring immediate response and interrupting and<br />
sometimes dis<strong>to</strong>rting local level initiatives, restructuring <strong>of</strong> Colleges <strong>of</strong> <strong>Education</strong><br />
resulting in demoralisation amongst staff who do not have skills and experience<br />
necessary for new roles and responsibilities and <strong>Education</strong> Development Officers<br />
overloaded with administrative tasks. These and other constraints have made it<br />
difficult for ECDOE and District <strong>of</strong>ficers <strong>to</strong> take up the challenges relating <strong>to</strong> the<br />
improvement <strong>of</strong> learning and classroom practices which the evaluation and final<br />
reports on IMBEWU I indicated as being <strong>of</strong> critical importance in the second<br />
phase. An all embracing context is the national and provincial level work on<br />
reviewing Curriculum 2005.<br />
The curriculum initiatives <strong>of</strong> the NEC are ambitious but laudable. Not just in<br />
terms <strong>of</strong> the redressing <strong>of</strong> social balance but also in educational terms; the way<br />
they have addressed curriculum development as a coherent philosophical and<br />
sociological framework for the development <strong>of</strong> pedagogy. This rarely occurs in<br />
systems <strong>of</strong> developing education where most frequently the rhe<strong>to</strong>ric <strong>of</strong> ‘child<br />
centred’ and ‘joyful learning’ replaces the intellectual effort <strong>of</strong> situating the school<br />
practices in a proper context 1 . As more schools become involved in the<br />
transformation process and whole school management initiatives gain ground<br />
and communities become involved with their children’s education the seedbed for<br />
learning improvement becomes more viable. <strong>Report</strong>s and reflections on<br />
IMBEWU I indicate how important concentration on this area is going <strong>to</strong> be if the<br />
outputs <strong>of</strong> the programme are <strong>to</strong> go any way <strong>to</strong>wards their ultimate goal. There<br />
are many indications that insufficient training, confused agendas and time<br />
constraints have so far militated against learning improvement <strong>to</strong> any distinctive<br />
extent. It may be that both the project and the programme <strong>to</strong>ok <strong>to</strong>o wide a view <strong>of</strong><br />
learning and need now <strong>to</strong> focus down on specific areas <strong>of</strong> classroom practice<br />
that will impact on the learners’ achievements. This was clearly stated by Ray<br />
Tywakadi 2 , ‘the debate about the place <strong>of</strong> content in the curriculum needs <strong>to</strong> be<br />
1 See e.g. Dankar.R (2002) Seeking Quality <strong>Education</strong>: In the Arena <strong>of</strong> Fun and Rhe<strong>to</strong>ric. Delhi:<br />
Occasional Paper, European Commission.<br />
2 In H.Perrold Refelections on the IMBEWU project. Oc<strong>to</strong>ber 1999. Page 39<br />
Page 1 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
reopened on the basis <strong>of</strong> the notion that ‘competence precedes commitment’.<br />
And later the point is made that this access <strong>to</strong> content knowledge will need <strong>to</strong> be<br />
integrated through workshops with materials. 3<br />
The programme is clearly focused on issues related <strong>to</strong> poverty alleviation and the<br />
empowering <strong>of</strong> a previously dispossessed and uneducated population.<br />
His<strong>to</strong>rically across the world access <strong>to</strong> literacy has been the means by which the<br />
oppressed have liberated themselves and taken control <strong>of</strong> their own lives.<br />
Competence in literacy allows people <strong>to</strong> make choices, <strong>to</strong> solve problems and <strong>to</strong><br />
be free from manipulation and bias. This fact is acknowledged in all the<br />
documents but the means <strong>of</strong> achieving it is not clearly spelled out. Without such<br />
clarity it will be difficult <strong>to</strong> plan effective interventions <strong>to</strong> bring about the required<br />
change in the learners.<br />
The improved access <strong>to</strong> schooling and the optimism <strong>of</strong> leaders is not matched by<br />
the local capacity <strong>to</strong> plan, train for and implement quality learning in the Early<br />
Years <strong>of</strong> education. The Foundation Years, particularly Grade 1 and 2 are the<br />
critical years for ensuring the poorest and neediest children are included in the<br />
education process. Yet in many schools these grades are placed in the largest<br />
classes, with the least experienced or qualified teachers, with few resources and<br />
little space in overcrowded classrooms for the active and participa<strong>to</strong>ry learning<br />
that is necessary as a foundation for the rest <strong>of</strong> their education. It is in Grade 1<br />
and 2 that they should learn <strong>to</strong> read and write, <strong>to</strong> problem solve and interact, <strong>to</strong><br />
become confident and independent learners. Concentrating resources and<br />
training on initial literacy provides the foundation for later learning. Such<br />
resources and training need <strong>to</strong> be based on practical and experiential learning by<br />
the educa<strong>to</strong>r so that they can confidently implement sound literacy learning in<br />
their classroom.<br />
Educa<strong>to</strong>rs are being moved, through the ECDOE initiatives, from the rote<br />
learning, textbook based content and factual recall tests that have mainly been<br />
their practice <strong>to</strong> date. There remains still however a confused and empty ‘gap’<br />
which is framed by the excellent intentions and sound theory <strong>of</strong> OBE but where<br />
actual learning and learning processes have not yet been addressed. In this gap<br />
the educa<strong>to</strong>rs flounder with poorly assimilated ideas <strong>of</strong> an ideal education –<br />
many <strong>of</strong> which require highly competent educa<strong>to</strong>rs, excellent resources and<br />
frequent classroom support and supervision. The acquisition <strong>of</strong> sound literacy<br />
can be framed by these methodologies but needs a clearly articulated learning<br />
continuum, clearly stated learning outcomes and an understanding <strong>of</strong> the<br />
processes and strategies necessary for acquiring literacy. These very specific<br />
understandings need <strong>to</strong> be embedded in the school transformation process.<br />
The problem could be briefly summarized as:<br />
• Insufficient understanding <strong>of</strong> how children learn<br />
• Insufficient understanding <strong>of</strong> the processes involved in learning <strong>to</strong> read<br />
and write<br />
3 ibid. P.49<br />
Page 2 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
• The need for educa<strong>to</strong>rs <strong>to</strong> have a reper<strong>to</strong>ire <strong>of</strong> methodologies and<br />
classroom management strategies that relate <strong>to</strong> learning outcomes<br />
• The need <strong>to</strong> understand that starting where the learner is, using the<br />
previous experience <strong>of</strong> the learner and helping the learner <strong>to</strong> be<br />
independent and enquiring requires careful planning, sequential and<br />
incremental learning and plenty <strong>of</strong> practice <strong>of</strong> reading and writing for real<br />
purposes.<br />
In order <strong>to</strong> achieve success in these areas carefully planned training, using the<br />
materials that will be used in the classroom, and delivered by trainers who have a<br />
good theoretical and practical understanding <strong>of</strong> literacy is necessary. Teachers<br />
further need <strong>to</strong> be helped <strong>to</strong>wards becoming reflective practitioners by involving<br />
them in the action research process focused on their own classrooms and<br />
learners and men<strong>to</strong>red and supported by trainers and supervisors who make<br />
regular classroom follow-up visits. The expenditure <strong>of</strong> time and resources on<br />
achieving quality education in the early years, focused on literacy and numeracy<br />
pays <strong>of</strong>f later when learners develop the ability <strong>to</strong> learn for themselves and learn<br />
faster and more efficiently because they are good readers and writers. It needs<br />
<strong>to</strong> be stressed that just the delivery <strong>of</strong> a short training and putting resources in<br />
the classroom will not result in improvement in learning quality.<br />
In field visits I visited a well resourced, IMBEWU I school which exemplifies some<br />
<strong>of</strong> the problems.<br />
School 1. Peri-urban. Quite well resourced. Some children with pre-school<br />
experience.<br />
Provided with Reading Scheme and many Big Books and s<strong>to</strong>ry books. These<br />
were well kept in the library used by the children and their educa<strong>to</strong>r once a week<br />
for s<strong>to</strong>ry time.<br />
In the classroom (Grade 1 – 3 classes) I observed good, committed teachers<br />
teaching phonics. They were relating the letters being learned <strong>to</strong> the words in<br />
the family thatha, umama. Children were pointing <strong>to</strong> the letters on the wall,<br />
repeating them out loud and then writing them under a picture in their writing<br />
books. Each class was doing the same. Some children did not join in and were<br />
not noticed by the teacher but later were ‘helped’ by another child. In all three<br />
classes one or two children didn’t have a book or a pencil but again were not<br />
noticed. Previous work on the wall consisted <strong>of</strong> a pho<strong>to</strong>copied frame by the<br />
teacher on which the children had cut out and stuck pictures <strong>of</strong> mother, father<br />
and siblings. Many <strong>of</strong> the pictures were <strong>of</strong> white models or film stars, presumably<br />
all the children could find. All the pictures had a mother, father and two children.<br />
There were a majority <strong>of</strong> children living with grandparents and at least three or<br />
four orphans in the class.<br />
An analysis <strong>of</strong> the lesson and learning outcomes shows:<br />
• Basic rote learning techniques<br />
Page 3 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
• Isolated letters not learned in the context <strong>of</strong> a word with no strategy for<br />
teaching shape<br />
• No use <strong>of</strong> children’s own experience <strong>to</strong> draw their own real families<br />
• No use <strong>of</strong> a number <strong>of</strong> Big Books, individual s<strong>to</strong>ry and picture books which<br />
were locked up in the library although they are designed as literacy<br />
artifacts for shared reading and would have stimulated writing<br />
• No differentiated learning – all doing the same thing although some<br />
children already knew all their letters and others had difficulty holding a<br />
pencil<br />
• No use <strong>of</strong> spelling strategies <strong>to</strong> teach children letters and phonics within<br />
the context <strong>of</strong> what they may be going <strong>to</strong> write (e.g. Look, cover, write ,<br />
check can be used for names and single words by most five year olds)<br />
• No use <strong>of</strong> sentence maker or word building materials although these were<br />
there in the classroom<br />
• Although children sat in groups they were being taught as a whole class<br />
This is no criticism <strong>of</strong> the teachers; within what they had learned they were trying<br />
hard <strong>to</strong> implement and their children were interested and well behaved. However<br />
teaching literacy well requires long enough training, with time for school work in<br />
between and feedback at a second workshop, for teachers <strong>to</strong> begin <strong>to</strong> internalise<br />
the ideas. It also requires an understanding <strong>of</strong> how <strong>to</strong> use literacy artifacts and<br />
resources in a systematic and effective way. Continuous classroom based<br />
assessment implies that the teacher has a well articulated learning plan,<br />
observable outcomes, remedial strategies and a means <strong>of</strong> differentiating the<br />
learners so that they are learning at their own level. Group work is a way <strong>of</strong><br />
helping children <strong>to</strong> work up <strong>to</strong> and beyond their capacity by ensuring that<br />
activities engage all the group in a joint activity. Facilitating means knowing what<br />
you want <strong>to</strong> do, how you are going <strong>to</strong> do it, the means <strong>of</strong> achieving the outcomes<br />
that you want, knowing when learners have achieved and understanding the<br />
way <strong>to</strong> support and extend all the learners in the class. This requires training,<br />
materials and support.<br />
For example a teacher who does not understand that the reading process<br />
consists <strong>of</strong> three strategies – grapho-phonemic (the look and sound <strong>of</strong> the<br />
letters), syntactic (the way the wentence hangs <strong>to</strong>gether grammatically) and<br />
semantic (the meaning in the sentence) - is unable <strong>to</strong> assess the reading <strong>of</strong> the<br />
learner and is unable <strong>to</strong> know what further learning they require in order <strong>to</strong> be<br />
able <strong>to</strong> use all three cueing strategies efficiently. A teacher who does not<br />
understand that writing consists <strong>of</strong> two separate activities – authorial, creative<br />
and communicative writing and then revision for technical accuracy, will impose<br />
unrealistic demands on their learners for getting writing correct first time or else<br />
just stick <strong>to</strong> copying. Once teachers grasp the processes and understand how<br />
they work in the classroom they can swiftly progress and start <strong>to</strong> create their own<br />
materials.<br />
Page 4 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
Experience in many countries, with far less educated teachers than South Africa,<br />
shows that once trained and given time and support <strong>to</strong> internalise the processes<br />
teachers enthusiastically teach literacy and their learners become very good<br />
readers and writers. It is generally agreed that if a child can be retained in school<br />
and can learn effectively up <strong>to</strong> Grade 2 then they are far more likely <strong>to</strong> finish at<br />
least basic schooling. Presently the feeding programme is ensuring the<br />
attendance <strong>of</strong> even the poorest Foundation Phase children; now is the optimal<br />
time <strong>to</strong> ensure that they are given quality education in the early years.<br />
Possible ways forward:<br />
• Emphasising the training <strong>of</strong> early years educa<strong>to</strong>rs and giving them<br />
structured materials <strong>to</strong> work with e.g. READ’s Outcome Based<br />
Assessment contains not only a structured learning continuum for<br />
teaching reading but also outlines simply the processes underlying<br />
reading. READ materials have already been put in<strong>to</strong> IMBEWU I schools<br />
but need the structured training in the use <strong>of</strong> the materials <strong>to</strong> make them<br />
effective.<br />
• Training two Subject Advisors in each District <strong>to</strong> become specialists in<br />
early year’s education. They could then head up the training and<br />
supervision in the schools in their district and give additional training <strong>to</strong><br />
identified Grade 1 and 2 educa<strong>to</strong>rs who show interest and promise.<br />
• Implement the proposed development <strong>of</strong> <strong>Education</strong>al Resource Centres<br />
by locating them in a school where good early year’s education is taking<br />
place and resourcing them with additional literacy materials as a first step.<br />
Once this area is consolidated then the language and content support <strong>of</strong><br />
other grades and learning areas will be simple.<br />
• Equip teachers with the understanding <strong>of</strong> the multiple low cost/no cost<br />
materials and activities that can support effective literacy and numeracy<br />
• Consider whether teachers, at least in the first instance, need teacher<br />
guides that structure the literacy process in ten day cycles with learning<br />
outcomes linked <strong>to</strong> practical activities and learning<br />
ASSESSMENT OF THE WORK OF READ NGO.<br />
READ is currently working in 186 schools in the Eastern Cape under the<br />
Business Trust: Learning for Living Project. The project has been developed in<br />
consultation with the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> and designed <strong>to</strong> encompass OBE<br />
principles. Interventions include:<br />
• Training and Training modules and notes which link the methodology <strong>to</strong><br />
OBE<br />
• Checklists<br />
• Charts<br />
• Educa<strong>to</strong>r Workbooks including lesson plan outlines<br />
• Action research activities linked <strong>to</strong> the training<br />
Page 5 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
The Project provides Big Books and their sets <strong>of</strong> small books for group and<br />
individual reading in English and all 11 languages <strong>of</strong> Southern Africa. Sets <strong>of</strong><br />
books in both local language and English, s<strong>to</strong>ry sets, reference books, individual<br />
readers and information activity books and packs. They also provide a<br />
classroom library ‘box’ incorporating a display and support for using Big Books.<br />
The methodology used is very sound and derives in part from Australia where the<br />
most effective and thorough early years government language programme has<br />
been implemented. All the methodology, materials and assessment is in accord<br />
with best practice for literacy teaching as accepted in most Northern countries<br />
and an increasing number <strong>of</strong> Southern countries.<br />
The training and materials are based on sound Early Years’ <strong>Education</strong> and<br />
reflect the findings <strong>of</strong> research and the experience <strong>of</strong> effective Early Years’<br />
practice. The emphasis in training and in classroom follow-up is <strong>to</strong> support the<br />
educa<strong>to</strong>r in becoming a reflective practitioner.<br />
The evaluation reports show significant increases in learning achievement in<br />
literacy and numeracy and a significant but not necessarily linked reduction in<br />
retention rates. The display <strong>of</strong> children’s work and the use <strong>of</strong> books in the<br />
classroom has also increased.<br />
READ works through training local facilita<strong>to</strong>rs who will ensure the sustainability <strong>of</strong><br />
the programme. They have used some Subject Specialists as trainers.<br />
Classroom follow-up <strong>to</strong> training courses is considered an essential element in<br />
improving the practice <strong>of</strong> the educa<strong>to</strong>rs.<br />
The literacy programme is embedded in a whole school effectiveness<br />
programme that is almost identical <strong>to</strong> the IMBEWU model.<br />
READ calculates that it can provide the full resources for every classroom in the<br />
school, training and the cost <strong>of</strong> supervision for R.59 per learner.<br />
Some <strong>of</strong> the READ book packs, which include Big Books, have been produced<br />
in Black and White and children have coloured the illustrations. They represent a<br />
very cheap resource with quality s<strong>to</strong>ries and poems.<br />
Writing practices may lag behind the reading in terms <strong>of</strong> modern and effective<br />
classroom strategies. No evidence in the school <strong>of</strong> using a visual spelling<br />
strategy such as Look, Cover, Write, Check – very important in learning English<br />
and no evidence <strong>of</strong> using re-drafting and engaging children in the authorial and<br />
technical redrafting <strong>of</strong> their work. This might be an area that needs developing.<br />
Interestingly the evaluation reports all refer <strong>to</strong> writing as not being as effective in<br />
terms <strong>of</strong> learning achievement as reading.<br />
Page 6 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
Field Visit. READ school.<br />
Rural school in Peddie. Small school, <strong>of</strong>f track. Clean and neat. Cow dung<br />
floors. Very poor neighbourhood. Large number <strong>of</strong> children without shoes. All<br />
materials s<strong>to</strong>red correctly. Up <strong>to</strong> date children’s work displayed in all classrooms.<br />
School had no prior notice <strong>of</strong> visit. Principal was absent.<br />
One teacher absent, not noticeable as the children working at an assignment and<br />
those who had finished were reading books from the library box.<br />
Children in Grade 5 could tell the s<strong>to</strong>ry <strong>of</strong> the last book they read. Many <strong>of</strong> them<br />
had taken books home <strong>to</strong> read.<br />
Grade 1,2 and 3 were using Big Books related <strong>to</strong> different aspects <strong>of</strong> reading and<br />
writing.<br />
Grade 1 were reading a iXoxha s<strong>to</strong>ry called Run. They could read the s<strong>to</strong>ry<br />
<strong>to</strong>gether, predict from the pictures what would happen next, identify individual<br />
words. They were writing the key words down in their notebooks. Notebooks<br />
contained drawings, letters, words and sentences.<br />
Grade 2 children were working in both English and iXoxha using small books in<br />
groups. They demonstrated their reading with a shared Big Book TOPSY . The<br />
small books in this class were well thumbed and obviously well used.<br />
Grade 3 children were reading My Sister’s Wedding a very funny book which<br />
they were thoroughly enjoying. They had written in groups different parts <strong>of</strong> the<br />
s<strong>to</strong>ry – deciding which <strong>to</strong> write and then doing the writing individually. It was<br />
displayed on the wall.<br />
Grade 4 children were preparing a play based on a s<strong>to</strong>ry that they had read. It<br />
had a song which they demonstrated as an action song. They could talk, in<br />
English, about the details <strong>of</strong> the s<strong>to</strong>ry.<br />
Generally work on the wall in the school was imaginative, individual and creative<br />
– not copied or coloured in pictures. The books were all in use in some way or<br />
other in all <strong>of</strong> the classrooms. Class 7 were doing the project based book about<br />
the Post Office You have Mail!<br />
General impression – happy and well focused children. All outcomes seemed<br />
<strong>to</strong> be related <strong>to</strong>learning achieved and teachers were aware and had planned<br />
what outcomes they wanted using the 10 day planning grid. Level <strong>of</strong> display was<br />
very high and reflected the children’s current work. Children could all sing and<br />
say poems. All children joined in and teachers were able <strong>to</strong> identify the learning<br />
levels <strong>of</strong> the children – in one class the children needing more support were<br />
grouped <strong>to</strong>gether on one table. English started in Grade 2 in a functional way,<br />
<strong>of</strong>ten using both languages, using English and mother <strong>to</strong>ngue in Big Books.<br />
Page 7 <strong>of</strong> 8
IMBEWU II OPR Annexe 4 March 2003<br />
Functional charts – weather, date, moni<strong>to</strong>r charts were all in English from Grade<br />
1.<br />
Page 8 <strong>of</strong> 8
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
DFID PROJECT PROGRESS REPORT<br />
OUTPUT TO PURPOSE ANNUAL REVIEW <strong>Report</strong><br />
Type <strong>of</strong> <strong>Report</strong>: OPR<br />
PART A.<br />
Country: South Africa, Republic <strong>of</strong> Project: IMBEWU II Contract No: 001962<br />
Project Officer<br />
Ms Lusungu<br />
Kanchenche<br />
Start Date:<br />
End Date:<br />
12 January 2002<br />
January 2009<br />
Date <strong>of</strong> Visit:<br />
March 2003<br />
Date <strong>of</strong> <strong>Report</strong>:<br />
MIS Code: 059-550-097<br />
Risk Category:<br />
Project Budget Spend in period under<br />
review<br />
Cumulative spend Forecast for current financial year<br />
£22m £1,932,600 (est) £1,932,600 (est) £1,932,600 (est)<br />
Goal Statement OVIs<br />
To increase significantly the learning achievement <strong>of</strong> children from Eastern<br />
Cape Province.<br />
• Significantly increased numbers <strong>of</strong> pupils completing primary school within 7<br />
year cycle (5% pa).<br />
<strong>Purpose</strong> Statement OVIs<br />
<strong>Purpose</strong>: To develop an effective, efficient and affordable<br />
decentralised education system<br />
• Measurable improvement in classroom practice.<br />
• Whole school development model processed in Eastern Cape schools.<br />
• District <strong>of</strong>fices providing effective and timely educational advice and support <strong>to</strong><br />
schools.<br />
• ECED allocating an increased % <strong>of</strong> their budget <strong>to</strong> non-personnel expenditure.<br />
Page 1 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• ECED meet service delivery targets for schools as agreed with communities<br />
and planned for in the MTEF.<br />
Page 2 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
<strong>Output</strong>s/OVIs Progress Comments and outputs for<br />
next period<br />
Planned (period under<br />
review)<br />
Actual (including comments<br />
if required)<br />
1. A provincial department <strong>of</strong><br />
education, with an enhanced<br />
strategic role.<br />
• Organogram finalised and critical<br />
posts filled in PY1.<br />
• 50 % <strong>of</strong> admin backlogs cleared by<br />
PY1 and completed by PY2<br />
• All key management systems and<br />
procedures in place by end <strong>of</strong> PY1.<br />
• All critical processes documented<br />
and implemented by the end <strong>of</strong><br />
PY1.<br />
• Specific policy guidelines completed<br />
by end <strong>of</strong> PY1<br />
• Comprehensive Provincial INSET<br />
programme operationalised by PY1.<br />
• All managers have personnel<br />
development plans by PY2.<br />
• INSET recorded and certificated in<br />
terms <strong>of</strong> skills and competencies by<br />
PY4.<br />
• National ‘Tirisano’ policy on HIV<br />
mitigation is reflected in Provincial<br />
Policy Development by PY1<br />
• A programme for HIV/AIDS<br />
education in schools from Age 7<br />
developed and training<br />
implemented.<br />
• Preparation by departmental<br />
players <strong>of</strong> an integrated and<br />
comprehensive annual workplan<br />
which reflects their strategic<br />
priorities and would form the<br />
basis for allocating IMBEWU<br />
resources around logframe<br />
outputs.<br />
• Continuing series <strong>of</strong><br />
programmme planning reviews<br />
and direct engagement with<br />
departmental planning cycle <strong>to</strong><br />
ensure maximum integration <strong>of</strong><br />
programme in<strong>to</strong> strategic plans<br />
and direc<strong>to</strong>rate budgets.<br />
• Initial work planning for <strong>Output</strong>s<br />
2 and 3 carried out in March but<br />
not linked <strong>to</strong> resource base nor<br />
integrated with (revised) ECED<br />
strategic plan. Limited<br />
participation in subsequent<br />
planning events leading<br />
incomplete plans<br />
• An effective TA support model is<br />
emerging in 5 Chief Direc<strong>to</strong>rates<br />
which enables them <strong>to</strong> access<br />
IMBEWU funding and facilitate<br />
project implementation through<br />
identifying priorities for<br />
management and admin systems<br />
improvements.<br />
Introduction <strong>of</strong> completely new staffing<br />
organogram coincided with Imbewu II<br />
start up in Jan 2002. Most managers<br />
without complete job descriptions/<br />
performance targets and many placed<br />
in<strong>to</strong> new positions without adequate<br />
preparation. Admin backlogs have<br />
caused serious problems and resulted in<br />
disruptive industrial action. No agreed<br />
baseline figures for admin backlogs from<br />
which <strong>to</strong> measure progress. Many<br />
departmental positions remain unfilled<br />
(e.g. 64% <strong>of</strong> middle management) so<br />
additional longer term TAs required<br />
across most Chief Direc<strong>to</strong>rates <strong>to</strong><br />
support development <strong>of</strong> effective<br />
planning and management systems and<br />
use <strong>of</strong> IMBEWU funds.<br />
The establishment <strong>of</strong> an IMBEWU<br />
Programme Executive Management<br />
Team (EMT), as specified in the funding<br />
agreement is still outstanding. This<br />
would help the Programme’s integrated<br />
work plan become fully integrated with<br />
the <strong>Department</strong>’s plans and facilitate the<br />
use <strong>of</strong> IMBEWU funds <strong>to</strong> complement<br />
priority strategic activities. The PPRU<br />
will assist with planning cycle and<br />
integrate IMBEWU plans and inputs.<br />
Page 3 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
A Management development<br />
programme for all senior managers set<br />
as priority by IMT. Will have a strong<br />
focus on personal transformation, team<br />
building and organisational culture and<br />
ethics. R11m investment in the<br />
University <strong>of</strong> Fort Hare’s new <strong>Education</strong><br />
Leadership and Management and<br />
Development Programme targeted at<br />
district staff.<br />
• Organise workshops for senior<br />
managers <strong>to</strong> integrate ECED<br />
transformation strategy in<strong>to</strong><br />
objectives and performance<br />
indica<strong>to</strong>rs <strong>to</strong> determine use <strong>of</strong><br />
IMBEWU resources.<br />
• Use <strong>of</strong> activity-based work<br />
planning <strong>to</strong>ol provided <strong>to</strong><br />
structure funding proposals and<br />
forecast IMBEWU programme<br />
expenditure leading <strong>to</strong> improving<br />
quality <strong>of</strong> proposals for Imbewu<br />
funding.<br />
Reflection and planning day scheduled<br />
in January not convened making it<br />
difficult <strong>to</strong> develop and agree IMBEWU<br />
integrated work plan for 2003-04.<br />
• <strong>Department</strong>al counterpart <strong>to</strong><br />
Programme Co-ordina<strong>to</strong>r <strong>to</strong> be<br />
identified<br />
• Counterpart <strong>to</strong>ok up appointment<br />
in January 2003.<br />
Will take a leading role in embedding<br />
Imbewu in<strong>to</strong> the ECED.<br />
• Recruit TAs <strong>to</strong> increase finance<br />
direc<strong>to</strong>rates’ capacity <strong>to</strong><br />
improve all financial and<br />
management systems.<br />
• TAs contributed <strong>to</strong> improved<br />
functioning <strong>of</strong> finance systems<br />
and reducing backlogs and<br />
assisted with the preparation <strong>of</strong><br />
proposals for 5 projects (R7m) <strong>to</strong><br />
improve financial management<br />
systems and personnel/payment<br />
records and which are aligned<br />
with the Provincial Treasury<br />
intervention programme.<br />
• Technical assistance has<br />
contributed <strong>to</strong> improved functions<br />
<strong>of</strong> finance systems and support.<br />
Substantial proposals that were put<br />
forward for IMBEWU funding (R27m) by<br />
Corporate Services were withdrawn as a<br />
result <strong>of</strong> the Treasury intervention<br />
programme. The limited capacity within<br />
the financial services direc<strong>to</strong>rates <strong>to</strong><br />
plan and manage approved projects has<br />
meant delays in implementation. A<br />
‘generic’ longer term specialist TA<br />
needed <strong>to</strong> facilitate programme delivery<br />
and develop capacity; and work with<br />
JMT <strong>to</strong> identify priorities.<br />
Page 4 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• Recruit TA <strong>to</strong> review LSM<br />
Integrated Supply Chain<br />
Management process and<br />
prepare design proposals for<br />
improved/cost effective LSM<br />
(learner support material)<br />
procurement/ delivery/local<br />
materials production for 2003/4.<br />
• TA <strong>to</strong> work with SG <strong>to</strong> develop<br />
Policy and Planning Unit (PPU)<br />
concept paper.<br />
• TA <strong>to</strong> establish reporting systems<br />
for all managers and<br />
departmental annual report;<br />
support for establishing<br />
communications<br />
• Establishing new ECED head<br />
<strong>of</strong>fice complex and upgrading<br />
ICT systems (R5m)<br />
• Development <strong>of</strong> an integrated<br />
framework for HRM; establishing<br />
a training and development<br />
reference group.<br />
• Crises with LSM procurement<br />
meant direct sourcing but has led<br />
<strong>to</strong> the development <strong>of</strong> a<br />
management information system<br />
for district direc<strong>to</strong>rs <strong>to</strong> moni<strong>to</strong>r<br />
deliveries<br />
• TOR for review prepared and<br />
project approved, TA contracted.<br />
• Agreed concept and<br />
development plan for<br />
establishing unit from 1/4/03.<br />
• TA support <strong>to</strong> SG’s <strong>of</strong>fice <strong>to</strong> plan<br />
and implement formal<br />
management reporting systems.<br />
Annual report prepared and<br />
reporting manual produced.<br />
• New modern <strong>of</strong>fice environment<br />
created equipped with electronic<br />
communications for all HQ staff<br />
• TA appointed <strong>to</strong> assist with ICT<br />
policy development and skills<br />
training/development.<br />
• TA assisted with preparation <strong>of</strong><br />
framework for the organisational<br />
development and training <strong>of</strong> the<br />
HRM Direc<strong>to</strong>rate at HQ and<br />
district level as well as<br />
strengthening admin and<br />
performance management<br />
systems. 7 sub-projects with a<br />
budget <strong>of</strong> R7.1m approved by<br />
PSC. School transformation<br />
training programme also training<br />
selected staff<br />
<strong>Department</strong> will need <strong>to</strong> urgently put out<br />
<strong>to</strong> tender LSM procurement <strong>to</strong> ensure<br />
timely delivery for 2004 and avoid the<br />
2002 contracting problems. LSM budget<br />
represents 20% <strong>of</strong> ECED non personnel<br />
budget. TA <strong>to</strong> assist with project<br />
managing the ISC and service<br />
providers.<br />
Full endorsement from new MEC <strong>to</strong><br />
establish the new PPU.<br />
Fully functioning PPRU established; and<br />
possibly with responsibility for donor coordination.<br />
New communications direc<strong>to</strong>rate<br />
established and contributing <strong>to</strong> improved<br />
internal/external reporting and image<br />
building; building knowledge base.<br />
Limited use by staff (survey indicated<br />
83% <strong>of</strong> staff cannot use computers and<br />
only 12% use emails).. Intensive training<br />
and technical support <strong>to</strong> HQ/districts<br />
planned.<br />
Substantial training activity for provincial<br />
and district staff throughout 2003 is<br />
proposed – will need <strong>to</strong> be carefully coordinated<br />
with the demands <strong>of</strong> other<br />
departmental training and pr<strong>of</strong>essional<br />
development programmes.<br />
The review <strong>of</strong> departmental staffing by<br />
JMT may have an impact on HR/<br />
performance management priorities.<br />
Page 5 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
<strong>Review</strong> <strong>of</strong> role <strong>of</strong> <strong>Department</strong>’s<br />
Information & Resource Centre<br />
• Support <strong>to</strong> 1500 schools project<br />
team through external<br />
comprehensive project<br />
management support team <strong>to</strong><br />
assist with roll out <strong>of</strong> project and<br />
co-ordinating additional service<br />
provider inputs.<br />
• Work with 1500 schools team<br />
project manager (TA) <strong>to</strong><br />
maximise opportunities for links<br />
with IMBEWU school<br />
transformation training<br />
programme and utilise media <strong>to</strong><br />
support campaign.<br />
• IMBEWU Programme Advisory<br />
Board meeting<br />
• TA completed review <strong>of</strong> role <strong>of</strong><br />
Information & Resource Centre<br />
and prepared draft development<br />
plan.<br />
• Extranet developed further and<br />
initial staff training undertaken.<br />
• Initial recruitment <strong>of</strong> service<br />
provider not successful as<br />
requirements changed <strong>to</strong> include<br />
managing disbursement <strong>of</strong> R40<br />
maintenance grants: TA<br />
appointed <strong>to</strong> assist with<br />
preparation <strong>of</strong> comprehensive<br />
project management proposal <strong>to</strong><br />
include TA.<br />
• Collaboration between IMBEWU<br />
training programme team with<br />
planning training events –<br />
support for financial<br />
management training in all<br />
districts.<br />
• No meeting - Advisory Board not<br />
in place.<br />
Second TA visit <strong>to</strong> progress plans,<br />
elaborate EDC plans and support<br />
strategies <strong>to</strong> districts. New staff<br />
positions for Centre not<br />
established/approved yet although<br />
department responsible for costs from<br />
April. Links established with new<br />
Direc<strong>to</strong>rate <strong>of</strong> Communications and<br />
Liaison and development strategy<br />
agreed.<br />
1500 project management funding<br />
proposal <strong>to</strong> PSC withdrawn. Unclear<br />
how the 1500 schools project is being<br />
developed <strong>to</strong> support the next cohort <strong>of</strong><br />
1500 schools in 2003-04.<br />
Availability <strong>of</strong> GET Direc<strong>to</strong>rate staffing <strong>to</strong><br />
project manage is limited. Targets for<br />
schools achieving conditional Section 21<br />
status not achieved.<br />
Set date and terms <strong>of</strong> reference for<br />
Advisory Board<br />
Page 6 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• TAs <strong>to</strong> assist with establishing<br />
new Curriculum Management<br />
and Pr<strong>of</strong>essional Development<br />
Chief Direc<strong>to</strong>rate.<br />
• Recruitment <strong>of</strong> 3 long term TAs<br />
and service providers <strong>to</strong> support<br />
Chief Direc<strong>to</strong>rate with planning<br />
and implementing Foundation<br />
Phase teacher training<br />
programme (advocacy, materials<br />
development, training delivery).<br />
• UFH scoping study for curriculum<br />
leadership programme<br />
• HR direc<strong>to</strong>rate established and<br />
process <strong>of</strong> filling posts started.<br />
• Strategy and policy framework<br />
for INSET endorsed and<br />
embedded<br />
• Development <strong>of</strong> delivery strategy<br />
and action plan for the roll out<br />
plan <strong>of</strong> the Foundation Phase<br />
Training Programme (18000<br />
educa<strong>to</strong>rs)<br />
• Provisional design <strong>of</strong> FD INSET<br />
training programme agreed and<br />
planning continuing for<br />
implementation <strong>of</strong> the action plan<br />
<strong>to</strong> train and prepare 18,000<br />
Foundation Phase educa<strong>to</strong>rs in,<br />
2003 <strong>to</strong> use National Curriculum<br />
Statements in 2004.<br />
• Training model and FP training<br />
materials development budget<br />
developed and approved.<br />
• Service provider for<br />
advocacy/awareness raising<br />
programme approved by PSC<br />
(R9.7m) and contracted.<br />
Constraints continue <strong>to</strong> include serious<br />
staffing shortages in provincial and<br />
district <strong>of</strong>fices. This also affects the<br />
working <strong>of</strong> effective counterpart<br />
arrangements for TAs.<br />
Two long-term TAs support CD <strong>to</strong> roll<br />
out FP Training Programme and coordinate<br />
inputs from several service<br />
providers.<br />
Additional service providers selected<br />
and ready <strong>to</strong> be contracted from 1 April<br />
when c. R35m will available from DoE<br />
funds.<br />
Study <strong>to</strong>ur for curriculum<br />
management/leaders <strong>to</strong> be conducted.<br />
Delivery <strong>of</strong> Foundation Phase training<br />
.<br />
• Quality assurance system for<br />
IMBEWU Programme activities <strong>to</strong><br />
be agreed and put in place<br />
• ECED system not yet developed Critical need <strong>to</strong> obtain departmental<br />
guidelines <strong>to</strong> provide base for design<br />
and implementation <strong>of</strong> system <strong>to</strong><br />
actualise planned activity.<br />
• Put in place baseline evaluation<br />
design and appoint evaluation<br />
team<br />
• Consultation meetings with<br />
stakeholders – approach will be<br />
participa<strong>to</strong>ry including using<br />
practitioners for moni<strong>to</strong>ring and<br />
data collection<br />
Evaluation programme agreed and<br />
commissioned.<br />
• Draft Programme Management<br />
manual<br />
• Version 2 circulated in January. Formal endorsement <strong>of</strong> PMM and<br />
dissemination.<br />
Page 7 <strong>of</strong> 21
2. A fully functioning and selfmanaging<br />
district structure providing<br />
quality support <strong>to</strong> schools.<br />
(See Strategic Plan Focus 7).<br />
• All critical posts filled by end <strong>of</strong> PY1.<br />
• EDOs more effectively involved in<br />
service <strong>of</strong> schools.<br />
• Administrative systems operational<br />
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• Development <strong>of</strong><br />
provincial/national/regional<br />
consultant data base and audit <strong>of</strong><br />
existing<br />
provincial/national/regional<br />
resources which can be utilised<br />
by the Programme<br />
• Advertisements resulted in very<br />
poor response.<br />
• Data base <strong>of</strong> consultants/service<br />
providers registered with<br />
Programme now operational.<br />
• TA assistance with establishing<br />
new <strong>Department</strong>al annual report<br />
format and preparation <strong>of</strong> annual<br />
report; and development<br />
provincial quarterly reporting<br />
format and assistance with<br />
producing management reports.<br />
Recruitment <strong>of</strong> PDI/empowerment<br />
individual consultants and service<br />
providers proving difficult – will require<br />
ECED <strong>to</strong> be more proactive in<br />
developing consultant base.<br />
Annual report published.<br />
Need continuing support <strong>to</strong> ensure<br />
regular reporting and analysis is<br />
embedded in<strong>to</strong> department.<br />
• TA assistance with developing<br />
longer term strategies for MIP<br />
Further strategic development work<br />
required and earlier implementation in<br />
2003 needed if matric. results are <strong>to</strong> be<br />
improved<br />
• Information and Resource Centre:<br />
upgrading <strong>of</strong> ICT and related<br />
resources; development <strong>of</strong> first<br />
phase short course programme<br />
for ECED staff<br />
TA required <strong>to</strong> formulate a development<br />
plan and budget in preparation for<br />
departmental management/resourcing <strong>of</strong><br />
centre in next financial year.<br />
• Technical assistance support <strong>to</strong><br />
HIV/AIDS education programme<br />
funded through a conditional grant<br />
• No HIV/AIDS dimension <strong>to</strong> any <strong>of</strong><br />
the projects funded by IMBEWU<br />
(except IMBEWU training<br />
programme)<br />
PSC must require that all future project<br />
proposals have a HIV/AIDS<br />
awareness/education component<br />
Delays in finalising migration<br />
programme still creating uncertainty<br />
amongst staff – disproportionate impact<br />
on districts in North East <strong>of</strong> Province<br />
with many unfilled posts and some staff<br />
placed in posts where they do not have<br />
recent relevant technical expertise.<br />
Newly appointed CES/DCESs, subject<br />
advisers beginning <strong>to</strong> contribute <strong>to</strong><br />
Page 8 <strong>of</strong> 21
<strong>to</strong> promote effectiveness and<br />
efficiency in bridging gap between<br />
province and schools.<br />
• EMIS PERSAL and FMS operating<br />
in target districts by PY2<br />
• All EDCs operating effectively as<br />
<strong>Education</strong> Resource Centres by<br />
end <strong>of</strong> PY3.<br />
• Build capacity <strong>of</strong> schools <strong>to</strong>wards<br />
self-generating state.<br />
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
improved school support. Still many<br />
positions unfilled.<br />
Freeze on <strong>Department</strong>al staff<br />
appointments as a result <strong>of</strong> overspend<br />
on salaries. Capacity <strong>of</strong> many districts <strong>to</strong><br />
support roll-out <strong>of</strong> the 2003 plans for<br />
training <strong>of</strong> 18000 Foundation Phase<br />
educa<strong>to</strong>rs and 3000 schools under the<br />
Section 21 initiative will be restricted.<br />
Improved co-operation <strong>to</strong> release district<br />
staff <strong>to</strong> assist with the IMBEWU School<br />
Transformation Training Programme.<br />
Ad hoc closure <strong>of</strong> Processing centres<br />
has had adverse impact on districts<br />
‘causing paralysis <strong>of</strong> service delivery’<br />
(from proceedings <strong>of</strong> District<br />
Development Planning Event).<br />
Agreement reached with IPSP <strong>to</strong><br />
participate in each other’s Steering<br />
Committee meetings and share<br />
documentation; and <strong>to</strong> collaborate on<br />
roll out <strong>of</strong> social needs cluster concept.<br />
However impact <strong>of</strong> large numbers <strong>of</strong><br />
provincial govt. staff on small district<br />
<strong>to</strong>wns not fully appreciated.<br />
• Establish district development<br />
support team <strong>to</strong> operationalise<br />
implementation/rollout <strong>of</strong> new<br />
model in phase I priority district<br />
<strong>of</strong>fices(6).<br />
• District <strong>Education</strong> Forums<br />
established.<br />
• District Development Technical<br />
Task Team Manager (12 month<br />
TA) recruited and operational<br />
from Jan 2003.<br />
Delays in recruitment process.<br />
Implementation <strong>of</strong> plan <strong>to</strong> action<br />
recommendations from survey <strong>of</strong> 6 most<br />
disadvantaged district <strong>of</strong>fices <strong>to</strong> identify<br />
immediate remedial action <strong>to</strong> improve<br />
infrastructure/services will commence.<br />
Service providers contracted <strong>to</strong> carry out<br />
infrastructure and services<br />
improvement.<br />
Recruitment <strong>of</strong> further 4 TAs <strong>to</strong> provide<br />
Page 9 <strong>of</strong> 21
3. Schools which, having undergone<br />
a whole school effectiveness<br />
process, are better able <strong>to</strong> provide<br />
improved learning opportunities for<br />
their learners.<br />
(See Strategic Plan Focus 1)<br />
• Pupil/teacher contact time increased<br />
by 5% pa.<br />
• Functional school management<br />
teams, school governing bodies, and<br />
Learner Representative Councils in<br />
place in all schools.<br />
• Negotiated code <strong>of</strong> conduct in place<br />
and disciplinary problems handled<br />
procedurally.<br />
• In the majority <strong>of</strong> schools there is<br />
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
direct support <strong>to</strong> district managers.<br />
Further development <strong>of</strong> EDC model and<br />
plans <strong>to</strong> establish first group <strong>of</strong><br />
functioning EDCs in 6 priority districts.<br />
• Facilitate development <strong>of</strong> robust<br />
<strong>Education</strong> Development Centre<br />
design for districts.<br />
• Equipping <strong>of</strong> 14 district <strong>of</strong>fices<br />
with additional ICT equipment<br />
and ongoing technical support<br />
1. Secure high level commitment <strong>to</strong><br />
appointing IMBEWU network <strong>of</strong><br />
staff (training co-coordina<strong>to</strong>rs) at<br />
district level.<br />
• TA completed contract <strong>to</strong> assist<br />
with improving basic <strong>of</strong>fice<br />
systems procedures in provincial<br />
department.<br />
• DMs supported <strong>to</strong> use email as<br />
key means <strong>of</strong> communications<br />
with provincial <strong>of</strong>fice.<br />
• Concept design for multipurpose<br />
resource centres <strong>to</strong><br />
support school clusters put<br />
forward as basic building block <strong>to</strong><br />
link with District EDC<br />
• Delayed due <strong>to</strong> many <strong>of</strong> these<br />
district <strong>of</strong>fices needing<br />
security/services upgrading<br />
before ICT equipment can be<br />
installed.<br />
2. Migration programme and other<br />
fac<strong>to</strong>rs mitigate against release<br />
<strong>of</strong> staff by direc<strong>to</strong>rates and<br />
district <strong>of</strong>fices. Improving<br />
collaboration on the release <strong>of</strong><br />
district staff.<br />
Priority for new district development<br />
technical task team <strong>to</strong> assist with the<br />
introduction <strong>of</strong> standardised<br />
development planning and admin<br />
systems and procedures.<br />
Further ICT training required <strong>to</strong> support<br />
use by DMs.<br />
EDC not yet established in great<br />
majority <strong>of</strong> districts. No budget available<br />
for this level <strong>of</strong> investment.<br />
Better co-ordination with other ICT<br />
initiatives still required. 10 districts being<br />
wired by USAID.<br />
Policy decision needed <strong>to</strong> guide<br />
departmental/district direc<strong>to</strong>rs on<br />
release <strong>of</strong> staff <strong>to</strong> work in the School<br />
Transformation Training Programme<br />
teams.<br />
Page 10 <strong>of</strong> 21
evidence on the walls <strong>of</strong> classrooms<br />
etc. Of an HIV/AIDS awareness<br />
campaign.<br />
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
3. Planning and design <strong>of</strong> detailed<br />
and comprehensive school<br />
transformation training workshop<br />
and materials development<br />
programme for 1500 schools <strong>to</strong><br />
March 2003<br />
• District orientation events<br />
launched<br />
• Media/PR programme<br />
• Advocacy/Publicity and<br />
information packs including radio<br />
promotion<br />
• TA <strong>to</strong> support logistics<br />
• Preparation for vision crafting<br />
training <strong>of</strong> trainers events<br />
(including printing <strong>of</strong> modules)<br />
• Introduction <strong>to</strong> OBE<br />
• modules for Grade 10 educa<strong>to</strong>rs;<br />
supply <strong>of</strong> materials.<br />
• Production <strong>of</strong> IMBEWU exhibition<br />
materials<br />
• <strong>Report</strong>ing on GET process<br />
4. TA support for longer term<br />
planning in 2003 <strong>to</strong> ensure Matric<br />
Intervention Programme<br />
interventions are introduced early<br />
in academic year<br />
• Imbewu Training Programme<br />
Retreat<br />
• Detailed programme prepared<br />
and budgeted. R5.4m budget<br />
approved at 30 Oc<strong>to</strong>ber PSC<br />
meeting.<br />
• Vision Crafting TOT and district<br />
workshops: Meetings <strong>to</strong> review<br />
and improve Vision Crafting<br />
Module and new video<br />
• TOT workshops for district<br />
orientation launches<br />
• District Orientation meetings in<br />
each district<br />
• Media coverage for launches<br />
(radio slots, newspaper district<br />
publicity)<br />
• New publicity materials<br />
• Collaborative/coordination/planning<br />
meetings<br />
with other departmental staff<br />
• Printing and delivery <strong>of</strong> Grade 10<br />
Introduction <strong>to</strong> OBE modules<br />
5. Strategy review <strong>of</strong> MIP and<br />
revised programme for 2003<br />
developed.<br />
• Successful 2 ½ day programme<br />
with full record and outcomes;<br />
included sessions for some<br />
senior staff <strong>to</strong> identify<br />
programme priorities <strong>to</strong> be<br />
included in the IMBEWU<br />
integrated work plan for 2002-03.<br />
Preparation and Delivery <strong>of</strong> Resource<br />
Packs in<strong>to</strong> targeted schools<br />
Extensive programme <strong>of</strong> vision crafting<br />
events, training <strong>of</strong> District Training<br />
Teams and <strong>Education</strong> Development<br />
Officers, new module/materials<br />
development planned for 2003 with a<br />
budget <strong>of</strong> R11m.<br />
Curriculum Direc<strong>to</strong>rate responsible<br />
follow-up training throughout province<br />
Other priorities meant that attendance<br />
by senior staff was limited.<br />
Page 11 <strong>of</strong> 21
4. Improved asset management and<br />
lower cost school buildings<br />
(See Strategic Plan Focus 4 and 3)<br />
• Break-in and damage <strong>to</strong> schools<br />
reduced by 5% pa.<br />
• Reduction in need for school<br />
transport<br />
• Reduction in pla<strong>to</strong>oning/ double<br />
shifts<br />
• Increased number <strong>of</strong> school<br />
buildings completed each year.<br />
5. Communities sufficiently<br />
motivated <strong>to</strong> become critically<br />
engaged with education decisionmakers.(See<br />
Strategic Plan Focus 3)<br />
• Increased use <strong>of</strong> schools for ABET,<br />
health education and other<br />
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• SDSS training in districts<br />
6. TA support <strong>to</strong> physical resource<br />
planning and design<br />
• School Development Support<br />
System: district workshops for<br />
2205 participants.<br />
TA report recommendation for 3 TAs<br />
<strong>to</strong> support development <strong>of</strong> physical<br />
resource planning (social interaction,<br />
skills audit, HIV/AIDS & disabilities)<br />
Detailed district reports prepared and<br />
will be used <strong>to</strong> plan future training. Will<br />
be handed over <strong>to</strong> DMs at IMBEWU<br />
retreat.<br />
Increased crime rate threatens security<br />
<strong>of</strong> school buildings and communities.<br />
7. Recruitment <strong>of</strong> TAs (project<br />
manager and appropriate<br />
technology school building<br />
expert) <strong>to</strong> assist Direc<strong>to</strong>rate<br />
with implementing two major<br />
project initiatives: 1500 schools<br />
project - financial management<br />
<strong>of</strong> R40m grant disbursement <strong>to</strong><br />
1500 schools (80m in 2003) and<br />
pilot low cost technology school<br />
building programme<br />
• Appropriate technology TA<br />
recruited<br />
• Short term TA <strong>to</strong> assist with EMIS<br />
mapping and identification <strong>of</strong> pilot<br />
sites<br />
Delay with setting up 1500 project and<br />
financial system means increasing<br />
likelihood that there will a serious underspend<br />
with consequences for next<br />
year’s budgetary allocation.<br />
Under staffing in this direc<strong>to</strong>rate means<br />
that the <strong>of</strong>ficers find it difficult <strong>to</strong> access<br />
IMBEWU programme funding. Interim<br />
arrangements may include a short-term<br />
TA. One TA (project manager) <strong>to</strong> be<br />
appointed.<br />
Selection <strong>of</strong> 8 pilot areas <strong>to</strong> build<br />
demonstration low cost schools and<br />
carry out mapping and community<br />
consultations for design stage in<br />
these areas.<br />
• Baseline mapping exercise<br />
project not yet completed from<br />
first consultancy visit in April<br />
2002.<br />
Proposed second short-term TA visit<br />
deferred <strong>to</strong> February 2003<br />
• Terms Of Reference for work on<br />
the Community – School<br />
Integration Pilot Project:<br />
• TOR and indicative work plan<br />
and budget for Phase 1 – 4<br />
prepared. TAs identified.<br />
• Working group contributing <strong>to</strong><br />
• Pilot launched in selected schools.<br />
Collaboration with existing<br />
community-based projects (microenterprise,<br />
socio-economic<br />
development, eco-<strong>to</strong>urism etc).<br />
Page 12 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
community activities.<br />
• Links formed with community fora.<br />
• Increased level <strong>of</strong> community<br />
involvement, more new people<br />
involved each year.<br />
• Implementation <strong>of</strong> outreach and<br />
community service learning projects<br />
at school.<br />
Learners involved in school mapping -<br />
related <strong>to</strong> security and safety <strong>of</strong> schools.<br />
• Joint working with other agencies<br />
working in the community<br />
enterprise arena<br />
planning <strong>of</strong> pilot project<br />
• Research study on existing<br />
community-based projects and<br />
in<strong>to</strong> identifying local projects <strong>to</strong><br />
collaborate with.<br />
• Study on existing community-based<br />
projects.<br />
• More emphasis on links with<br />
HIV/AIDS programmes needs <strong>to</strong> be<br />
made.<br />
General/overall progress assessment – Project <strong>Purpose</strong> X – <strong>to</strong>o early <strong>to</strong> judge extent <strong>of</strong> achievement<br />
Justification<br />
Although there is evidence <strong>of</strong> progress <strong>to</strong>wards achievement <strong>of</strong><br />
project outputs, particularly the school transformation output, it is<br />
<strong>to</strong>o early <strong>to</strong> judge the extent <strong>to</strong> which the project purpose will be<br />
achieved. Fine-tuned OVIs (see revised logframe) and the<br />
evaluation framework should be able <strong>to</strong> inform this assessment at<br />
the next review.<br />
General/overall progress assessment – Project <strong>Output</strong>s 4 – only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent<br />
Justification<br />
There is evidence <strong>of</strong> progress <strong>to</strong>wards achievement <strong>of</strong> project<br />
outputs. The score <strong>of</strong> 4 reflects a rounded <strong>of</strong>f average figure <strong>of</strong><br />
the output scores for 4 <strong>of</strong> the 5 project outputs. It is <strong>to</strong>o early <strong>to</strong><br />
indicate likelihood <strong>of</strong> achievement <strong>of</strong> one <strong>of</strong> the outputs at this<br />
Page 13 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
time.<br />
Log Frame Level<br />
Inputs/activities Performance ratings Comments<br />
(a) Appropriateness (quality) (a) DFID Rating Personnel & TA?<br />
(b) Partner Rating<br />
(b) Efficiency (quantity) (a) DFID Rating Funds? Personnel & TA?<br />
Engagement?<br />
(b) Partner Rating Personnel? Engagement? Re<br />
undertakings/conditionalities<br />
(c) Sufficiency (timeliness) (a) DFID Rating Speed? Re planning,<br />
implementation<br />
(b) Partner Rating<br />
Overall Assessment* Rating<br />
*Including conditionality aspects where relevant<br />
PART B<br />
<strong>Purpose</strong>/OVIs Progress Comments<br />
1. Measurable improvement in classroom practice.<br />
2. Whole school development model processed in<br />
1. The extent <strong>of</strong> improvement in classroom practice<br />
is currently not known in the absence <strong>of</strong> baseline<br />
1. An evaluation framework has been developed<br />
Page 14 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
Eastern Cape schools.<br />
3. District <strong>of</strong>fices providing effective and timely<br />
educational advice and support <strong>to</strong> schools.<br />
4. ECED allocating an increased % <strong>of</strong> their budget<br />
<strong>to</strong> non-personnel expenditure.<br />
5. ECED meet service delivery targets for schools<br />
as agreed with communities and planned for in the<br />
MTEF.<br />
information and an evaluation framework.<br />
2. The review and reports presented <strong>to</strong> the PSC<br />
indicate that the implementation <strong>of</strong> the school<br />
transformation model is going well. Vision crafting<br />
workshops for principals, educa<strong>to</strong>rs and SGB<br />
members is underway and found <strong>to</strong> be effectively<br />
undertaken with no dilution <strong>of</strong> quality by district<br />
<strong>of</strong>ficials.<br />
3. There has been little progress against this OVI.<br />
4. Spend on the non-personnel allocation has eaten<br />
in<strong>to</strong> allocations for non-personnel expenditure.<br />
5.<br />
and is awaiting approval.<br />
2. The Imbewu school transformation model has<br />
been adopted by the <strong>Department</strong>. This was<br />
successfully implemented in the 523 Imbewu<br />
Schools under Imbewu Phase I. The model is now<br />
being rolled out <strong>to</strong> the poorest first 1500 schools.<br />
3. Districts are currently not operating as they<br />
should. There is need <strong>to</strong> strengthen structures and<br />
infrastructure in the districts. District managers<br />
currently provide mostly administrative support and<br />
little educational advice <strong>to</strong> schools.<br />
4. This OVI has been dropped at the<br />
recommendation <strong>of</strong> the review (see revised<br />
logframe).<br />
5. This OVI has been dropped at the<br />
recommendation <strong>of</strong> the review (see revised<br />
logframe)<br />
Attribution<br />
It is <strong>to</strong>o early <strong>to</strong> judge the extent <strong>to</strong> which planned outputs have contributed <strong>to</strong> the achievement <strong>of</strong> the project purpose. Planned projects<br />
outputs are necessary and sufficient <strong>to</strong> achieve the project purpose. The review has recommended some fine-tuning <strong>to</strong> some purpose<br />
OVIs as well as added a project assumption.<br />
<strong>Purpose</strong> <strong>to</strong> Goal<br />
The implementation <strong>of</strong> an evaluation framework currently under development is envisaged <strong>to</strong> give incremental indications <strong>of</strong> achievement<br />
<strong>of</strong> the goal OVI.<br />
Page 15 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
DOES LOGFRAME REQUIRE REVISION? YES<br />
Old version and agreed revised version attached as Annex 1 and 2 respectively.<br />
Do PIMS markers require revision? NO<br />
Quality <strong>of</strong> scoring<br />
The multi-disciplinary 13-person review team visited a sample <strong>of</strong> districts (9) and schools (>35) schools in the Eastern Cape. These<br />
visits enabled the team <strong>to</strong> see and assess the impact and progress <strong>of</strong> Imbewu through meetings and observation. The review team met<br />
with and interviewed more than 60 people including the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> including districts and schools, <strong>Department</strong> <strong>of</strong><br />
Economic Affairs and Environment, Office <strong>of</strong> the Premier, National Treasury, the Managing Consultants, external donors and donor<br />
funded projects, Imbewu managers, IMT/<strong>Department</strong> for Public Administration, Universities, the Provincial Legislature, DFID-funded<br />
technical assistants, and the IPSP programme. The review team was provided with enough materials on the Imbewu programme itself<br />
as well as the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> including a budget speech (the review also coincided with the provincial budget speech). In<br />
addition, the review has coincided with the presence <strong>of</strong> National Governments Interim Management Team/Joint Management Team in<br />
the Eastern Cape. Final review recommendations, forward programme workplans and recommended logframe revisions expect <strong>to</strong><br />
complement and/or support IMT/JMT imperatives.<br />
The only important <strong>of</strong>ficials that the review team was unable <strong>to</strong> meet were from the Human Resources direc<strong>to</strong>rate.<br />
Lessons learned and suggested dissemination<br />
• People need space <strong>to</strong> internalise training - attitude change takes longer.<br />
• The structured transformation model works – When you concentrate on the school, it makes a significant impact.<br />
• Moving from project <strong>to</strong> programme requires high level integrated strategic planning.<br />
Page 16 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
• Need for clear policy framework within which programmes operate.<br />
• The PSC role is key and needs <strong>to</strong> become more emphasised.<br />
• In change management, the TA strategy needs <strong>to</strong> change and reflect cultural diversity and equity.<br />
• Evidence based planning is critical in a fraught situation.<br />
• Structural problems can inhibit the focus on pro-poor programmes.<br />
• It is important <strong>to</strong> have agreement <strong>of</strong> systems and procedures early in the programme.<br />
Part C<br />
Key issues/points <strong>of</strong> information<br />
1. The President appointed an Interim Management Team (IMT) supported by sec<strong>to</strong>ral technical Joint Management Team (JMT) <strong>to</strong><br />
analyse and investigate the problems in the Eastern Cape and recommend interventions.<br />
2. Up <strong>to</strong> ?% <strong>of</strong> posts are vacant. These include the critical post <strong>of</strong> Superintend General. The recruitment and selection <strong>of</strong> this post is<br />
currently under way.<br />
3. The Provincial Growth and Development Strategy is currently under review and scheduled <strong>to</strong> be completed in April 2003.<br />
4. The Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> has been allocated a budget <strong>of</strong> R9.9 million (MEC’s Budget Speech, March 2003).<br />
5. In the Eastern Cape 1500 schools were identified by the former MEC <strong>to</strong> be given Section 21 status. The process <strong>of</strong> preparing these<br />
schools for Section 21 status is currently under way. A second cohort <strong>of</strong> 1500 schools is soon <strong>to</strong> be selected.<br />
6. Other key issues and points <strong>of</strong> information are contained in a detailed Aide Memoire prepared for the review.<br />
Page 17 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
Recommendations Responsibility Date for completion<br />
1. That the Direc<strong>to</strong>rate for Corporate<br />
services includes and acknowledges<br />
Imbewu funding in an integrated budgetary<br />
process so that there is transparency and<br />
understanding <strong>of</strong> the purpose and<br />
additionality <strong>of</strong> Imbewu funds. This will<br />
enable the <strong>Department</strong> <strong>to</strong> moni<strong>to</strong>r how<br />
Imbewu is assisting in delivering their<br />
Strategic Plan.<br />
Corporate Services<br />
2. An intensive capacity building<br />
programme for <strong>Education</strong> Development<br />
Officers (EDOs) <strong>to</strong> enhance their<br />
competencies and capabilities <strong>to</strong> enhance<br />
their own responsibility and accountability in<br />
terms <strong>of</strong> supporting and developing schools.<br />
District Development<br />
3. That the Executive Management Team<br />
and the Advisory Board be formed during<br />
the coming project year.<br />
DoE and PSC June 2003?<br />
4. That the roll out <strong>of</strong> the Transformation<br />
Model <strong>to</strong> schools is given <strong>to</strong>p priority in<br />
terms <strong>of</strong> resources and attention during the<br />
next year <strong>of</strong> the programme with an<br />
emphasis also in providing resources <strong>to</strong><br />
schools but that this should happen at a<br />
slower pace and in parallel <strong>to</strong> plans <strong>to</strong> give<br />
section “1 status <strong>to</strong> schools, with the criteria<br />
for selection <strong>of</strong> Imbewu schools being more<br />
transparent and addressing the poorest<br />
schools first.<br />
Page 18 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
5. Vision crafting for districts within the<br />
whole district development framework<br />
involving all staff and school principals<br />
within their jurisdiction.<br />
District Development<br />
6. That the teacher development strategy<br />
and the roll out <strong>of</strong> training <strong>to</strong> teachers give<br />
attention <strong>to</strong> the need <strong>to</strong> focus more on how<br />
children learn and on the learning<br />
processes.<br />
7. Endorsement <strong>of</strong> the priority that is being<br />
given <strong>to</strong> expedite, following completion <strong>of</strong><br />
the planning and design cycle, the building<br />
<strong>of</strong> the eight pro<strong>to</strong>type constructions, as soon<br />
as practicable.<br />
PSC<br />
8. Continue the development <strong>of</strong> a TA<br />
strategy for Imbewu but ensure that it<br />
includes an affirmative action policy that<br />
actively seek <strong>to</strong> ensure gender and racial<br />
diversity.<br />
PSC<br />
9. That the logframe be amended. Arcadis/PSC Logframe revised. Next PSC <strong>to</strong> agree<br />
revised version.<br />
10. That the <strong>Department</strong> make every effort<br />
at all levels in the system <strong>to</strong> engage in<br />
social cluster activities and planning and<br />
that in this context Imbewu focus on<br />
assisting the integrated planning and<br />
implementation <strong>of</strong> school based HIV/AIDS<br />
strategies and the SGB/community run<br />
feeding programme.<br />
Page 19 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
11. “Mobile” resource packs <strong>to</strong> be<br />
developed for the EDOs in terms <strong>of</strong><br />
supporting and developing schools.<br />
District Development<br />
12. Emphasis is placed in the development<br />
<strong>of</strong> a core team <strong>of</strong> pr<strong>of</strong>essionals (EDOs &<br />
Subject Advisors) <strong>to</strong> facilitate the process <strong>of</strong><br />
support and development in terms <strong>of</strong><br />
teaching and learning.<br />
13. That the Programme Management<br />
Manual be formally endorsed.<br />
PSC 26 March 2003<br />
14. That the role <strong>of</strong> the PSC be clarified<br />
and membership formalised.<br />
DFID (Clarity)<br />
PSC (Endorsement)<br />
DoE (Formalisation <strong>of</strong> membership)<br />
<strong>Review</strong> team: Barbara Payne; Richard Thomas; Brigid Smith; Mareka Monyokolo; Rosaline Ntshingila-Khosa;<br />
Mokgapi Maleka; Chris Heymans; Heather Garner; Trevor Taft; Nick Smart; Bob Blakelock; Lusungu<br />
Kanchenche; Bas Kotterink. Briefing at DFID : Paul Barbour; Bridget Dillon; and Jim McAlpine.<br />
People met: Odette Ramsingh; Barry Reeves; John Andrew Murray; Tony Wadsworth; Noxy Gwarube; Zola<br />
Ntsimango; Bill Davies; Gavin Stuart; Reg Berry; Valerie Moeler; Peter Vale; Robinson Ramaite;<br />
Susan Boeysen; Sibongile Mutwa; Lungisa Zuzile; Speaker (legislature); Valerie Moller; Collin Allen &<br />
Research Team; Mrs Nondiyebo Tyapolwana; Noxy Gwarube; Dr Tom; Mrs Zibi; Ms Kumbaca; Mrs<br />
Mabe; Lorraine Lawrence; Belinda Smit; Miles Ritchie; Richard Noble; Ray Tywakadi; Pr<strong>of</strong>essor<br />
Danie Breytenbach; Noleen Barry; Shot<strong>to</strong>n; Brian Williams; Ewan Harris; John Bartlett; Robinson<br />
Ramaite; Mr Zibi; Mr Mathonda; Ms N M Tunzelana; Lyn Knight; Richard Ngcobo; Bo Synnerholm;<br />
Henry Aspeqvist; Kevin Lillis; B T Mfenyana; Mr Khumalo; Mr Boesak; Mr Siphunzi; Gavin Stuart;<br />
Reg Berry; Peter Vale; Ewan Harris.<br />
Page 20 <strong>of</strong> 21
IMBEWU Eastern Cape Provincial District and School Development Programme: PRISM FORMAT<br />
Districts & Schools:<br />
Grahams<strong>to</strong>wn – Mr A Fetsha, Mr Mantsane; Mr Maselane; Mr Mqingwane; Ms Hanise; Mr Koliti; Mrs<br />
Saule; SGB members; Subject Adviser<br />
Port Elizabeth – Mr S Snayer; Mr D Grove (Principal); Mr M Lampretch (EDO); Ms B Bolosha<br />
(Coordina<strong>to</strong>r); Ms Mabunzi ; Mr Bartman (Principal); Mr Nyati; Ms J Sauer;<br />
Idutya & Maluti – Mr Sokutu (District Manager); EDOs; School Principals; Mr Z Loni (District<br />
Manager); Mr Barry Greville-Eyves; Mr Miles; Mr R M Ngolodela; School Management Committee;<br />
Subject Advisers.<br />
Butterworth – Mr Kanyi (District Manager); EDO; School Principals<br />
Umtata – Pat Tyebileyo; Siphiwe Goqwana; Ms K D Gilman; Mrs Machube; Mr Ngwenya; SMT<br />
members; Educa<strong>to</strong>rs<br />
Libode – Mr A S Nuku; Ms Mandisa Dinga; Mr Nyabali; Mrs Ndndiyebo Tyapolwana; SGB members<br />
Encobe –<br />
C<strong>of</strong>imvaba-<br />
Scoring system:<br />
1. = likely <strong>to</strong> be completely achieved<br />
2. = likely <strong>to</strong> be largely achieved<br />
3. = likely <strong>to</strong> be partly achieved<br />
4. = only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent<br />
5. = unlikely <strong>to</strong> be realised<br />
X = <strong>to</strong>o early <strong>to</strong> judge extent <strong>of</strong> achievement<br />
Page 21 <strong>of</strong> 21
IMBEWU OPR<br />
MARCH-APRIL 2004<br />
AIDE MEMOIRE<br />
DFID<br />
&<br />
ECED<br />
1
Contents<br />
Page<br />
Section 1 3<br />
Introduction, Overview and Recommendations<br />
Section 2 7<br />
Responses <strong>to</strong> OPR 2003 recommendations<br />
Section 3 11<br />
<strong>Report</strong> on <strong>Output</strong>s :<br />
<strong>Output</strong> 1 11<br />
<strong>Output</strong> 2 14<br />
<strong>Output</strong> 3 17<br />
<strong>Output</strong> 4 20<br />
<strong>Output</strong> 5 22<br />
Revisions <strong>to</strong> the Logframe 23<br />
Section 4 24<br />
Programme Management Issues<br />
Section 5 26<br />
Lessons learnt and wider context<br />
ANNEXES<br />
1 Terms <strong>of</strong> Reference<br />
2 PRISM document<br />
3 Revisions <strong>to</strong> the Logframe<br />
4 Table <strong>of</strong> linkages between Imbewu and other programmes<br />
5 <strong>Output</strong> 1 – further detail<br />
<strong>Output</strong>-Indica<strong>to</strong>rs document<br />
2
Section 1<br />
Introduction, Overview and Recommendations<br />
This is the report <strong>of</strong> the second annual OPR <strong>of</strong> the Imbewu 2 programme in<br />
the Eastern Cape. The review was carried out by a team <strong>of</strong> 10 DFID and<br />
DFID-sponsored personnel, assisted by Eastern Cape <strong>Education</strong> <strong>Department</strong><br />
staff. The model <strong>of</strong> this OPR was new : the first week <strong>of</strong> the review was spent<br />
reading documents available on the ‘Imbewu Extranet’ (see below) and<br />
formulating questions and issues <strong>to</strong> be raised in Eastern Cape during the<br />
second week. The conclusions, PRISM document and scoring, and<br />
recommendations were agreed with the Imbewu Programme Steering<br />
Committee in East London, and disseminated <strong>to</strong> DFID staff in Pre<strong>to</strong>ria.<br />
Since the first OPR, there have been a number <strong>of</strong> changes <strong>to</strong> the programme,<br />
and within the Eastern Cape education context, which have had an impact on<br />
Imbewu, either positively or negatively. (These are also indicated in the<br />
responses <strong>to</strong> some <strong>of</strong> the previous OPR recommendations – see below.)<br />
Firstly, DFID has significantly reduced its contribution <strong>to</strong> Imbewu (from £22m<br />
<strong>to</strong> £17m over 7 years) which has resulted in the need for the Eastern Cape<br />
<strong>Education</strong> <strong>Department</strong> (ECED) <strong>to</strong> re-prioritise its programme focus and<br />
activities. This was undertaken during a Strategic Realignment Workshop<br />
attended by ECED senior <strong>of</strong>ficials, DFID representatives and Imbewu staff, on<br />
11-13 February 2004. This OPR endorses the percentage budget<br />
reallocations for programme outputs adopted at that workshop (see Annex). It<br />
is <strong>to</strong> the credit <strong>of</strong> the ECED that the spirit in which they addressed the issue <strong>of</strong><br />
a severe cutback in funding enabled the good relationship with DFID’s<br />
<strong>Education</strong> Adviser and colleagues <strong>to</strong> survive, even while the programme was<br />
curtailed.<br />
Secondly, recognising departmental need, a National <strong>Department</strong>-established<br />
Joint Moni<strong>to</strong>ring Team (JMT) was set up in the Province <strong>to</strong> assist ECED with<br />
various management decisions, including the development <strong>of</strong> an agreed<br />
organogram. This intervention resulted in a 12-programme ‘Turnaround Plan’<br />
involving the following administrative areas :<br />
• Rationalisation <strong>of</strong> schools<br />
• Pr<strong>of</strong>essionalisation <strong>of</strong> District Offices<br />
• Learner support material<br />
• Matriculation readiness<br />
• School nutrition<br />
• Human resources<br />
• Corporate services<br />
• Systems and procedures<br />
• Discipline and Labour relations<br />
• Financial services<br />
• Physical facilities<br />
3
All the programmes are included in the ECED Strategic Plan 2004-2007.<br />
Thirdly, in response <strong>to</strong> leadership and administrative instability over recent<br />
months, a number <strong>of</strong> key appointments have been made <strong>to</strong> <strong>to</strong>p level positions,<br />
which will stabilise the management <strong>of</strong> ECED and enable the Turnaround and<br />
Strategic Plans <strong>to</strong> be more effectively implemented. These include the Head<br />
<strong>of</strong> <strong>Department</strong> (Superintendent-General – Dr D Edley) and Chief Financial<br />
Officer – Ms T Cumming).<br />
These changes, including the appointment <strong>of</strong> two additional Chief Direc<strong>to</strong>rs<br />
under the new organogram, have resulted in a gradual change in culture <strong>to</strong><br />
include more reporting and accountability, tighter control <strong>of</strong> finances, and<br />
greater focus on the ECED’s ‘core business’.<br />
The Imbewu programme has also faced some upheaval over the last year,<br />
with the original Programme Coordina<strong>to</strong>r leaving, and difficulties in appointing<br />
a Financial Manager. Imbewu also had <strong>to</strong> face the sharp reduction in its<br />
budget caused by the DFID cuts.<br />
Nonetheless, Imbewu has remained stable as a programme. The Programme<br />
Coordina<strong>to</strong>r has been replaced by a South African national with good<br />
knowledge <strong>of</strong> education work in the Eastern Cape. A new Financial Manager<br />
has been appointed, and will start work in April. Imbewu has managed the resizing<br />
<strong>of</strong> the programme, negotiating it successfully with the ECED. It has kept<br />
<strong>to</strong> its agreed spending levels, maintained the training programme, and<br />
undertaken many output-focussed activities during the year (see PRISM<br />
document).<br />
An important innovation instituted in time for the current OPR, is the<br />
establishment <strong>of</strong> an ‘Imbewu Extranet’ accessible <strong>to</strong> team members with<br />
passwords, which holds electronic copies <strong>of</strong> all key documents relating <strong>to</strong><br />
Imbewu. In response <strong>to</strong> a request from the OPR team, Imbewu staff produced<br />
an additional document (the <strong>Output</strong>-Indica<strong>to</strong>rs document – see Annex) which<br />
demonstrates clearly how activities relate <strong>to</strong> the various output indica<strong>to</strong>rs. This<br />
will prove a useful <strong>to</strong>ol for future moni<strong>to</strong>ring and matching <strong>of</strong> activity against<br />
outputs and should be made available on the Extranet and provided in<br />
updated form for future OPRs.<br />
Other positive outcomes include the fact that the Imbewu ‘school<br />
transformation model’ has now been gazetted by the <strong>Department</strong>, so it<br />
becomes Province-wide policy for improving schools. This represents a great<br />
achievement for the programme. There is also evidence that the energy<br />
(‘electricity’) generated by Imbewu activities among District <strong>of</strong>ficials and<br />
schools – including non-Imbewu schools – has resulted in a wide-ranging<br />
series <strong>of</strong> productive activities being undertaken, and a sense <strong>of</strong> pride in the<br />
education being provided <strong>to</strong> Eastern Cape children, sometimes in very difficult<br />
and poorly resourced circumstances. A further positive outcome in relation <strong>to</strong><br />
skills acquisition is reported under <strong>Output</strong> 4.<br />
4
The management <strong>of</strong> the project has been assessed as sound and effective,<br />
even when facing challenges in terms <strong>of</strong> personnel and the budget cut.<br />
Overall, the OPR Team endorses the ECED approach <strong>to</strong> and support <strong>of</strong><br />
Imbewu, and suggests that Imbewu should move <strong>to</strong> become more fully a<br />
programme <strong>of</strong> the <strong>Department</strong> in the next year (and no longer be thought <strong>of</strong><br />
as a ‘project’).<br />
The first OPR in March 2003 made a <strong>to</strong>tal <strong>of</strong> 10 recommendations for the<br />
future operation and improvement <strong>of</strong> the programme. These are reported on<br />
in Section 2 below.<br />
Recommendations <strong>of</strong> the 2004 OPR<br />
<strong>Output</strong> 1<br />
i) The OPR team endorses the plan <strong>of</strong> the ECED <strong>to</strong> hold a workshop in<br />
June <strong>to</strong> plan for the remaining years <strong>of</strong> the project. It is recommended that<br />
the programme staff work closely with the relevant Chief Direc<strong>to</strong>rates <strong>of</strong> the<br />
ECED <strong>to</strong> ensure that its funds and plans are integrated with those <strong>of</strong> the<br />
department in the 2005-2008 Strategic Plan.<br />
ii) It is recommended that Imbewu provide technical and management<br />
support in 2004/05 <strong>to</strong> records management initiatives and consider providing<br />
support in other areas (eg anti-corruption strategy, performance appraisal,<br />
internal audit, basic financial management training, integration <strong>of</strong> personnel<br />
and payroll systems procurement, capacity building <strong>to</strong> use evaluation<br />
material) which would improve the environment in which the ECED operates<br />
and help it shift from short-term crisis management <strong>to</strong>wards a more ordered<br />
longer-term focus.<br />
iii) With regard <strong>to</strong> HIV/AIDS it will be critically important for the Imbewu<br />
programme <strong>to</strong> begin <strong>to</strong> play a proactive role on HIV/Aids issues within ECED<br />
by :<br />
• assisting the ECED <strong>to</strong> develop action plans on its workplace policy and<br />
implement these in accordance with DPSA policies;<br />
• assisting ECED <strong>to</strong> develop an overarching plan that will address the<br />
needs <strong>of</strong> orphans and vulnerable children (OVCs), incorporates<br />
initiatives <strong>of</strong> other social partners, and integrates the school nutrition<br />
programme.<br />
<strong>Output</strong> 2<br />
iv) There is a need for clarity regarding whether or not corporate service<br />
centres are going <strong>to</strong> be permanent features <strong>of</strong> the district landscape but there<br />
is also an urgent need <strong>to</strong> provide pr<strong>of</strong>essional support <strong>to</strong> schools in those<br />
districts where no infrastructure exists This appears <strong>to</strong> be a unique problem<br />
facing Eastern Cape. It is recommended that Imbewu assist the <strong>Department</strong><br />
in resolving the issue regarding the provision <strong>of</strong> district infrastructure in the six<br />
most disadvantaged districts through advocacy, and technical assistance.<br />
5
<strong>Output</strong> 3<br />
Regarding the school transformation programme -<br />
v) Ongoing support <strong>to</strong> schools should be prioritized, both in terms <strong>of</strong><br />
governance and curriculum aspects. In order <strong>to</strong> achieve this, innovative<br />
strategies and mechanisms such as school clusters, learning areas<br />
committees and the use <strong>of</strong> lead teachers, should be promoted across the<br />
province and be enhanced;<br />
vi) The in-depth training <strong>of</strong> all EDOs and Subject advisors should continue,<br />
it should be deepened, and they should be provided with appropriate <strong>to</strong>ols <strong>to</strong><br />
be able <strong>to</strong> support schools;<br />
vii) The curriculum aspects <strong>of</strong> school transformation model should be<br />
integrated in<strong>to</strong> the INSET programme <strong>of</strong> the ECED. The INSET programme<br />
should have clear and achievable strategies and objectives.<br />
viii) A comprehensive programme for rolling out the school transformation<br />
model <strong>to</strong> the rest <strong>of</strong> the schools in the province should be developed,<br />
budgeted for, and implemented.<br />
<strong>Output</strong> 4<br />
ix) It is recommended that as soon as practicable a strategy is developed<br />
<strong>to</strong> ensure the two way communication flow <strong>of</strong> data and that managers be<br />
given the relevant data relating <strong>to</strong> their schools and districts which they can<br />
reflect in their development plans.<br />
<strong>Output</strong> 5<br />
x) It is recommended that <strong>Output</strong> 5 be integrated in<strong>to</strong> <strong>Output</strong> 3 and that<br />
unallocated aspects <strong>of</strong> this budget for <strong>Output</strong> 5 be reallocated <strong>to</strong> <strong>Output</strong> 1.<br />
6
Section 2<br />
The OPR team requested the Imbewu team <strong>to</strong> review the recommendations<br />
from the previous OPR and indicate how the programme has responded <strong>to</strong><br />
them over the past year.<br />
Response <strong>to</strong> 2003 OPR recommendations<br />
Recommendation (i)<br />
That the Direc<strong>to</strong>rate for Corporate Services includes Imbewu funding in an<br />
integrated budgetary process so that there is transparency and understanding<br />
<strong>of</strong> the purpose and additionality <strong>of</strong> Imbewu funds. (This will enable the<br />
<strong>Department</strong> <strong>to</strong> moni<strong>to</strong>r how Imbewu is assisting in delivering their strategic<br />
plan)<br />
Response 1<br />
The <strong>Department</strong>al Strategic and Budget planning processes are being aligned<br />
from this financial year so that the strategic planning process now fully<br />
precedes the budget cycle planning process (scheduled and co-ordinated<br />
through the Provincial Treasury). The new <strong>Department</strong>al organisational<br />
structure also now incorporates a new Branch focussing on Planning &<br />
Moni<strong>to</strong>ring. Within this Branch there is a Direc<strong>to</strong>rate for Strategic Management<br />
Support, within which co-ordination & liaison with donor-funded projects also<br />
resides; hence all structures are now being put in place for more integrated<br />
budget planning from 2004/05. In addition, a Chief Financial Officer has<br />
recently been appointed, who will also be a full member <strong>of</strong> the PSC.<br />
Recommendation (ii)<br />
That the Imbewu programme concentrates on district development in the year<br />
ahead and particularly the following activities:-<br />
• Vision-crafting for districts within the whole district development<br />
framework, involving staff and school principals within their jurisdiction.<br />
• An intensive capacity building for <strong>Education</strong> Development Officers<br />
(EDOs) <strong>to</strong> enhance their competencies and capabilities in terms <strong>of</strong><br />
supporting and developing schools<br />
• Mobile resource packs <strong>to</strong> enable EDOs <strong>to</strong> provide outreach for their<br />
schools.<br />
• Emphasis on the development <strong>of</strong> a core team <strong>to</strong> facilitate the process<br />
<strong>of</strong> support <strong>to</strong> teaching and learning<br />
7
Response 2<br />
a) More than 90% <strong>of</strong> the 24 Districts have undergone a process <strong>of</strong> crafting<br />
visions, missions & district development plans<br />
b)<br />
• At least 1 EDO per district has been involved in Training Teams<br />
delivering School Transformation Programme modules and/or<br />
Orientation Training <strong>of</strong> Foundation Phase teachers<br />
• 25% <strong>of</strong> District Management teams were empowered around<br />
men<strong>to</strong>rship<br />
• 2 EDOs per district participated in workshops around conceptualisation<br />
& planning <strong>of</strong> EDCs (<strong>Education</strong> Development Centres)<br />
• EDOs are also included in the 4 district teams presently participating in<br />
the ELMD programme being conducted through Univ <strong>of</strong> Fort Hare<br />
c) & d) : budget restructuring, inter alia, has resulted in these not being<br />
implemented at this stage; a core team was developed in Chief Direc<strong>to</strong>rate :<br />
District Development, but has had <strong>to</strong> focus on various other functions at this<br />
stage.<br />
Recommendation (iii)<br />
That the roll-out <strong>of</strong> the school transformation model <strong>to</strong> schools be given <strong>to</strong>p<br />
priority in terms <strong>of</strong> resources and attention during the next year with an<br />
emphasis on providing resources <strong>to</strong> the poorest schools. This should happen<br />
in parallel <strong>to</strong> the move <strong>to</strong> Section 21 status but not at the same pace.<br />
Response 3<br />
Being implemented, and budget spending patterns also indicate this. The<br />
provision <strong>of</strong> material resources, beyond the reading packs being supplied <strong>to</strong><br />
all 1500 schools for Reading Week programme, will take place during the<br />
INSET & EMD module training phase. The School Training Programme is<br />
being ‘delinked’ from the Section 21 process.<br />
Recommendation (iv)<br />
That the teacher development strategy gives attention <strong>to</strong> the need <strong>to</strong> focus<br />
more on how learning takes place and on the learning process (Annex Four<br />
<strong>of</strong> 2003 OPR)<br />
Response 4<br />
This is being taken in<strong>to</strong> account, and particularly in the revision <strong>of</strong> the INSET<br />
modules.<br />
8
Recommendation (v)<br />
The programme should support the development <strong>of</strong> a strategy for the longer<br />
term roll-out <strong>of</strong> Inclusive education and Early Childhood <strong>Education</strong><br />
Response 5<br />
Implementation <strong>of</strong> Inclusive <strong>Education</strong> policy and processes is still awaiting<br />
the outcomes <strong>of</strong> the pilot operating in 12 schools in the province<br />
Recommendation (vi)<br />
The <strong>Review</strong> team fully endorse the priority being given, following completion<br />
<strong>of</strong> the planning and design cycle, <strong>to</strong> the building <strong>of</strong> eight pro<strong>to</strong>type<br />
constructions.<br />
Response 6<br />
Accepted; however, budgetary constraints will affect the final number.<br />
Recommendation (vii)<br />
The <strong>Education</strong> <strong>Department</strong> should make every effort at all levels <strong>of</strong> the<br />
system <strong>to</strong> engage in social cluster activities and planning and that in this<br />
context Imbewu should focus on assisting the integrated planning and<br />
implementation <strong>of</strong> school based HIV/Aids Strategies and SGB/Communityrun<br />
feeding programmes.<br />
Response 7<br />
In the social cluster, the MEC : <strong>Education</strong> now chairs the Provincial Aids<br />
Council; a new Direc<strong>to</strong>rate for HIV/Aids has been created in the new<br />
organisational structure being implemented in the <strong>Department</strong>, and Imbewu<br />
will provide strategic support <strong>to</strong> the planning and co-ordination <strong>of</strong> the activities<br />
within this structure. The School Nutrition Programme will become the<br />
competence <strong>of</strong> the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> as from 1 April 2004. SGBs will<br />
now oversee the delivery <strong>of</strong> this programme at school level.<br />
Recommendation (viii)<br />
The TA strategy for Imbewu should include an affirmative action policy that<br />
actively seeks <strong>to</strong> ensure gender and racial diversity.<br />
Response 8<br />
Being implemented<br />
9
Recommendation (ix)<br />
Letters <strong>of</strong> appointment for the members <strong>of</strong> the PSC <strong>to</strong> be issued by the<br />
<strong>Department</strong> before the end <strong>of</strong> the first quarter <strong>of</strong> next year.<br />
Response 9<br />
The new organisational structure has resulted in a delay in formalising this; a<br />
proposal relating <strong>to</strong> composition <strong>of</strong> PSC accommodating the new organogram<br />
is currently under consideration by ECED Management.<br />
Recommendation (x)<br />
Plans for the formation <strong>of</strong> the Executive Management Committee and the<br />
Advisory Board should be included in the activity plans for the coming year.<br />
Response 10<br />
PSC has shelved the formation <strong>of</strong> the Advisory Board at this stage; the<br />
mandate <strong>of</strong> the PSC, and its relationship <strong>to</strong> Executive Management, is being<br />
addressed in the proposal referred <strong>to</strong> in (9) above.<br />
10
Section 3<br />
<strong>Report</strong>s on Programme <strong>Output</strong>s<br />
3.1<br />
<strong>Output</strong> 1 - A provincial department <strong>of</strong> education, with an enhanced strategic<br />
role<br />
Summary <strong>of</strong> Key Findings <strong>of</strong> the <strong>Review</strong> <strong>of</strong> <strong>Output</strong> 1 (see Annex 5 for further<br />
details)<br />
Evidence on ECED expenditures suggests that the department has improved<br />
its personnel:non-personnel expenditure ratio over the past few years and that<br />
its non-personnel resources are increasingly being allocated <strong>to</strong> favour those<br />
districts where poverty is most acute.<br />
Imbewu expenditures follow similar patterns <strong>to</strong> ECED’s voted funds ie they<br />
are largely spent at school level and in districts where they are likely <strong>to</strong> have<br />
the biggest impact on reducing poverty. They are also being used, however,<br />
<strong>to</strong> fill gaps in non-school expenditures, where funding has been low. It is<br />
essential that Imbewu and other donor funds be integrated in future Strategic<br />
Plans <strong>to</strong> ensure that these activities are not underfunded in years when donor<br />
funds are unavailable and <strong>to</strong> ensure the sustainability <strong>of</strong> activities funded by<br />
Imbewu. The creation <strong>of</strong> a new Planning and Moni<strong>to</strong>ring Branch should help<br />
achieve this aim.<br />
Integration <strong>of</strong> sources <strong>of</strong> funds would also ensure that Imbewu is seen as a<br />
departmental programme (and not a project) and that performance measures<br />
apply <strong>to</strong> all activities regardless <strong>of</strong> the source <strong>of</strong> funds. In addition greater<br />
transparency on the activities being funded by donors provides the data for<br />
greater coordination between donor activities, including moni<strong>to</strong>ring and<br />
reviews.<br />
The Planning and Moni<strong>to</strong>ring Branch is also responsible for quality assurance.<br />
It is anticipated that placing planning and moni<strong>to</strong>ring in the same branch will<br />
raise the pr<strong>of</strong>ile <strong>of</strong> learning from past experience when forming and<br />
implementing policies. Imbewu’s innovative Evaluation Framework which is<br />
now in place should in time assist planning at all levels, and provide the<br />
vehicle for capacity building in the <strong>Department</strong> in terms <strong>of</strong> evaluation skills and<br />
research- and evidence-based planning.<br />
The appointment <strong>of</strong> a new Head <strong>of</strong> <strong>Department</strong> (SG) and Chief Finance<br />
Officer (CFO) on secure contracts (rather than having these posts filled on an<br />
“acting” basis) has provided much needed stability in the department and<br />
helped improve the relationship with the Treasury. This is helping <strong>to</strong> change<br />
the culture in ED <strong>to</strong>wards one <strong>of</strong> greater compliance with procedures and<br />
increased accountability for actions.<br />
The ECED still faces major problems <strong>of</strong> payment backlogs and poor records<br />
management. The new Chief Financial Officer and staff in the newly created<br />
11
Office <strong>of</strong> the CFO have made some progress in reducing these, but technical<br />
and staff constraints mean that this will take some time <strong>to</strong> complete.<br />
Poor records management continues <strong>to</strong> be a major constraint on the<br />
effectiveness <strong>of</strong> the <strong>Department</strong> and the main reason why it has had eight<br />
consecutive years <strong>of</strong> disclaimers from the Provincial Audi<strong>to</strong>r General on its<br />
accounts.<br />
A post provisioning survey has not been undertaken since 1998 and there is<br />
now a great variation in learner:educa<strong>to</strong>r ratios throughout the province, with<br />
the result that an estimated 6900 teachers need <strong>to</strong> be redeployed. In the<br />
meantime, a large number <strong>of</strong> contract staff are being employed <strong>to</strong> reduce<br />
ratios in those areas which are negatively affected. This, in turn, reduces the<br />
funds available for non-personnel expenditures and <strong>to</strong> fill vacancies <strong>of</strong> noneduca<strong>to</strong>r<br />
staff.<br />
A number <strong>of</strong> these key vacancies are at Headquarters, particularly in the<br />
newly created Office <strong>of</strong> the Chief Finance Officer. Filling these with<br />
competent staff could have a major impact on the effectiveness <strong>of</strong> the ECED.<br />
In its short life the new Office <strong>of</strong> the Chief Financial Officer has already made<br />
great strides <strong>to</strong>wards res<strong>to</strong>ring financial controls and eliminating financial<br />
indiscipline. Measures <strong>to</strong> reduce the scope for discretion in procurement and<br />
appointment <strong>of</strong> staff have been introduced. These have been reinforced by<br />
changes in management structures which have increased the accountability <strong>of</strong><br />
senior managers for expenditures in their branches.<br />
The <strong>Department</strong> continues <strong>to</strong> have an overspend on its personnel budget.<br />
There are a number <strong>of</strong> fac<strong>to</strong>rs causing this, some within the <strong>Department</strong>’s<br />
control and related <strong>to</strong> problems listed above, but many beyond it. However, <strong>to</strong><br />
convince the Provincial Treasury <strong>to</strong> grant it more funds, the onus is on the<br />
ECED <strong>to</strong> demonstrate that its personnel records are in order, that it has<br />
cleared backlogs and that it is allocating personnel resources efficiently.<br />
HIV/AIDS<br />
The 2003 Imbewu OPR highlighted the importance <strong>of</strong> integrating/<br />
mainstreaming HIV/Aids within the programme (and the ECED) <strong>to</strong>gether with<br />
other key cross-cutting social issues. Institutional and policy frameworks exist<br />
within the ECED <strong>to</strong> tackle the challenges <strong>of</strong> HIV/Aids. The department, like<br />
other provincial departments, developed a workplace policy <strong>to</strong> feed in<strong>to</strong> the<br />
provincial HIV/Aids policy. Also, the newly approved ECED Strategic Plan <strong>of</strong><br />
2004-2007 incorporates broad HIV/Aids mitigation strategies. However, the<br />
implementation <strong>of</strong> these strategies remains a challenge as systems and/or<br />
programme are yet <strong>to</strong> be developed in this regard. For instance a post at<br />
Direc<strong>to</strong>r level has been created in the new organisational structure .It is<br />
expected that the incumbent <strong>of</strong> this post will lead the HIV/Aids Unit. However,<br />
at the moment it is not clear when this post will be filled. Ironically, the MEC<br />
for <strong>Education</strong> chairs the Provincial HIV/Aids Council.<br />
12
Nonetheless the review was pleased <strong>to</strong> note that the ECED has made some<br />
significant strides at district and school levels, where it was reported that<br />
policies and strategies have been developed <strong>to</strong> mitigate the impact <strong>of</strong><br />
HIV/Aids. District <strong>of</strong>ficials reported that they work with other social partners,<br />
and in some instances as is the case with C<strong>of</strong>imvaba, have in fact set up<br />
multi-sec<strong>to</strong>ral structures in order <strong>to</strong> respond comprehensively <strong>to</strong> the<br />
challenge. Such approaches are underlined by the fact that as research<br />
shows, most people affected and infected belong <strong>to</strong> the 15-24 age group.<br />
The review noted also that the Imbewu programme has managed <strong>to</strong><br />
mainstream HIV/Aids in its training materials. Whilst it was reported that there<br />
is some work in progress, especially in the area <strong>of</strong> curriculum and in schools,<br />
the programme could still play a more focused, strategic, and influential role<br />
by partnering the department in formulating a comprehensive response <strong>to</strong><br />
mitigate the impact <strong>of</strong> HIV/Aids. This could be in a form <strong>of</strong> a programme <strong>of</strong><br />
action <strong>to</strong> deal with the issue <strong>of</strong> implementing policies. Such a response could<br />
then be filtered down <strong>to</strong> districts and then ultimately <strong>to</strong> schools. In this way the<br />
programme will continue playing an influencing and catalytic role within the<br />
ECED.<br />
One <strong>of</strong> the key challenges faced by the ECED, as indicated by the <strong>of</strong>ficials<br />
interviewed, including the SG, was <strong>to</strong> move beyond advocacy. There is a<br />
general feeling that enough advocacy has been done, and that what is<br />
needed now is <strong>to</strong> implement practical programmes in <strong>of</strong>fices, schools and in<br />
communities. It was reported that one <strong>of</strong> the strategic areas where Imbewu<br />
could assist the department is in simplifying some aspects the complex<br />
procurement process. Some <strong>of</strong>ficials indicated that R12m and R26 m for 2002<br />
and 2003 respectively in conditional grants had <strong>to</strong> be returned <strong>to</strong> Treasury<br />
because the tender specifications submitted did not meet the required<br />
procurement standards. It would seem that there are no existing guidelines <strong>to</strong><br />
help <strong>of</strong>ficials submit proper tender specifications.<br />
<strong>Output</strong> 1 Recommendations<br />
The OPR team endorses the plan <strong>of</strong> the ECED <strong>to</strong> hold a workshop in<br />
June <strong>to</strong> plan for the remaining years <strong>of</strong> the project. It is recommended<br />
that the programme staff work closely with the relevant Chief<br />
Direc<strong>to</strong>rates <strong>of</strong> the ECED <strong>to</strong> ensure that its funds and plans are<br />
integrated with those <strong>of</strong> the department in the 2005-2008 Strategic Plan.<br />
It is recommended that Imbewu provide technical and management<br />
support in 2004/05 <strong>to</strong> records management initiatives and consider<br />
providing support in other areas (eg anti-corruption strategy,<br />
performance appraisal, internal audit, basic financial management<br />
training, integration <strong>of</strong> personnel and payroll systems procurement,<br />
capacity building <strong>to</strong> use evaluation material) which would improve the<br />
environment in which the ECED operates and help it shift from shortterm<br />
crisis management <strong>to</strong>wards a more ordered longer-term focus.<br />
13
It will be critically important for the Imbewu programme <strong>to</strong> begin <strong>to</strong> play<br />
a proactive role on HIV/Aids issues within ECED by :<br />
• assisting the ECED <strong>to</strong> develop action plans on its workplace<br />
policy and implement these in accordance with DPSA policies;<br />
• assisting ECED <strong>to</strong> develop an overarching plan that addresses the<br />
needs <strong>of</strong> orphans and vulnerable children (OVCs), incorporates<br />
initiatives <strong>of</strong> other social partners, and integrates the school<br />
nutrition programme<br />
3.2<br />
<strong>Output</strong> 2 - A fully functioning and self-managing district structure providing<br />
quality support <strong>to</strong> schools<br />
This output shows significant development strides since the last OPR. This is<br />
amidst the ongoing resourcing challenges in respect <strong>to</strong> the unavailability <strong>of</strong><br />
<strong>of</strong>fice space, transport and key human resources such as Subject Advisors. A<br />
positive development with respect <strong>to</strong> institutional development is that districts<br />
have introduced circuits for which managers have been employed. Districts<br />
such as C<strong>of</strong>imbvaba have identified their core programmes and strategies for<br />
supporting schools. These include strategies for replicating the transformation<br />
model from 36 participating schools <strong>to</strong> 120 non-participating schools, and<br />
analysis <strong>of</strong> the different interventions in the districts <strong>to</strong> establish and<br />
mainstream them.<br />
The provision, in the new organogram, <strong>of</strong> three chief direc<strong>to</strong>rates responsible<br />
for the districts has released capacity for these senior managers <strong>to</strong> do more<br />
than maintenance work. While the creation <strong>of</strong> the three chief direc<strong>to</strong>rates has<br />
the potential <strong>to</strong> cause unhealthy competition, provisions are made for tight<br />
coordination among them through a standing weekly meeting with their<br />
respective DDG, common development and moni<strong>to</strong>ring frameworks. Within<br />
the chief direc<strong>to</strong>rate coordination <strong>of</strong> district activity is done through monthly<br />
meetings. This reconfiguration can only add <strong>to</strong> the effectiveness <strong>of</strong> the<br />
districts in supporting and moni<strong>to</strong>ring schools.<br />
The restructuring process led <strong>to</strong> the conclusion that district corporate services<br />
have not been functioning <strong>to</strong> expectations due <strong>to</strong> the shortage <strong>of</strong> skilled staff.<br />
To address this inadequacy a decision has been taken <strong>to</strong> create four<br />
corporate service centres that will serve the 24 districts. The service centres<br />
will be headed by chief direc<strong>to</strong>rs supported by HR and Finance direc<strong>to</strong>rs,<br />
respectively. Each corporate service centre would be responsible for six<br />
districts, and one <strong>of</strong> the centres would also cater for the head <strong>of</strong>fice. The<br />
corporate service centres will have dual accounting lines: formally <strong>to</strong> a DDG at<br />
provincial level and through Service Level Agreement (SLA) <strong>to</strong> the districts. It<br />
is the contention <strong>of</strong> the department that such corporate centres will relieve the<br />
district pr<strong>of</strong>essional staff <strong>of</strong> peripheral administrative responsibilities. In<br />
addition, the creation <strong>of</strong> these centres will foster capacity building among the<br />
staff who will be drawn from the respective districts. It is still <strong>to</strong> be decided<br />
whether <strong>to</strong> retain the corporate centres as permanent structures or <strong>to</strong> dissolve<br />
them once the necessary capacity is built among the corporate staff corps.<br />
14
It is clear that District Managers and EDOs from the districts are receiving<br />
training that is developing their capabilities and competences <strong>of</strong> managing<br />
their districts such that they would in turn be able <strong>to</strong> support schools. The<br />
<strong>Education</strong> Leadership and Management Development (ELMD) programme<br />
<strong>of</strong>fered by the University <strong>of</strong> Fort Hare (see below) is targeting <strong>of</strong>ficials in four<br />
districts amongst whom the EDOs are participating. Approximately 25% <strong>of</strong> the<br />
District Managers have received training in men<strong>to</strong>ring, the rest <strong>of</strong> them still<br />
need <strong>to</strong> be capacitated in this area. The main purpose <strong>of</strong> such training is <strong>to</strong><br />
enable the district <strong>of</strong>ficials <strong>to</strong> develop and support schools even beyond the<br />
Imbewu schools. When master trainers train EDOs, they always make sure<br />
that at the end <strong>of</strong> the workshop an implementation plan is jointly developed so<br />
that further training can be rolled out <strong>to</strong> the other EDOs immediately. District<br />
<strong>of</strong>ficials felt that they need training on financial management, so that they can<br />
handle the needs <strong>of</strong> their schools.<br />
In the case <strong>of</strong> corporate services some districts have attempted <strong>to</strong> get their<br />
few staff trained <strong>to</strong> become multi-skilled personnel in order <strong>to</strong> do more than<br />
one person’s function. This initiative has assisted such districts <strong>to</strong> be able <strong>to</strong><br />
attend <strong>to</strong> the corporate services functions.<br />
District managers have indicated their intention <strong>to</strong> harmonize other<br />
programmes and/or projects such as Isithole, READ, RUMEP and Thuthuka in<br />
order <strong>to</strong> make sure that they complement each other. Imbewu’s support has<br />
provided districts and schools with the confidence and capability <strong>to</strong> reach out<br />
for more resources beyond those Imbewu <strong>of</strong>fers. In some districts the District<br />
Managers have recruited volunteers through the municipalities who became<br />
the support staff <strong>of</strong> the EDOs in each circuit. They have already started <strong>to</strong><br />
replicate Imbewu activities in other non-Imbewu schools within their own<br />
districts without any additional resources from the provincial headquarters.<br />
The ECED is still facing the challenge <strong>of</strong> a large number <strong>of</strong> districts that are<br />
under-capacitated in terms <strong>of</strong> staffing, resources, infrastructure and other<br />
systems. Some <strong>of</strong> the critical posts have not as yet been filled, and as a result<br />
many <strong>of</strong> the few staff available are over-burdened and cannot provide the<br />
necessary support <strong>to</strong> schools. Some <strong>of</strong> the EDOs who are permanently<br />
appointed have subsidized vehicles and are making an effort <strong>to</strong> provide<br />
support <strong>to</strong> schools. Such support is currently not adequate because there are<br />
lots <strong>of</strong> schools that cannot be visited regularly, due <strong>to</strong> unfilled EDO posts.<br />
In many districts, cluster meetings are held where schools report <strong>to</strong> the<br />
collective group what they have been doing after receiving training in their<br />
respective circuits. Principals also expressed the positive gains from the<br />
training workshops, but they still need “in school support” for them <strong>to</strong><br />
successfully implement what they have learned. During cluster meetings their<br />
trainers, in this case EDOs, attend such meetings in order <strong>to</strong> support them<br />
and also identify areas that need further training and support. The<br />
appointment <strong>of</strong> additional staff would facilitate proper moni<strong>to</strong>ring, men<strong>to</strong>ring<br />
and tu<strong>to</strong>ring.<br />
15
One <strong>of</strong> the remarkable areas <strong>of</strong> progress since the last Imbewu OPR is the<br />
way in which District Managers have gained confidence and taken charge in<br />
their districts, developed district plans and encouraged the development <strong>of</strong><br />
school development plans. The <strong>Review</strong> Team were given the opportunity <strong>to</strong><br />
hear from three <strong>of</strong> the district managers how they had utilised the limited<br />
resources they have <strong>to</strong> great effect. Many <strong>of</strong> the districts are widely dispersed<br />
with responsibility for 300-plus schools and approximately 4000 educa<strong>to</strong>rs.<br />
Circumstances have forced some creative solutions : lack <strong>of</strong> infrastructure in<br />
one instance has led <strong>to</strong> decentralisation <strong>to</strong> circuit level <strong>of</strong> all pr<strong>of</strong>essional<br />
services.<br />
There is clear understanding among District Managers that the key core<br />
functions <strong>of</strong> the newly articulated “pr<strong>of</strong>essional” districts are (with back <strong>of</strong>fice<br />
support from 4 Corporate Service centres) are:<br />
• the effective management and governance <strong>of</strong> schools,<br />
• the establishment <strong>of</strong> teaching and learning support in classrooms and<br />
• support <strong>to</strong> Values education, HIV/Aids, Human Rights and Inclusive<br />
<strong>Education</strong><br />
although in some instances they lack the human resources <strong>to</strong> carry out all<br />
these activities.<br />
Initially it was envisaged that two courses developed and run by Fort Hare<br />
University would support capacity development at the district level. The<br />
much-needed Curriculum Leadership Course has had <strong>to</strong> be put on hold<br />
because <strong>of</strong> the cuts in DFID funding.<br />
However the OPR team were able <strong>to</strong> meet the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> at<br />
Fort Hare and receive a report on the cutting edge development <strong>of</strong> an<br />
<strong>Education</strong> Leadership and Management Development course which is<br />
continuing with restricted funding. This course is currently developing the skills<br />
and capacities <strong>of</strong> 130 district stakeholders, SGBs, principals, lead teachers<br />
and District <strong>of</strong>ficials engaged in the same course, as part <strong>of</strong> a new holistic<br />
development paradigm which will provide interesting research material for the<br />
new action research network <strong>of</strong> teachers, 200 <strong>of</strong> whom were <strong>to</strong> meet the week<br />
<strong>of</strong> the OPR at the launch <strong>of</strong> an action research network.<br />
The major constraint <strong>to</strong> district development in six <strong>of</strong> the districts remains the<br />
lack <strong>of</strong> infrastructure <strong>to</strong> provide district <strong>of</strong>fice space. This was an issue which<br />
the 2003 OPR thought long and hard about and recommended that DFID<br />
would provide funding for two <strong>of</strong> these <strong>of</strong>fices. Protracted discussions have<br />
taken place during the year regarding the appropriateness <strong>of</strong> utilising DFID<br />
funds for this purpose. Two new issues have arisen since the initial<br />
discussions <strong>to</strong>ok place. One is that the department have decided with the JMT<br />
<strong>to</strong> separate financial and educational management, which means that district<br />
<strong>of</strong>fices will only need <strong>to</strong> provide pr<strong>of</strong>essional core functions, ie. support <strong>to</strong><br />
teaching and learning. The second issue is that DFID funding has been cut<br />
significantly.<br />
16
The OPR team feels that there needs <strong>to</strong> be further discussion with the SG and<br />
Senior Management regarding this issue. There are procurement questions <strong>to</strong><br />
be explored. This is a provincial responsibility but there may well be a role for<br />
DFID <strong>to</strong> provide a pro<strong>to</strong>type model in one district (presumed <strong>to</strong> be C<strong>of</strong>imvaba)<br />
possibly along the lines <strong>of</strong> the school construction process. If this suggestion<br />
is not practicable there needs at least <strong>to</strong> be a review <strong>of</strong> the design being<br />
proposed, in the light <strong>of</strong> the above changes.<br />
<strong>Output</strong> 2 Recommendation<br />
There is a need for clarity regarding whether or not corporate service<br />
centres are going <strong>to</strong> be permanent features <strong>of</strong> the district landscape. But<br />
there is an urgent need <strong>to</strong> provide pr<strong>of</strong>essional support <strong>to</strong> schools in<br />
those districts where no infrastructure exists. This appears <strong>to</strong> be a<br />
unique problem facing Eastern Cape. It is recommended that Imbewu<br />
assist the department in resolving the issue regarding the provision <strong>of</strong><br />
district infrastructure in the six most disadvantaged districts through<br />
advocacy and technical assistance.<br />
3.3<br />
<strong>Output</strong> 3 - Schools which, having undergone a whole school effectiveness<br />
process, are better able <strong>to</strong> provide improved learning opportunities for their<br />
learners<br />
School Transformation Programme<br />
The school transformation programme continues <strong>to</strong> be the driving lever <strong>of</strong> the<br />
Imbewu Programme. Evidence all around, and without exception, suggests<br />
that the programme is very successful. Its adoption and gazetting as policy by<br />
the Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> is a significant development and<br />
will go a long way <strong>to</strong> ensure its sustainability. The key challenge is <strong>to</strong> develop<br />
a programme for rolling out <strong>of</strong> the School Transformation Model <strong>to</strong> the rest <strong>of</strong><br />
the schools in the province.<br />
There has been a great deal <strong>of</strong> success in some aspects <strong>of</strong> the model. There<br />
is consensus that a great deal has been achieved in terms <strong>of</strong> such elements<br />
<strong>of</strong> the programme as vision crafting, community involvement, and reflective<br />
practice. However, a lot still has <strong>to</strong> be done in terms <strong>of</strong> in-service training and<br />
curriculum aspects.<br />
The respondents <strong>to</strong> the OPR have witnessed marked improvements in the<br />
learning environment <strong>of</strong> the schools. This has included, amongst others, the<br />
following achievements:<br />
• Vision crafting and the development school development plans in many<br />
schools<br />
• Active participation <strong>of</strong> communities in these processes and other school<br />
activities, and thus the improvement <strong>of</strong> the relationship between schools<br />
and their communities<br />
• The working <strong>to</strong>gether <strong>of</strong> school managers, teachers and learners <strong>to</strong><br />
achieve educational goals<br />
17
• Most schools have SGBs that are functional <strong>to</strong> a greater degree<br />
• The development <strong>of</strong> sense <strong>of</strong> responsibility and pride amongst school<br />
communities<br />
Further, evidence shows that non-Imbewu schools are also beginning <strong>to</strong><br />
benefit from the programme. Many <strong>of</strong> the districts are initiating various<br />
innovative strategies aimed at ensuring that best practices emerging from<br />
Imbewu are shared amongst ALL the schools. For instance, in Covimvaba,<br />
the district has developed what they refer <strong>to</strong> as the ‘Replication Model’. This<br />
involves partnering Imbewu schools with two or three other schools around<br />
them, for purposes <strong>of</strong> creating opportunities for sharing <strong>of</strong> experiences,<br />
practices and resources from the Imbewu Programme, and also finding<br />
common solutions <strong>to</strong> the schools’ problems. Other strategies include utilizing<br />
teachers from Imbewu schools as lead teachers who assist districts with the<br />
training <strong>of</strong> teachers in non-Imbewu schools.<br />
The rolling out <strong>of</strong> the training on the STP has undoubtedly been going very<br />
well, particularly when one takes in<strong>to</strong> account the sheer numbers <strong>of</strong> people<br />
who have gone through it, (in the thousands). The training is cascaded from<br />
head <strong>of</strong>fice <strong>to</strong> districts and then <strong>to</strong> schools. Evidence shows that the impact <strong>of</strong><br />
the training has been positive. Those who have received it have a good<br />
understanding <strong>of</strong> the content <strong>of</strong> the programme and have developed a great<br />
deal <strong>of</strong> confidence <strong>to</strong> train others on it, and have also been able <strong>to</strong> implement<br />
it. However, the greatest challenge remains the provision <strong>of</strong> ongoing support<br />
<strong>to</strong> schools.<br />
Curriculum support <strong>to</strong> schools on an ongoing basis remains a critical<br />
challenge – although training has been rolled out <strong>to</strong> some 25 thousand<br />
teachers. The lack <strong>of</strong> resources and capacity within districts are some <strong>of</strong> the<br />
fac<strong>to</strong>rs that are attributable <strong>to</strong> the lack <strong>of</strong> such support. Generic training in<br />
RNCS continues <strong>to</strong> be rolled out under difficult circumstances. However, there<br />
is consensus that the training needs <strong>to</strong> go beyond the cascade model, which<br />
tends <strong>to</strong> be generic in nature and inadequate. There is a need for intensive<br />
and comprehensive in-service training <strong>of</strong> teachers as well as district <strong>of</strong>ficials<br />
such as subject advisors. This training should focus on providing teachers and<br />
subject advisors with critical skills and knowledge in subject content,<br />
innovative teaching methodologies, as well as provide school managers skills<br />
<strong>to</strong> manage curriculum implementation.<br />
It is important <strong>to</strong> point out that the education department recently gazetted a<br />
policy on INSET. It is also interesting <strong>to</strong> note that this Province is probably one<br />
<strong>of</strong> the few provincial departments that have such a policy in place. This<br />
development is welcomed by all. However, the key challenge is how the policy<br />
will be implemented <strong>to</strong> address the legacy <strong>of</strong> very poor teacher education in<br />
the province.<br />
At present, a wide range <strong>of</strong> strategies are employed <strong>to</strong> provide classroom<br />
support <strong>to</strong> schools, and these should be enhanced and promoted by the<br />
department:<br />
18
• School clusters, which are currently one <strong>of</strong> the most effective strategies <strong>to</strong><br />
provide opportunities for teachers <strong>to</strong> share ideas and find common<br />
solutions the challenges facing them;<br />
• The establishment <strong>of</strong> learning area committees, aimed at proving support<br />
around subject area-specific matters;<br />
• Utilizing lead teachers as a resource <strong>to</strong> the district and other schools<br />
The implementation <strong>of</strong> the INSET policy will hopefully recognize these<br />
strategies and strengthen them through making available basic resources and<br />
providing coordination <strong>to</strong> their work. The department will certainly need <strong>to</strong><br />
partner with other key players such as higher education institutions and NGOs<br />
<strong>to</strong> successfully implement the INSET policy. The policy will need <strong>to</strong> be<br />
translated in<strong>to</strong> concrete programmes and resources will need <strong>to</strong> be leveraged<br />
<strong>to</strong> implement it.<br />
Lastly, there are strong perceptions amongst many interviewees that schools<br />
have experienced significant improvement in the performance <strong>of</strong> the learners<br />
since they started implementing the school transformation model. They testify<br />
<strong>to</strong> the fact that the STP has brought about, stability, an environment that is<br />
conducive <strong>to</strong> learning, fresh commitment from teachers <strong>to</strong> their work, and thus<br />
more contact time with learners. Although there is no clear linear relationship<br />
between the programme and learner performance, evidence shows that the<br />
programme is a necessary but not sufficient condition for improved learner<br />
performance and school effectiveness.<br />
HIV/AIDS<br />
At school level it was reported that most schools have strategies in place in<br />
dealing with issues relating <strong>to</strong> HIV/AIDS. Schools which do not have such<br />
strategies are assisted <strong>to</strong> develop such strategies. Schools are also provided<br />
with safety and first aid kits, and also given some training on handling<br />
emergencies, including sports injuries, <strong>to</strong> minimise chances <strong>of</strong> accidental<br />
infections.<br />
It was also reported that most schools have dedicated life-skills educa<strong>to</strong>rs<br />
whose function includes among other things counselling. Learners are also<br />
encouraged <strong>to</strong> volunteer <strong>to</strong> be trained as peer counsellors. District <strong>of</strong>ficials<br />
and principals attributed their ability <strong>to</strong> respond positively <strong>to</strong> HIV/Aids issues <strong>to</strong><br />
the on-going training and support from the Imbewu programme since as they<br />
put it, the programme has “empowered them <strong>to</strong> deal effectively and<br />
proactively with different kinds <strong>of</strong> challenges rather than wait for the<br />
department”.<br />
The provincial strategic plan also commits the ECED <strong>to</strong> increase awareness<br />
about the management HIV/Aids by the schools and communities. This is<br />
aimed at encouraging schools <strong>to</strong> develop their own HIV/Aids policies and<br />
strategies in line with the National HIV/Aids Policies<br />
19
<strong>Output</strong> 3 Recommendations<br />
Regarding the school transformation programme -<br />
• Ongoing support <strong>to</strong> schools should be prioritized, both in terms <strong>of</strong><br />
governance and curriculum aspects. In order <strong>to</strong> achieve this,<br />
innovative strategies and mechanisms such as school clusters,<br />
learning areas committees and the use <strong>of</strong> lead teachers, should be<br />
promoted across the province and be enhanced;<br />
• The in-depth training <strong>of</strong> all EDOs and Subject advisors should<br />
continue, it should be deepened, and they should be provided with<br />
appropriate <strong>to</strong>ols <strong>to</strong> be able <strong>to</strong> support schools;<br />
• The curriculum aspects <strong>of</strong> school transformation model should be<br />
integrated in<strong>to</strong> the INSET programme <strong>of</strong> the ECED. The INSET<br />
programme should have clear and achievable strategies and<br />
objectives.<br />
• A comprehensive programme for rolling out the school<br />
transformation model <strong>to</strong> the rest <strong>of</strong> the schools in the province<br />
should be developed, budgeted for, and implemented.<br />
3.4<br />
<strong>Output</strong> 4 - Improved asset management in place and cost effective school<br />
buildings constructed<br />
There are two aspects <strong>to</strong> Out put four. One is the development <strong>of</strong> an asset<br />
management system and the other is <strong>to</strong> demonstrate by the development <strong>of</strong> a<br />
process for the development <strong>of</strong> Community based Cost effective technology.<br />
The JMT Turnaround plan refers <strong>to</strong> improved infrastructure planning with a<br />
sharper focus on poorer areas. And the Imbewu objectives are directly in line<br />
with the <strong>Education</strong> <strong>Department</strong> objectives <strong>to</strong> initiate and implement a medium<br />
term plan <strong>to</strong> address infrastructure backlogs, <strong>to</strong> improve collaboration with<br />
Public works and <strong>to</strong> align donor funding with <strong>Department</strong>al priorities. <strong>Output</strong><br />
Four has directly assisted the <strong>Department</strong> in meeting these objectives by<br />
assisting the development <strong>of</strong> a comprehensive Asset Management system.<br />
All schools have been visited and assessed. There is a full knowledge base<br />
<strong>of</strong> the condition <strong>of</strong> schools and their geophysical locations on a GIS platform<br />
which enables the department <strong>to</strong> look at where new classrooms and schools<br />
are needed and where rationalisation could take place. This knowledge base<br />
is being developed further <strong>to</strong> include a wide bank <strong>of</strong> information related <strong>to</strong><br />
schools and their communities , which will provide a key planning <strong>to</strong>ol at all<br />
levels <strong>of</strong> the system, especially for the new Policy, Planning and Research<br />
Chief Direc<strong>to</strong>rate. During the review it became obvious that District Managers<br />
and School Principals could provide the system with feedback <strong>of</strong> what<br />
information would be useful for their needs and there is an urgency, if the<br />
<strong>Department</strong> is <strong>to</strong> develop an evidenced planning culture for the further<br />
development <strong>of</strong> this knowledge base <strong>to</strong> be a participative process and not a<br />
<strong>to</strong>p down one.<br />
20
It is recommended that as soon as practicable a strategy is developed <strong>to</strong><br />
ensure two way communication flow <strong>of</strong> data and that managers be given the<br />
relevant data relating <strong>to</strong> their schools and districts which they an reflect in their<br />
development plans.<br />
Over the past year the process <strong>to</strong> build extra class rooms at the Bantwanana<br />
school has been successfully initiated with the full cooperation and agreement<br />
<strong>of</strong> public works and the local community. This has involved skills and resource<br />
mapping in the local area, much negotiation with Border Training Centre and<br />
other technical agencies. There has been an accredited 45 day painting<br />
programme for 6 members <strong>of</strong> the community funded by the Ministry <strong>of</strong> labour.<br />
Electrical trainees have also been sent on courses with one woman<br />
community member receiving extended electrical leadership training. Fifteen<br />
unemployed youth from the local community have also been accredited by<br />
the Training Centre in brick making and laying. A new building technique as<br />
been quality approved called Afribond, which involves laying bricks on their<br />
sides <strong>to</strong> reduce the number <strong>of</strong> bricks laid with consequent significant cost<br />
reduction.<br />
Construction is underway and it is envisaged that a second process <strong>of</strong><br />
resource mapping and skills audit will begin in a second geophysical area,<br />
Maluti, a mountainous and remote area where it is likely that other local<br />
materials and technologies will be engaged. This second enterprise should be<br />
completed by the end <strong>of</strong> 2004.<br />
The Physical Planning Direc<strong>to</strong>rate have been fully empowered <strong>to</strong> develop this<br />
process further. The TA has left and on going support will be provided by<br />
occasional visits from the original TA who introduced the overall concept <strong>to</strong><br />
the province. It is clear that the use <strong>of</strong> this technology will be most appropriate<br />
in the remotest parts <strong>of</strong> the province with the added benefit that local people<br />
develop skills which will enable them be productive beyond the construction<br />
period. Thus this output is providing a small but significant contribution <strong>to</strong> the<br />
EGDP. It is widely applauded by the <strong>Department</strong> and the opening <strong>of</strong><br />
Bantwanana School keenly anticipated. The OPR team feel that this is a<br />
critical success s<strong>to</strong>ry <strong>of</strong> the Imbewu programme and should continue <strong>to</strong> be<br />
encouraged and supported. Given the cuts in DFID support <strong>to</strong> the Eastern<br />
cape it would be helpful if some <strong>of</strong> the new support <strong>to</strong> be provided by the<br />
European Commission should be used <strong>to</strong> produce the demonstration schools<br />
in those areas where DFID has had <strong>to</strong> cut back. (The original intention was <strong>to</strong><br />
provide 8 schools in the different geophysical areas.)<br />
21
<strong>Output</strong> 4 Recommendation<br />
It is recommended that as soon as practicable a strategy is developed <strong>to</strong><br />
ensure the two way communication flow <strong>of</strong> data and that managers be<br />
given the relevant data relating <strong>to</strong> their schools and districts which they<br />
can reflect in their development plans.<br />
3.5<br />
<strong>Output</strong> 5 - Communities sufficiently motivated <strong>to</strong> become critically engaged<br />
with education decision-makers and other community level service providers<br />
The <strong>Education</strong> <strong>Department</strong>’s Strategic plan indicates that planning has been<br />
influenced by the Provincial Growth and Development Plan (PGDP), the<br />
Millennium Development Goals and the National <strong>Department</strong>’s ‘Tirisano’<br />
Framework. There is emphasis on integrated holistic planning which<br />
concentrates on mobilising local communities around schools. In 2004 the<br />
Eastern Cape <strong>Education</strong> department will take over 1140 Community based<br />
sites from the Social Development <strong>Department</strong> with an allocated budget <strong>of</strong><br />
R39,245,000 (over the next three years). Responsibility for the Food and<br />
Nutrition Programme will also transfer from Health <strong>to</strong> <strong>Education</strong>. The MEC<br />
states in the foreword <strong>to</strong> the Strategic Plan that she regards the nutrition<br />
programme as an opportunity for making PGDP objectives a reality biased<br />
<strong>to</strong>wards rural women. There are plans <strong>to</strong> increase literacy programmes, <strong>to</strong><br />
develop skills programmes and <strong>to</strong> increase the number <strong>of</strong> Health-promoting<br />
schools.<br />
The School Transformation model (see <strong>Output</strong> 3) is founded on the principle<br />
<strong>of</strong> mobilising communities and drawing on the wisdom <strong>of</strong> the community, <strong>to</strong><br />
create a spirit <strong>of</strong> self-sufficiency.<br />
<strong>Review</strong>ing Imbewu’s contribution <strong>to</strong> mobilising communities around schools<br />
the OPR team noted that the model is being rolled out <strong>to</strong> 1734 schools and<br />
165 district <strong>of</strong>ficials will have fully mobilised their communities within the next<br />
year. The team were <strong>to</strong>ld that many <strong>of</strong> the original 527 Imbewu schools were<br />
now Health-promoting schools, utilising volunteers from the communities <strong>to</strong><br />
nurture poor children, especially orphans and vulnerable children, assisting<br />
them with washing and laundry, providing food and clothing and waiving<br />
school fees. In C<strong>of</strong>imvaba district the District Direc<strong>to</strong>r is rolling out the<br />
transformation model <strong>to</strong> all his schools. Many schools are developing gardens<br />
and developing community programmes, irrespective <strong>of</strong> whether they have<br />
been through the STP.<br />
Imbewu set up a separate pilot scheme, the School Community Improvement<br />
Pilot Programme (SCIPP) <strong>to</strong> deepen the involvement <strong>of</strong> communities . This<br />
has <strong>to</strong> date worked in 28 schools and encouraged entrepreneurial activity<br />
where there was an existing spirit <strong>of</strong> self-help. What has been achieved <strong>to</strong><br />
date in the pilot programme is encouraging, but the OPR have come <strong>to</strong> the<br />
conclusion that it is not productive <strong>to</strong> separate out the community aspect <strong>of</strong><br />
22
transformation in this way, especially when the PGDP is encouraging all<br />
schools and communities <strong>to</strong> address the social as well as educational needs<br />
<strong>of</strong> the learners.<br />
It is recommended that <strong>Output</strong> 5 be integrated in<strong>to</strong> <strong>Output</strong> 3 and<br />
unallocated aspects <strong>of</strong> this budget be reallocated <strong>to</strong> <strong>Output</strong> One.<br />
3.6<br />
Revisions <strong>to</strong> the Logframe<br />
The OPR makes several suggestions for revisions <strong>to</strong> the logframe, in<br />
particular in respect <strong>of</strong> the <strong>Output</strong>s and their OVIs. These will be discussed at<br />
the OPR PSC meeting, and agreed with output managers before the next<br />
PSC in May. The draft amendments are included as an Annex <strong>to</strong> this OPR.<br />
23
Section 4<br />
Programme Management Issues<br />
Programme management <strong>of</strong> IMBEWU II has been generally sound and<br />
effective, even though the programme experienced challenges with respect <strong>to</strong><br />
the positions <strong>of</strong> Programme Co-ordina<strong>to</strong>r and Finance Manager. The<br />
<strong>Department</strong>al counterpart temporarily assumed the role <strong>of</strong> the Programme coordina<strong>to</strong>r<br />
for few months whilst the Managing Consultants (MC) were busy<br />
with the process <strong>of</strong> recruiting the new Co-ordina<strong>to</strong>r. During that time, both the<br />
Managing Direc<strong>to</strong>r and the Senior <strong>Education</strong> Specialist based in the<br />
Netherlands periodically visited the programme and provided technical and<br />
management support <strong>to</strong> ensure the smooth running <strong>of</strong> the programme. The<br />
Managing Consultants also provided temporary cover for the Finance<br />
Manager. The Programme Co-ordina<strong>to</strong>r has since been appointed by the<br />
programme (in January 2004) and the Finance Manager with effect from 1<br />
April 2004.<br />
In their response <strong>to</strong> the recommendations <strong>of</strong> the 2003 OPR Aide Memoire<br />
recommendations, the Programme Office informed the <strong>Review</strong> team that the<br />
<strong>Department</strong>al Strategic and Budget planning processes are being aligned<br />
from this financial year <strong>to</strong> ensure that the planning process now fully precedes<br />
the budget cycle planning process (scheduled and co-ordinated through the<br />
Provincial Treasury). The new organizational structure also now incorporates<br />
a new unit focusing on Planning & Moni<strong>to</strong>ring. This unit has incorporated a<br />
Direc<strong>to</strong>rate for Strategic Management Support, which among others, is<br />
charged with the responsibility <strong>of</strong> co-ordination and liaison with donor funded<br />
projects and programmes. This has led <strong>to</strong> a change <strong>of</strong> <strong>Department</strong>al<br />
leadership <strong>of</strong> the programme : the Direc<strong>to</strong>r <strong>of</strong> Strategic Management Support<br />
and Moni<strong>to</strong>ring has assumed the responsibility <strong>of</strong> Programme Manager <strong>of</strong> the<br />
programme, and the current manager is therefore an ordinary member <strong>of</strong> the<br />
PSC.<br />
The Managing Consultants raised concern that although DFIDSA has verbally<br />
informed both the programme and themselves about the reduction on the<br />
overall financial commitment <strong>of</strong> the programme, <strong>to</strong> date no formal notification<br />
has been received either by the Managing Consultants or the <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong>.<br />
The second concern raised was that the implications <strong>of</strong> the cumulative<br />
£100,000 sterling threshold on the procurement <strong>of</strong> goods was not fully<br />
explained <strong>to</strong> the MC, and this has major financial implications both on the<br />
contract and programme funds and on implementation processes. This should<br />
be clarified by the DFIDSA <strong>Education</strong> team with DFIDSA management and<br />
contracts branch on return from this OPR.<br />
Arcadis (the Managing Consultants) have agreed <strong>to</strong> arrange <strong>to</strong> have their<br />
financial accounts externally audited, and also that key people in the<br />
programme should have permanent access <strong>to</strong> Extranet.<br />
24
Financial and progress reports are submitted timeously <strong>to</strong> the monthly<br />
Programme Steering Committee in accordance with the requirement <strong>of</strong> the<br />
Programme Management Manual. PRISM reports are also produced on a<br />
quarterly basis.<br />
Financial reports and invoices are sent <strong>to</strong> contracts branch who check that<br />
expenditure is line with the contract . The reports are then sent <strong>to</strong> the<br />
spending department (DFIDSA) for verification and authorization. The<br />
programme has, however indicated that they have spent approximately<br />
£1million in March. This may have implications for the 2004/05 financial<br />
budget, and the situation will have <strong>to</strong> be closely moni<strong>to</strong>red.<br />
Arcadis Advisers based in the Netherlands provide constant support <strong>to</strong> the<br />
management <strong>of</strong> the programme. There are clear roles and responsibilities for<br />
the management <strong>of</strong> the programme , PSC and the other key partners, and<br />
these are clearly set out in the Programme Management Manual. The<br />
Programme Steering Committee still meets on a monthly basis. A decision<br />
now needs <strong>to</strong> be taken on the frequency <strong>of</strong> the meetings in future, and who<br />
should chair these meetings. This should be discussed and agreed at the next<br />
PSC meeting (in May 2004).<br />
25
Section 5<br />
Lessons learnt and wider context<br />
The Imbewu Programme <strong>of</strong>fers an opportunity <strong>to</strong> the ECED <strong>to</strong> link up DFIDand<br />
other donor-funded initiatives in the Province. This would not only<br />
ensures operational leverage but also provides opportunities and the means<br />
for ensuring best practices and a continuous improvement culture. The<br />
previous OPR highlighted the need for the department <strong>to</strong> work closely with<br />
other departments in the provincial administration, particularly those that fall<br />
within the Social Needs Cluster. Although this Cluster has not been<br />
functioning optimally, it is encouraging <strong>to</strong> see that the department now<br />
participates in its activities. The MEC for <strong>Education</strong> currently chairs the<br />
Eastern Cape AIDS Council, which falls under the Social Needs Cluster. The<br />
participation is further demonstrated by the improved relationship between the<br />
department and the Treasury. The PGDP (Provincial Growth and<br />
Development Plan) provides an added platform for better coordination and<br />
integrated planning between ECED and other departments.<br />
The Integrated Provincial Support Programme (IPSP) could <strong>of</strong>fer technical<br />
support <strong>to</strong> the <strong>Education</strong> <strong>Department</strong> as well evidence <strong>of</strong> best practices, within<br />
the province. For example the file documentation project <strong>of</strong> the <strong>Department</strong> <strong>of</strong><br />
Social Development provides a good learning opportunity for the department<br />
<strong>to</strong> deal with the filing and documentation challenge <strong>of</strong> the <strong>Education</strong><br />
<strong>Department</strong>. The HIV/AIDS Multi-Sec<strong>to</strong>r Programme could also give meaning<br />
<strong>to</strong> the comprehensive HIV/AIDS strategy <strong>of</strong> the department, as it also focuses<br />
on building capacity in various provincial departments including the ECED.<br />
Further linkages between the Imbewu Programme and other DFID initiatives<br />
are reflected in a Table – see Annex 4.<br />
There are further opportunities that could be explored with other donors<br />
currently operating within the Eastern Cape such as EU, USAID, DBSA, NDA<br />
etc. Some <strong>of</strong> these organizations may not be necessarily operating in the<br />
education sec<strong>to</strong>r, but could link perfectly with some <strong>of</strong> the departmental<br />
programmes. It is important <strong>to</strong> note that the support from these donor<br />
organizations should be <strong>to</strong> support strategic and catalytic interventions that<br />
ensure successful implementation <strong>of</strong> the outputs <strong>of</strong> the Imbewu Programme<br />
and the Strategic Plan.<br />
26
ANNEXE 1<br />
TORS FOR THE IMBEWU OUTPUT TO PURPOSE REVIEW<br />
( MARCH 23 rd – 2 nd April 2004)<br />
BACKGROUND<br />
Last years OPR involved complicated field visits and a lot <strong>of</strong> snapshot<br />
judgements. Time was very pressured and the completion <strong>of</strong> the Aide<br />
Memoire somewhat stressful. I am proposing a slightly different approach <strong>to</strong><br />
the Imbewu OPR this year which will rely on a more evidence based approach<br />
and would require by in <strong>to</strong> play an active role and <strong>to</strong> undertake some<br />
preliminary work by all team members. It would also involve lateral so that we<br />
can articulate DFIDs contribution <strong>to</strong> development in the Eastern Cape in a<br />
more coherent manner.<br />
OUTCOMES<br />
The outcomes <strong>of</strong> the OPR would be;<br />
A completed PRISM Document<br />
An Aide Memoire<br />
A revised logframe<br />
A visual presentation <strong>of</strong> the linkages and potential for increased linkages with<br />
other programmes.<br />
THE EVIDENCE BASE<br />
Arcadis have set up an Intranet. All team members will have access <strong>to</strong> this<br />
well in advance <strong>of</strong> the OPR.<br />
Key documents which will be available on the Intranet include;<br />
The draft PRIM report<br />
An issues paper specially prepared for the OPR.<br />
<strong>Report</strong> on the outcomes <strong>of</strong> the Strategic Realignment Workshop ( Feb<br />
10-12 th )<br />
Evaluation <strong>Report</strong>- baseline will have been completed<br />
<strong>Report</strong> on the special School Community Improvement Project<br />
Progress rolling out the Imbewu School transformation model <strong>to</strong> more<br />
than 1700 schools ( the model has been gazetted and is now the<br />
<strong>of</strong>ficial Eastern Cape model)<br />
<strong>Report</strong>s on each <strong>Output</strong><br />
A report on gender equity within the programme<br />
2. General Terms <strong>of</strong> Reference<br />
The overall purpose <strong>of</strong> the review is <strong>to</strong> take a strategic look at the achievements <strong>of</strong> the<br />
project against the targets as outlined in the logical framework and considering<br />
progress against outputs including any constraints the project has come across.<br />
(i) Project Impact<br />
· Assess the appropriateness, effectiveness and relevance <strong>of</strong> programme<br />
content.<br />
· Assess the impact <strong>of</strong> the programme on the department<br />
27
(iv) Project Achievements<br />
• Assess progress <strong>to</strong>wards the <strong>Output</strong>s against the OVIs;<br />
• Assess progress <strong>to</strong>wards project <strong>Purpose</strong>. Consider the extent <strong>to</strong> which<br />
planned project <strong>Output</strong>s are contributing <strong>to</strong> the <strong>Purpose</strong> and whether they<br />
are still relevant and realistic.<br />
• Consider contribution <strong>to</strong> <strong>Purpose</strong> <strong>to</strong> project Goal.<br />
• Consider validity <strong>of</strong> Risks/Assumptions identified during project design are<br />
impacting on the project <strong>Purpose</strong>; How they are being managed and<br />
whether any new Risks/Assumptions have been identified.<br />
• Assess the likelihood <strong>of</strong> the project achieving its objective, and ,make<br />
recommendations accordingly.<br />
• Assess the progress on integrating the programme with the education<br />
system at local level.<br />
(ii) Project Management<br />
• <strong>Review</strong> the effectiveness <strong>of</strong> project moni<strong>to</strong>ring and reporting;<br />
• <strong>Review</strong> the arrangements for the control <strong>of</strong> expenditure and procurement;<br />
• <strong>Review</strong> expenditure <strong>to</strong> date against the project’s budget;<br />
• <strong>Review</strong> project management arrangements and effectiveness;<br />
• <strong>Review</strong> individual’s roles, responsibilities and level <strong>of</strong> co-ordination within<br />
the project team.<br />
(iii) Lessons Learnt and Wider Context<br />
• Assess what linkages exist and their contribution <strong>to</strong> the achievement <strong>of</strong> the<br />
project purpose.<br />
QUESTIONS WHICH NEED SPECIAL CONSIDERATION<br />
The Team will need <strong>to</strong> look at how the management <strong>of</strong> the programme in its<br />
new structure complies with DFID requirements in terms <strong>of</strong> strategic thrust,<br />
transition from project <strong>to</strong> programme , financial management and<br />
procurement.<br />
<br />
<br />
<br />
How is the Imbewu programme mainstreaming work on HIV/Aids<br />
and how could this be improved?<br />
How can the sustainability <strong>of</strong> the programme be ensured?<br />
How can the programme generate more employment opportunities for<br />
communities around schools?<br />
3. Team composition<br />
External inputs<br />
The OPR will be led by Myra Harrison ex Chief <strong>Education</strong> Adviser for DFID<br />
who will lead the team and coordinate the outputs It is further suggested that<br />
one other external consultant who was part <strong>of</strong> last years review, Mareka<br />
Monyokolo, be contracted <strong>to</strong> be able <strong>to</strong> give and external view <strong>of</strong> progress,<br />
especially in relation <strong>to</strong> the teacher training programme and its integration<br />
in<strong>to</strong> the departments own training programme. ( 2)<br />
28
DFID inputs<br />
It is hoped that the following advisers will be able <strong>to</strong> participate in the <strong>Review</strong><br />
process; Richard Thomas, ( governance) David Pedley,( economist) Paula<br />
Chalinder ( Livelihoods adviser) Barbara Payne( <strong>Education</strong> adviser) Mokgapi<br />
Maleka ( <strong>Education</strong> adviser) Bob Blakelock ( engineering Adviser) and that<br />
Pinky Pheeloane ( Programme Officer) and Mzu Bushet ( DFID EC rep) will<br />
also be part <strong>of</strong> the team ( 8)<br />
National and Provincial inputs<br />
It is hoped that the National and Provincial <strong>Department</strong> will nominate<br />
members <strong>to</strong> participate in the review as part <strong>of</strong> the OPR team ( <strong>to</strong> be advised)<br />
INDIVIDUAL TORs<br />
I am suggesting the following responsibilities within the DFID team . When we<br />
know who the other participants will be, there can be adjustments, but the<br />
important issue is that all the themes are covered.<br />
Procurement and Financial management –Pinky Pheeloane<br />
Roll Out <strong>of</strong> Training programme and School transformation model, materials-<br />
Mareka Monyokolo.<br />
Deepening Community involvement/ SCIP project- linkages with livelihoods<br />
issues- Paula Chalinder<br />
Progress mainstreaming HIV Aids work within Imbewu- Mokgapi Maleka<br />
Imbewu’s contribution <strong>to</strong> Eastern Cape’s economic growth and development<br />
strategy and programme evaluation - David Pedley<br />
Progress <strong>to</strong>wards Cost Effective Construction Asset Management and Skills<br />
development – Bob Blakelock<br />
How IPSP, Imbewu, Fort Hare can work <strong>to</strong>gether <strong>to</strong>wards addressing<br />
concerns about Public Sec<strong>to</strong>r reforms and sustainability – Richard Thomas<br />
Producing a matrix <strong>of</strong> DFID Eastern Cape activities and how they interlink-<br />
Mzu Bushet (with inputs from the whole team)<br />
The movement from project <strong>to</strong> programme , decentralisation and district<br />
development- Barbara Payne<br />
Progress against outputs interrelatedness <strong>of</strong> outputs and the bigger picture –<br />
Myra Harrison (with inputs from other members <strong>of</strong> the team) Myra will also<br />
be the team leader<br />
THE PROCESS<br />
The team will meet in the DFID <strong>of</strong>fice in Pre<strong>to</strong>ria on Tuesday 23 rd March at<br />
11 am for a full briefing and role and responsibility assignments (with the SA<br />
Programme Manager Jim McAlpine) The work during this week will be desk<br />
29
esearch on the documents on the Intranet, culminating with brief Task<br />
reports <strong>to</strong> be available at a meeting <strong>to</strong> be held on Friday 26 th at 10 am <strong>to</strong><br />
establish what the key issues are for interaction with the Imbewu team during<br />
the subsequent week.<br />
The team will travel <strong>to</strong> the Eastern Cape on Sunday 28 th March late pm.<br />
Monday 29 th March<br />
Meeting with the MEC and SG in Eastern Cape and other senior <strong>of</strong>ficials<br />
<strong>Report</strong>s on outputs and the issues raised above, with members <strong>of</strong> the team<br />
acting as” respondents” and leading on questions which have arisen as a<br />
result <strong>of</strong> their preparation.<br />
This is also the suggested format for Tuesday 30 th March, with Wednesday<br />
31 st being a day for follow up meetings with individual key member <strong>of</strong> the<br />
department in the morning as and if necessary, and then a full OPR team in<br />
the afternoon meeting <strong>to</strong> draw <strong>to</strong>gether conclusions and recommendations for<br />
discussion the following day.<br />
It is hoped that there can be a full meeting on Thursday April 1 st at 8 30 am<br />
with the PSC and other senior members <strong>of</strong> the <strong>Department</strong> <strong>to</strong> finalise the<br />
PRISM document, undertake scoring <strong>of</strong> the programme, agree the Log Frame<br />
changes, assess lessons learnt, and discuss recommendations contained in<br />
an Executive Summary <strong>of</strong> the Aide Memoire .<br />
The team will leave for Johannesburg on the last flight <strong>to</strong> Joburg 19 30 pm on<br />
Thursday 1 st April<br />
Friday 2 nd April at 10am a meeting in the DFIDSA <strong>of</strong>fice <strong>to</strong> report back on the<br />
OPR process <strong>to</strong> the full DFIDSA <strong>of</strong>fice. Finalisation <strong>of</strong> documentation etc .<br />
4. <strong>Report</strong>ing<br />
The main output <strong>of</strong> the review will be the completion <strong>of</strong> the <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong><br />
review report in the PRISM format and an Aide Memoire. All team members<br />
will be required <strong>to</strong> contribute <strong>to</strong>wards the main reports by producing mini<br />
reports on the areas they have been allocated <strong>to</strong> review, and Myra Harrison<br />
(team leader will be required <strong>to</strong> produce the final documents.<br />
Barbara Payne<br />
Senior <strong>Education</strong> Adviser.<br />
February 9 th 2004<br />
30
ANNEX 3<br />
PROJECT LOGICAL FRAMEWORK<br />
Amended after the First <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> <strong>Review</strong> in March 2003 and<br />
including proposed amendments <strong>to</strong> date <strong>of</strong> the OPR 2004<br />
(The original logframe used the ECED’s 2001 Strategic Plan Performance<br />
Indica<strong>to</strong>rs and revisions <strong>to</strong> the same have been used in amending the<br />
logframe)<br />
Narrative<br />
Summary<br />
Goal: To increase<br />
significantly the<br />
learning achievement<br />
<strong>of</strong> children from<br />
Eastern Cape<br />
Province.<br />
<strong>Purpose</strong>: To develop<br />
an effective, efficient<br />
and affordable<br />
decentralised<br />
education system.<br />
<strong>Output</strong>s:<br />
1. An effective,<br />
efficient and<br />
appropriately staffed<br />
provincial <strong>Department</strong><br />
<strong>of</strong> <strong>Education</strong>, fulfilling<br />
a strategic role.<br />
OVIs MoV Assumptions<br />
• 25% improvement in<br />
completion rates over the<br />
baseline by the end <strong>of</strong> the<br />
Programme<br />
• District <strong>of</strong>fices providing<br />
effective and timely<br />
educational services and<br />
support <strong>to</strong> schools<br />
• Whole school<br />
development model<br />
processed in Eastern<br />
Cape schools.<br />
• Increased number <strong>of</strong><br />
transformed and selfmanaged<br />
schools in the<br />
Eastern Cape<br />
• <strong>Department</strong>al audit<br />
improves <strong>to</strong> ‘qualified’ by<br />
end FY 2004/5 and <strong>to</strong><br />
‘unqualified’ by 2005/6.<br />
• ECED Procurement Board<br />
established and<br />
operational by end 2004.<br />
• Anti-corruption strategy<br />
written and being<br />
implemented by end<br />
2004.<br />
• All managers in SMS <strong>to</strong><br />
have agreed personnel<br />
development plans by end<br />
2004 and all above grade<br />
9 <strong>to</strong> have pdps in place by<br />
end 2005.<br />
• Audit committee<br />
• Baseline<br />
measurements<br />
through EMIS<br />
and associated<br />
Cohort Study<br />
• Provincial Annual<br />
<strong>Report</strong>s<br />
• Evaluation<br />
Framework<br />
<strong>Report</strong>s<br />
• Above baseline<br />
measurements<br />
e.g. EMIS<br />
• Provincial Annual<br />
<strong>Report</strong>s<br />
• Evaluation<br />
Framework<br />
<strong>Report</strong>s<br />
• Approved<br />
organogram<br />
published<br />
• Evaluation<br />
Framework<br />
<strong>Report</strong>s<br />
• Transformation<br />
unit established<br />
• <strong>Report</strong>s from HR<br />
and Finance<br />
• Performance<br />
management<br />
contracts for<br />
senior <strong>of</strong>ficers<br />
• Strategy in place<br />
with resources<br />
and materials <strong>to</strong><br />
support WSD<br />
• Sufficient resources<br />
are provided <strong>to</strong><br />
schools after<br />
rationalisation and<br />
migration have been<br />
completed and in the<br />
context <strong>of</strong> mitigating<br />
the effects <strong>of</strong><br />
HIV/AIDS<br />
• Provincial initiative <strong>to</strong><br />
address continued<br />
over-expenditure on<br />
personnel budgets is<br />
effective<br />
• High level political<br />
commitment <strong>to</strong><br />
decentralisation policy<br />
is maintained and<br />
implemented<br />
• Provincial <strong>of</strong>fice <strong>to</strong><br />
maintain clear lines <strong>of</strong><br />
co-ordinating the<br />
programme<br />
• JMT Action Plan<br />
implemented and<br />
efffective<br />
• Provincial planning<br />
appropriately fac<strong>to</strong>rs<br />
in HIV/AIDS<br />
pandemic<br />
• Senior ECED staff<br />
develop skills and<br />
competencies <strong>to</strong> drive<br />
transformation<br />
• EMIS system reports<br />
are utilised in<br />
planning and<br />
prioritising<br />
• Continued political<br />
support for recently<br />
appointed SG and<br />
31
Narrative<br />
Summary<br />
2. A fully functioning<br />
and self-managing<br />
district structure<br />
providing quality<br />
support <strong>to</strong> schools.<br />
OVIs MoV Assumptions<br />
established by mid 2004<br />
and internal audit <strong>of</strong>fice<br />
fully operational by end<br />
2004.<br />
• HR plans in place during<br />
PY3 and critical posts<br />
(Direc<strong>to</strong>r and upwards)<br />
filled by PY4.<br />
• ECED actively<br />
participating in the<br />
planning and<br />
implementation process <strong>of</strong><br />
the Provincial Social<br />
Needs and Economic<br />
Clusters.<br />
• <strong>Department</strong>al HIV/Aids<br />
strategy implemented by<br />
PY4 for staff and for<br />
schools/learners.<br />
• Payment backlogs<br />
reduced by 50% in PY4<br />
and 80% by PY5 in<br />
relation <strong>to</strong> March 2004<br />
positions.<br />
• Performance<br />
Management Systems in<br />
place at all level by PY3<br />
(IQMS during PY4).<br />
• Functioning Moni<strong>to</strong>ring<br />
and <strong>Report</strong>ing systems<br />
connecting province,<br />
districts and schools in<br />
place by PY5.<br />
• Persal system cleaned,<br />
maintained and available<br />
as part <strong>of</strong> the<br />
management information<br />
systems by end 2005.<br />
• HR and leave records,<br />
cleaned maintained and<br />
available as part <strong>of</strong> the<br />
management information<br />
systems by end 2005.<br />
• All critical posts filled by<br />
PY2<br />
• EDOs and subject<br />
advisers more effectively<br />
involved in service <strong>of</strong><br />
schools<br />
• 50% <strong>of</strong> administrative<br />
systems operational <strong>to</strong><br />
promote effectiveness and<br />
efficiency in bridging gap<br />
between province and<br />
schools by PY2 and the<br />
reminder by PY 4<br />
• Evaluation<br />
directed by<br />
Tirisano policy<br />
• HR plans are<br />
produced<br />
incorporating<br />
predicted HIV<br />
attrition rates<br />
• Key reports on<br />
costs,<br />
infrastructure<br />
and staffing<br />
• District reports<br />
• Performance<br />
contracts <strong>of</strong><br />
District Direc<strong>to</strong>rs<br />
• ECED and<br />
programme<br />
reports<br />
• Evaluation<br />
reports<br />
Senior managers.<br />
• DFID funding remains<br />
at promised level.<br />
• Improved relations<br />
with social partners.<br />
• Sufficient resources<br />
are available and<br />
allocated <strong>to</strong> schools<br />
• Suitably qualified and<br />
skilled personnel ,<br />
with awareness <strong>of</strong><br />
gender balance, are<br />
appointed <strong>to</strong> key<br />
district posts<br />
• Recruitment <strong>of</strong><br />
suitably qualified and<br />
skilled personnel, with<br />
awareness <strong>of</strong> gender<br />
32
Narrative<br />
Summary<br />
3. Schools which,<br />
having undergone a<br />
whole school<br />
effectiveness process,<br />
are better able <strong>to</strong><br />
provide improved<br />
learning opportunities<br />
for their learners<br />
4. Improved asset<br />
management in place<br />
and cost effective<br />
school buildings<br />
constructed<br />
OVIs MoV Assumptions<br />
• EMIS PERSAL and FMS<br />
phased in<strong>to</strong> districts by<br />
PY3<br />
• All EDCs established and<br />
functional by PY3<br />
• Elected, inducted and<br />
trained School Governing<br />
Bodies (and Learner<br />
Representative Councils<br />
in secondary schools) in<br />
place with approved<br />
constitutions<br />
• School Governing Bodies<br />
managing feeding<br />
programmes where<br />
appropriate<br />
• Communities mobilised <strong>to</strong><br />
become critically engaged<br />
with education decision<br />
makers and community<br />
level service providers<br />
• ,generation <strong>of</strong> community<br />
projects which enhance<br />
learning environment<br />
• Negotiated code <strong>of</strong><br />
conduct in place and<br />
disciplinary problems<br />
handled procedurally.<br />
• All schools <strong>to</strong> have<br />
developed HIV/AIDS<br />
strategy<br />
• Learner/educa<strong>to</strong>r contact<br />
time increased<br />
• Marked improvements in<br />
the learning environment<br />
in schools<br />
• Learners, carers and<br />
community members<br />
testify <strong>to</strong> improved<br />
learning opportunities by<br />
Programme end<br />
• Improvements in learning<br />
achievement above<br />
baseline by programme<br />
end<br />
• Break-in and damage <strong>to</strong><br />
schools reduced<br />
• FMIS used in school<br />
rationalisation and<br />
selection <strong>of</strong> new schools<br />
sites<br />
• <strong>Report</strong>s from the<br />
Office <strong>of</strong> the<br />
Premier<br />
• Statistics on<br />
implementation<br />
and<br />
consolidation <strong>of</strong><br />
norms and<br />
standards for<br />
schools funding<br />
in the Province<br />
• Whole School<br />
Evaluation<br />
<strong>Report</strong>s<br />
• Evaluation<br />
Framework<br />
<strong>Report</strong>s<br />
• District reporting<br />
and moni<strong>to</strong>ring<br />
• SCIPP project<br />
reports<br />
• Provincial and<br />
District reporting<br />
and moni<strong>to</strong>ring<br />
balance, <strong>to</strong> key posts<br />
• Effective<br />
management <strong>of</strong><br />
supernumerary posts<br />
and personnel<br />
• District prioritisation is<br />
consistent with<br />
provincial policy<br />
• SGBs are functional<br />
• Whole School<br />
Evaluation Policy<br />
implemented<br />
• Teachers are<br />
sufficiently motivated<br />
<strong>to</strong> engage in<br />
continuing<br />
pr<strong>of</strong>essional support<br />
• Teachers, especially<br />
women, are willing <strong>to</strong><br />
be deployed <strong>to</strong><br />
remote areas<br />
• Strategic partnerships<br />
33
Narrative<br />
Summary<br />
OVIs MoV Assumptions<br />
built between community ,<br />
the ECED and service<br />
providers<br />
• Pro<strong>to</strong>type schools built<br />
and replicated by other<br />
donors<br />
• All quintile 1 & 2 schools<br />
raised <strong>to</strong> levels 3 and<br />
above<br />
• Accredited relevant skills<br />
course provided <strong>to</strong><br />
community members<br />
engaged in construction<br />
activities<br />
• Learnerships in<br />
construction and<br />
maintenance completed.<br />
• •<br />
34
Imbewu <strong>Output</strong> 1:<br />
Strategic role <strong>of</strong><br />
Provincial<br />
<strong>Department</strong><br />
Imbewu <strong>Output</strong> 2:<br />
District<br />
Development<br />
ANNEXE 4<br />
IMBEWU PROGRAMME LINKAGES WITH OTHER DFID INITIATIVES IN THE EASTERN CAPE<br />
IPSP MSF CMTP SCAPE SCLP CONMARK/<br />
FINMARK<br />
• Lessons from the<br />
HR update<br />
conducted in<br />
other<br />
departments.<br />
• Programme<br />
Management<br />
(through<br />
Technical<br />
support).<br />
• Provincial<br />
Lessons Learning<br />
network (IPSP<br />
provides<br />
benchmarking<br />
good practices<br />
through this<br />
programme)<br />
• Direct linkages<br />
with <strong>Output</strong> 2 <strong>of</strong><br />
IPSP (Improved<br />
resource<br />
utilisation). Ex<br />
colleges <strong>of</strong><br />
education has<br />
been renovated<br />
<strong>to</strong> house district<br />
<strong>of</strong>fices for<br />
education, health<br />
• Programme<br />
Management <strong>of</strong><br />
the department’s<br />
HIV/AIDS<br />
• Development<br />
integrated<br />
HIV/AIDS<br />
programme, with<br />
links <strong>to</strong> PGDP &<br />
EC AIDS Council<br />
• Strengthening <strong>of</strong><br />
the district health<br />
services – better<br />
co-ordination and<br />
integration<br />
between the<br />
depts, as they<br />
fall under the<br />
same Social<br />
Needs Cluster<br />
• HIV/AIDS in the<br />
• Links IDP, re:<br />
provision <strong>of</strong><br />
infrastructure<br />
(roads) that lead<br />
<strong>to</strong> schools.<br />
• Participation in<br />
planning<br />
processes at<br />
district level<br />
• Institutionalised<br />
relationship<br />
through IDP<br />
forums <strong>to</strong> include<br />
needs <strong>of</strong> district<br />
in municipal<br />
planning. This is<br />
particularly<br />
important in view<br />
<strong>of</strong> delegation <strong>of</strong><br />
more<br />
• Partnership<br />
with Civil<br />
Society<br />
organisation<br />
through<br />
Eastern Cape<br />
NGO Coalition.<br />
• Participation <strong>of</strong><br />
civil society<br />
organisations<br />
at district level<br />
on issues<br />
service<br />
delivery,<br />
resource<br />
planning,<br />
HIV/AIDS, LED<br />
(re: School<br />
• No direct<br />
linkages<br />
• No direct<br />
linkages<br />
• No direct<br />
linkages<br />
• No direct<br />
linkages<br />
36
Imbewu <strong>Output</strong> 3:<br />
School<br />
Transformation<br />
Imbewu <strong>Output</strong> 4:<br />
Strategic Asset<br />
Management<br />
Imbewu <strong>Output</strong> 5:<br />
Community<br />
Integration<br />
IPSP MSF CMTP SCAPE SCLP CONMARK/<br />
FINMARK<br />
& social dev. workplace responsibilities <strong>to</strong><br />
districts.<br />
• No direct linkages • Technical support<br />
<strong>to</strong> the department<br />
<strong>of</strong> education in<br />
strengthening its<br />
capacity on<br />
HIV/AIDS<br />
• Asset<br />
management is<br />
the responsibility<br />
<strong>of</strong> Dept <strong>of</strong> Public<br />
Works, there are<br />
linkages with<br />
current processes<br />
supported by<br />
IPSP for<br />
rationalisation <strong>of</strong><br />
provincial<br />
property portfolio<br />
• Links with output<br />
that deals with<br />
transparency and<br />
accountability <strong>of</strong><br />
government<br />
• No direct<br />
linkages<br />
• Community<br />
mobilisation and<br />
participation &<br />
partnerships<br />
• Awareness &<br />
Prevention<br />
• Capacity building<br />
initiatives<br />
• Linkages can be<br />
explored with the<br />
department’s<br />
School Nutrition<br />
Programme<br />
which can be<br />
integrated as part<br />
<strong>of</strong> municipality’s<br />
Local Economic<br />
Development<br />
(LED) initiatives<br />
• Development <strong>of</strong><br />
pro<strong>to</strong>types<br />
schools could be<br />
linked <strong>to</strong> LED and<br />
expanded public<br />
works<br />
programme.<br />
• Links with<br />
governance<br />
component <strong>of</strong> the<br />
CMTP (e.g. Ward<br />
Committees)<br />
Nutrition<br />
Programme)<br />
• Linkages with<br />
education<br />
sec<strong>to</strong>r NGOs/<br />
CBOs such as<br />
Early<br />
Childhood<br />
Centres etc.<br />
• Linkages with<br />
management<br />
and protection<br />
<strong>of</strong> school<br />
buildings and<br />
district <strong>of</strong>fices.<br />
• Participation <strong>of</strong><br />
communities in<br />
management<br />
and protection<br />
and use <strong>of</strong><br />
school facilities<br />
for community<br />
initiatives.<br />
• Integration <strong>of</strong><br />
sustainable<br />
livelihoods<br />
practices in<strong>to</strong><br />
the school<br />
curriculum.<br />
No direct<br />
linkages<br />
• Engaging<br />
and<br />
supporting<br />
sustainable<br />
livelihoods<br />
activities at<br />
schools<br />
through the<br />
• No direct<br />
linkages<br />
• No direct<br />
linkages<br />
There are<br />
possibilities <strong>of</strong><br />
linkages with<br />
CONMARK around<br />
access excess<br />
production <strong>of</strong> crops <strong>to</strong><br />
local markets. This<br />
project could provide<br />
37
IPSP MSF CMTP SCAPE SCLP CONMARK/<br />
FINMARK<br />
SGBs and capacity building<br />
learners. opportunities <strong>to</strong><br />
schools/communities<br />
38
Annex: 5 The Broader Environment In Which the <strong>Education</strong> <strong>Department</strong><br />
Operates and the Implications For Imbewu<br />
<strong>Education</strong> Budgeting and Moni<strong>to</strong>ring<br />
The Strategic Plan 2004-2007 represents an improvement on the previous<br />
year’s plan. Budgets are listed in detail and are supported by objectives,<br />
activities and performance measures. Funds voted by provincial legislature<br />
and conditional grants have been allocated <strong>to</strong> programmes, but donor funds<br />
are merely listed in a table <strong>to</strong>wards the end <strong>of</strong> the document (it is<br />
acknowledged that this format is currently prescribed at the National level.<br />
Thus one <strong>of</strong> the recommendations <strong>of</strong> the 2003 OPR, that Imbewu funds be<br />
integrated with ones from the National and Provincial Governments has not<br />
been acted upon, as least in the published budget documents.<br />
However, institutional changes have been introduced which should make it<br />
easier for government and donor funds <strong>to</strong> be integrated in<strong>to</strong> next year’s<br />
strategic plan. The <strong>Department</strong>al strategic and budget planning processes<br />
have been aligned so that the strategic planning process now fully precedes<br />
the budget cycle planning process. The new <strong>Department</strong>al organisational<br />
structure also now incorporates a new Planning and Moni<strong>to</strong>ring Branch.<br />
Within this Branch there is a Direc<strong>to</strong>rate for Strategic Management Support,<br />
within which coordination and liaison with donor-funded projects also resides.<br />
The appointment <strong>of</strong> a new Chief Financial Officer with a supporting branch<br />
moni<strong>to</strong>ring expenditures will put pressure on spenders <strong>to</strong> allocate<br />
expenditures efficiently and <strong>to</strong> bring all sources <strong>of</strong> finance within the budget<br />
envelope.<br />
The integration <strong>of</strong> donor funds and the activities they finance in the Strategic<br />
Plan is important for ensuring the sustainability <strong>of</strong> activities funded by Imbewu<br />
and other donor projects. Integration would also ensure that performance<br />
measures listed in the Strategic Plan apply <strong>to</strong> all activities regardless <strong>of</strong> the<br />
source <strong>of</strong> funds. In addition greater transparency on the activities being<br />
funded by donors provides the data for the greater coordination between<br />
donor activities, including moni<strong>to</strong>ring and reviews.<br />
The Planning and Moni<strong>to</strong>ring Branch is also responsible for quality<br />
assurance. It is anticipated that placing planning and moni<strong>to</strong>ring in the<br />
same branch will raise the pr<strong>of</strong>ile <strong>of</strong> learning from past experience when<br />
forming and implementing policies. The Imbewu Evaluation Framework<br />
is now in place and should, in time, assist planning at all levels.<br />
<strong>Education</strong> Expenditures<br />
The ED receives the majority <strong>of</strong> its funds from the Provincial government: over<br />
96% <strong>of</strong> the 2004/05 budget is expected <strong>to</strong> come from this source, the rest<br />
coming from conditional grants and donors. Whilst small, these latter funds<br />
are important at the margins since the large majority <strong>of</strong> Provincially voted<br />
funds are spent on personnel. The ED has had difficulty in spending<br />
conditional grants owing <strong>to</strong> difficulties in meeting the bureaucratic<br />
39
equirements <strong>of</strong> the National <strong>Department</strong>, unclear management<br />
responsibilities for their implementation and limited management<br />
capacity.<br />
National norms specify a 85:15 split between personnel and non-personnel<br />
expenditure and that the personnel budget is split the same ratio between<br />
educa<strong>to</strong>rs and non-educa<strong>to</strong>r expenditures. Eastern Cape Province has<br />
always exceeded the first ratio, but the trend is an improving one. In 2001/02<br />
91.2% <strong>of</strong> expenditure was on personnel, but this was less than in the years <strong>of</strong><br />
financial crisis in the late 1990s when personnel expenditure was as high as<br />
97% <strong>of</strong> the budget. The downward trend for personnel expenditures has<br />
continued and was 88% <strong>of</strong> expenditures in 2003/04.<br />
About 86% <strong>of</strong> expenditures in 2002/03 were on Programme 2, “Public<br />
Schools”. Of this over 80% was on pre-primary, primary and secondary<br />
schools. The increased expenditure on non-personnel items is reflected in<br />
increases in expenditures in learner materials and infrastructure. In 2002/03<br />
expenditure per learner on learning materials was R101, a major increase on<br />
the late 1990s period <strong>of</strong> financial crisis when such expenditure was below R20<br />
per learner. For 2002/03 higher expenditure per learner is generally<br />
concentrated in the former Transkei and Ciskei districts where poverty is most<br />
acute.<br />
Non-school expenditures have been low. Expenditure on teacher training,<br />
technical education and adult education came <strong>to</strong> about 4% <strong>of</strong> provincial<br />
government expenditures in 2002/03. Further education and training<br />
expenditure has grown at a lower rate than all other non-school education<br />
programmes. Whilst expenditure on teacher training was low, there was,<br />
however, additional funding for teacher training from conditional grants linked<br />
<strong>to</strong> the introduction <strong>of</strong> the new curriculum and donors (DFID, Swiss<br />
government and USAID).<br />
Implications for Imbewu<br />
Imbewu expenditures are focused in similar ways <strong>to</strong> ED expenditures from<br />
voted funds: on public schools and in the poorest areas. Funds from Imbewu<br />
and other donors’ funds are also being used, however, <strong>to</strong> cover for low nonschool<br />
allocations. It is, perhaps, fortui<strong>to</strong>us that Imbewu funds are available<br />
at a time when the ED is facing the major financial commitment <strong>of</strong> training and<br />
preparation for the introduction <strong>of</strong> the new RNCS curriculum. This may reflect<br />
a low level <strong>of</strong> priority placed by the ED on these areas, or else a rational<br />
response <strong>to</strong> the availability <strong>of</strong> donor funds in such areas. However, the risk is<br />
that if donor funds do not come through, non-school expenditures will be<br />
underfunded.<br />
The significant cuts <strong>to</strong> Imbewu funds announced in the last quarter <strong>of</strong> 2003<br />
have necessarily meant that expenditure planning has had <strong>to</strong> focus largely on<br />
the year ahead. Once this exercise has been completed, Imbewu will need <strong>to</strong><br />
engage in indicative planning for the rest <strong>of</strong> the project, both <strong>to</strong> assist the<br />
department in resource planning for the next 3 year strategic plan and <strong>to</strong><br />
40
ensure that all activities necessary for achieving the project <strong>Purpose</strong> and<br />
securing the sustainability <strong>of</strong> the project will be funded.<br />
Recommendation – The OPR team endorses the plan <strong>of</strong> the ED <strong>to</strong> hold a<br />
workshop in June <strong>to</strong> plan for the remaining years <strong>of</strong> the project. It is<br />
recommended that the programme staff work closely with the relevant<br />
Direc<strong>to</strong>rates <strong>of</strong> the ED <strong>to</strong> ensure that its funds and plans are integrated<br />
with those <strong>of</strong> the department in the 2005-2008 Strategic Plan.<br />
Other Fac<strong>to</strong>rs Affecting the Environment in which Imbewu operates<br />
In spite <strong>of</strong> the improvements in resource allocation documented above, The<br />
ED still has faces problems which impinge on its effectiveness and its<br />
capacity <strong>to</strong> implement Imbewu at the pace envisaged in the Project<br />
Memorandum. Whilst there are signs <strong>of</strong> improvement, a number <strong>of</strong> people<br />
the OPR team met mentioned that crisis management is the norm throughout<br />
much <strong>of</strong> the department.<br />
One outcome <strong>of</strong> the March 2003 OPR was <strong>to</strong> refocus the Imbewu<br />
programme on the educational issues involving learners, schools support<br />
services, HIV/AIDS strategies etc. Meanwhile the “output 1” issues <strong>of</strong><br />
planning, finance, expenditure management and the broader governance<br />
questions were left <strong>to</strong> the Pre<strong>to</strong>ria-supported Joint Management Team (JMT)<br />
which was set up <strong>to</strong> improve the management performance <strong>of</strong> the ED.<br />
It was agreed that progress on these issues would be reviewed at the next<br />
OPR. Progress has been mixed and the general view is that the intervention,<br />
while promising much, has achieved little. However, in late 2003 the JMT<br />
recommended 12 technical development programmes. These have been<br />
accepted by the ED and integrated in<strong>to</strong> the departmental strategic plan for<br />
2004/05.<br />
The ED still has a lot <strong>of</strong> payment backlogs. Some have been reduced (staff<br />
payments and payment <strong>of</strong> goods) but many remain because <strong>of</strong> lack <strong>of</strong><br />
managerial and technical capacity, problems with PERSAL, as well as poor<br />
records keeping. The lack <strong>of</strong> available records means that a lot <strong>of</strong> payments<br />
are in suspense and that payments are rolled over from year <strong>to</strong> year. The<br />
inability <strong>to</strong> produce documents is the main reason why the Provincial Audi<strong>to</strong>r<br />
General has issued a disclaimer for the ED’s accounts for eight years running.<br />
The <strong>Department</strong> continues <strong>to</strong> overspend on its personnel budget. There are a<br />
number <strong>of</strong> fac<strong>to</strong>rs causing this, some within the <strong>Department</strong>’s control, but<br />
many beyond it. Relationships with the Provincial Treasury have been poor<br />
during the past few years. The appointment <strong>of</strong> a new SC and Chief Finance<br />
Officer on secure contracts (rather than having these posts filling on an<br />
“acting” basis) has provided much needed stability in the department and<br />
helped improve the relationship with the Treasury. The fact that the Treasury<br />
no longer has <strong>to</strong> pre-approve expenditures has also helped. Nevertheless, <strong>to</strong><br />
convince the Provincial Treasury <strong>to</strong> grant it more funds, the onus is on the ED<br />
41
<strong>to</strong> demonstrate that its personnel records are in order, that it has cleared<br />
backlogs and that it is allocating personnel resources efficiently.<br />
One way in which it could do this is <strong>to</strong> improve the allocation <strong>of</strong> teachers<br />
within the province. A post provisioning survey has not been undertaken<br />
since 1998 and there is now a great variation in learner:educa<strong>to</strong>r ratios<br />
throughout the province, with the result that an estimated 6900 teachers need<br />
<strong>to</strong> be redeployed. In the meantime, a large number <strong>of</strong> contract staff are being<br />
employed <strong>to</strong> reduce ratios in those districts which are negatively affected.<br />
This, in turn reduces the funds available for non-personnel expenditures and<br />
<strong>to</strong> fill vacancies <strong>of</strong> non-educa<strong>to</strong>r staff.<br />
A number <strong>of</strong> these key vacancies are at Head Quarters, particularly in the<br />
newly created Office <strong>of</strong> the Chief Finance Officer. Filling these with<br />
competent staff could have a major impact on the effectiveness <strong>of</strong> the ED. In<br />
its short life the new Office <strong>of</strong> the Chief Financial Officer has already made<br />
great strides <strong>to</strong>wards res<strong>to</strong>ring financial controls and eliminating financial<br />
indiscipline. Measures <strong>to</strong> reduce the scope for discretion in procurement and<br />
appointment <strong>of</strong> staff have been introduced. Consistency between EMIS and<br />
PERSAL databases has also been improved. A major weakness in the<br />
department is that there is limited understanding amongst staff <strong>of</strong> basic<br />
financial management concepts (eg the difference between recurrent and<br />
non-recurrent expenditures, the need <strong>to</strong> secure authority <strong>to</strong> vire funds etc)<br />
There have improvements in the management <strong>of</strong> the ED. DDGs have now<br />
been made Programme Managers (previously this was delegated <strong>to</strong> Chief<br />
Direc<strong>to</strong>r and Direc<strong>to</strong>r level) and hence are now accountable for expenditures<br />
in their Branches. Monthly senior management meetings on expenditures<br />
have been introduced and more frequent ones for more general operations <strong>of</strong><br />
the department.<br />
There are a number <strong>of</strong> areas where Imbewu could support this positive trend.<br />
The most urgent need is for problems <strong>of</strong> records management <strong>to</strong> be tackled.<br />
Other departments which have tackled this problem have improved their<br />
Audi<strong>to</strong>r General’s audit opinion. The JMT estimates that this would require R<br />
11 million. Possible sources <strong>of</strong> funding outside Imbewu have been identified.<br />
Otherwise it would need <strong>to</strong> come either from reduced expenditures elsewhere<br />
or from outside resources, notably Imbewu and/or IPSP<br />
Other areas where Imbewu may be able <strong>to</strong> provide support are:<br />
• In the production <strong>of</strong> the Anti-Corruption strategy;<br />
• In the establishment <strong>of</strong> and effective use <strong>of</strong> a staff performance<br />
management system;<br />
• In the establishment <strong>of</strong> and functioning <strong>of</strong> an internal audit <strong>of</strong>fice.<br />
• Training <strong>of</strong> staff in basic financial management concepts and<br />
undertaking an evaluation <strong>of</strong> existing training provision.<br />
42
• Integration <strong>of</strong> Personnel and Payroll systems<br />
• Developing an effective supply chain management (procurement)<br />
process at HQ and the Corporate Service Centres.<br />
• Extending the support <strong>to</strong> the development <strong>of</strong> an Evaluation Framework<br />
<strong>to</strong> include building capacity<br />
Recommendation<br />
It is recommended that Imbewu provide technical and management<br />
support in 2004/05 <strong>to</strong> records management initiatives and consider<br />
providing support in other areas (eg anti-corruption strategy,<br />
performance appraisal, internal audit, basic financial management<br />
training, integration <strong>of</strong> personnel and payroll systems procurement,<br />
capacity building <strong>to</strong> use evaluation material) which would improve the<br />
environment in which the ED operates and help it shift from short-term<br />
crisis management <strong>to</strong>wards a more ordered longer-term focus.<br />
43
Version 0.6<br />
DFID PROJECT PROGRESS REPORT - Annex D<br />
Type <strong>of</strong> <strong>Report</strong>:OPR<br />
Load <strong>Review</strong><br />
For quarterly moni<strong>to</strong>ring, complete Part A and C; for annual review complete Parts A, B and C<br />
For Project Completion <strong>Report</strong>s complete Parts A, B and C but it is not necessary <strong>to</strong> complete the <strong>Output</strong>s/OVI field in Part A.<br />
PART A.<br />
Country: South Africa, Republic <strong>of</strong> Project: Provincial, District & School Dev Prog Eastern Cape (IMBEWU)<br />
Project Officer<br />
Date <strong>of</strong> Visit:<br />
Date <strong>of</strong> <strong>Report</strong>:<br />
Ms Pinky Pheeloane<br />
23/3/2004<br />
Start Date:<br />
End Date:<br />
MIS Code:<br />
Risk Category:<br />
19/04/2001<br />
01/12/2007<br />
059550097<br />
Medium<br />
Project Budget Spend in period under review Cumulative spend Forecast for current financial year<br />
£22,000,000 £3,425,488 £5,642,626 £4,500,000<br />
Goal Statement OVIs<br />
To increase significantly the learning achievement <strong>of</strong> children 25% improvement in completion rates over the baseline by the end <strong>of</strong><br />
from Eastern Cape Province.<br />
the Programme<br />
<strong>Purpose</strong> Statement OVIs<br />
To develop an effective, efficient and affordable decentralised • District <strong>of</strong>fices providing effective and timely educational<br />
education system<br />
services and support <strong>to</strong> schools<br />
• Whole school development model processed in Eastern Cape<br />
schools.<br />
Deleted: Moni<strong>to</strong>ring ID :
Version 0.6<br />
• Increased number <strong>of</strong> transformed and self-managed schools<br />
in the Eastern Cape<br />
<strong>Output</strong>s /OVIs Progress Comments<br />
Planned (period under review) Actual (including comments if Planned for next period<br />
required)<br />
1. A provincial<br />
department <strong>of</strong> education,<br />
with an enhanced<br />
strategic role.<br />
• All critical processes<br />
documented and<br />
implemented by the end <strong>of</strong><br />
PY1<br />
• Specific policy<br />
guidelines completed by<br />
end <strong>of</strong> PY1<br />
• Comprehensive<br />
Provincial INSET<br />
programme<br />
operationalised by PY1<br />
• National ‘Tirisano’<br />
policy on HIV mitigation is<br />
reflected in Provincial<br />
Policy Development by<br />
1. <strong>Department</strong>al counterpart <strong>to</strong><br />
Programme Co-ordina<strong>to</strong>r <strong>to</strong><br />
take up post during quarter<br />
2. Implementation <strong>of</strong> 4<br />
Corporate Services Projects <strong>to</strong><br />
improve financial management<br />
and accounting services.<br />
3. TA support for completion <strong>of</strong><br />
<strong>Department</strong>al Annual <strong>Report</strong>:<br />
in compliance with national &<br />
provincial norms<br />
1. Completed with significant<br />
positive implications for sustaining<br />
programme gains in the<br />
<strong>Department</strong>.<br />
2. I project completed vis. TA<br />
assisted in preparation <strong>of</strong> Dept<br />
Annual Financial Statements<br />
which were submitted <strong>to</strong> Prov<br />
Treasury by 31 May with Other 3<br />
projects shelved -- awaiting IMT<br />
Plan implementation -- 1 project<br />
(clearing <strong>of</strong> suspense a/cs & bank<br />
recon. implemented in second<br />
semester <strong>of</strong> 2003<br />
3. Completed<br />
a. Preparation <strong>of</strong> <strong>Department</strong><br />
Annual Financial Statements<br />
according <strong>to</strong> Treasury norms.<br />
b. Provision <strong>of</strong> support <strong>to</strong><br />
development <strong>of</strong> Integrated Quality<br />
Management System.<br />
c. Continued support <strong>to</strong> ELMD<br />
Deleted: Measurable<br />
improvement in classroom<br />
practice.· Whole school<br />
development model processed<br />
in Eastern Cape<br />
schools.· District <strong>of</strong>fices<br />
providing effective and timely<br />
educational advice and support<br />
<strong>to</strong> schools.· ECED allocating<br />
an increased % <strong>of</strong> their budget<br />
<strong>to</strong> non-personnel<br />
expenditure.· ECED meet<br />
service delivery targets for<br />
schools as agreed with<br />
communities and planned for<br />
in the MTEF.
PY1<br />
• ECED fully functional<br />
within the Provincial Social<br />
Needs and Economic<br />
Development Clusters<br />
planning and<br />
implementation processes<br />
by PY2<br />
• The DPSA HIV/AIDS<br />
Workplace programme<br />
fully functional by PY2<br />
• A programme for<br />
HIV/AIDS education in<br />
schools from Age 7<br />
developed and training<br />
implemented by PY2<br />
• Backlogs cleared and<br />
completed by PY2<br />
• All managers have<br />
personnel development<br />
plans by PY2<br />
• INSET recorded and<br />
certificated in terms <strong>of</strong><br />
skills and competencies by<br />
PY4<br />
• All key management<br />
systems and procedures in<br />
place by end <strong>of</strong> the<br />
Programme<br />
4. Engagement <strong>of</strong> serv<br />
provider for LSM<br />
procurement/Integrated Supply<br />
Chain Management (ISCM)<br />
contract<br />
5. LSM <strong>Review</strong>: Research team<br />
<strong>to</strong> carry out work on<br />
costing model, review <strong>of</strong> LSM<br />
selection; change management<br />
and ISCM process<br />
6. Support new Communications<br />
Direc<strong>to</strong>rate <strong>to</strong> produce quarterly<br />
management reports and<br />
newsletter<br />
7. Operationalisation <strong>of</strong> Phase II<br />
<strong>of</strong> programme evaluation; <strong>to</strong> be<br />
directed through Chief Direc<strong>to</strong>r<br />
Quality Assurance.<br />
8. Recruitment <strong>of</strong> TA project<br />
manager <strong>to</strong> rollout the suite <strong>of</strong><br />
7 HRD projects<br />
9. Bursary application<br />
management project (HRM) –<br />
(service provider direct sourced<br />
Version 0.6<br />
4. Completed<br />
5. Completed with potential for<br />
<strong>Department</strong> <strong>to</strong> sustain this<br />
Programme contribution<br />
6. Completed and operational with<br />
<strong>Department</strong> <strong>to</strong> take responsibility<br />
for newsletter in 2004-5<br />
7. In operation and currently<br />
finalising baseline. Critical <strong>to</strong> the<br />
sustainability <strong>of</strong> the Porgramme.<br />
8. Shelved pending IMT decision<br />
but DFID budget cuts imply no<br />
possibilities for action<br />
9. Completed
due <strong>to</strong> urgent need <strong>to</strong> process<br />
13000 applications within<br />
3-week payment deadliines<br />
10. ICT Systems: SITA<br />
Integration.<br />
11. Plan and implement IT<br />
literacy training course for<br />
District Managers.<br />
12. Filling <strong>of</strong> posts in ICT<br />
Direc<strong>to</strong>rate.<br />
13. Creation <strong>of</strong> Electronic<br />
Document Management System<br />
(EDMS).<br />
14. Schools Strategic ICT Plan<br />
15. University <strong>of</strong> Fort Hare’s<br />
ELMD Programme contract<br />
negotiated & finalised<br />
16. Assist with finalisation <strong>of</strong><br />
Phase 1 <strong>of</strong> USAID Connectivity<br />
project.<br />
17. Chief Direc<strong>to</strong>r Curriculum<br />
Management <strong>to</strong> prepare a<br />
Version 0.6<br />
10. Completed<br />
11. Shelved<br />
12. Posts created but not all filled.<br />
13. Completed<br />
14. In progress<br />
15. Completed<br />
16. Completed<br />
17. Proposal in progress
2. A fully functioning and<br />
self-managing district<br />
structure providing quality<br />
support <strong>to</strong> schools.<br />
• All critical posts filled by<br />
PY2<br />
• EDOs and subject<br />
advisers more effectively<br />
involved in service <strong>of</strong><br />
schools<br />
• 50% <strong>of</strong> administrative<br />
systems operational <strong>to</strong><br />
promote effectiveness and<br />
efficiency in bridging gap<br />
between province and<br />
schools by PY2 and the<br />
reminder by PY 4<br />
• EMIS PERSAL and<br />
FMS phased in<strong>to</strong> districts<br />
by PY3<br />
• All EDCs established<br />
and functionnal by PY3<br />
proposal for integrating the<br />
Resource Centre in<strong>to</strong><br />
departmental budgets<br />
1. Develop detailed<br />
infrastructure & service<br />
development plans for 6<br />
identified priority districts<br />
culminating in a fully functioning<br />
operational base consisting <strong>of</strong><br />
flexible <strong>of</strong>fice space, ICT<br />
services and an educational<br />
development centr<br />
2. Establish a team <strong>of</strong> TAs,<br />
including HRD TA<br />
3. Facilitate development <strong>of</strong><br />
robust <strong>Education</strong> Development<br />
Version 0.6<br />
1. Appointed specialist TA :<br />
infrastructure. Engaged extensively<br />
with relevant stakeholders including<br />
Dept <strong>of</strong> Public Works around<br />
preparation <strong>of</strong> a development plan<br />
and necessary tender<br />
documentation. Completed plan /<br />
tender documentation submitted <strong>to</strong><br />
DFID for approval & actioning Aug<br />
2003. DFID instituted process <strong>to</strong><br />
determine appropriate procurement<br />
mechanisms/implementing agents.<br />
Portable <strong>to</strong>ilets have been hired<br />
and funded through Imbewu 2 at<br />
these 6 sites<br />
2. Recruitment process entered<br />
in<strong>to</strong> for HRD TA, but received<br />
directive from ECED & JMT/IMT <strong>to</strong><br />
shelve this at this stage<br />
Short term IT support TAs engaged<br />
3. * Organised & conducted a<br />
national EDC conference/workshop<br />
a. Need for infrastructure remains<br />
dire & immediate. Numerous<br />
expectations around such facilities<br />
have been raised and lack <strong>of</strong><br />
delivery has had a significant<br />
impact (negative) on district<br />
<strong>of</strong>ficials and rural impoverished<br />
communities they serve. R5m set<br />
aside in 2004/2005 FY for<br />
construction <strong>of</strong> 2 district <strong>of</strong>fices<br />
b. Recommended that <strong>to</strong>ilet hire<br />
costs currently covered by<br />
IMBEWU in the other 4 sites be<br />
phased out in the 2004/2005 FY &<br />
agreement that ECED will provide<br />
adequate <strong>to</strong>ilet facilities at these<br />
sites<br />
c. Strong emphasis placed on<br />
focussed TA (mainly short term - 6<br />
mths & less) across suite <strong>of</strong><br />
specialisation areas -- ICT, HRD,<br />
QS, systems development (incl
Centre design for districts.<br />
4. Critical training &<br />
development needs will be<br />
addressed within envisaged<br />
leadership and management<br />
development programme for<br />
district managers<br />
Version 0.6<br />
* Ran district-based EDC<br />
information/planning sessions --<br />
culminating in nomination <strong>of</strong> EDC<br />
co-ordina<strong>to</strong>rs in districts<br />
* concept design for multipurpose<br />
resource centres <strong>to</strong><br />
support sch clusters as EDC<br />
satellites in some districts<br />
4. * TA : Dist Dev assisted with the<br />
development <strong>of</strong> a management<br />
development module --<br />
"Men<strong>to</strong>rships - dynamic human<br />
resource dev interventions.."<br />
* All Dist Managers underwent<br />
Certificate in Organisational<br />
Leadership training (thro' Rhodes<br />
Univ's J & J Leadership Dev<br />
Institute<br />
* Six dist <strong>of</strong>fice management<br />
teams (approx 240 <strong>of</strong>ficials)<br />
attended 1-day seminar on theory<br />
& practice <strong>of</strong> Men<strong>to</strong>rships<br />
* Identified critical dist <strong>of</strong>fice<br />
training requirements depite<br />
numerous dist <strong>of</strong>fice staff<br />
vacancies<br />
* provided critical link & support<br />
between ECED H/Office, UFH &<br />
districts participating in ELMD<br />
dev <strong>of</strong> operations manual) --<br />
particularly in context <strong>of</strong><br />
decentralisation & new<br />
Organisational Structure.<br />
d. <strong>Department</strong>al task team<br />
consisting <strong>of</strong> 8 members <strong>to</strong> shortly<br />
undertake a study <strong>to</strong>ur <strong>to</strong> KZN<br />
EDCs<br />
e. Phased operationalisation <strong>of</strong><br />
EDCs in districts<br />
f. Create a dedicated ICT support<br />
platform designed <strong>to</strong> interface<br />
between HQ DDG, Cluster<br />
Managers, Dist Managers & their<br />
teams, with an emphasis on 2-way<br />
communication i.r.o reporting,<br />
moni<strong>to</strong>ring & info management<br />
g. Extend RU : J&JLD training <strong>to</strong><br />
2nd tier <strong>of</strong> district management<br />
h. Roll out this training seminar on<br />
Men<strong>to</strong>rships <strong>to</strong> remaining district<br />
<strong>of</strong>fices
3. . Schools which, having<br />
undergone a whole school<br />
effectiveness process, are<br />
better able <strong>to</strong> provide<br />
improved learning<br />
opportunities for their<br />
learners.<br />
• Elected, inducted and<br />
trained School Governing<br />
Bodies (and Learner<br />
5. ICT Tech Support <strong>to</strong> district<br />
<strong>of</strong>fices<br />
6. Produce standardised ditrict<br />
operations manual & parallel<br />
ODL-based skills dev prog<br />
Planning and design <strong>of</strong> detailed<br />
and comprehensive School<br />
Transformation Training and<br />
Materials Development<br />
Programme for 1500 schools <strong>to</strong><br />
March 2005<br />
School Transformation<br />
Programme:<br />
1. Engage TA and establish<br />
Reference Group <strong>to</strong> review and<br />
Version 0.6<br />
programme being run by UFH<br />
5. * 2 short term (3-month) TAs<br />
appointed - dedicated <strong>to</strong> ICT<br />
support & training in districts<br />
* Approx 200 district-based<br />
<strong>of</strong>ficials received basic computer<br />
literacy training<br />
6. Not implemented due <strong>to</strong> lack <strong>of</strong><br />
capacity & recommendation by<br />
JMT/IMT <strong>to</strong> shelve engagement <strong>of</strong><br />
HRD TA<br />
School Transformation Model<br />
gazetted ( Volume 10 No. 1015 -<br />
Extraordinary ) : 19 May 2003.<br />
Logframes for Training Programme<br />
completed. Reprioritization &<br />
budget cuts affect rollout <strong>of</strong><br />
planned activities:<br />
1. Completed : Local TA's<br />
contracted.<br />
i. Training & dev interventions for<br />
admin staff in districts<br />
j. Produce & help disseminate<br />
quarterly newsletter for districts<br />
k. Continue with dedicated ITC<br />
support & training in computer<br />
literacy for <strong>of</strong>fice management<br />
teams<br />
a. Complete development & print<br />
5000 ISPD training modules & 200<br />
Facilita<strong>to</strong>r's Guides<br />
b. Complete development & print<br />
2000 GUIDES TO ISPD<br />
c. Complete development & print<br />
2000 ISPD activity files for 1500<br />
schools<br />
d. Train & support 4500
Representative Councils in<br />
secondary schools) in<br />
place with approved<br />
constitutions<br />
• School Governing<br />
Bodies managing feeding<br />
programmes where<br />
appropriate<br />
• Negotiated code <strong>of</strong><br />
conduct in place and<br />
disciplinary problems<br />
handled procedurally.<br />
• All schools <strong>to</strong> have<br />
devloped HIV/AIDS<br />
strategy<br />
• Learner/educa<strong>to</strong>r<br />
contact time increased<br />
• Marked improvments in<br />
the learning environment<br />
in schools<br />
• Learners, carers and<br />
community members<br />
testify <strong>to</strong> improved learning<br />
opportunities by<br />
Programme end<br />
• Improvements in<br />
learning achievement<br />
above baseline by<br />
programme end<br />
rewrite Whole School<br />
Development ( WSD ) Pilot<br />
Module<br />
1.1 Presentation <strong>of</strong> finalised<br />
WSD module <strong>to</strong> DoE and PSC<br />
1.2 Print 6500 WSD Modules<br />
and 200 Facilita<strong>to</strong>rs Guides<br />
1.3 Conduct WSD Training <strong>of</strong><br />
Trainers workshop for 165<br />
district training <strong>of</strong>ficials ( 24<br />
district training teams )<br />
1.4 3 day Radio Slot <strong>to</strong><br />
advocate WSD and district<br />
training<br />
1.5 Conduct WSD training<br />
workshops in 24 districts for<br />
1500 schools and 6000 schoolcommunity<br />
participants<br />
1.6 Provincial Facilita<strong>to</strong>rs <strong>to</strong><br />
provide support <strong>to</strong> 24 district<br />
training teams<br />
1.7 24 District WSD reports<br />
produced by district training<br />
Version 0.6<br />
1.1 Completed. Presented at PSC<br />
meeting.<br />
1.2 Completed. Local<br />
empowerment company contracted<br />
1.3 Completed. Training<br />
contributes <strong>to</strong> building capacity in<br />
district.<br />
1.4 Completed. Advocacy <strong>of</strong> WSD<br />
amongst school communities in the<br />
Eastern Cape<br />
1.5 Completed. Contributes <strong>to</strong><br />
community particpation in schools.<br />
1.6 Completed. Enhances<br />
sustainability and builds capacity in<br />
districts.<br />
1.7 24 Draft reports obtained. To<br />
be finalised.<br />
participants in 1500 schools on<br />
ISPD<br />
e. Finalise and Complete 8<br />
Foundation Phase INSET<br />
Modules<br />
f. Print Foundation Phase INSET<br />
Modules for Imbewu 2 Programme<br />
Schools<br />
g. Constitute Foundation Phase<br />
Training Teams for delivery <strong>of</strong><br />
INSET <strong>to</strong> Programme schools<br />
h. Delivery <strong>of</strong> Foundation Phase<br />
INSET (Module 1& 2) in district<br />
cluster workshops<br />
i. Develop provincial rollout plan<br />
for Intermediate Phase RNCS<br />
Orientation training <strong>of</strong> schools<br />
j. Develop & print Intermediate<br />
Phase RNCS training materials<br />
k.Engage service providers <strong>to</strong><br />
develop 15 Intermediate Phase<br />
RNCS INSET Modules<br />
l. Engage TA <strong>to</strong> assist DoE <strong>to</strong>
teams.<br />
2. Engage TA Logistical<br />
support <strong>to</strong> Imbewu Training<br />
Programme<br />
3. Standard Bank Financial<br />
Literacy Programme introduced<br />
<strong>to</strong> 1515 schools<br />
3.1 Economic and<br />
Management Sciences Financial<br />
Literacy packs provided <strong>to</strong> 1515<br />
teachers<br />
3.2 160 EMS Financial<br />
Literacy learner guides supplied<br />
<strong>to</strong> each <strong>of</strong> the 1515 schools<br />
3.3 Stand Bank Financial<br />
Literacy Training <strong>of</strong> Trainers<br />
workshop conducted for 30 EMS<br />
Subject Advisors<br />
3.4 Standard Bank Finanical<br />
Literacy Programme workshops<br />
conducted across 24 districts in<br />
cluster<br />
Version 0.6<br />
2. TA contracted 01 April 2003 <strong>to</strong><br />
21 November 2003<br />
3. Completed. Build capacity<br />
among district subject advisors and<br />
school particpants in critical<br />
learning area.<br />
3.1 Completed. Contribution <strong>to</strong><br />
TLSM in 1515 schools.<br />
3.2 Completed. Value<br />
R1,151,400.00. Contribution <strong>to</strong><br />
TLSM in 1515 schools.<br />
3.3 Completed. Build capacity<br />
amongst district subject advisors<br />
and school particpants in critical<br />
learning area<br />
3.4 Completed. <strong>Report</strong>s and<br />
attendance registers available.<br />
develop FET provincial rollout plan<br />
and NCS Orientation & INSET<br />
materials<br />
m. Extend contracts for 2 existing<br />
Field Coordina<strong>to</strong>rs<br />
n. Extend secondment <strong>of</strong> 2<br />
existing departmental Imbewu<br />
Field Coordina<strong>to</strong>rs<br />
o. Extend contracts <strong>of</strong> SCIPP<br />
writer & Training, support &<br />
development TA<br />
p. Engage / appoint Data Capturer<br />
for Imbewu 2 Training programme<br />
database<br />
q. Conduct Planning workshops <strong>to</strong><br />
plan rollout <strong>of</strong> Imbewu Training<br />
programme & develop plans for<br />
2004/5 financial year<br />
r. Coordinate rollout <strong>of</strong> Financial<br />
Literacy Programme <strong>to</strong> 1000<br />
additional Eastern Cape schools<br />
(Grades 7-9)<br />
s. Conduct Annual <strong>Report</strong> Writing
3.5 24 District Financial<br />
Literacy reports produced by<br />
EMS Subject Advisors<br />
3.6 Standard Bank Financial<br />
Literacy Annual <strong>Report</strong> for 2002<br />
produced<br />
4. Appointment <strong>of</strong> 4 Imbewu II<br />
Field Coordina<strong>to</strong>rs ( Umtata,<br />
Kokstad, Port Elizabeth and<br />
Queens<strong>to</strong>wn ) & Assistant<br />
Training Programme<br />
Coordina<strong>to</strong>r<br />
4.1 Assumption <strong>of</strong> duties by 4<br />
field coordina<strong>to</strong>rs<br />
4.2 Assuption <strong>of</strong> duties by<br />
assistant training programme<br />
coordina<strong>to</strong>r<br />
5. Establishment <strong>of</strong> training<br />
programme database<br />
5.1 Request for proposals for<br />
design and establishment <strong>of</strong><br />
training programme database by<br />
programme coordina<strong>to</strong>r<br />
Version 0.6<br />
3.5 Completed.<br />
3.6 Completed. <strong>Report</strong> on<br />
Extranet.<br />
4. Completed. Sustainability could<br />
be enhanced with further<br />
secondements from department<br />
staff<br />
4.1 Completed. Assumed duties 1<br />
August 2003.<br />
4.2 Completed. Assuption <strong>of</strong><br />
duties 1 February 2004.<br />
5. Completed.<br />
5.1 Completed: May 2003<br />
Workshop & produce 2004 Annual<br />
<strong>Report</strong><br />
t. Develop / design Imbewu 2<br />
materials for 2005<br />
u. Engage additional trainers for<br />
support <strong>to</strong> Imbewu 2 Training<br />
Programme (INSET & EMD)<br />
v. Print EMD training materials for<br />
Imbewu 2 Training Programme<br />
Schools<br />
w. Conduct Training <strong>of</strong> Trainers<br />
for Foundation Phase INSET<br />
x.Conduct Training <strong>of</strong> Trainers for<br />
Intermediate Phase RNCS<br />
Orientation training<br />
y. Print & deliver Intermediate<br />
Phase RNCS Orientation training<br />
materials<br />
z. Conduct Training <strong>of</strong> Trainers<br />
workshops for EMD (24 District<br />
Training Teams)<br />
aa. Secondment <strong>of</strong> additional 4
5.2 4 Proposals obtained by<br />
programme coordina<strong>to</strong>r<br />
5.3 Proposals scored and<br />
adjudicated by programme<br />
coordina<strong>to</strong>r<br />
5.4 Service provider contracted<br />
<strong>to</strong> design and develop database<br />
5.5 Training programme<br />
database <strong>to</strong> be installed<br />
5.6 Training programme<br />
personnel trained on database<br />
5.7 Database maintained<br />
6. Planning and Refinement<br />
Workshops <strong>to</strong> finalise Training<br />
Programme activities<br />
( Logframes ) <strong>to</strong> March 2005<br />
6.1 <strong>Department</strong>al <strong>of</strong>ficials<br />
invited ( provincial and district )<br />
6.2 Workshop programme and<br />
workbook developed and printed<br />
Version 0.6<br />
5.2 Completed: May 2003<br />
5.3 Completed: June 2003<br />
5.4 Completed: September/August<br />
2003<br />
5.5 Completed: November 2003<br />
5.6 Not started: Data Capturer not<br />
appointed in the period<br />
5.7 Not started: Awaiting data<br />
capturer<br />
6. Completed: 80 <strong>Department</strong>al<br />
<strong>of</strong>ficials attend workshop<br />
6.1 Completed: 80 Provincial and<br />
District <strong>of</strong>ficials attend<br />
6.2 Completed: 100 workbooks and<br />
files produced<br />
Field Coordina<strong>to</strong>rs from DoE <strong>to</strong><br />
Imbewu 2 Training Programme
6.3 Planning workshops<br />
conducted and logframes<br />
developed and refined <strong>to</strong> March<br />
2005 ( in all training programme<br />
areas )<br />
6.4 Training programme plans<br />
budgeted for and presented <strong>to</strong><br />
PSC<br />
7. <strong>Department</strong>al newsletter :<br />
Umdibanisi<br />
7.1 Training Programme<br />
articles placed in monthly<br />
editions<br />
8. Engage TA and establish<br />
Reference Group <strong>to</strong> review and<br />
rewrite School Development<br />
Support ( SDS ) Pilot module<br />
8.1 Presentation <strong>of</strong> final SDS<br />
module <strong>to</strong> DoE and PSC<br />
8.2 Print 6500 SDS modules<br />
and 200 facilita<strong>to</strong>rs guides<br />
Version 0.6<br />
6.3 Completed: Logframes printed<br />
and produced at PSC meeting<br />
6.4 Completed: Reprioritization and<br />
budget cuts mitigate against rollout<br />
<strong>of</strong> planned activities<br />
7. Completed: Articles serve as<br />
institutional memory <strong>of</strong> Training<br />
Programme activities<br />
7.1 Completed: Articles available at<br />
Training Programme Offices<br />
8. Completed: Local TA contracted.<br />
Capacity for materials development<br />
build amongst DoE <strong>of</strong>ficials<br />
8.1 Completed: Final versions <strong>of</strong><br />
SDS materials agreed and<br />
approved<br />
8.2 Completed: Local<br />
empowerment company contrated
8.3 Print 3000 SDS Planning<br />
Guides for 1500 schools<br />
8.4 Print 2500 Standards<br />
Reference Guides for 1500<br />
schools<br />
8.5 Conduct SDS Training <strong>of</strong><br />
Trainers workshop for 165<br />
district training <strong>of</strong>ficials ( 24<br />
district training teams )<br />
8.6 3 day radio slots <strong>to</strong><br />
advocate SDS and district<br />
training<br />
8.7 Conduct SDS training<br />
workshops in 24 districts for<br />
1500 schools in clusters by end<br />
<strong>of</strong> September 2003<br />
8.8 Provincial and field<br />
coordina<strong>to</strong>rs provide support <strong>to</strong><br />
24 district training teams<br />
8.9 24 District SDS reports<br />
produced by District Training<br />
Teams<br />
Version 0.6<br />
8.3 Completed<br />
8.4 Completed<br />
8.5 Completed: Builds capacity<br />
amongst <strong>of</strong>ficials in 24 district<br />
<strong>of</strong>fices<br />
8.6 Completed: Advocacy <strong>to</strong><br />
Eastern Cape school communities<br />
on School Development<br />
8.7 Completed: Build capacity<br />
amongst school-community<br />
participants; pportunities for local<br />
employment <strong>of</strong> caterers; Emphasis<br />
on development <strong>of</strong> plans <strong>to</strong> include<br />
HIV/AIDS, Food Gardens, etc.<br />
8.8 Completed: Sustainability<br />
enhanced<br />
8.9 Draft reports submitted for<br />
editing. To be finalised
8.10 Moni<strong>to</strong>r development <strong>of</strong><br />
1500 School Development<br />
Plans ( SDP )<br />
8.11 Schools submit SDP's <strong>to</strong><br />
District <strong>of</strong>fices / Circuit<br />
managers<br />
8.12 Field coordina<strong>to</strong>rs plan<br />
and conduct cluster support<br />
meetings and school support<br />
visits<br />
9. Reading Week for 1500<br />
Imbewu 2 schools<br />
9.1 Conduct coordination<br />
meeting with <strong>Education</strong><br />
Resource and Information<br />
Services ( ERIS )<br />
9.2 Plan and host book<br />
selection exhibition with<br />
publishers associated with<br />
PASA<br />
9.3 Develop book selection<br />
workbook<br />
9.4 District librarians and<br />
Version 0.6<br />
8.10 Completed: Field, District<br />
Coordina<strong>to</strong>rs and EDO's moni<strong>to</strong>r<br />
progress<br />
8.11 In progress: 65% submissions<br />
<strong>to</strong> date<br />
8.12 Ongoing: Cluster meeting<br />
after each training module<br />
conducted; schools at risk selected<br />
for visits<br />
9. In progress: Completed by 19<br />
March 2004<br />
9.1 Completed<br />
9.2 Completed: August 2003<br />
9.3 Completed: August 2003<br />
9.4 Completed: August 2003
esource centre personnel<br />
select literacy materials for all<br />
levels ( Foundation phase,<br />
Intermediate Phase, Senior<br />
Phase and Grade 10 )<br />
9.5 Finalise selection <strong>of</strong> literacy<br />
materials<br />
9.6 Procure literacy materials<br />
9.7 Distribute literacy materials<br />
<strong>to</strong> 1500 schools in 24 districts<br />
9.8 1500 Schools develop<br />
reading week programmes<br />
9.9 Host reading week<br />
programmes<br />
9.10 District training teams and<br />
field coordina<strong>to</strong>rs support<br />
Reading Week in 24 districts<br />
9.11 24 District <strong>Report</strong>s on<br />
Reading week completed<br />
10. Engage TA and Reference<br />
Group <strong>to</strong> review and rewrite<br />
Managing Change in <strong>Education</strong><br />
( MC ) Pilot module<br />
Version 0.6<br />
9.5 Completed: Oc<strong>to</strong>ber 2003<br />
9.6 Completed: December 2003<br />
9.7 Completed: 12 March 2004<br />
9.8 Completed: end February/<br />
beginning March 2004<br />
9.9 In progress: 15 - 19 March<br />
2004<br />
9.10 In progress<br />
9.11 To be completed by mid-April<br />
2004<br />
10. Completed: Local TA engaged.<br />
Capacity built for materials<br />
development amongst DoE <strong>of</strong>ficials
10.1 Presentation <strong>of</strong> finalised<br />
MC module <strong>to</strong> DoE and PSC<br />
10.2 Print 5000 MC modules<br />
and 200 Facilita<strong>to</strong>rs Guides<br />
10.3 Conduct MC Training <strong>of</strong><br />
trainers workshop for 165 district<br />
<strong>of</strong>ficials ( 24 district trainign<br />
teams )<br />
10.4 4 day Radio Slot <strong>to</strong><br />
advocate MC training and<br />
Reading Week<br />
10.5 Conduct MC training<br />
workshops in districts for 1500<br />
schools and 4500 schoolcommunity<br />
participants<br />
10.6 Provincial facilita<strong>to</strong>rs and<br />
field co-ordina<strong>to</strong>rs support<br />
Version 0.6<br />
10.1 Completed<br />
10.2 Completed: Local<br />
empowerment company contracted<br />
10.3 Completed by January 2004:<br />
capacity built amongst EDO's &<br />
Subject Advisors in 24 districts<br />
10.4 Completed: Advocacy <strong>of</strong><br />
educational change and Reading<br />
Week amongst Eastern Cape<br />
communities<br />
10.5 In Progress: Building capacity<br />
amongst school communities <strong>to</strong><br />
manage change and transformation<br />
processes in education.<br />
Employment opportunities created<br />
for communities for catering. Links<br />
with HIV/AIDS in managing change<br />
in health status <strong>of</strong> learners and<br />
teachers<br />
10.6 In progress: Sustainability<br />
enhanced
district training teams<br />
10.7 24 District training reports<br />
produced by 24 district training<br />
teams<br />
10.8 Field coordina<strong>to</strong>rs plan<br />
and conduct cluster support<br />
meetings and school support<br />
visits<br />
11. Production and distribution<br />
<strong>of</strong> Imbewu 2 Promotional<br />
Materials including 2004 wall<br />
calendars, pocket diaries and<br />
Christmas cards<br />
12. Annual <strong>Report</strong> Writing<br />
Workshop<br />
12.1 Develop workbook <strong>to</strong><br />
report on Imbewu 2 Training<br />
Programme activities for 2003<br />
12.2 Conduct report writing<br />
workshop with 24 district<br />
coordina<strong>to</strong>rs, field coordina<strong>to</strong>rs<br />
and team members<br />
12.3 Produce Imbewu Training<br />
Version 0.6<br />
10.7 To be completed by end <strong>of</strong><br />
May 2004<br />
10.8 To be completed by end June<br />
2004<br />
11. Completed: Completed by end<br />
November 2004<br />
12. Completed by December 2003<br />
12.1 Completed by end November<br />
2003<br />
12.2 Completed by 11 December<br />
2003<br />
12.3 In progress: Final report ready
Programme annual report for<br />
2003<br />
13. Engage TA's and reference<br />
group for revision and rewriting<br />
<strong>of</strong> In School Pr<strong>of</strong>essional<br />
Development ( ISPD ) modules,<br />
facilita<strong>to</strong>rs guide, A Guide <strong>to</strong><br />
ISPD and ISPD activities /<br />
resource file<br />
13.1 Develop framework for<br />
ISPD materials<br />
13.2 Develop ISPD module and<br />
facilita<strong>to</strong>rs guide<br />
13.3 Develop A Guide <strong>to</strong> ISPD<br />
in schools<br />
13.4 Develop ISPD WSD<br />
Activity resource file<br />
13.5 Conduct 2 workshops with<br />
TA's, departmental reference<br />
group, principals, teachers and<br />
SGB members <strong>to</strong> write ISPD<br />
activities<br />
13.6 Conduct briefing meeting<br />
Version 0.6<br />
by end March 2004<br />
13. TA's contracted & reference<br />
Group members engaged for ISPD<br />
revision and writing/ materials<br />
development process<br />
13.1 In progress<br />
13.2 In progress<br />
13.3 In progress<br />
13.4 In progress<br />
13.5 Completed: Drafted and<br />
developed 75 WSD activities<br />
13.6 Completed on 09 March 2003
with printers on specifications<br />
for ISPD materials<br />
13.7 Print and produce 6500<br />
ISPD modules and 200<br />
facilita<strong>to</strong>rs guides<br />
13.8 Print and produce 2000<br />
ISPD Activity Files<br />
13.9 Print and produce 2000<br />
Guides <strong>to</strong> ISPD in schools<br />
14. Revision and development<br />
<strong>of</strong> INSET and EMD materials for<br />
Imbewu 2 Training Programme<br />
14.1 Advertise Expressions <strong>of</strong><br />
Interest for placement on<br />
Training Programme database<br />
<strong>to</strong> assist in delivery <strong>of</strong> INSET<br />
and EMD <strong>to</strong> <strong>Education</strong><br />
<strong>Department</strong> / Imbewu 2 Schools<br />
14.2 Advertise Expressions <strong>of</strong><br />
Interest for revising and<br />
commissioning <strong>of</strong> INSET and<br />
EMD modules for <strong>Education</strong><br />
<strong>Department</strong> / Imbewu 2 Training<br />
Programme<br />
Version 0.6<br />
13.7 Planned for next quarter<br />
13.8 Planned for next quarter<br />
13.9 Planned for next quarter<br />
14. In progress<br />
14.1 Completed by November 2003<br />
14.2 Completed by November 2003
14.3 Engage service providers<br />
for writing and revising INSET<br />
and EMD materials<br />
14.4 Establish departmental<br />
reference groups as critical<br />
readers <strong>of</strong> INSET and EMD<br />
manuscripts<br />
14.5 Finalise INSET and EMD<br />
modules and present <strong>to</strong> DoE /<br />
PSC<br />
15. Roll out <strong>of</strong> Revised National<br />
Curriculum Statements ( RNCS<br />
) for Foundation Phase in the<br />
Province<br />
15.1 Comprehensive Multilevel<br />
Advocacy Programme for<br />
RNCS targetting entire school<br />
communities across the<br />
Province (including press<br />
supplements, regular radio slots,<br />
information brochures, road<br />
shows, drama presentations,<br />
school advocacy packs, phoneins<br />
15.2 Foundation Phase RNCS<br />
Version 0.6<br />
14.3 In progress: January -<br />
February 2004<br />
14.4 In progress<br />
14.5 In progress<br />
15.1 Completed by September<br />
2003<br />
15.2 Completed: August <strong>to</strong>
Orientation Training<br />
15.2.1 Roll out plan for<br />
orientation training programme<br />
developed<br />
15.2.2 Training <strong>of</strong> 200 Trainers<br />
in conjunction with National<br />
<strong>Department</strong><br />
15.2.3 Development <strong>of</strong><br />
orientation training<br />
materials/modules (4)<br />
15.2.4 70 service providers<br />
contracted <strong>to</strong> assist district<br />
training teams in delivery <strong>of</strong><br />
programme<br />
15.2.5 District roll out <strong>of</strong><br />
orientation traIning programme<br />
<strong>to</strong> 25,000 teachers<br />
15.2.6 Moni<strong>to</strong>ring and<br />
evaluai<strong>to</strong>n process (service<br />
provider contracted) put in place<br />
Version 0.6<br />
November 2003<br />
15.2.1 Completed by March 2003<br />
15.2.2 Completed by August 2003<br />
15.2.3 Completed May-July 2003<br />
15.2.4 Contracted beginning <strong>of</strong><br />
August 2003<br />
15.2.5 Mainly IMBEWU 2 funding<br />
utilised August - November 2003<br />
contrary <strong>to</strong> initial expectation that<br />
<strong>Department</strong> would fully fund this in<br />
line with principle that IMBEWU 2<br />
operates as strategic<br />
lever<br />
15.2.6 November 2003
15.2.7 Cluster support<br />
programme<br />
15.2.8 Develop data base for<br />
RNCS training programme (25<br />
000 teachers)<br />
15.3 Development <strong>of</strong> RNCS<br />
training materials<br />
15.4 Rollout plan for Training<br />
Foundation Phase teachers<br />
developed<br />
15.5 <strong>Department</strong>al budget<br />
sourced for rollout <strong>of</strong> RNCS<br />
Foundation Phase training <strong>to</strong><br />
districts<br />
15.6 Additional service<br />
providers recruited <strong>to</strong> assist<br />
rollout<br />
15.7 External evaluation <strong>of</strong><br />
training conducted<br />
15.8 Developed database for<br />
Version 0.6<br />
15.2.7 November 2003<br />
15.2.8 Completed September -<br />
December 2003<br />
15.3 May - July 2003<br />
15.4 Completed: January <strong>to</strong> March<br />
2003<br />
15.5 Imbewu 2 Programme<br />
funding utilized for this purpose<br />
(except catering). Sustainability <strong>to</strong><br />
be addressed, since Imbewu<br />
resources <strong>to</strong> be utelised as a<br />
strategic lever and not for funding<br />
major rollout <strong>of</strong> DoE programmes<br />
15.6 Completed: Imbewu Funding<br />
utilized for payment <strong>of</strong> additional<br />
trainers for RNCS training<br />
15. 7 Completed: September <strong>to</strong><br />
November 2003<br />
15.8 Completed: September <strong>to</strong>
4. . Improved asset<br />
management and lower<br />
cost school buildings<br />
• Break-in and damage <strong>to</strong><br />
schools reduced by 5%<br />
pa.<br />
• Break-in and damage <strong>to</strong><br />
schools reduced<br />
• Reduction in need for<br />
school transport<br />
• Reduction in<br />
pla<strong>to</strong>oning/double shifts<br />
• Strategic partnerships<br />
built between community ,<br />
the ECED and service<br />
providers<br />
• Increased number <strong>of</strong><br />
cost effective school<br />
buildings completed each<br />
year<br />
• All quintile 1 & 2<br />
schools have been raised<br />
<strong>to</strong> levels 3 and above<br />
• Learnerships in<br />
RNCS training for 25 000<br />
teachers .<br />
1. Work schedule for 12 months<br />
ending 31 March 2004 <strong>to</strong> be<br />
prepared by TA<br />
2. Soil samples taken at<br />
identified site and labora<strong>to</strong>ry<br />
tests in progress.<br />
3. Workshops with community<br />
<strong>to</strong> set up selection process<br />
4. Labora<strong>to</strong>ry tests <strong>to</strong> be<br />
completed<br />
5. Block manufacturing yard <strong>to</strong><br />
be set up at Bantwanana site<br />
6. PK Das (TA from India) <strong>to</strong><br />
personally input during the<br />
whole month <strong>of</strong> August.<br />
7. Brick/blocklaying training <strong>to</strong><br />
start at end <strong>of</strong> July though<br />
August.<br />
Version 0.6<br />
November 2003<br />
1. Completed<br />
2. Completed<br />
3. Completed<br />
4. Completed<br />
5. Completed. Only local labour<br />
utilized<br />
6. Completed<br />
7. Completed.<br />
a. Bantwanana building continues:<br />
walls, ro<strong>of</strong>, <strong>to</strong>ilets, external works<br />
b. Rondavel Drawings completed<br />
c. PK Das (TA) <strong>to</strong> complete draft<br />
Procedure & Design Manual<br />
d. Resource Mapping (RM)<br />
Consolidation Workshop<br />
e. Begin Maluti School Training<br />
and work<br />
f. RM Procedure Manual finalized<br />
and published<br />
g. Bantwanana school completed<br />
h. Resource Mapping for<br />
remaining pro<strong>to</strong>type schools<br />
1. Maluti school completed
construction and<br />
maintenance completed<br />
5. . Communities<br />
sufficiently motivated <strong>to</strong><br />
become critically engaged<br />
with education decisionmakers.<br />
8. Blockmaking training <strong>to</strong> be<br />
given on site through August.<br />
9. Blocklaying <strong>to</strong> start on<br />
site early September<br />
10. Complete Phase 1 <strong>of</strong><br />
Resource mapping<br />
11. Complete all<br />
contract/service level agreement<br />
documentation & contract<br />
drawings<br />
12. Skills Training <strong>of</strong> 14<br />
Blockmakers; 12 Bricklayers; 8<br />
Carpenters; 8 Electricians; 6<br />
Painters<br />
13. Manufacture sufficient<br />
cement stabiliser blocks<br />
1. Engagement <strong>of</strong> TA for<br />
materials development, field<br />
work and programme support<br />
2. Development <strong>of</strong> training<br />
Version 0.6<br />
8. Completed<br />
9. Delayed. Waited for SABS<br />
approval <strong>of</strong> Compressed Earth<br />
Block. Implementation March 2004<br />
10. Completed<br />
11. Only Rondavel Drawings<br />
outstanding<br />
12. Completed. Trained labourers<br />
now being 'poached'/employed by<br />
other businesses<br />
13. Blocks manufactured (17,000)<br />
1. Completed: Contracte in place<br />
<strong>to</strong> March 2004]<br />
2. In progress: Orientation<br />
a. Finalize & print 1000 School<br />
Community Relations module<br />
b. Conduct Training <strong>of</strong> Trainers'<br />
Workshop for 3 SCIPP District
• Increased use <strong>of</strong><br />
schools for ABET, health<br />
education and other<br />
community activities.<br />
• Links formed with<br />
community fora.<br />
• Increased level <strong>of</strong><br />
community involvement,<br />
more new people involved<br />
each year.<br />
• Implementation <strong>of</strong><br />
outreach and community<br />
service learning projects at<br />
school.<br />
• Learners involved in<br />
school mapping - related<br />
<strong>to</strong> security and safety <strong>of</strong><br />
schools.<br />
materials for capacity building<br />
programme<br />
3. Production <strong>of</strong> SCIPP training<br />
video for capacity building<br />
programme<br />
4. SCIPP School Assessment<br />
conducted<br />
5. SCIPP Community Project<br />
Verification conducted<br />
6. SCIPP school assessment<br />
and project verification data<br />
analysed<br />
7. Bookmarks,Posters (English<br />
& Xhosa), and brochures <strong>to</strong> be<br />
developed for commencing <strong>of</strong><br />
pilot projects.<br />
8. Resourcing the 28 projects<br />
with necessary implements /<br />
<strong>to</strong>ols, seeds, etc.<br />
9. Training on sourcing and<br />
Version 0.6<br />
Workbooks and Community<br />
Mapping Modules completed and<br />
printed<br />
3. Completed: Video produced and<br />
utilized during Community Mapping<br />
Workshops<br />
4. Completed: School Assessment<br />
visits conducted and forms<br />
completed<br />
5. Completed: Community Project<br />
Verification conducted and forms<br />
completed<br />
6. Completed: Information not<br />
captured in<strong>to</strong> database formats<br />
7. Completed: SCIPP promotional<br />
materials printed and distributed<br />
8. Not started. Orientation and<br />
Stage 1 training <strong>to</strong> be conducted<br />
first<br />
9. Not yet started<br />
Teams<br />
c. Conduct School Community<br />
Relations workshops in 7 SCIPP<br />
cluster for 700 participants<br />
d. Plan & conduct SCIPP Indabas<br />
in 3 SCIPP districts & 7 SCIPP<br />
clusters<br />
e. Produce end <strong>of</strong> Stage 1& 2<br />
reports<br />
f. Plan and conduct SCIPP<br />
Planning Workshop / Retreat for<br />
defining & planning Stage 2 <strong>of</strong> the<br />
SCIPP capacity building<br />
programme & embark on SCIPP<br />
Stage 2 programme <strong>to</strong> March<br />
2005<br />
g. Engage government and NGO's<br />
in rollout & delivery <strong>of</strong> integrated<br />
services, training & skills<br />
development programmes <strong>to</strong> <strong>to</strong><br />
SCIPP school communities<br />
h. Identify & procure resources for<br />
28 school communities (projects)<br />
i. Conduct school community
maintaining resources issued <strong>to</strong><br />
28 school communities<br />
10. Establishment <strong>of</strong> SCIPP<br />
structures:<br />
10.1 Provincial Reference<br />
Group<br />
10.2 District Coordinating<br />
Committees<br />
10.3 Cluster Coordinating<br />
Committees<br />
12. District and Cluster<br />
Orientation Workshops planned<br />
and held<br />
13. Dev <strong>of</strong> Community Mapping<br />
material<br />
14. SCIPP Retreat for<br />
developing Capacity Building<br />
Version 0.6<br />
10. In progresss<br />
10.1In progress: Difficulties<br />
experienced in engaging<br />
commitment <strong>of</strong> provincial <strong>of</strong>ficials<br />
from various departments<br />
10.2: In progress: Libode DCC &<br />
Idutywa formed: Umtata DCC <strong>to</strong> be<br />
finalized<br />
10.3 Completed in all 3 districts<br />
12. Completed: Orientation<br />
workshops held for 3 DCC's & 7<br />
CCC's<br />
13. Completed: Community<br />
Mapping Module developed and<br />
1000 copies printed for district and<br />
school commjunity workshop<br />
participants<br />
14. Completed: Conceptual<br />
framework and capacity building<br />
support visits <strong>to</strong> 28 school<br />
community projects<br />
j. Conduct assessment <strong>of</strong> 624<br />
Imbewu 1, Ikhwezi, Isithole, Read<br />
and other programme schools for<br />
further support through resourcing<br />
k. Training for 624 schools on<br />
developing WSD business plans<br />
for sustaining school<br />
transformation<br />
l. Adjudicate school business<br />
plans, procure & train schools on<br />
resource management &<br />
development<br />
m. Identify intake <strong>of</strong> additional<br />
schools by end <strong>of</strong> FY for<br />
commencement in SCIP in April<br />
2005<br />
n. Locate SCIPP in <strong>Department</strong> by<br />
March 2005<br />
o. Evaluation <strong>of</strong> SCIPP by<br />
Evaluation Team
6.<br />
7.<br />
8.<br />
9.<br />
10.<br />
11.<br />
12.<br />
Framework for schoolscommunities<br />
i.r.o project<br />
development & management<br />
15 School Community Relations<br />
Modules designed<br />
16. SCIPP Information Booklet,<br />
School Assessment Booklet &<br />
Project Verification booklets<br />
designed<br />
17. School Community Indabas<br />
planned<br />
18. SCIPP planning workshop /<br />
retreat planned<br />
19. SCIPP 2003 <strong>Report</strong><br />
produced<br />
Version 0.6<br />
framework developed in Oc<strong>to</strong>ber<br />
2003<br />
15. In progress<br />
16. Completed: To be edited for<br />
printing in March 2004<br />
17. In progress<br />
18. Planned for next period<br />
19. Completed. To be posted on<br />
Extranet
Version 0.6<br />
13.<br />
14.<br />
15.<br />
General /Overall progress assessment - Project<br />
<strong>Purpose</strong><br />
Justification<br />
3 - Likely <strong>to</strong> be partially achieved<br />
Evidence <strong>of</strong> progress <strong>to</strong>wards purpose from ECED organogram, Strategic Plan; also District <strong>of</strong>ficials showing energy and enterprise.<br />
Not full-scale decentralisation as yet.<br />
General /Overall progress assessment - Project<br />
<strong>Output</strong>s<br />
Justification<br />
3 - Likely <strong>to</strong> be partially achieved<br />
Some evidence <strong>of</strong> progress in <strong>Output</strong> 1, though perhaps a little patchy. <strong>Output</strong>s 2-4 showing good work and real impact. <strong>Output</strong> 5 is<br />
pilot-level and can contribute more if integrated in<strong>to</strong> <strong>Output</strong> 3.<br />
Log Frame Level<br />
INPUTS/ACTIVITIES PERFORMANCE RATING COMMENTS<br />
(a) Appropriateness (quality): (a) DFID 2 Likely <strong>to</strong> be largely achieved Some questions on the<br />
relevance <strong>of</strong> some<br />
activities under <strong>Output</strong> 1<br />
(b) Partner 2 Likely <strong>to</strong> be largely achieved<br />
(b) Efficiency (quantity): (a) DFID 3 Likely <strong>to</strong> be partially achieved Budget cut has had<br />
impact on work in year
Version 0.6<br />
03/04, resulting in<br />
spending over revised<br />
budget - not originally<br />
agreed budget - because<br />
<strong>of</strong> earlier commitments.<br />
NB. Formal instruction <strong>of</strong><br />
cut not yet received by<br />
either ECED or Managing<br />
Consultants<br />
(b) Partner 3 Likely <strong>to</strong> be partially achieved<br />
(c) Sufficiency (timeliness): (a) DFID 3 Likely <strong>to</strong> be partially achieved<br />
(b) Partner 3 Likely <strong>to</strong> be partially achieved Timely inputs at activity<br />
level<br />
OVERALL ASSESSMENT*: 3 Likely <strong>to</strong> be partially achieved Agreed by OPR Team<br />
and Programme Steering<br />
Committee, including S-G<br />
<strong>of</strong> Dept, as projection at<br />
present moment over the<br />
life <strong>of</strong> the programme, ie<br />
a further 5 years.<br />
(*) Including conditionality aspects where relevant
Version 0.6<br />
PART B.<br />
<strong>Purpose</strong> /OVIs Progress Comments<br />
Progress recorded and acknowledged against all OVIs, especially OVIs 2 and 3. School<br />
transformation model now gazetted as ECED policy for whole Province; evidence that other schools already adopting STM outside Imbewu cadre<br />
Support for District <strong>of</strong>fices and their work from<br />
ECED is urgent need, and Imbewu could<br />
assist with advocacy and encouragement in<br />
this respect.<br />
Attribution<br />
Policy on STM and Prov. policy on INSET. Numbers <strong>of</strong> transformed achools. Discussions with District <strong>of</strong>fices indicate need for support<br />
from ECED.<br />
<strong>Purpose</strong> <strong>to</strong> Goal<br />
There are strong perceptions that Imbewu transformation and inset support are already showing positive impacts on learning<br />
achievements <strong>of</strong> children, due <strong>to</strong> a number <strong>of</strong> fac<strong>to</strong>rs including increased commitment by teachers, more contact time, better learning<br />
environments.<br />
DOES LOGFRAME REQUIRE REVISION?<br />
Yes. Proposed changes will be agreed through iteration between DFIDSA, Imbewu and ECED, before final agreement at Programme<br />
Steering Committee in mid-May 2004.<br />
DO PIMS MARKERS REQUIRE REVISION [ Manda<strong>to</strong>ry for projects approved prior <strong>to</strong> 1.4.98 ]<br />
n/a<br />
Quality <strong>of</strong> Scoring<br />
The OPR has based its scoring on evidence gathered through discussions with various levels <strong>of</strong> stakeholders and participants, and<br />
from documentation. High levels <strong>of</strong> skills and expereince have been utilised in the make-up <strong>of</strong> the OPR team, both from DFID and<br />
ECED.<br />
Deleted:
Version 0.6<br />
Lessons learned, and suggested dissemination. For PCRs please comment on (i) Project/Programme Level Lessons, (ii) Sec<strong>to</strong>r Level or<br />
Thematic Lessons, and (iii) General Development Lessons<br />
i) The importance <strong>of</strong> working closely Dept, and <strong>of</strong> the Dept absorbing programme activity has been demonstrated in terms <strong>of</strong> fruitful<br />
outcomes fromprogramme activity.<br />
ii) There are unanticipated spin-<strong>of</strong>fs, especially in terms <strong>of</strong> the Infrastructure-related <strong>Output</strong> (4) in training and skills development<br />
leading <strong>to</strong> employment and income generation by trainees - this shoujld be highlighted and further built upon.<br />
iii) In a complex multi-year programme a well-developed and innovative Evaluation framework can capture both baseline and<br />
developmental data, and provide the basis for further lesson learning and dissemination. It should be built in from the start <strong>of</strong> the<br />
programme and sustained throughout its life.<br />
iv) Dissemination <strong>of</strong> the OPR findings should be broad-based and include (eg) the MEC, participants and respondents, and District<br />
personnel.
Version 0.6<br />
Part C<br />
Key Issues / Points <strong>of</strong> information. For PCRs please comment on Sustainability<br />
Key issue - District developmen as points <strong>of</strong> delivery and contact between the Dept and Schools.<br />
Points <strong>of</strong> information - the development <strong>of</strong> the Extranet is a good innovation and could be replicated in other programmes. Gazetting <strong>of</strong><br />
the Imbewu model is key information about the success being built up by Imbewu. Stable management is key <strong>to</strong> both programme and<br />
Dept - these now seem <strong>to</strong> be in place.<br />
Recommendations Responsibility Date for completion<br />
1. <strong>Output</strong> 1 The OPR team endorses the plan <strong>of</strong> the ECED <strong>to</strong><br />
hold a workshop in June <strong>to</strong> plan for the remaining years <strong>of</strong> the<br />
project. It is recommended that the programme staff work<br />
closely with the relevant Chief Direc<strong>to</strong>rates <strong>of</strong> the ECED <strong>to</strong><br />
ensure that its funds and plans are integrated with those <strong>of</strong><br />
the department in the 2005-2008 Strategic Plan.<br />
2. It is recommended that Imbewu provide technical and<br />
management support in 2004/05 <strong>to</strong> records management<br />
initiatives and consider providing support in other areas (eg<br />
anti-corruption strategy, performance appraisal, internal audit,<br />
basic financial management training, integration <strong>of</strong> personnel<br />
and payroll systems procurement, capacity building <strong>to</strong> use<br />
evaluation material) which would improve the environment in<br />
which the ECED operates and help it shift from short-term<br />
crisis management <strong>to</strong>wards a more ordered longer-term<br />
focus.<br />
3. With regard <strong>to</strong> HIV/AIDS it will be critically important for the<br />
Imbewu programme <strong>to</strong> begin <strong>to</strong> play a proactive role on<br />
HIV/Aids issues within ECED by : (a) assisting the ECED <strong>to</strong><br />
Imbewu and ECED Chief<br />
Direc<strong>to</strong>rs/staff<br />
DFIDSA and ECED<br />
Imbewu programme staff and<br />
ECED<br />
All <strong>to</strong> be decided at or prior <strong>to</strong> next<br />
PSC in mid-May.
Version 0.6<br />
develop action plans on its workplace policy and implement<br />
these in accordance with DPSA policies; (b) assisting ECED<br />
<strong>to</strong> develop an overarching plan that will address the needs <strong>of</strong><br />
orphans and vulnerable children (OVCs), incorporates<br />
initiatives <strong>of</strong> other social partners, and integrates the school<br />
nutrition programme.<br />
4. <strong>Output</strong> 2 There is a need for clarity regarding whether or not<br />
corporate service centres are going <strong>to</strong> be permanent features<br />
<strong>of</strong> the district landscape. It is recommended that plans for the<br />
provision <strong>of</strong> infrastructure be finalized as soon as possible –<br />
see also report on <strong>Output</strong> 4.<br />
5. <strong>Output</strong> 3 - Regarding the school transformation programme -<br />
Ongoing support <strong>to</strong> schools should be prioritized, both in<br />
terms <strong>of</strong> governance and curriculum aspects. In order <strong>to</strong><br />
achieve this, innovative strategies and mechanisms such as<br />
school clusters, learning areas committees and the use <strong>of</strong><br />
lead teachers, should be promoted across the province and<br />
be enhanced<br />
6. The in-depth training <strong>of</strong> all EDOs and Subject advisors should<br />
continue, it should be deepened, and they should be provided<br />
with appropriate <strong>to</strong>ols <strong>to</strong> be able <strong>to</strong> support schools<br />
7. The curriculum aspects <strong>of</strong> school transformation model<br />
should be integrated in<strong>to</strong> the INSET programme <strong>of</strong> the ECED.<br />
The INSET programme should have clear and achievable<br />
strategies and objectives<br />
8. A comprehensive programme for rolling out the school<br />
transformation model <strong>to</strong> the rest <strong>of</strong> the schools in the province<br />
should be developed, budgeted for, and implemented<br />
ECED <strong>to</strong> clarify and discuss<br />
with Imbewu staff and DFIDSA<br />
ECED relevant C Direc<strong>to</strong>rates<br />
and District Managers, in<br />
discussion with Imbewu staff<br />
ECED with Imbewu support<br />
ECED with Imbewu support<br />
ECED with Imbewu support<br />
9. <strong>Output</strong> 4 It is recommended that as soon as practicable a ECED EMIS and Imbewu<br />
Formatted: Bullets and<br />
Numbering<br />
Formatted: Bullets and<br />
Numbering<br />
Formatted: Bullets and<br />
Numbering<br />
Formatted: Bullets and<br />
Numbering<br />
Formatted: Bullets and<br />
Numbering
Version 0.6<br />
strategy is developed <strong>to</strong> ensure the two way communication<br />
flow <strong>of</strong> data and that managers be given the relevant data<br />
relating <strong>to</strong> their schools and districts which they can reflect in<br />
their development plans.<br />
10.<strong>Output</strong> 5 It is recommended that <strong>Output</strong> 5 be integrated in<strong>to</strong><br />
<strong>Output</strong> 3 and that the budget for <strong>Output</strong> 5 be reallocated <strong>to</strong><br />
<strong>Output</strong> 1 specifically for the Evaluation Framework (<strong>to</strong> make<br />
up the shortfall created by the DFID cut in funding.) (The<br />
latter subject <strong>to</strong> commitments under <strong>Output</strong> 5, and <strong>to</strong> further<br />
discussion and agreement)<br />
11.<br />
12.<br />
DFIDSA in collaboration with<br />
ECED and Imbewu<br />
<strong>Review</strong> team: (DFID) Myra Harrison, Barbara Payne, Pinky Pheeloane, Makgapi Maleka, Mareka Monyokolo,<br />
Godwin Khosa, Matthew Mhlongo, Richard Thomas, David Pedley, Mzu Bishet.<br />
(ECED) :<br />
People met: (To be included)<br />
Scoring system:<br />
1 = likely <strong>to</strong> be completely achieved 4 = only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent<br />
2 = likely <strong>to</strong> be largely achieved 5 = unlikely <strong>to</strong> be realised<br />
3 = likely <strong>to</strong> be partially achieved x = <strong>to</strong>o early <strong>to</strong> judge extent <strong>of</strong> achievement<br />
Formatted: Bullets and<br />
Numbering<br />
Formatted: Bullets and<br />
Numbering
AIDE MEMOIRE<br />
2005 IMBEWU ANNUAL REVIEW<br />
25/APRIL/2005<br />
1
AIDE MEMOIRE TO THE 2005 ANNUAL REVIEW OF IMBEWU<br />
1. Introduction<br />
This is an Aide Memoire <strong>to</strong> the third Annual <strong>Review</strong> <strong>of</strong> Imbewu Schools<br />
Improvement Program that <strong>to</strong>ok place from the 17 th April <strong>to</strong> 22 nd April 2005.<br />
The review was carried out as part <strong>of</strong> DFID Southern Africa (DFIDSA)<br />
assessment <strong>of</strong> Imbewu progress <strong>to</strong>wards the achievement <strong>of</strong> <strong>Output</strong>s <strong>to</strong><br />
<strong>Purpose</strong>, as well as progress made <strong>to</strong>wards achievement <strong>of</strong> the project goal.<br />
(See Terms <strong>of</strong> Reference in Annex 1.)<br />
The methodology included on-site visits <strong>to</strong> six schools in the four Districts <strong>of</strong><br />
King Williams Town, Dutywa, Umtata and Libode, as part <strong>of</strong> assessing impact<br />
at both District and classroom levels, as well as meetings with a<br />
comprehensive range <strong>of</strong> stakeholders, including; the MEC <strong>Education</strong>, The<br />
Superintendent General for <strong>Education</strong>, District Managers and the Direc<strong>to</strong>r<br />
General in the Premier’s <strong>of</strong>fice.<br />
(See PRISM document for details).<br />
The team was lead by Ray Tywakadi, the <strong>Education</strong> Advisor, assisted by<br />
three DFIDSA advisors, namely:<br />
Kemi William: Social Development<br />
Angela Bester: Governance<br />
Mzu Bushet: Eastern Cape attaché<br />
The head <strong>of</strong> DFIDSA, Sue Wardell, joined the team.<br />
1.1. Overview and context<br />
The rollout <strong>of</strong> Imbewu Program in the Eastern Cape is taking place against a<br />
backdrop <strong>of</strong> complex socio-political and economic challenges, characterised<br />
in the main by:<br />
<br />
<br />
<br />
<br />
An under-developed economy with high unemployment rates<br />
A dynamic and fluid political landscape<br />
Administrative and management capacity challenges<br />
High pr<strong>of</strong>ile Presidential and Premier level interventions.<br />
However, the project is making great strides in meeting its objectives.<br />
2
1.2. Impressions and observations<br />
The team’s impression and observation <strong>of</strong> progress is that Imbewu is<br />
definitely one <strong>of</strong> the most successful models <strong>of</strong> school transformation and<br />
whole school development in the Eastern Cape, with an approach that is<br />
working very well. Progress made by Imbewu schools is all the more<br />
commendable in the light <strong>of</strong> extremely difficult conditions <strong>of</strong> poor<br />
infrastructure, overcrowded classrooms and lack <strong>of</strong> basic amenities.<br />
The model, anchored in the three pillars <strong>of</strong> vision crafting, pr<strong>of</strong>essional<br />
development and management support has taken root in most schools, with<br />
both schools and their communities singing praise <strong>of</strong> its progress.<br />
Schools have become hubs <strong>of</strong> school-community integration, with impressive<br />
and high levels <strong>of</strong> community involvement in the life <strong>of</strong> schools, giving rise <strong>to</strong><br />
notable educative processes such as establishment <strong>of</strong> community-school<br />
garden projects, infusion <strong>of</strong> traditional craft-work in<strong>to</strong> school curriculum and<br />
general life-skills education interventions derived from the community.<br />
Most project schools have demonstrated outstanding models <strong>of</strong> well-managed<br />
and well-run schools, with outstanding teaching and management capabilities.<br />
Worth noting is the observation that the well-run schools were headed by<br />
excellent Principals and Headmasters, and therefore, the <strong>Department</strong> should<br />
consider giving priority <strong>to</strong> the training and men<strong>to</strong>ring <strong>of</strong> school principals and<br />
leadership.<br />
The ownership levels <strong>of</strong> the program by managers, by both District and Head<br />
Offices, are highly commendable. The number <strong>of</strong> senior <strong>of</strong>ficials, particularly<br />
the <strong>Education</strong> Development Officers, involved in both design and delivery<br />
phases <strong>of</strong> the program, is quite impressive.<br />
However, a number <strong>of</strong> crosscutting and recurrent themes point <strong>to</strong> a need for a<br />
deeper strategic review <strong>of</strong> priorities accorded <strong>to</strong> the last two years <strong>of</strong> the<br />
project.<br />
1.3.Cross-cutting themes<br />
The implementation <strong>of</strong> the Provincial HIV/AIDS strategy has not as yet<br />
exploited the opportunities presented by the multi-entry points <strong>of</strong> the whole<br />
school transformation model. Schools visited had no coherent HIV/AIDS<br />
education integration strategy that could successfully exploit the social<br />
grounding and sociological basis <strong>of</strong> the model.<br />
The 2004 <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> <strong>Review</strong> made a compelling recommendation in<br />
this regard. The team recommends that the Project Office and the<br />
<strong>Department</strong> must design and deliver an HIV/AIDS integration strategy in<br />
a manner that fully utilises the benefits <strong>of</strong> the Whole School<br />
Development model.<br />
3
Learning experiences and lessons from the program are <strong>of</strong> creditable and<br />
admirable standard, both nationally and internationally, but no demonstrated<br />
instances <strong>of</strong> cross-province and cross-border sharing <strong>of</strong> these successes.<br />
The project should begin a process <strong>of</strong> packaging <strong>of</strong> these in<strong>to</strong> models <strong>of</strong><br />
learnings and invaluable experiences.<br />
The shift from a resource intensive pilot in<strong>to</strong> a full scale implementation by the<br />
<strong>Department</strong> will require a clear strategic plan, articulating what <strong>to</strong> scale up<br />
and the full implications <strong>of</strong> such choices. The Project Office should start<br />
developing a strategy think piece <strong>to</strong> serve as a planning basis.<br />
Infrastructure and schools building remain a daunting challenge for the<br />
Eastern Cape, particularly in far-flung and rural communities. There are good<br />
and well-run schools, under very difficult and challenging physical conditions.<br />
The <strong>Department</strong> should consider prioritising infrastructure development<br />
where there are good practices.<br />
4
2. RECOMMENDATIONS<br />
2.1. Most Project schools have demonstrated how excellent and outstanding<br />
schooling can be under capable leadership and effective management. The<br />
Team recommends that Imbewu Project Office assist the <strong>Department</strong> in<br />
conceptualising and developing a comprehensive School Leadership &<br />
Men<strong>to</strong>ring programme for all school Principals in the Province, as part <strong>of</strong> the<br />
envisaged pr<strong>of</strong>essional development program <strong>of</strong> the <strong>Department</strong>.<br />
2.2. The non-integration <strong>of</strong> HIV/AIDS education in<strong>to</strong> the school transformation<br />
program was a missed opportunity, given success rates <strong>of</strong> the program in<br />
uniting parents, community leaders and teachers around the development <strong>of</strong> a<br />
child. The Team recommends that the Project Office urgently designs an<br />
HIV/Aids <strong>Education</strong> Strategy that will be integrated in<strong>to</strong> the School<br />
Transformation Programme roll-out.<br />
2.3. The quality <strong>of</strong> learning experiences and lessons <strong>of</strong> the program are <strong>of</strong><br />
creditable and admirable standard, and therefore worth sharing with the<br />
National Ministry <strong>of</strong> <strong>Education</strong> and other Provinces. The Team recommends<br />
that the Project Office, with assistance from <strong>Education</strong> Advisor, start<br />
packaging learnings <strong>of</strong> national and international value and share these<br />
across institutions, Provinces and national borders.<br />
2.4. The Imbewu successes were quite impressive, given the amount<br />
resources and energies dedicated <strong>to</strong> a pilot. The Team recommends that<br />
Imbewu Project Office should develop a strategy think piece on how the<br />
project will shift from a resource-intensive pilot phase <strong>to</strong> a full-blown<br />
implementation, with clear strategic choices on what should be scaled up, as<br />
part <strong>of</strong> the Project’s exit strategy.<br />
2.5. The Program has recommended the establishment <strong>of</strong> a Provincial<br />
Institute for <strong>Education</strong>al Leadership, as one pillar <strong>of</strong> the sustainability strategy<br />
beyond DFID funding. The Team noted and applauded the proposal, but<br />
raised concerns about establishment <strong>of</strong> an Institute <strong>to</strong>wards a project close<br />
down period, when there are no firm budgetary commitments from the<br />
<strong>Department</strong>. However, the Team recommends that DFID and the Project<br />
Office must discuss the implications <strong>of</strong> the rollout before any further<br />
commitment <strong>of</strong> DFID funds.<br />
2.6. The team noted and recognised the value <strong>of</strong> activities currently being<br />
carried out under <strong>Output</strong>s 1 and 2, but concerned with lack <strong>of</strong> strategy <strong>to</strong> build<br />
Head Office and District capacity as part <strong>of</strong> the sustainability strategy. The<br />
Team recommends that the Project Office design a 2-year capacity-enhancing<br />
support strategy <strong>to</strong> both Districts and Head Office <strong>to</strong> sustain the model<br />
beyond DFID funding. The Governance and <strong>Education</strong> Advisors would follow<br />
up and assist with the design.<br />
2.7. The team noted strides made in the design and delivery <strong>of</strong> the two lowcost<br />
schools building models at Bantwanana and Mavundleni, and therefore<br />
recommends that the pilot phase be limited <strong>to</strong> the 2 sites, and the <strong>Department</strong><br />
5
find ways <strong>of</strong> integrating the model in<strong>to</strong> the Government’s EPWP (Expanded<br />
Public Works Programme)<br />
3. PROGRAM PROGRESS AGAINST OUTPUTS<br />
3.1. <strong>Output</strong> 1.<br />
The ownership levels <strong>of</strong> the program at Head Office are highly commendable,<br />
with a number <strong>of</strong> senior <strong>of</strong>ficials, particularly the Chief Direc<strong>to</strong>rs and Direc<strong>to</strong>rs,<br />
leading in integration <strong>of</strong> <strong>Output</strong>s in<strong>to</strong> their work-plans. A strong and<br />
strategically focussed <strong>Department</strong> <strong>of</strong> <strong>Education</strong> will be necessary <strong>to</strong> sustain<br />
this momentum beyond the <strong>of</strong>ficial ‘end date’ <strong>of</strong> DFID support. Current<br />
activities undertaken in <strong>Output</strong> 1, though have been <strong>of</strong> value, could be more<br />
focussed on building the strategic capacity <strong>of</strong> the <strong>Department</strong>.<br />
Recommendation<br />
The program must consider providing technical and strategic inputs that will<br />
enable Head Office <strong>to</strong> manage and sustain the impact Imbewu. The DFIDSA<br />
Governance and <strong>Education</strong> Advisors should assist with this process.<br />
3.1. <strong>Output</strong> 2.<br />
District support <strong>to</strong> the program rollout <strong>of</strong> the program <strong>to</strong> schools was quite<br />
good and impressive, with EDOs actively engaged in training and<br />
implementation. However, support <strong>to</strong> the District Office has been minimal.<br />
Districts have noted a decline in the support levels <strong>of</strong> Phase 2, except for an<br />
ICDL training course, which they feel has been delivered at <strong>to</strong>o rapid a pace<br />
for their level <strong>of</strong> development. The challenge <strong>of</strong> scaling up the program in<br />
Phase 2 will fall largely on the shoulders <strong>of</strong> a District Office.<br />
Recommendation.<br />
A District Support Strategy over the next two years will be extremely<br />
invaluable <strong>to</strong> ensure program sustainability. The Project Office might have <strong>to</strong><br />
prioritise resources <strong>to</strong> meet this objective. The DFIDSA Governance and<br />
<strong>Education</strong> Advisors will assist with the process.<br />
DFIDSA notes the proposal for the establishment <strong>of</strong> an Institute for<br />
Pr<strong>of</strong>essional Development, as part <strong>of</strong> sustainability strategy. The MEC gave<br />
assurances that the <strong>Department</strong> will provide full funding in its 2006/2007<br />
budget allocation, however DFIDSA would request for a full discussion before<br />
any funds are committed further.<br />
3.2. <strong>Output</strong> 3<br />
A great deal <strong>of</strong> progress has been made <strong>to</strong> advance the objectives <strong>of</strong> <strong>Output</strong><br />
3, and evidence at school level bears testimony <strong>to</strong> that. The model has taken<br />
root in most schools, with both schools and their communities singing praise<br />
<strong>of</strong> its achievements and successes.<br />
6
Schools have become hubs <strong>of</strong> school-community integration, with impressive<br />
and high levels <strong>of</strong> community involvement in the life <strong>of</strong> schools, giving rise <strong>to</strong><br />
notable educative processes such as establishment <strong>of</strong> community-school<br />
garden projects, infusion <strong>of</strong> traditional craft-work forms in<strong>to</strong> school curriculum<br />
and general life-skills education interventions derived from the community.<br />
Most project schools have demonstrated outstanding models <strong>of</strong> well-managed<br />
and well-run schools, with outstanding teaching and management capabilities.<br />
The results <strong>of</strong> piloting the School Community Integration Pilot Project are<br />
phenomenal, with unprecedented levels <strong>of</strong> community involvement.<br />
However, the Whole School Development model rollout has neglected<br />
HIV/AIDS education and its integration in<strong>to</strong> the model.<br />
Recommendations<br />
The project should consider packaging working models and pilots in<strong>to</strong> national<br />
learning experiences that could be shared nationally and internationally.<br />
However, all <strong>of</strong> the well-run schools were headed by excellent Principals and<br />
Headmasters, and therefore a dire need <strong>to</strong> train and men<strong>to</strong>r good school<br />
leaders.<br />
The project must design an integration strategy that will embed HIV/AIDS<br />
education in<strong>to</strong> Whole School Development program<br />
3.3.<strong>Output</strong> 4.<br />
The low cost schools construction model piloted in Bantwanana is sufficient <strong>to</strong><br />
demonstrate the point. Work is in progress on the second pilot.<br />
Recommendation<br />
The team recommends that the pilot be limited <strong>to</strong> the two models constructed,<br />
and the <strong>Department</strong> <strong>of</strong> <strong>Education</strong> should find ways <strong>of</strong> integrating the model<br />
in<strong>to</strong> the Expanded Public Works Program <strong>of</strong> government.<br />
4. PROGRAMME MANAGEMENT ISSUES<br />
7
4.1.The impression <strong>of</strong> the <strong>Review</strong> Team is that programme management has<br />
been sound and effective.<br />
4.2. The Managing Consultants, Arcadis BMB, who commenced work in<br />
January 2002, have performed their duties satisfac<strong>to</strong>rily and in accordance<br />
with their terms <strong>of</strong> reference. Financial and progress reports have been<br />
provided <strong>to</strong> both the PSC and DFID in accordance with requirements. The<br />
secondment <strong>of</strong> one departmental member <strong>of</strong> staff <strong>to</strong> the Imbewu programme<br />
<strong>of</strong>fice has enhanced the overall management and implementation <strong>of</strong> the<br />
programme.<br />
4.3. Programme management arrangements are set out in the Imbewu<br />
Project Memorandum and outlined further, in more detail, in a Programme<br />
Management Manual (PMM). A Project Steering Committee (PSC) that<br />
meets on a monthly basis is in place. Formal appointment <strong>of</strong> departmental<br />
members <strong>of</strong> the PSC has been concluded.<br />
Recommendation<br />
The Project Office raised concerns about contractual obligations<br />
beyond 2006, and the <strong>Education</strong> Advisor was requested <strong>to</strong> look in<strong>to</strong> the<br />
matter.<br />
5. CONCLUSIONS AND THE WAY FORWARD.<br />
5.1. The Annual <strong>Review</strong> team have tried <strong>to</strong> concentrate on a few key<br />
recommendations. In some cases these represent endorsement <strong>of</strong> what is<br />
already planned, but in others new effort and action is required.<br />
5.2. A report back session <strong>to</strong> DFIDSA has been arranged for 09 th May 2005.<br />
The document will be circulated within DFIDSA for information and comment.<br />
5.3. The draft Aide Memoire and the related PRISM document will be<br />
presented <strong>to</strong> the Project Steering Committee meeting scheduled for the 12 th<br />
May 2005, and the MEC for his consideration, as well as disseminated widely<br />
among stakeholders.<br />
5.4. The Governance and <strong>Education</strong> Advisors will soon visit the Eastern Cape<br />
<strong>to</strong> take forward recommendations around <strong>Output</strong>s 1 and 2.<br />
Ray Tywakadi<br />
Senior <strong>Education</strong> Adviser<br />
25 th April 2005<br />
8
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
IMBEWU 2005 ANNUAL REVIEW:<br />
FOLLOW UP 21-22 JUNE 2005<br />
1. INTRODUCTION<br />
1.1 DFIDSA conducted an Annual <strong>Review</strong> <strong>of</strong> the Imbewu Schools<br />
Improvement Programme from 17-22 April 2005. The review found<br />
that although the Imbewu programme demonstrated success at the<br />
schools level, the sustainability <strong>of</strong> the schools transformation model<br />
was in question. The review team therefore recommended that:<br />
(a)<br />
(b)<br />
The Project Office develop a Think Piece on how Imbewu will<br />
shift from a resource-intensive pilot phase <strong>to</strong> a full-scale<br />
implementation, with clear strategic choices on what should be<br />
scaled up; and<br />
The Project Office design a 2 year capacity enhancing support<br />
strategy <strong>to</strong> both Districts and Head Office <strong>to</strong> sustain the schools<br />
transformation model beyond DFID funding.<br />
1.2 Ray Tywakadi (<strong>Education</strong> Adviser) and Angela Bester (Governance<br />
Adviser) from DFIDSA were tasked <strong>to</strong> follow-up and assist the Project<br />
Office with taking these recommendations forward. The two Advisers<br />
visited the Eastern Cape from 21-22 June 2005 <strong>to</strong> assess the current<br />
and proposed activities under <strong>Output</strong> 1 and <strong>Output</strong> 2 (as these pertain<br />
<strong>to</strong> capacity <strong>of</strong> Head Office and Districts respectively) and assist the<br />
Project Office <strong>to</strong> identify key considerations in developing the strategy.<br />
1.3 The Advisory Team met with the following individuals:<br />
• Allan Zinn: Imbewu Programme Co-ordina<strong>to</strong>r<br />
• John Bartlett: <strong>Department</strong>al secondee <strong>to</strong> Imbewu<br />
• Ms Rowan Bruce: Imbewu Financial Manager<br />
• Ms Tracy Cumming: Chief Financial Officer<br />
• Greg McMaster: Chief Direc<strong>to</strong>r: <strong>Education</strong> Planning & Moni<strong>to</strong>ring<br />
• Mr W M Ngwanya; Direc<strong>to</strong>r, East London District<br />
• Ms Thoko Moniwa: Imbewu District Coordina<strong>to</strong>r, East London<br />
1.4 The Advisory Team had access <strong>to</strong> key <strong>Department</strong>al documents,<br />
namely, Strategic Plan for 2005/2006 <strong>to</strong> 2009/2010; Annual<br />
Performance Plan 2005/2006 and the Human Resource Development<br />
Strategy. The Imbewu Project Office provided a spreadsheet <strong>of</strong><br />
proposed activities and budget for 2005/2006.<br />
1
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
2. MAIN OBSERVATIONS<br />
Commitment and capacity <strong>of</strong> <strong>Department</strong><br />
2.1 Discussions with the Chief Financial Officer and the Chief Direc<strong>to</strong>r:<br />
<strong>Education</strong> Planning & Moni<strong>to</strong>ring were encouraging. They revealed a<br />
firm commitment on the part <strong>of</strong> the <strong>Education</strong> <strong>Department</strong> <strong>to</strong> take<br />
forward the work <strong>of</strong> Imbewu post- DFID funding. There is also<br />
acknowledgement that some <strong>of</strong> the work being done by Imbewu should<br />
be part <strong>of</strong> the normal business <strong>of</strong> the <strong>Department</strong>. Actions by the<br />
<strong>Department</strong> <strong>to</strong> date include the following:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
The <strong>Department</strong> is taking positive steps <strong>to</strong> address the high<br />
level <strong>of</strong> vacancies – the filling <strong>of</strong> 250 posts (mainly middle<br />
management) has been prioritised within a constrained<br />
personnel budget. Funds for filling <strong>of</strong> posts will double next<br />
year, with the objective <strong>of</strong> filling 60% <strong>of</strong> the current organogram<br />
over the period <strong>of</strong> the Medium Term Expenditure Framework.<br />
The long-overdue placement <strong>of</strong> ex-college lecturers is about <strong>to</strong><br />
be completed, redirecting human resources <strong>to</strong> areas <strong>of</strong> need.<br />
The strategic management capacity <strong>of</strong> the <strong>Department</strong> has been<br />
limited as a result <strong>of</strong> critical vacancies at senior management<br />
level. The recent appointment <strong>of</strong> the Chief Direc<strong>to</strong>rs for<br />
<strong>Education</strong> Planning & Moni<strong>to</strong>ring, Curriculum and Clusters will<br />
go some way <strong>to</strong>wards addressing this capacity constraint.<br />
The option <strong>of</strong> setting aside departmental funds (between R15<br />
million and R20 million) <strong>to</strong> cover funding for the first year<br />
following DFID exit has been presented <strong>to</strong> the MEC for<br />
consideration. The <strong>Department</strong> is awaiting a decision on this.<br />
The Office <strong>of</strong> the MEC is leading the development a<br />
transformation agenda for the next 10 years. The vision<br />
document is <strong>to</strong> be discussed at the <strong>Education</strong> Summit<br />
scheduled for July 2005. The Imbewu Project Office anticipates<br />
that the outcomes <strong>of</strong> the July Summit will have a bearing on the<br />
future <strong>of</strong> the Imbweu Programme.<br />
2.2 The discussions at District level confirm observations <strong>of</strong> the Annual<br />
<strong>Review</strong> that there is a high level <strong>of</strong> enthusiasm and commitment <strong>to</strong><br />
Imbewu as a model <strong>of</strong> schools transformation. The discussions also<br />
confirm concerns raised by other districts that there may not be<br />
sufficient resources (materials, staff and training) <strong>to</strong> sustain Imbewu<br />
beyond DFID funding. Although East London is one <strong>of</strong> the betterresourced<br />
districts, it is experiencing gaps in support provided by Head<br />
Office, particularly in the area <strong>of</strong> In-service Training and learning<br />
materials.<br />
2
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
2.3 Without diminishing the positive developments within the <strong>Department</strong>,<br />
the environment is likely <strong>to</strong> remain a challenging one for the next two <strong>to</strong><br />
three years. The underlying structural problems associated with the<br />
budget; the problems associated with the size <strong>of</strong> schools; and building<br />
the skills base in the educa<strong>to</strong>r and non-educa<strong>to</strong>r sec<strong>to</strong>rs <strong>of</strong> the<br />
<strong>Department</strong> will take time <strong>to</strong> resolve. These realities need <strong>to</strong> be taken<br />
in<strong>to</strong> consideration in taking Imbewu beyond 2007.<br />
2.4 There appears <strong>to</strong> be a disjuncture between the Imbewu Project Office,<br />
the <strong>Education</strong> <strong>Department</strong> and the Office <strong>of</strong> the MEC. Whilst it is<br />
appropriate for the Imbewu <strong>of</strong>fice <strong>to</strong> be responsive <strong>to</strong> the Office <strong>of</strong> the<br />
MEC, it is essential that the Senior Management <strong>of</strong> the <strong>Department</strong> be<br />
“on board” and champion key developments being supported by<br />
Imbewu. The appointment <strong>of</strong> the Chief Direc<strong>to</strong>rs provides the Imbewu<br />
Project Office with a good opportunity <strong>to</strong> institutionalise Imbewu at the<br />
Senior Management level.<br />
<strong>Review</strong> <strong>of</strong> <strong>Output</strong> 1 and <strong>Output</strong> 2 activities:<br />
2.5 The Imbewu Project Office provided a schedule <strong>of</strong> activities and budget<br />
for 2005/2006. The Advisory Team relied on verbal information from<br />
the Project Office about the nature <strong>of</strong> these activities as there was no<br />
brief explana<strong>to</strong>ry note <strong>to</strong> accompany the schedule.<br />
2.6 Some activities in <strong>Output</strong> 1 and <strong>Output</strong> 2 though they may have been<br />
relevant at the time <strong>of</strong> the Oc<strong>to</strong>ber 2004 planning workshop, are<br />
questionable within the context <strong>of</strong> the sustainability imperative. Other<br />
activities though relevant, need <strong>to</strong> be adjusted <strong>to</strong> ensure that they focus<br />
on the core issue, namely, strategic support <strong>to</strong> Head Office and<br />
Districts. The Advisory Team noted that District <strong>of</strong>fice infrastructure<br />
planning and the EMIS survey will be discontinued as the <strong>Department</strong><br />
will be funding these.<br />
2.7 <strong>Output</strong> 1:<br />
(a)<br />
(b)<br />
The Project Office should consider dropping activities relating <strong>to</strong><br />
ABET and ECD as they do not deal with the strengthening the<br />
strategic role <strong>of</strong> the <strong>Department</strong> or supporting the Districts.<br />
The Advisory Team has strong reservations about the activity <strong>of</strong><br />
Intra-departmental communication. This activity, which forms<br />
the largest single budget item under <strong>Output</strong> 1, is primarily <strong>to</strong><br />
cover the production costs <strong>of</strong> the <strong>Department</strong>al newsletter.<br />
Though the Advisory Team is sympathetic <strong>to</strong> the capacity<br />
constraints within the <strong>Department</strong>al Communication Direc<strong>to</strong>rate,<br />
Imbewu should not be funding the newsletter. The Advisory<br />
Team recommends that this component <strong>of</strong> the activity be<br />
discontinued.<br />
3
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
(c)<br />
The Advisory Team has reservations about the allocation and<br />
the proposed ‘projects’ funded under the HIV/AIDS activity. The<br />
funding <strong>of</strong> R100,000 is <strong>to</strong> be used for integrating HIV/AIDS in<br />
the <strong>Department</strong> and for team building in the HIV/AIDS<br />
Direc<strong>to</strong>rate. The amount <strong>of</strong> allocated is clearly insufficient for a<br />
serious mainstreaming <strong>of</strong> HIV/AIDS in the <strong>Department</strong>. There is<br />
also no mention <strong>of</strong> the Annual <strong>Review</strong> recommendation that the<br />
Imbewu Project Office urgently designs an HIV/AIDS <strong>Education</strong><br />
Strategy that will be integrated in<strong>to</strong> the schools transformation<br />
rollout. The HIV/AIDS activity should be changed <strong>to</strong> respond <strong>to</strong><br />
adequately <strong>to</strong> the HIV/AIDS agenda.<br />
2.8 <strong>Output</strong> 2:<br />
(a)<br />
(b)<br />
(c)<br />
Activities in <strong>Output</strong> 2 are generally in the right direction and<br />
elements <strong>of</strong> a support strategy are beginning <strong>to</strong> take shape. The<br />
<strong>Department</strong> and the Imbewu Project Office recognise Districts<br />
as critical vehicles for sustainability <strong>of</strong> schools transformation.<br />
The pr<strong>of</strong>iling <strong>of</strong> districts and prioritising them for additional<br />
training support is a positive initiative by the Imbewu Project<br />
Office.<br />
The proposed Eastern Cape Institute for <strong>Education</strong>al Leadership<br />
is emerging as the centrepiece <strong>of</strong> the sustainability strategy.<br />
The Chief Financial Officer confirmed that the Institute would be<br />
fully funded by the <strong>Department</strong> from 2006/2007 and that she<br />
would be requesting inputs <strong>to</strong> the budget process in July. The<br />
Imbewu Project Office has committed R3 million for 2005/2006<br />
covering just under 50% <strong>of</strong> the Institute’s operational budget.<br />
From discussions with the Imbewu Project Office, it appears that<br />
a number <strong>of</strong> issues need <strong>to</strong> be addressed before the Institute<br />
can become operational. The discussion on the Institute<br />
between DFIDSA and the <strong>Department</strong>, as requested by the<br />
Head <strong>of</strong> DFIDSA, has not yet taken place.<br />
The Advisory Team has reservations about the value <strong>of</strong> the<br />
ICDL programme. Discussions during the April review as well<br />
as in this follow-up suggest that the necessary IT infrastructure<br />
in the Districts is inadequate or unstable, thus limiting the<br />
application <strong>of</strong> the training in the workplace. Continuing with the<br />
ICDL programme while the basic IT infrastructure problems are<br />
not resolved may result in wasted expenditure.<br />
4
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
3. RECOMMENDED ACTIONS<br />
3.1 The Advisory Team proposes that the recommendations <strong>of</strong> the Annual<br />
<strong>Review</strong> that relate <strong>to</strong> the issue <strong>of</strong> sustainability be consolidated <strong>to</strong><br />
develop a single Sustainability Strategy. The development <strong>of</strong> the<br />
Sustainability Strategy should be the responsibility <strong>of</strong> the Imbewu<br />
Project Office in consultation with the <strong>Education</strong> <strong>Department</strong> and<br />
should be completed by 31 July 2005. The Imbewu Project Office<br />
should building on the work it has already done on sustainability.<br />
3.2 The Advisory Team recommends that the Sustainability Strategy<br />
addresses the key considerations set out below. The list is not<br />
exhaustive and can be amended.<br />
1. How the current resource-intensive schools transformation model can be modified <strong>to</strong><br />
rollout <strong>to</strong> all schools, within the <strong>Department</strong>’s capacity and budgetary limits.<br />
2. The projected state <strong>of</strong> <strong>Output</strong>s and Activities by 30 November 2007 (End date <strong>of</strong><br />
DFID funded project). Activities in <strong>Output</strong> 1 and <strong>Output</strong> 2 would need revision as<br />
indicated in paragraphs 2.7 and 2.8 in this report, <strong>to</strong> focus on strategic support<br />
geared <strong>to</strong>wards sustainability <strong>of</strong> schools transformation.<br />
3. Identification <strong>of</strong> activities that can realistically be carried by the <strong>Education</strong><br />
<strong>Department</strong> after November 2007, both in terms <strong>of</strong> budget and capacity. Identifying<br />
linkages with the <strong>Department</strong>’s Ten Year transformation agenda would facilitate<br />
institutionalisation.<br />
4. As the proposed Institute is likely <strong>to</strong> form a key part <strong>of</strong> the Sustainability Strategy,<br />
discussion on how the Institute will be operationalised should be included. Pertinent<br />
issues here include funding, structure, target groups for training and indicative<br />
content <strong>of</strong> training.<br />
5. The current risk analysis is outdated. A thorough risk analysis should be included,<br />
with an indication <strong>of</strong> how these risks are <strong>to</strong> be mitigated.<br />
6. What governance structures are envisaged <strong>to</strong> support the process <strong>of</strong> institutionalising<br />
Imbewu in the <strong>Department</strong>, for example, where in the <strong>Department</strong> can Imbewu-type<br />
activities be located once the Imbewu Project Office ceases <strong>to</strong> exist.<br />
7. How lessons from Imbewu can be captured and shared with other education<br />
departments in South Africa and in the Southern Africa Region.<br />
8. A detailed implementation plan will not be feasible at this stage. The strategy should<br />
however provide a high level mapping <strong>of</strong> the key stages <strong>of</strong> the transition, indicative<br />
time frames and who is responsible for delivery on these.<br />
9. The strategy should include an indication <strong>of</strong> how the transition will be communicated<br />
<strong>to</strong> all stakeholders.<br />
5
Imbewu 2005 Annual <strong>Review</strong>: Follow-up<br />
3.3 The Imbewu Project budget should be revised, as activities are likely <strong>to</strong><br />
change. A firm budget should be prepared for 2005/2006 and<br />
indicative budgets prepared for the remainder <strong>of</strong> the project (<strong>to</strong> 30<br />
November 2007).<br />
3.4 The discussion on the Institute between DFIDSA and the <strong>Department</strong>,<br />
as requested by the Head <strong>of</strong> DFIDSA, should be expedited by mid-<br />
July 2005. The Imbewu Project Office should facilitate the meeting<br />
between the DFIDSA team and the appropriate <strong>of</strong>ficials in the<br />
<strong>Department</strong> <strong>to</strong> discuss the issue <strong>of</strong> DFID funding for the Institute.<br />
4. CONCLUDING REMARKS<br />
4.1 The concept <strong>of</strong> Imbewu is well embedded in the participating schools<br />
and the developments that are taking place in the <strong>Education</strong><br />
<strong>Department</strong> Head Office bode well for the sustaining the concept and<br />
spirit <strong>of</strong> Imbewu beyond November 2007. The forthcoming <strong>Education</strong><br />
Summit, the appointment <strong>of</strong> senior managers and the forthcoming<br />
strategic planning and MTEF cycle <strong>of</strong>fer a window <strong>of</strong> opportunity <strong>to</strong><br />
institutionalise Imbewu in the <strong>Department</strong>. DFIDSA will continue <strong>to</strong><br />
work with the Imbewu Project Office and the <strong>Education</strong> <strong>Department</strong> <strong>to</strong><br />
realise the ambitions <strong>of</strong> the Imbewu Programme.<br />
Angela Bester<br />
Governance Adviser<br />
Ray Tywakadi<br />
<strong>Education</strong> Adviser<br />
27 June 2005<br />
6
Annual <strong>Review</strong><br />
o This document is the new template for the Annual <strong>Review</strong>. It is not protected in any way so may be used<br />
as different departments see fit. It is divided in<strong>to</strong> five parts. (There is a separate form for Budgetary<br />
Support / SWAPS).<br />
o For a full explanation <strong>of</strong> information required please read Guidance on Scoring Projects & Programmes<br />
in PRISM.<br />
o See also notes for completion at end <strong>of</strong> this form.<br />
Annual <strong>Review</strong> V1.1
Annual <strong>Review</strong><br />
Part A - Project Data<br />
Project<br />
Short Title<br />
IMBEWU EDUCATION SUPPORT II<br />
Benefiting Country / Region South Africa MIS code 059-550-097<br />
Current Project Officer Name Pinky Pheeloane Approved Commitment £17,000,000<br />
Actual Start Date<br />
(dd/mm/yyyy)<br />
Planned End Date<br />
(dd/mm/yyyy)<br />
19/04/2001 Spend To Date £10,401,407<br />
01/12/2007 Date <strong>of</strong> <strong>Review</strong> £4,909,849<br />
Annual <strong>Review</strong> V1.1 Page 1
Part B - Recommendations<br />
Summary <strong>of</strong> Recommendations Responsibility<br />
1. Most Project schools have demonstrated how outstanding schooling can be under capable ECDoE<br />
leadership -- the Team recommends the development <strong>of</strong> a school leadership & men<strong>to</strong>ring<br />
programme for school Principals in the E Cape<br />
2. Urgent need for the design and integration <strong>of</strong> a coherent HIV/Aids strategy in<strong>to</strong> the School<br />
Transformation Programme<br />
3. Learning experience and lessons are <strong>of</strong> creditable and admirable standard; it is recommended<br />
that the Project packages all national and international learnings for cross-border sharing,<br />
4. The Project should start developing a strategic think-piece on how <strong>to</strong> shift from a resourceintensive<br />
pilot phase <strong>to</strong> a full-blown implementation as part <strong>of</strong> the Project’s exit strategy<br />
5. Having noted the proposal for the establishment <strong>of</strong> an <strong>Education</strong>al leadership Institute, the<br />
Team recommends that DFID and Project discuss the implications <strong>of</strong> the rollout before<br />
committing any funds<br />
6. Whilst recognising the value <strong>of</strong> the current activities under <strong>Output</strong>s 1 and 2, the team<br />
recommends that more focus be given <strong>to</strong> the design <strong>of</strong> a 2-year capacity-enhancing support<br />
strategy <strong>to</strong> both Districts and head Office <strong>to</strong> sustain the model beyond DFID funding<br />
Project Office<br />
Project Office & <strong>Education</strong><br />
Advisor<br />
Project Office<br />
DFID & Project Office<br />
<strong>Education</strong> & Governance<br />
Advisors & Project Office<br />
Annual <strong>Review</strong> V1.1 Page 2
Part C – Project Scoring Assessment<br />
Goal Statement Objectively Verifiable Indica<strong>to</strong>rs (OVIs)<br />
To increase significantly the learning achievement <strong>of</strong> children 25% improvement in completion rates over the baseline by the end<br />
from Eastern Cape Province.<br />
<strong>of</strong> the Programme<br />
<strong>Purpose</strong> Statement Objectively Verifiable Indica<strong>to</strong>rs<br />
(OVIs )<br />
To develop an effective,<br />
efficient and affordable<br />
decentralised education<br />
system<br />
• District <strong>of</strong>fices providing effective<br />
and timely educational services<br />
and support <strong>to</strong> schools<br />
• Whole school development<br />
model processed in Eastern Cape<br />
schools.<br />
• Increased number <strong>of</strong><br />
transformed and self-managed<br />
schools in the Eastern Cape<br />
Measurable improvement in<br />
classroom practice.<br />
* ECED allocating an increased %<br />
<strong>of</strong> their budget <strong>to</strong> non-personnel<br />
expenditure.<br />
* ECED meet service delivery<br />
targets for schools as agreed with<br />
communities and planned for in<br />
the MTEF.<br />
Progress Recomme<br />
ndations/C<br />
• Technical Support <strong>to</strong> establishment <strong>of</strong> 24 Districts<br />
& provisioning <strong>of</strong> relief structures <strong>to</strong> 4 <strong>of</strong> the<br />
severely disadvantaged districts <strong>to</strong> improve<br />
service delivery<br />
• School transformation programme has been<br />
gazetted & rolled-out in 1700 schools in E Cape<br />
• 2222 schools now declared as Section 21 ( as<br />
defined in SASA) schools .<br />
• Improved ratio now down <strong>to</strong> 88.1% spent on<br />
Personnel<br />
Improvement noted<br />
omments<br />
<strong>Review</strong> &<br />
strengthen<br />
focus on<br />
support <strong>to</strong><br />
Districts<br />
Target for<br />
nonpersonnel<br />
funding is<br />
85%<br />
More<br />
improveme<br />
nt expected<br />
Annual <strong>Review</strong> V1.1 Page 3
<strong>Purpose</strong> <strong>to</strong> Goal The Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> has taken significant strides in:<br />
• Implementing a clearly agreed strategy <strong>to</strong> address & contain over-expenditure on Personnel (e.g. Declaration <strong>of</strong> a<br />
reduced Post-provisioning educa<strong>to</strong>r ‘basket’)<br />
• Clear political commitment <strong>to</strong> decentralisation & devolution <strong>of</strong> responsibility<br />
• Embedding the Programme in<strong>to</strong> the <strong>Department</strong><br />
Project <strong>Purpose</strong> Rating - General / Overall progress assessment 2<br />
Justification Good progress <strong>to</strong>wards integration <strong>of</strong> the school transformation framework.<br />
Institutionalisation <strong>of</strong> the model in<strong>to</strong> <strong>Department</strong>al policy. The exit strategy will focus on<br />
building capacity <strong>of</strong> the <strong>Department</strong> at Provincial and District level <strong>to</strong> sustain the Programme.<br />
State how far the project has helped <strong>to</strong> deliver the objectives <strong>of</strong> the Country Assistance Plan (where appropriate)<br />
The Imbewu Programme is specifically addressing the issue <strong>of</strong> strengthening service delivery in the education sec<strong>to</strong>r, which in the long<br />
run will also address the legacy <strong>of</strong> apartheid in terms <strong>of</strong> inequality <strong>of</strong> access <strong>to</strong> education and also <strong>to</strong> jobs.<br />
<strong>Output</strong>s Objectively Verifiable<br />
Indica<strong>to</strong>rs (OVIs)<br />
1. A provincial department <strong>of</strong><br />
education,<br />
with an enhanced strategic<br />
role.<br />
• <strong>Department</strong>al audit improves<br />
<strong>to</strong> ‘qualified’ by end FY<br />
2004/5 and <strong>to</strong> ‘unqualified’ by<br />
2005/6.<br />
• ECED Procurement Board<br />
established and operational<br />
by end 2004.<br />
• Anti-corruption strategy<br />
written and being<br />
implemented by end 2004.<br />
Progress Recommendations/<br />
Comments<br />
Ownership levels <strong>of</strong><br />
Programme at Head Office<br />
level are highly commendable,<br />
with a number <strong>of</strong> Senior<br />
Officials leading in integration<br />
<strong>of</strong> <strong>Output</strong>s in<strong>to</strong> their Work<br />
Plans<br />
A strong strategically<br />
focussed Dept Of <strong>Education</strong><br />
is necessary for the<br />
sustainability <strong>of</strong> Imbewu<br />
beyond DFID support, &<br />
therefore a need for a<br />
focussed support in <strong>Output</strong><br />
1 in order <strong>to</strong> build strategic<br />
capacity <strong>of</strong> the Dept.<br />
Score<br />
3<br />
Annual <strong>Review</strong> V1.1 Page 4
• All managers in SMS <strong>to</strong> have<br />
agreed personnel<br />
development plans by end<br />
2004 and all above grade 9 <strong>to</strong><br />
have pdps in place by end<br />
2005.<br />
• Audit committee established<br />
by mid 2004 and internal<br />
audit <strong>of</strong>fice fully operational<br />
by end 2004.<br />
• HR plans in place during PY3<br />
and critical posts (Direc<strong>to</strong>r<br />
and upwards) filled by PY4.<br />
• ECED actively participating in<br />
the planning and<br />
implementation process <strong>of</strong><br />
the Provincial Social Needs<br />
and Economic Clusters.<br />
• <strong>Department</strong>al HIV/Aids<br />
strategy implemented by PY4<br />
for staff and for<br />
schools/learners.<br />
• Payment backlogs reduced<br />
by 50% in PY4 and 80% by<br />
PY5 in relation <strong>to</strong> March 2004<br />
positions.<br />
• Performance Management<br />
Systems in place at all level<br />
by PY3 (IQMS during PY4).<br />
• Functioning Moni<strong>to</strong>ring and<br />
<strong>Report</strong>ing systems<br />
connecting province, districts<br />
and schools in place by PY5.<br />
• Persal system cleaned,<br />
maintained and available as<br />
part <strong>of</strong> the management<br />
information systems by end<br />
2005.<br />
The DFID Governance &<br />
<strong>Education</strong> Advisors will<br />
assist in this regard<br />
Annual <strong>Review</strong> V1.1 Page 5
2. A fully functioning and selfmanaging<br />
district structure<br />
providing quality<br />
support <strong>to</strong> schools.<br />
HR and leave records, cleaned<br />
maintained and available as part<br />
<strong>of</strong> the management information<br />
• All critical posts filled by end<br />
PY3<br />
• Trained district staff more<br />
effectively involved in service<br />
<strong>of</strong> schools<br />
• All administrative systems <strong>to</strong><br />
promote effectiveness and<br />
efficiency in bridging gap<br />
between province and<br />
schools operational by PY 4<br />
• EMIS PERSAL and BASS<br />
phased in<strong>to</strong> districts by PY3<br />
• 10 EDCs established and<br />
functional by end <strong>of</strong> PY3<br />
District support <strong>to</strong> the rollout <strong>of</strong><br />
Imbewu programmes is<br />
impressive, with EDOs actively<br />
engaged in training and<br />
implementation; however,<br />
districts are noting a decline in<br />
support levels in Phase 2<br />
The establishment <strong>of</strong> an<br />
<strong>Education</strong>al Leadership<br />
Institute is a significant<br />
development<br />
The Project <strong>of</strong>fice has been<br />
tasked <strong>to</strong> design a District<br />
Support strategy for the<br />
next 2 years.<br />
DFID <strong>Education</strong> and<br />
Governance Advisors will<br />
assist in this process.<br />
The <strong>Department</strong> needs <strong>to</strong><br />
accept full responsibility for<br />
the operation <strong>of</strong> the<br />
Institute.<br />
3. Schools which, having<br />
undergone a whole school<br />
effectiveness process, are<br />
better able <strong>to</strong> provide improved<br />
learning opportunities for their<br />
learners.<br />
• Trained curriculum support<br />
structures/teams operational<br />
at district level<br />
• Trained management support<br />
structures/teams operational<br />
at district level<br />
• School Governing Bodies<br />
managing feeding<br />
programmes where<br />
appropriate<br />
• Communities mobilised <strong>to</strong><br />
become critically engaged<br />
with education decision<br />
makers and community level<br />
service providers<br />
• Negotiated code <strong>of</strong> conduct in<br />
place and disciplinary<br />
problems handled<br />
A great deal <strong>of</strong> progress has<br />
been made in implementation<br />
<strong>of</strong> this <strong>Output</strong>. Of note are the<br />
following :<br />
* the model has taken root in<br />
most <strong>of</strong> the Project schools,<br />
with both schools and<br />
communities praising its<br />
achievements<br />
* schools have become hubs<br />
<strong>of</strong> community life with notable<br />
educative processes, such as<br />
establishment <strong>of</strong> community<br />
garden projects, craft work &<br />
life skills education<br />
The Project should consider<br />
packaging working models<br />
<strong>of</strong> school management &<br />
leadership for sharing at<br />
local and international<br />
levels<br />
Annual <strong>Review</strong> V1.1 Page 6<br />
3<br />
1
procedurally.<br />
• Schools <strong>to</strong> have developed<br />
HIV/AIDS strategy<br />
• Learner/educa<strong>to</strong>r contact time<br />
increased<br />
• Marked improvements in the<br />
learning environment in<br />
schools<br />
• Learners, carers and<br />
community members testify <strong>to</strong><br />
improved learning<br />
opportunities by Programme<br />
end<br />
• Improvements in learning<br />
achievement above baseline<br />
by programme end<br />
* outstanding models <strong>of</strong> wellrun<br />
& well-managed schools,<br />
with outstanding teaching &<br />
management capabilities<br />
* results <strong>of</strong> piloting SCIPP are<br />
phenomenal with<br />
unprecedented levels <strong>of</strong><br />
community involvement in<br />
school life<br />
•Communities sufficiently<br />
motivated <strong>to</strong> become critically<br />
engaged with education<br />
decision-makers.<br />
4. Improved asset<br />
management and lower cost<br />
school buildings<br />
• Buy-in and ownership <strong>of</strong><br />
assets and processes by<br />
communities<br />
• Break-in and damage <strong>to</strong><br />
schools reduced<br />
• EFMIS and EMIS used in<br />
school rationalization,<br />
prioritization <strong>of</strong><br />
maintenance & new<br />
school<br />
The low cost construction<br />
models, piloted at Bantwanana<br />
and Mavundleni, have been<br />
adopted by the <strong>Department</strong><br />
The team recommends that<br />
the pilot phase be limited <strong>to</strong><br />
the 2 sites, and the<br />
<strong>Department</strong> find ways <strong>of</strong><br />
integrating the model in<strong>to</strong><br />
the Government’s EPWP<br />
(Expanded Public Works<br />
Programme)<br />
• Strategic partnerships<br />
built between community,<br />
Annual <strong>Review</strong> V1.1 Page 7<br />
2
local government<br />
structures, ECED and<br />
service providers<br />
• Pro<strong>to</strong>type schools built<br />
and replicated (possibly<br />
by other Donors) for<br />
small rural schools<br />
• All current (baseline)<br />
quintile 1 & 2 schools<br />
raised <strong>to</strong> levels 3 and<br />
above<br />
Accredited relevant skills course<br />
provided <strong>to</strong> community members<br />
engaged in construction activities<br />
Project <strong>Output</strong>s Rating - General / Overall progress assessment 2<br />
Justification The average <strong>of</strong> the above ratings used. The last 2 years <strong>of</strong> the programme will focus on output 1 &2 and as<br />
the major part <strong>of</strong> the programme, being output 3, has already been achieved, there is now an opportunity <strong>to</strong> achieve<br />
sustainability <strong>of</strong> the Programme by focusing on output 1&2.<br />
<strong>Purpose</strong> Attribution Clear evidence exists that the successful delivery <strong>of</strong> outputs is significantly<br />
contributing <strong>to</strong> ultimately achieving the Project purpose.<br />
Annual <strong>Review</strong> V1.1 Page 8
Part D – Risk Management<br />
The risk level for the project should be reassessed during Annual / <strong>Output</strong>-<strong>to</strong>-<strong>Purpose</strong> <strong>Review</strong>s.<br />
Risk Category Low-medium<br />
Has the Risk Category changed since the last review? If so explain why. No<br />
New risks identified No new risk identified<br />
Action being taken <strong>to</strong> moni<strong>to</strong>r / manage risks C & E remain valid and need <strong>to</strong> be moni<strong>to</strong>red, however Imbewu has had<br />
proactive involvement in the HIV/AIDS strategy.<br />
Recommended changes <strong>to</strong> plans or management strategies in respect <strong>of</strong> project associated risks<br />
Focus on sustainability and exit strategy.<br />
Does the Logframe Require Revision? Yes<br />
Do the PIMS Markers Require Revision? [Manda<strong>to</strong>ry for projects approved prior <strong>to</strong> 01/04/1998]<br />
No<br />
Method <strong>of</strong> Scoring – state the team composition, the methods used <strong>to</strong> conduct the review, how the scoring was agreed upon,<br />
and whether partners and stakeholders were involved. Team composed <strong>of</strong> :<br />
* R Tywakadi (Educ Advisor - Team Leader)<br />
* K Williams (Soc Dev Advisor)<br />
* A Bester (Gov Advisor)<br />
* M Bushet (DFID Attache’, E Cape)<br />
* S Wardell (Head <strong>of</strong> DFIDSA)<br />
Annual <strong>Review</strong> V1.1 Page 9
METHODOLOGY : On-site visits <strong>to</strong> 4 Districts (K.W.T, Dutywa, Mthatha, Libode) & 6 schools<br />
in these districts; <strong>Review</strong> <strong>of</strong> Programme Documentation & <strong>Report</strong>s; Interviews with<br />
Programme Staff and <strong>Department</strong>al Officials, over a period <strong>of</strong> 4 days (17 – 21 April 2005).<br />
An Aide Memoire was generated and scoring was collectively agreed<br />
Scoring was then collectively agreed upon by the <strong>Review</strong> Team <strong>to</strong>gether with the Programme<br />
Office and the <strong>Department</strong>.<br />
Annual <strong>Review</strong> V1.1 Page 10
Part E – Lessons Learned<br />
You can no longer input general lessons learned. You need <strong>to</strong> specify at least one <strong>of</strong> the categories <strong>of</strong> lessons learned in sections<br />
1,2 and 3 below.<br />
Lessons learned, and suggested dissemination.<br />
1. Working with Partners Importance <strong>of</strong> having <strong>Department</strong>al counterparts and including transfer <strong>of</strong> skills/men<strong>to</strong>ring<br />
in all TA assignments<br />
2. Best Practice / Innovation Involving other key <strong>Department</strong>s & social partners in development programmes; using<br />
community/school projects as catalysts and levers in organically promoting schoolcommunity<br />
integration; integrating the Evaluation Component with Quality Assurance<br />
structures in the <strong>Department</strong> has reaped rich dividends<br />
3. Project / Programme Management Collaborative management involving <strong>Department</strong>al and Managing Agent representatives<br />
Key Issues / Points <strong>of</strong> information There appears <strong>to</strong> be general agreement on the value <strong>of</strong> smaller, more interactive annual<br />
reviews, with one full-scale OPR in the life <strong>of</strong> a Project<br />
If appropriate, please comment on the effectiveness <strong>of</strong> the institutional relationships involved with the project<br />
(e.g. comment on processes and how relationships have evolved) Refer <strong>to</strong> ‘Lessons Learned’ above<br />
What key documentary evidence is available <strong>to</strong> support the conclusions <strong>of</strong> this report? List any supporting documents<br />
annexed <strong>to</strong> this report. Quarterly <strong>Report</strong>s; 2004 OPR; <strong>Department</strong>al Newsletters; Training Modules; Scoping & other Research<br />
<strong>Report</strong>s; Evaluation <strong>Report</strong>s.<br />
Annual <strong>Review</strong> V1.1 Page 11
Notes for completion<br />
o Where ratings are required please consider the following:<br />
1. = Likely <strong>to</strong> be completely achieved. The outputs /purpose are well on the way <strong>to</strong> completion (or completed)<br />
2. = Likely <strong>to</strong> be largely achieved. There is good progress <strong>to</strong>wards purpose completion and most outputs have been<br />
achieved, particularly the most important ones.<br />
3. = Likely <strong>to</strong> be partly achieved. Only partial achievement <strong>of</strong> the purpose is likely and/or achievement <strong>of</strong> some<br />
outputs.<br />
4. = Only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent. <strong>Purpose</strong> unlikely <strong>to</strong> be achieved but a few outputs likely <strong>to</strong><br />
be achieved.<br />
5. = Unlikely <strong>to</strong> be achieved. No progress on outputs or purpose<br />
X. = It is impossible <strong>to</strong> say whether there has been any progress <strong>to</strong>wards the final achievement <strong>of</strong> outputs or<br />
purpose. This score should not be used unless they meet at least one <strong>of</strong> the following criteria:<br />
• Project is postponed because <strong>of</strong> conflict<br />
• External Constraints<br />
• Recruitment delays<br />
Other reasons: contact PRISM support<br />
Note for subsequent annual reviews you should not be using X unless you can justify using this X rating, it is unusual for<br />
projects running for 3 years or more <strong>to</strong> be scored X.<br />
Annual <strong>Review</strong> V1.1 Page 12
o Once the review is completed a small subset <strong>of</strong> the data gathered must be entered in<strong>to</strong> PRISM for analysis<br />
purposes. There is an online form within PRISM for entering this data. Under the Enter a <strong>Review</strong> screen /<br />
link click the ‘Add Performance <strong>Review</strong> Online’ link. The manda<strong>to</strong>ry parts required on the Online screen<br />
are marked on this form with an asterisk *.<br />
o Dates should be entered in the format dd/mm/yyyy e.g. 24/08/2004 .<br />
Annual <strong>Review</strong> V1.1 Page 13
AIDE MEMOIRE TO THE 2006 ANNUAL REVIEW OF IMBEWU<br />
1. Introduction<br />
This is an Aide Memoire <strong>to</strong> the fourth Annual <strong>Review</strong> <strong>of</strong> Imbewu Programme<br />
that <strong>to</strong>ok place from the 9 th <strong>to</strong> 11 th Oc<strong>to</strong>ber 2006. The objective <strong>of</strong> the review<br />
was <strong>to</strong> assess the progress <strong>to</strong>, and likelihood <strong>of</strong>, the programme achieving its<br />
purpose and outputs and make recommendations <strong>to</strong> ensure the achievement<br />
<strong>of</strong> the project goal (see terms <strong>of</strong> reference attached). Lesson learning was<br />
also a focus <strong>of</strong> the review given that the programme is <strong>to</strong> end in November<br />
2007.<br />
The methodology included meetings with the MEC for <strong>Education</strong>, the newly<br />
appointed Superintendent General for <strong>Education</strong>, senior departmental <strong>of</strong>ficials<br />
and Imbewu staff (see attached TOR’s). A site meeting was held with the<br />
Confimvaba District Direc<strong>to</strong>r and his team, and two school principals from<br />
within that District.<br />
The team also reviewed key documents from both the <strong>Department</strong> and<br />
Imbewu (see annex attached).<br />
The team was led by Subethri Naidoo, the Governance Advisor, assisted by<br />
Melanie Abrahams-Sher, the <strong>Education</strong> programme <strong>of</strong>ficer within DFIDSA.<br />
1.1 Overview and Context<br />
Provincial Context<br />
The Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> is the largest provincial education<br />
department in the country in terms <strong>of</strong> the number <strong>of</strong> schools <strong>to</strong> be<br />
administered. It has over 2 million learners and the census in 2004 indicated<br />
the number <strong>of</strong> educa<strong>to</strong>rs as being 65 043. The 2004/5 budget expenditure for<br />
the Province was in excess <strong>of</strong> R10.8 billion. The scope <strong>of</strong> the system, coupled<br />
with the his<strong>to</strong>rical legacy <strong>of</strong> disadvantage, deprivation and marginalisation,<br />
presents a significant challenge <strong>to</strong> leaders in education <strong>to</strong> transform the<br />
systems <strong>to</strong> achieve a transformed system <strong>of</strong> education. 1<br />
Many rural schools lack running water and electricity; 87% <strong>of</strong> the education<br />
budget is absorbed by personnel costs with half <strong>of</strong> the remaining 13% spent<br />
on non-recurrent non-personnel school related costs. The provincial matric<br />
results indicate that performance <strong>of</strong> students remains a challenge. In addition,<br />
the provincial education department has suffered negatively from prolonged<br />
political and administrative instability, and antagonistic labour union activity<br />
which has impacted negatively on organisational effectiveness.<br />
Despite this situation however, the <strong>Department</strong> is in its best position since<br />
1994: the leadership cadre has expanded ten-fold; hundreds <strong>of</strong> <strong>Education</strong><br />
1 A Concept paper: the development <strong>of</strong> the Institute for <strong>Education</strong>al leadership, March 2006,<br />
p10<br />
1
Development Officers and Subject Advisors have been hired (and will<br />
continue <strong>to</strong> be hired) in the upcoming months; the MEC is a strong, visionary<br />
leader undeterred by the many management challenges; a new SG has been<br />
appointed, a new organogram has been approved paving the way for a new<br />
period <strong>of</strong> growth and stability, and a ten year strategic Transformation Agenda<br />
has been approved that will usher in a new era <strong>of</strong> development. 2<br />
Move from Project <strong>to</strong> Programme<br />
In responding <strong>to</strong> these complexities and with a view <strong>to</strong> building sustainability<br />
so that development continues beyond DFIDSA funding, Imbewu 2 has<br />
shifted focus <strong>to</strong> programme support (where Imbewu 1 was more project<br />
driven). A conference <strong>to</strong> be held in June 2007 will share lessons learnt and<br />
discuss the impact <strong>of</strong>, among other things, this shift from ‘project <strong>to</strong><br />
programme’.<br />
1.2 Main Observations<br />
1.2.1 Shift from project <strong>to</strong> strategic focus (from Imbewu 1 <strong>to</strong> Imbewu 2)<br />
In 2004, DFIDSA led a reprioritisation process as a result <strong>of</strong> budget cuts <strong>to</strong> the<br />
Imbewu programme. While this was challenging at the time, the project team<br />
are now convinced that the exercise helped them <strong>to</strong> focus, clarify and plan for<br />
Imbewu 2 more coherently. The shift from resource intensive <strong>to</strong> scaling down<br />
meant making more strategic choices focused on improving systems, training<br />
and development, a skills strategy targeted at building capacity within the<br />
<strong>Department</strong> and effective decentralisation <strong>to</strong> District level (outputs 1 and 2). It<br />
also necessitated a conscious choice <strong>to</strong> re-brand Imbewu as part <strong>of</strong> the<br />
Whole School Transformation process driven by the <strong>Department</strong>.<br />
1.2.2 Commitment and Leadership Capacity<br />
1. Political<br />
The interview held with the MEC for <strong>Education</strong> was extremely positive and<br />
highlighted the vision, commitment and strong political leadership now driving<br />
the transformation agenda within the <strong>Department</strong>. He has been<br />
uncompromising in dealing with any reluctance <strong>to</strong> buy in<strong>to</strong> the <strong>Department</strong>’s<br />
vision and credited Imbewu with supporting much <strong>of</strong> the change management<br />
processes currently under way. He also emphasized the importance <strong>of</strong><br />
bringing the community in<strong>to</strong> the planning and management <strong>of</strong> schools. He has<br />
had a review summit which included visiting communities, traditional leaders,<br />
and has managed relations with the Unions very effectively.<br />
2. Administration and Imbewu staff<br />
The Superintendent-General has been in post only a few weeks, but<br />
demonstrated a keen interest in and detailed knowledge <strong>of</strong> the programme.<br />
2 A Concept paper: The Development <strong>of</strong> the Institute for <strong>Education</strong>al Leadership, March 2006,<br />
p 10<br />
2
The Deputy Direc<strong>to</strong>r –General (Operations) was appointed in September last<br />
year and the Acting DDG for Planning is someone who has had a long his<strong>to</strong>ry<br />
with Imbewu (1 and 2) and provides an important link between the<br />
Programme and its integration in<strong>to</strong> the <strong>Department</strong>. Many <strong>of</strong> the other<br />
individuals interviewed highlighted that the <strong>Department</strong> is finally able <strong>to</strong><br />
respond efficiently and build capacity as its staffing at strategic management<br />
level is almost at full complement. Hundreds <strong>of</strong> EDO’s and Subject advisors<br />
are being employed and will provide much needed capacity and support <strong>to</strong> the<br />
Districts.<br />
The Imbewu Team demonstrate an impressive range <strong>of</strong> skills, institutional<br />
memory and capacity that is critical <strong>to</strong> ensuring the programme’s integration<br />
in<strong>to</strong> the <strong>Department</strong>. They have established networks with Higher education<br />
institutions, civil society organisations and are intricately woven in<strong>to</strong> the broad<br />
fabric <strong>of</strong> transforming education and building capacity within the province and<br />
<strong>Department</strong>.<br />
3. Shift in emphasis from Imbewu 1 <strong>to</strong> Imbewu 2<br />
The Imbewu team are consciously beginning <strong>to</strong> scale down their own lead<br />
role in implementation and are increasingly integrating Imbewu activities with<br />
the work being done within the <strong>Department</strong>. While this development is<br />
something which DFIDSA has encouraged, and in fact is central <strong>to</strong> the goal <strong>of</strong><br />
the programme, it will make it less easy <strong>to</strong> attribute the impact <strong>of</strong> DFID’s role<br />
in the future.<br />
The programme team has responded <strong>to</strong> the need <strong>to</strong> leave a footprint in a<br />
number <strong>of</strong> ways: inter alia, through supporting the MEC’s vision <strong>of</strong><br />
establishing a community/business/ government Trust, through a lesson<br />
learning conference scheduled for June 2007, through the concept paper for<br />
the development <strong>of</strong> an Institute for <strong>Education</strong>al Leadership, as well as various<br />
other studies and surveys (particularly those comprising the comprehensive<br />
evaluation programme).<br />
4. The Institute for <strong>Education</strong>al Leadership<br />
The idea <strong>of</strong> the Institute has been brewing for a long time, and there is great<br />
support and excitement both within the <strong>Department</strong> and the MEC’s <strong>of</strong>fice <strong>to</strong><br />
see progress with it. Imbewu has provided the resources <strong>to</strong> refurbish and<br />
establish the East London campus, and two additional campuses (in Port<br />
Elizabeth and Mthatha) are at various stages <strong>of</strong> readiness. The Institute will<br />
focus on management coaching and men<strong>to</strong>ring for principals and other<br />
supervisory level staff (eg.EDOs and Subject Advisors); conduct innovative<br />
research on ways <strong>to</strong> deal with whole school effectiveness; revise, develop<br />
training material and train on effective school management; and consolidate<br />
and keep updated a School Management Manual. These are just some ideas<br />
which the Head <strong>of</strong> the Institute shared with the review team, and the approved<br />
concept paper provides further detail on how the Institute will work. It is clear<br />
that much progress has been made in operationalising the Institute as part <strong>of</strong><br />
the broader sustainability strategy.<br />
3
5. Integrated, Evidence-based planning within the <strong>Department</strong><br />
Institutional<br />
The <strong>Department</strong> earlier this year approved a new organogram which includes<br />
for the first time a Planning branch (attached for reference). The branch is<br />
currently headed in an Acting capacity by a consultant who has been involved<br />
with Imbewu since inception. The branch will be responsible for EMIS, quality<br />
assurance, Strategic Planning & Moni<strong>to</strong>ring, Research, Curriculum<br />
Management, and, importantly, manage the Institute for <strong>Education</strong>al<br />
Leadership. This demonstrates the commitment by the <strong>Department</strong> <strong>to</strong><br />
integrating the Institute in<strong>to</strong> the internal reporting structures and in so doing,<br />
ensuring sustainability <strong>of</strong> Imbewu learning beyond DFIDSA funding. The<br />
programme team work closely with counterparts in the department, although it<br />
should be noted that there are still sections within the department that are not<br />
completely on board.<br />
At a political level, the portfolio committee is pushing departmental <strong>of</strong>ficials <strong>to</strong><br />
engage and respond effectively <strong>to</strong> recommendations around improved<br />
planning.<br />
6. Conclusions<br />
• It can be concluded that there has been extremely good progress in<br />
meeting the new focus <strong>of</strong> output 1 (building an effective, efficient, well<br />
staffed provincial education department).<br />
• However, there is acknowledgement by both the <strong>Department</strong> and the<br />
programme team that there is still some way <strong>to</strong> go <strong>to</strong>wards fully<br />
achieving the goals the <strong>Department</strong> has set for itself in its<br />
Transformation Agenda. Much <strong>of</strong> the progress in the future will depend<br />
on consistent, visionary leadership, hard work, commitment <strong>to</strong> the 10<br />
year transformation strategy and stability (politically and within the<br />
administration).<br />
• The issue <strong>of</strong> absorption <strong>of</strong> the Imbewu programme in<strong>to</strong> the <strong>Department</strong><br />
has begun and a clear strategy is in place <strong>to</strong> ‘handover’ key areas <strong>of</strong><br />
work through men<strong>to</strong>ring and coaching and ‘shifting’ <strong>of</strong> key<br />
responsibilities<br />
• The Institute is likely <strong>to</strong> face some initial operational and management<br />
challenges while the department finalises how it will be run within the<br />
current roles and responsibilities as defined in the new organogram.<br />
1.2.3 Decentralisation process<br />
The second focus <strong>of</strong> the programme has been <strong>to</strong> effectively provide a fully<br />
functioning and self-managing district structure providing quality support <strong>to</strong><br />
schools.<br />
It has been acknowledged that there are vast differences in the operation,<br />
capacity and systems at a District level. The modus operandi <strong>to</strong> date pursued<br />
a ‘one size fits all’ approach and the programme team has identified the need<br />
<strong>to</strong> change the approach <strong>to</strong> support Districts in the ways that respond <strong>to</strong> their<br />
4
specific challenges. This has <strong>to</strong> be done within the confines <strong>of</strong> shrinking<br />
resources: the main thrust <strong>of</strong> such an approach has <strong>to</strong> focus on improved<br />
strategic planning. A District colloquium was recently held with the National<br />
<strong>Department</strong> <strong>of</strong> <strong>Education</strong> and there has been agreement on building bot<strong>to</strong>mup<br />
capacity <strong>to</strong> making decentralisation effective. A number <strong>of</strong> approaches are<br />
being implemented and while some are in their infancy, there is evidence <strong>of</strong><br />
support from all sec<strong>to</strong>rs (educa<strong>to</strong>rs, district and provincial <strong>of</strong>ficials,<br />
communities, and politicians) <strong>to</strong> making this work.<br />
7. There is great political interest in resurrecting the School Community<br />
Integration Pilot Project (SCIPP), piloted in Imbewu 2, <strong>to</strong> ensure community<br />
engagement and participation at schools. The MEC is very enthusiastic about<br />
this approach and has begun <strong>to</strong> root the idea with communities, the<br />
department and districts/ schools with great success. He has met with local<br />
traditional leaders and business and is also talking about the establishment <strong>of</strong><br />
a Trust as a means <strong>of</strong> driving a vision <strong>of</strong> community-school integration, with<br />
the school becoming one <strong>of</strong> the centres <strong>of</strong> community life.<br />
8. The impact <strong>of</strong> poverty on early childhood development (ECD) and Grade<br />
R have until recently, not been included in the decentralisation planning<br />
processes within the <strong>Department</strong>. The issue <strong>of</strong> access <strong>to</strong> schools has been<br />
hampered by the system <strong>of</strong> inefficient clustering, (where grades R/O through<br />
<strong>to</strong> grade 9 have been in one school, and grades 10 – 12 in another). This has<br />
impacted negatively on the availability <strong>of</strong> classroom space. The <strong>Department</strong><br />
has begun <strong>to</strong> review and discuss aligning the processes with Districts.<br />
Quantitative research has been conducted <strong>to</strong> determine a baseline <strong>of</strong><br />
information which will inform planning decisions and the <strong>Department</strong> is also<br />
beginning <strong>to</strong> reflect for the first time global targets like the MDG’s in its<br />
information analysis.<br />
9. A system <strong>of</strong> establishing circuit managers, building the cadre <strong>of</strong> EDO’s<br />
and subject advisors as foot soldiers <strong>to</strong> support educa<strong>to</strong>rs and district teams<br />
is underway. The institutionalization <strong>of</strong> this approach speaks <strong>to</strong> the recognition<br />
within the <strong>Department</strong> <strong>of</strong> the need <strong>to</strong> plan inclusively and consult with those in<br />
the field.<br />
10. The development <strong>of</strong> appropriate policy, curriculum and training continues<br />
<strong>to</strong> be the focus <strong>of</strong> much <strong>of</strong> the programme team’s efforts with a clear strategy<br />
<strong>to</strong> implement at the District level. Curriculum development is setting the pace<br />
for the broader enhancement <strong>of</strong> district delivery.<br />
11. The review team’s visit <strong>to</strong> the C<strong>of</strong>imvaba district was extremely valuable<br />
in demonstrating the extent <strong>to</strong> which decentralisation is being effectively<br />
managed by the provincial department and being driven by the District itself. It<br />
has <strong>to</strong> be said, though, that the visionary leadership <strong>of</strong> the District direc<strong>to</strong>r in<br />
keeping his team motivated is an obvious fac<strong>to</strong>r in this successful example <strong>of</strong><br />
decentralisation. This raises the issue <strong>of</strong> the importance <strong>of</strong> leadership in<br />
driving transformation at the district level and the question <strong>of</strong> how <strong>to</strong> ensure<br />
that an absence <strong>of</strong> good leadership doesn’t hamper change.<br />
5
Conclusions<br />
• The decentralisation process is well underway with great progress<br />
being made in providing a supportive environment <strong>to</strong> districts.<br />
• The biggest challenge is going <strong>to</strong> be managing this initiative from within<br />
the department and providing the resources <strong>to</strong> maintain achievements<br />
made <strong>to</strong> date. It relates directly <strong>to</strong> the sustained capacity required<br />
within the department which is being developed, but is not yet at full<br />
strength.<br />
• The question <strong>of</strong> whether this support could come from within the<br />
Imbewu programme was raised, but the reviewer believes that it would<br />
really only be delaying a longer term process which ultimately would<br />
require the <strong>Department</strong>’s management.<br />
• The many infrastructure, resource and management challenges facing<br />
the department will only be dealt with once the ownership and<br />
responsibility are entrenched within the department itself. These<br />
challenges are not unique <strong>to</strong> the programme, but rather reflective <strong>of</strong> a<br />
much broader transformation challenge within this and many other,<br />
provinces.<br />
1.2.4 HIV/AIDS<br />
The programme team highlighted what they saw as inaccuracies in the last<br />
review report on HIV/AIDS. They argued that the relatively small amount <strong>of</strong><br />
funding spent on developing an HIV/AIDS strategy was all that was actually<br />
required, in terms <strong>of</strong> actual funds, from IMBEWU. The <strong>Department</strong> receives<br />
an annual conditional grant (R23m in 2004/05), which is intended <strong>to</strong> fund all<br />
school-related activities, including curriculum and materials development,<br />
peer group training, advocacy work and some work place issues. There was<br />
an initial under-spend which Imbewu assisted in unblocking, resulting in 100%<br />
expenditure in 2004/05 and 2005/06. Imbewu helped facilitate, in collaboration<br />
with some members <strong>of</strong> the MTT (an HIV&Aids task team funded by USAID),<br />
the development <strong>of</strong> the HIV & Aids Strategy (also incorporating workplacebased<br />
action plans) and Policy for the <strong>Department</strong>. The Direc<strong>to</strong>rate for<br />
HIV&Aids & Social Planning Programmes has now been populated and is<br />
actively engaged in proactively driving this multi-sec<strong>to</strong>ral programme, as well<br />
as engaging and collaborating with other <strong>Department</strong>s in an attempt <strong>to</strong> deal<br />
holistically with the many facets <strong>of</strong> this pandemic.<br />
These views were reinforced by the Chief Direc<strong>to</strong>r responsible for HIV&IDs<br />
who discussed the varied approaches being rolled out at district level <strong>to</strong> deal<br />
with the pandemic. The advocacy work continues <strong>to</strong> focus on abstinence, and<br />
there is collaboration with faith based organisations <strong>to</strong> work at school level.<br />
2. RECOMMENDATIONS<br />
2.1 All interviewees demonstrated an enthusiasm for and commitment <strong>to</strong><br />
internalising the Imbewu approach in<strong>to</strong> the <strong>Department</strong>. They also<br />
demonstrated a keen understanding <strong>of</strong> the challenges <strong>of</strong> whole school<br />
6
transformation, particularly around the time it takes <strong>to</strong> institutionalise<br />
change.<br />
• The team recommends that the Imbewu philosophy be consciously<br />
branded and driven as part <strong>of</strong> a broader communications strategy<br />
within the context <strong>of</strong> the <strong>Department</strong>’s ten year transformation agenda<br />
2.2 The programme team has been instrumental in developing a number <strong>of</strong><br />
sustainability strategies <strong>to</strong> support the exit <strong>of</strong> Imbewu next year. Among<br />
others, materials have been developed, men<strong>to</strong>ring is currently underway,<br />
an effective moni<strong>to</strong>ring and quality assurance process has been<br />
developed and is integrated in<strong>to</strong> the department’s own processes, the<br />
Institute for <strong>Education</strong>al Leadership is well on its way <strong>to</strong> being integrated<br />
in<strong>to</strong> the department’s structures. But important strategic lessons which<br />
have been learnt in this process are currently not yet captured.<br />
• It is recommended that the programme team, as part <strong>of</strong> developing the<br />
lesson learning component for the Conference next year, write up the<br />
lessons learnt in managing this programme and include it as a part <strong>of</strong><br />
the final programme report.<br />
2.3 The review and programme team worked on refining the OVI’s <strong>of</strong> the<br />
Logframe as presented by the last review team. Agreement was reached<br />
on the changes <strong>to</strong> be made that would appropriately reflect a measure <strong>of</strong><br />
progress <strong>to</strong> date. The programme Goal and OVI remains relevant, but the<br />
review team felt that the <strong>Purpose</strong> OVI was much <strong>to</strong>o broad and could<br />
jeopardise reaching a reliable score which measured the extent <strong>to</strong> which<br />
this outcome had been achieved.<br />
• It is recommended that the purpose OVI be amended <strong>to</strong> be ‘SMART’<br />
as this would provide a clearer picture <strong>of</strong> what had been achieved.<br />
2.4 The <strong>Department</strong> has developed a 10 year transformation agenda; a 5 year<br />
strategic plan, annual performance plans in compliance with the PFMA for<br />
the first time in the province’s his<strong>to</strong>ry. While this is highly commendable,<br />
care should be taken <strong>to</strong> include moni<strong>to</strong>ring and tracking mechanisms <strong>to</strong><br />
ensure not only compliance but systemic inclusion in<strong>to</strong> the various<br />
branches <strong>of</strong> the <strong>Department</strong>.<br />
• It is recommended that the programme team assist the department in<br />
building in the necessary institutional and structural processes <strong>to</strong> track<br />
progress against the strategic and transformation plans.<br />
2.5 The Institute is an idea that has now been embedded within the<br />
<strong>Department</strong>. In December a budget will be finalised within the <strong>Department</strong><br />
and Dave Edley, the previous SG, will take this forward and integrate it<br />
in<strong>to</strong> the <strong>Department</strong>’s budget cycle. However, it would be short-sighted not<br />
<strong>to</strong> acknowledge that the institute could be (mis)perceived by some within<br />
the <strong>Department</strong> as constituting some sort <strong>of</strong> threat <strong>to</strong> their span <strong>of</strong> control,<br />
and consequently not receive universal support.<br />
• It is recommended that an overall communications strategy is<br />
developed <strong>to</strong> ensure that all within the department understand the<br />
7
context <strong>of</strong> the Institute and see it as a resource <strong>to</strong> be utilised (and not<br />
as a threat)<br />
2.6 The objectives <strong>of</strong> the review focused on assessing the extent <strong>to</strong> which<br />
outputs 1 and 2 are being achieved. This meant an emphasis on building<br />
management capacity and strengthening the institutional support <strong>to</strong><br />
districts which is undoubtedly successfully underway. The <strong>Department</strong> has<br />
lagged somewhat in developing a long-term comprehensive INSET (inservice<br />
training) strategy. Without a parallel process focused on<br />
developing teachers <strong>to</strong> respond <strong>to</strong> the new policy and management<br />
models, it is very likely that the progress made <strong>to</strong> date would be<br />
unsustainable. Developing an appropriate training strategy for teachers<br />
would allow for the bot<strong>to</strong>m-up pressure referred <strong>to</strong> by some in the<br />
interviews.<br />
• It is recommended that the programme team support the department in<br />
developing an INSET strategy as a part <strong>of</strong> the broader support <strong>to</strong><br />
management at provincial level.<br />
2.7 The last two Imbewu reviews highlighted the need <strong>to</strong> capture lessons<br />
learnt specifically in working with partners, sharing best practice models<br />
and programme management. While discussions with the Team are rich<br />
with anecdotal evidence <strong>of</strong> these lessons, there is very little which has<br />
been documented outside <strong>of</strong> the quarterly formal reports. The University <strong>of</strong><br />
Fort Hare is planning <strong>to</strong> publish a book, sharing various transformation<br />
strategies that have been piloted. The book is an exciting initiative and will<br />
include a range <strong>of</strong> case studies in which the University has been involved<br />
– including the Imbewu project. However, it would still be useful <strong>to</strong> capture<br />
the programme management <strong>of</strong> specifically Imbewu, as a donor driven<br />
initiative.<br />
• It is recommended that the team develop a comprehensive lesson<br />
learning ‘kit’ <strong>to</strong> include possibly some case studies, as well as other<br />
innovative communication <strong>to</strong>ols <strong>to</strong> be shared both within the donor<br />
community as well as more broadly on the three areas identified.<br />
3. CONCLUSIONS AND WAY FORWARD<br />
3.1 The contextual challenges facing the Eastern Cape Province are not likely<br />
<strong>to</strong> disappear in the near future. What this means for a programme that has<br />
been as evidently successful as Imbewu is that it will be difficult <strong>to</strong> attribute<br />
longer term success <strong>to</strong> work done over the last nine years once the<br />
programme has closed. The programme team has certainly exceeded<br />
achievements against planned outputs.<br />
But broader contextual challenges <strong>of</strong> development and change cannot be<br />
dealt with from outside <strong>of</strong> government forever and therefore it is the opinion <strong>of</strong><br />
the review team that it is really Government’s role <strong>to</strong> make a substantive<br />
difference <strong>to</strong> dealing with these challenges. The programme has had impact,<br />
it has been incredibly successful, but it is time <strong>to</strong> allow the department <strong>to</strong> take<br />
full responsibility for making this work beyond external funding.<br />
8
The <strong>Department</strong>, MEC and all those interviewed were very clear in their<br />
praise <strong>of</strong> DFIDSA’s support <strong>to</strong> date in making a real impact on the<br />
transformation <strong>of</strong> the department. There is much commitment <strong>to</strong> the<br />
philosophy <strong>of</strong> Imbewu and this is acknowledged as part <strong>of</strong> DFID’s heritage <strong>to</strong><br />
the Province. Much anecdotal evidence was shared and it is worth noting that<br />
this should be captured and shared as an example <strong>of</strong> what is possible with<br />
consistent, long-term support driven by excellent programme management<br />
3.2 The report will be circulated <strong>to</strong> the Programme team for comment and will<br />
be finalised and tabled for approval at the next Project Steering Committee <strong>to</strong><br />
be held in December 2006.<br />
3.3 Preparation for the planned International Conference in June 2007 is<br />
underway. The Programme team will work closely with DFIDSA <strong>to</strong> ensure that<br />
the conference is planned as a high pr<strong>of</strong>ile event which will ensure that the<br />
successes achieved in Imbewu are shared as widely as possible.<br />
Subethri Naidoo<br />
Governance Advisor<br />
12 th Oc<strong>to</strong>ber 2006<br />
9
Annual <strong>Review</strong><br />
o This document is the new template for the Annual <strong>Review</strong>. It is not protected in any way so may be used<br />
as different departments see fit. It is divided in<strong>to</strong> five parts. (There is a separate form for Budgetary<br />
Support / SWAPS).<br />
o For a full explanation <strong>of</strong> information required please read Guidance on Scoring Projects & Programmes<br />
in PRISM.<br />
o See also notes for completion at end <strong>of</strong> this form.<br />
Annual <strong>Review</strong> V1.1
Annual <strong>Review</strong><br />
Part A - Project Data<br />
Project<br />
Short Title<br />
Imbewu II<br />
Benefiting Country / Region South Africa MIS code 059-550-097<br />
Current Project Officer Name Mel Abrahams-Sher Approved Commitment £17,000,000<br />
Actual Start Date<br />
(dd/mm/yyyy)<br />
Planned End Date<br />
(dd/mm/yyyy)<br />
19/04/2001 Spend To Date £13,726,251<br />
30/11/2007 Date <strong>of</strong> <strong>Review</strong> 9 – 11 Oc<strong>to</strong>ber 2006<br />
Part B - Recommendations<br />
Summary <strong>of</strong> Recommendations Responsibility<br />
1. The Imbewu philosophy be consciously branded and driven as part <strong>of</strong> a broader<br />
communications strategy within the context <strong>of</strong> the <strong>Department</strong>’s ten year transformation agenda Eastern Cape <strong>Department</strong> <strong>of</strong><br />
<strong>Education</strong> (ECDE)<br />
2. Amend the purpose OVI’s so that progress can be more measurable. Programme Office & DFIDSA<br />
3. Develop a Moni<strong>to</strong>ring & Evaluation process <strong>to</strong> track progress against the strategic &<br />
transformation plans<br />
ECDE & Programme Office<br />
4. Develop a communications strategy <strong>to</strong> promote the Institute as an important resource <strong>to</strong> ECDE ECDE, the Institute & Programme<br />
Office<br />
5. Develop an INSET (in-service training) strategy <strong>to</strong> support management at provincial level ECDE & Programme Office<br />
6. Develop a comprehensive lesson learning ‘kit’ that can be shared with the donor community and Programme Office<br />
Annual <strong>Review</strong> V1.1 Page 1
7.<br />
8.<br />
9.<br />
10.<br />
more broadly<br />
Annual <strong>Review</strong> V1.1 Page 2
Part C – Project Scoring Assessment<br />
Goal Statement Objectively Verifiable Indica<strong>to</strong>rs (OVIs)<br />
To increase significantly the learning achievement <strong>of</strong> children 25% improvement in completion rates over the baseline by the end<br />
from Eastern Cape Province.<br />
<strong>of</strong> the Programme<br />
<strong>Purpose</strong> Statement Objectively Verifiable Indica<strong>to</strong>rs<br />
(OVIs )<br />
Progress Recommendations/Comments<br />
• Amend the OVI’s so that progress can<br />
be more meaurable.<br />
To develop an effective,<br />
efficient and affordable<br />
decentralised education<br />
system<br />
• District <strong>of</strong>fices providing effective and<br />
timely educational services and support<br />
<strong>to</strong> schools<br />
• All district, middle management &<br />
EDO posts filled. Many Subject<br />
Adviser posts filled with<br />
recruitment continuing.<br />
• Imbewu & Institute have/are<br />
providing training <strong>to</strong> district <strong>of</strong>fices.<br />
• Whole school development model<br />
processed in Eastern Cape schools.<br />
• Trained management & curriculum<br />
support structures/teams<br />
operational at district level.<br />
• Increased number <strong>of</strong> transformed and<br />
self-managed schools in the Eastern<br />
Cape Measurable improvement in<br />
classroom practice.<br />
* ECED allocating an increased % <strong>of</strong><br />
their budget <strong>to</strong> non-personnel<br />
expenditure.<br />
* ECED meet service delivery targets for<br />
schools as agreed with communities and<br />
planned for in the MTEF.<br />
• 13% <strong>of</strong> budget spent on nonpersonnel<br />
school related costs.<br />
• School Community Integration<br />
Pilot (SCIP) in 28 schoolcommunities<br />
completed with follow<br />
– up review.<br />
• MEC planning on forming a trust as a<br />
mean <strong>of</strong> driving a vision <strong>of</strong> community<br />
involvement in education.<br />
Annual <strong>Review</strong> V1.1 Page 3
<strong>Purpose</strong> <strong>to</strong> Goal<br />
Project <strong>Purpose</strong> Rating - General / Overall progress assessment 2<br />
Justification<br />
State how far the project has helped <strong>to</strong> deliver the objectives <strong>of</strong> the Country Assistance Plan (where appropriate)<br />
The programme specifically addresses the issue <strong>of</strong> strengthening service delivery in the education sec<strong>to</strong>r, which in the long run<br />
addresses the apartheid legacy in terms <strong>of</strong> inequality <strong>of</strong> education access and also <strong>to</strong> jobs.<br />
<strong>Output</strong>s Objectively Verifiable<br />
Indica<strong>to</strong>rs (OVIs)<br />
Progress Recommendations/<br />
Comments<br />
Comment for ALL outputs: There<br />
is some confusion as <strong>to</strong> when the<br />
programme actually started -<br />
DFID says 2001 & ECED says<br />
2002. For this reason the OVI’s<br />
referring <strong>to</strong> PY? has caused<br />
confusion and progress against<br />
deadlines may be inaccurate. It is<br />
recommended that all PY be<br />
shown as a year <strong>to</strong> avoid<br />
confusion.<br />
1. A provincial department <strong>of</strong><br />
education, with an enhanced<br />
strategic role.<br />
• <strong>Department</strong>al audit improves<br />
<strong>to</strong> ‘qualified’ by end FY<br />
2004/5 and <strong>to</strong> ‘unqualified’ by<br />
2005/6.<br />
•<br />
•<br />
• Although audit has not yet<br />
reached ‘qualified’ status, some<br />
progress has been noted :<br />
findings have progressed from the<br />
level <strong>of</strong> actually locating<br />
documents <strong>to</strong> process and<br />
content-based issues. Further<br />
significant improvement expected<br />
now that HR Registry System in<br />
place<br />
Annual <strong>Review</strong> V1.1 Page 4<br />
Score<br />
2
•<br />
• ECED Procurement Board<br />
established and operational<br />
by end 2004.<br />
• Established in line with PFMA<br />
• Anti-corruption strategy<br />
written and being<br />
implemented by end 2004.<br />
• Chief Finance Officer only<br />
appointed in 2004. Draft<br />
completed and tabled at Top<br />
Management; awaiting final<br />
approval and structural location<br />
within <strong>Department</strong><br />
• All managers in SMS <strong>to</strong> have<br />
agreed personnel<br />
development plans by end<br />
2004 and all above grade 9 <strong>to</strong><br />
have pdps in place by end<br />
2005.<br />
• Yes, done<br />
• Yes, including educa<strong>to</strong>rs through<br />
IQMS<br />
• Audit committee established<br />
by mid 2004 and internal<br />
audit <strong>of</strong>fice fully operational<br />
by end 2004.<br />
• Done, internal audit function<br />
outsourced (<strong>to</strong> Ernst & Young)<br />
• HR plans in place during PY3<br />
and critical posts (Direc<strong>to</strong>r<br />
and upwards) filled by PY4.<br />
• Yes, in place. Critical posts filled<br />
except recent vacancies (attrition)<br />
• ECED actively participating in<br />
the planning and<br />
implementation process <strong>of</strong><br />
the Provincial Social Needs<br />
and Economic Clusters.<br />
• The MEC, SG and ECED (through<br />
the Strategic Planning Division) all<br />
actively participate.<br />
• <strong>Department</strong>al HIV/Aids<br />
strategy implemented by PY4<br />
for staff and for<br />
schools/learners.<br />
• Strategy developed in 2005 &<br />
parts <strong>of</strong> it are being rolled out.<br />
Plse see output 3 point 6.<br />
Annual <strong>Review</strong> V1.1 Page 5
• Payment backlogs reduced<br />
by 50% in PY4 and 80% by<br />
PY5 in relation <strong>to</strong> March 2004<br />
positions.<br />
• Targets super-ceded. Payments<br />
Service Direc<strong>to</strong>rate set up & there<br />
is a 4-day turn around on<br />
payments.<br />
• Performance Management<br />
Systems in place at all level<br />
by PY3 (IQMS during PY4).<br />
• Performance Management<br />
Systems in place at all levels, but<br />
there is inconsistent enforcement.<br />
• Functioning Moni<strong>to</strong>ring and<br />
<strong>Report</strong>ing systems<br />
connecting province, districts<br />
and schools in place by PY5.<br />
• System 80% effective with plans<br />
in place <strong>to</strong> move <strong>to</strong> electronic<br />
system. At present there is both a<br />
paper & electronic system.<br />
• Persal system cleaned,<br />
maintained and available as<br />
part <strong>of</strong> the management<br />
information systems by end<br />
2005.<br />
• 95% complete<br />
• HR and leave records,<br />
cleaned maintained and<br />
available as part <strong>of</strong> the<br />
management information<br />
• In process; critical posts identified<br />
<strong>to</strong> be filled in districts <strong>to</strong> maintain<br />
the records. Leave capping<br />
process fully completed by end<br />
2005<br />
2. A fully functioning and selfmanaging<br />
district structure providing<br />
quality<br />
support <strong>to</strong> schools.<br />
• All critical posts filled by end<br />
PY3<br />
•<br />
•<br />
•<br />
• Trained district staff more<br />
effectively involved in service<br />
• All District and Corporate Services<br />
Middle Management posts filled.<br />
All EDO posts filled end 2005.<br />
Phased filling <strong>of</strong> greatly increased<br />
(relative <strong>to</strong> baseline) nos. <strong>of</strong><br />
Subject Advisor posts (340 in post<br />
-- no. <strong>of</strong> posts <strong>to</strong> be doubled and<br />
filled in next 3 years)<br />
• Significant progress made with<br />
EDO’s & Subject Advisers<br />
Annual <strong>Review</strong> V1.1 Page 6<br />
1
<strong>of</strong> schools<br />
•<br />
•<br />
• All administrative systems <strong>to</strong><br />
promote effectiveness and<br />
efficiency in bridging gap<br />
between province and<br />
schools operational by PY 4<br />
• EMIS PERSAL and BASS<br />
phased in<strong>to</strong> districts by PY3<br />
receiving training and induction.<br />
More training planned through<br />
Institute. Much higher level <strong>of</strong><br />
visibility in schools . Induction and<br />
initial training has been<br />
undertaken.<br />
• Significant progress made.<br />
Systems in place.<br />
• Fully achieved<br />
• EDCs are no longer relevant<br />
& the OVI has been amended<br />
in the new logframe.<br />
• 10 EDCs established and<br />
functional by end <strong>of</strong> PY3<br />
• Institute + 2 satellites presently<br />
mapping out comprehensive<br />
INSET policy including “EDC’s”.<br />
Various District “EDC” pilot<br />
models in progress.<br />
3. Schools which, having undergone<br />
a whole school effectiveness<br />
process, are better able <strong>to</strong> provide<br />
improved learning opportunities for<br />
their learners.<br />
• Trained curriculum support<br />
structures/teams operational<br />
at district level<br />
•<br />
• Trained management support<br />
structures/teams operational<br />
at district level<br />
•<br />
• School Governing Bodies<br />
managing feeding<br />
programmes where<br />
appropriate<br />
• Yes. Provincial & District<br />
Curriculum Co-ordinating<br />
structures established, with<br />
detailed guidelines in place.<br />
• Cluster Chief Direc<strong>to</strong>rs driving<br />
process with CES + EDOs <strong>to</strong><br />
ensure training. New appointees<br />
undergoing induction.<br />
• MEC’s new Co-operative Feeding<br />
scheme being rolled out by the<br />
ECDE<br />
•<br />
•<br />
• School Governing Bodies<br />
play a supporting role not a<br />
management one.<br />
• Communities mobilised <strong>to</strong><br />
• SCIP Pilot in 28 School-<br />
Annual <strong>Review</strong> V1.1 Page 7<br />
1
ecome critically engaged<br />
with education decision<br />
makers and community level<br />
service providers<br />
•<br />
•<br />
• Negotiated code <strong>of</strong> conduct in<br />
place and disciplinary<br />
problems handled<br />
procedurally.<br />
• Schools <strong>to</strong> have developed<br />
HIV/AIDS strategy<br />
•<br />
• Learner/educa<strong>to</strong>r contact time<br />
increased<br />
•<br />
• Marked improvements in the<br />
learning environment in<br />
schools<br />
•<br />
• Learners, carers and<br />
community members testify <strong>to</strong><br />
Communities completed with<br />
follow-up review. MEC planning<br />
on forming a trust <strong>to</strong> take this<br />
forward. SGB organisations fully<br />
engaged in Prov Summits; a Prov<br />
Educ Advisory Council currently<br />
being established.<br />
• Clear code <strong>of</strong> conduct in place.<br />
Significant improvement in<br />
handling disciplinary procedures.<br />
Some problems with<br />
implementation. Staff still needed<br />
in some <strong>of</strong> the districts.<br />
• 1259 schools trained <strong>to</strong> develop<br />
strategy. 927 schools have 10<br />
learners each trained as Peer<br />
Educa<strong>to</strong>rs. 1710 Primary School<br />
Teachers have been trained <strong>to</strong><br />
promote Abstinence programme.<br />
600 master trainers rolling out<br />
integration <strong>of</strong> HIV & AIDS across<br />
the curriculum in GET schools in<br />
districts<br />
• Quantitative data from various<br />
sources still being analyzed.<br />
Baseline data available.<br />
• No fee schools rolled out with<br />
minimum per learner funding re:<br />
norms & standards. Work<br />
continues on eradication <strong>of</strong> mud<br />
schools. Given very low baseline<br />
level, steady progress noted.<br />
• At the end <strong>of</strong> 2006 another Public<br />
•<br />
•<br />
•<br />
• Advocacy work has been<br />
done; however, there is a<br />
challenge in developing<br />
workplace skills plans.<br />
Annual <strong>Review</strong> V1.1 Page 8
improved learning<br />
opportunities by Programme<br />
end<br />
Perception Survey (part <strong>of</strong><br />
comprehensive, longitudinal<br />
evaluation) will be available<br />
• Improvements in learning<br />
achievement above baseline<br />
by programme end<br />
• Baseline studies done<br />
4. Improved asset management and<br />
lower cost school buildings<br />
• Buy-in and ownership <strong>of</strong><br />
assets and processes by<br />
communities<br />
• Break-in and damage <strong>to</strong><br />
schools reduced<br />
• <strong>Output</strong> 4 was judged <strong>to</strong> have<br />
been completed in the 2005<br />
review. The log frame has<br />
been amended accordingly.<br />
• EFMIS and EMIS used in<br />
school rationalization,<br />
prioritization <strong>of</strong><br />
maintenance & new<br />
school<br />
• Strategic partnerships<br />
built between community,<br />
local government<br />
structures, ECED and<br />
service providers<br />
• Pro<strong>to</strong>type schools built<br />
and replicated (possibly<br />
by other Donors) for<br />
small rural schools<br />
• All current (baseline)<br />
quintile 1 & 2 schools<br />
raised <strong>to</strong> levels 3 and<br />
above<br />
Annual <strong>Review</strong> V1.1 Page 9
5.<br />
6.<br />
7.<br />
8.<br />
• Accredited relevant skills<br />
course provided <strong>to</strong><br />
community members<br />
engaged in construction<br />
activities<br />
Project <strong>Output</strong>s Rating - General / Overall progress assessment 1<br />
Justification<br />
<strong>Purpose</strong> Attribution<br />
Clear evidence exists that the successful delivery <strong>of</strong> outputs is significantly contributing <strong>to</strong> ultimately achieving the project purpose.<br />
Annual <strong>Review</strong> V1.1 Page 10
Part D – Risk Management<br />
The risk level for the project should be reassessed during Annual <strong>Review</strong>s.<br />
Risk Category Low-Medium<br />
Has the Risk Category changed since the last review? If so explain why.<br />
No<br />
New risks identified<br />
Action being taken <strong>to</strong> moni<strong>to</strong>r / manage risks<br />
Recommended changes <strong>to</strong> plans or management strategies in respect <strong>of</strong> project associated risks<br />
Does the Logframe Require Revision?<br />
The logframe was supposed <strong>to</strong> be amended following the 2005 review as it was felt the OVI’s did not reflect how far the programme<br />
had progressed & changed since the budget cuts. This was not done. OVI’s for outputs have now been revised and the purpose OVI’s<br />
will be revised by the end <strong>of</strong> Oc<strong>to</strong>ber 2006.<br />
Do the PIMS Markers Require Revision? [Manda<strong>to</strong>ry for projects approved prior <strong>to</strong> 01/04/1998]<br />
No<br />
Method <strong>of</strong> Scoring – state the team composition, the methods used <strong>to</strong> conduct the review, how the scoring was agreed upon,<br />
and whether partners and stakeholders were involved.<br />
Team: Subethri Naidoo (DFID Governance Adviser); Mel Abrahams-Sher (DFID Programme Officer); Zama Tom (ECED Programme<br />
Manager & PSC Chairperson); and John Bartlett (ECED IMBEWU Programme Co-ordina<strong>to</strong>r)<br />
Method: On-site visit <strong>to</strong> C<strong>of</strong>imvaba District Office; <strong>Review</strong> <strong>of</strong> Programme Documentation & <strong>Report</strong>s; Interviews with <strong>Department</strong>al<br />
Officials & Programme Staff, over a period <strong>of</strong> 3 days. An Aide Memoire has been generated and scoring collectively agreed upon by<br />
the review team <strong>to</strong>gether with the Programme Office & the <strong>Department</strong>.<br />
Annual <strong>Review</strong> V1.1 Page 11
Part E – Lessons Learned<br />
You can no longer input general lessons learned. You need <strong>to</strong> specify at least one <strong>of</strong> the categories <strong>of</strong> lessons learned in sections<br />
1,2 and 3 below.<br />
Lessons learned, and suggested dissemination.<br />
1. Working with Partners • The buy in and commitment from the ECED <strong>to</strong> the Imbewu programme is directly<br />
responsible for its success.<br />
• ECED appreciates DFID being involved in the programme over an extended period<br />
<strong>of</strong> time (1997 – 2007 Imbewu I & II). It has allowed for innovation & taken in<strong>to</strong><br />
consideration that it takes time <strong>to</strong> ensure sustainability <strong>of</strong> the programme within the<br />
Eastern Cape.<br />
• Although the programme has managed <strong>to</strong> continue with it’s success, the absence <strong>of</strong><br />
an <strong>Education</strong> Adviser within DFID-SA has been felt.<br />
2. Best Practice / Innovation • Imbewu has assisted the ECED <strong>to</strong> institutionalise & embed the gains made from the<br />
programme within the department. The Imbewu name is referred <strong>to</strong> mainly by <strong>to</strong>p<br />
management within the ECED and the Imbewu principles/modules are thought <strong>of</strong> as<br />
being ECED principles/modules.<br />
• An International <strong>Review</strong> Conference <strong>of</strong> Imbewu is planned for June 2007. It is<br />
intended that it be the primary means for the development <strong>of</strong> the dissemination<br />
strategy. The conference is an opportunity <strong>to</strong> discuss and thereafter publish &<br />
disseminate what are the key lessons learned from the programme.<br />
3. Project / Programme Management • The flexibility <strong>to</strong> respond <strong>to</strong> requests from the ECED and the trust DFID has shown<br />
in the management agent <strong>to</strong> deal with these requests has contributed <strong>to</strong> the<br />
success <strong>of</strong> the programme.<br />
• The PSC meetings are well attended, showing the commitment <strong>of</strong> the ECED, with<br />
good discussion and decision-making taking place.<br />
Key Issues / Points <strong>of</strong> information<br />
Please see comments within the report.<br />
Annual <strong>Review</strong> V1.1 Page 12
If appropriate, please comment on the effectiveness <strong>of</strong> the institutional relationships involved with the project<br />
(eg comment on processes and how relationships have evolved)<br />
What key documentary evidence is available <strong>to</strong> support the conclusions <strong>of</strong> this report? List any supporting documents<br />
annexed <strong>to</strong> this report.<br />
Quarterly <strong>Report</strong>s, 2005 OPR, Scoping & Other Research <strong>Report</strong>s, Evaluation <strong>Report</strong>s, Finance Documentation & Minutes from PSC’s<br />
Notes for completion<br />
o Where ratings are required please consider the following:<br />
1. = Likely <strong>to</strong> be completely achieved. The outputs /purpose are well on the way <strong>to</strong> completion (or completed)<br />
2. = Likely <strong>to</strong> be largely achieved. There is good progress <strong>to</strong>wards purpose completion and most outputs have been<br />
achieved, particularly the most important ones.<br />
3. = Likely <strong>to</strong> be partly achieved. Only partial achievement <strong>of</strong> the purpose is likely and/or achievement <strong>of</strong> some<br />
outputs.<br />
Annual <strong>Review</strong> V1.1 Page 13
4. = Only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent. <strong>Purpose</strong> unlikely <strong>to</strong> be achieved but a few outputs likely <strong>to</strong><br />
be achieved.<br />
5. = Unlikely <strong>to</strong> be achieved. No progress on outputs or purpose<br />
X. = It is impossible <strong>to</strong> say whether there has been any progress <strong>to</strong>wards the final achievement <strong>of</strong> outputs or<br />
purpose. This score should not be used unless they meet at least one <strong>of</strong> the following criteria:<br />
• Project is postponed because <strong>of</strong> conflict<br />
• External Constraints<br />
• Recruitment delays<br />
Other reasons: contact PRISM support<br />
Note for subsequent annual reviews you should not be using X unless you can justify using this X rating, it is unusual for<br />
projects running for 3 years or more <strong>to</strong> be scored X.<br />
o Once the review is completed a small subset <strong>of</strong> the data gathered must be entered in<strong>to</strong> PRISM for analysis<br />
purposes. There is an online form within PRISM for entering this data. Under the Enter a <strong>Review</strong> screen /<br />
link click the ‘Add Performance <strong>Review</strong> Online’ link. The manda<strong>to</strong>ry parts required on the Online screen<br />
are marked on this form with an asterisk *.<br />
o Dates should be entered in the format dd/mm/yyyy e.g. 24/08/2004 .<br />
Annual <strong>Review</strong> V1.1 Page 14
DRAFT<br />
AIDE MEMOIRE<br />
IMBEWU II<br />
PROJECT COMPLETION REPORT (PCR)<br />
Oc<strong>to</strong>ber 2- 5 th 2007.<br />
1. Introduction<br />
1.1. Terms <strong>of</strong> Reference for the Project Completion <strong>Report</strong> (PCR) Mission for<br />
Imbewu are detailed at Annex 1. The team comprised Barbara Payne, Senior<br />
<strong>Education</strong> Adviser DFID Bangladesh, John Bartlett representing, the Eastern<br />
Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> and Kate English Programme Manager, DFID<br />
Southern Africa, who was able <strong>to</strong> join the team for the final 3 days.<br />
1.2. A Final Evaluation <strong>Report</strong> (FER) <strong>of</strong> the Imbewu programme, written by<br />
Pr<strong>of</strong>essor Roy Carr-Hill and Dr Saloshini Muthayan, was submitted <strong>to</strong> the<br />
Imbewu project team in September 2007. The FER is a long report (some<br />
274 pages, plus annexes) but in the view <strong>of</strong> the PCR team leader, it fails <strong>to</strong><br />
provide a sufficiently coherent and comprehensive analysis <strong>of</strong> programme<br />
impact. It contradicts itself, and makes controversial personal remarks. In the<br />
view <strong>of</strong> the PCR Team Leader it is not a robust evaluation report. Therefore<br />
the PCR team has relied heavily on other sources <strong>of</strong> evidence <strong>to</strong> complete the<br />
PCR. These are detailed at Annex 2.<br />
2. Contextual Background<br />
2.1. One important contextual fac<strong>to</strong>r, which is underplayed in the FER, is the<br />
way in which provincial politics has constrained the potential effectiveness <strong>of</strong><br />
Imbewu.<br />
2.2. The Eastern Cape <strong>Department</strong> <strong>of</strong> <strong>Education</strong> (ECoD) has been in a state<br />
<strong>of</strong> continual flux during the life <strong>of</strong> the programme. This is reflected in the<br />
turnover <strong>of</strong> education leadership in the Province. There have been seven<br />
Members <strong>of</strong> the Executive Council (MECs) and 12 Superintendent Generals<br />
(SGs) for <strong>Education</strong>, with an average tenure <strong>of</strong> 22.7 months and 13.2 months<br />
respectively, since 1994. There has never been a fully staffed Executive in<br />
place (i.e. MEC, SG and full complement <strong>of</strong> Deputy Direc<strong>to</strong>r Generals<br />
(DDGs) as represented in the <strong>of</strong>ficial organogram) The many instances <strong>of</strong><br />
change involving other key senior <strong>of</strong>ficials; some transferred, sacked or<br />
suspended, has also impacted seriously on the progress <strong>of</strong> the Imbewu<br />
programme (when one person is suspended in a <strong>Department</strong> it creates a kind<br />
<strong>of</strong> paralysis <strong>of</strong> fear and has an impact on the productivity <strong>of</strong> the rest).<br />
2.3. Had the ECDoE remained stable and had staff been retained in post,<br />
during the life <strong>of</strong> Imbewu, it is likely that there would have been even higher<br />
levels <strong>of</strong> impact. Given the prevailing circumstances, it is a matter for<br />
congratulation that so much has been achieved.<br />
2.4. The Imbewu programme budget, (£22 m reduced <strong>to</strong> £17 million in 2004)<br />
appears quite insignificant when measured against the <strong>to</strong>tal <strong>Education</strong> budget<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
1
for Eastern Cape (approx. £1000 million per annum), though Imbewu funding,<br />
at the start <strong>of</strong> Phase 2, represented a high percentage <strong>of</strong> the disposable funds<br />
available <strong>to</strong> the <strong>Department</strong>.<br />
2.5. At that time, (before budget allocations recognised norms and standards<br />
and weighted deprivation), Eastern Cape was faced with an alleged 1 billion<br />
rand overspend, which put the <strong>Department</strong> in<strong>to</strong> negative budgeting and<br />
made it impossible <strong>to</strong> recruit staff <strong>to</strong> fill key vacant posts - posts that were<br />
vital for reform and <strong>to</strong> take other remedial measures. It also meant that so<br />
called “turn around plans” were under funded and destined <strong>to</strong> fail.<br />
2.6. Eastern Cape was subject <strong>to</strong> a number <strong>of</strong> interventions by the National<br />
<strong>Education</strong> Ministry, which sent in teams <strong>to</strong> sort out Provincial education<br />
problems. These missions failed <strong>to</strong> understand the complexity <strong>of</strong> the problems<br />
facing ECDoE and were eventually withdrawn. These missions used up<br />
precious time, energy and resources which could perhaps have been utilised<br />
more beneficially <strong>to</strong> bring about systems reform and transformation.<br />
2.7. Imbewu was designed <strong>to</strong> impact upon primary education. It was decided<br />
early on in Phase II, that Imbewu should extend its reach <strong>to</strong> secondary, by<br />
assisting the Province transform 1500 schools, so they could be designated<br />
Section 21(self governing) schools. Later, Imbewu was tasked with the Matric<br />
Improvement Project (MIP) and a further remedial project for failing schools.<br />
These new priorities inevitably diluted the original primary education focus.<br />
Requests from the <strong>Department</strong> were difficult <strong>to</strong> resist and were justified as<br />
ways <strong>of</strong> embedding Imbewu within the policy priorities <strong>of</strong> the ECDoE. These<br />
changing priorities also demonstrated the fact that moving from project <strong>to</strong><br />
programme, had unforeseen implications.<br />
2.8. As the programme progressed, the <strong>Department</strong> <strong>to</strong>ok more and more<br />
ownership and control <strong>of</strong> decision making, through the modality <strong>of</strong> the<br />
Programme Steering Committee (PSC). This created some tensions between<br />
the programme framework and emerging, different priorities within ECDoE.<br />
These tensions were always resolved through the collaborative partnership <strong>of</strong><br />
the ECDoE, the Managing Consultant and DFID-SA, which was built on<br />
mutual trust and respect. For a time the Imbewu <strong>of</strong>fice became the virtual<br />
Policy and Planning Unit on which the <strong>Department</strong> relied. Now there is a fully<br />
fledged integrated Planning, Moni<strong>to</strong>ring and Evaluation Branch, under a Chief<br />
Direc<strong>to</strong>r.<br />
2.9. Before Imbewu began, there was a very basic organogram in place.<br />
There was no budget <strong>to</strong> pay for appointments and huge numbers <strong>of</strong> key posts<br />
lay vacant. There was no Direc<strong>to</strong>rate responsible for the Curriculum, no<br />
Evaluation & Moni<strong>to</strong>ring Section, no Planning Unit, no Quality Assurance nor<br />
Communications Unit, and a weak <strong>Education</strong>al Management Information<br />
System (EMIS) A major impact <strong>of</strong> the Imbewu programme has been the<br />
establishment <strong>of</strong> fully functional units in all these areas.<br />
2.10. Little consideration has been given till now <strong>to</strong> the fact that Imbewu II did<br />
not just take Imbewu I <strong>to</strong> scale, but became something <strong>of</strong> a mini Sec<strong>to</strong>r Wide<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
2
Approach Programme (SWAP) and faced many <strong>of</strong> the challenges SWAPs<br />
face.<br />
2.11. DFID’s involvement with Imbewu changed over time. At the outset, DFID<br />
was heavily engaged in the design and implementation <strong>of</strong> both Phases I and<br />
II, and were active participants in the PSC and in implementation, using<br />
influence and leverage, at the political level, <strong>to</strong> keep Imbewu on the radar<br />
screen <strong>of</strong> the Eastern Cape. However, due <strong>to</strong> changing political imperatives<br />
and reduced staffing levels (including the removal <strong>of</strong> the <strong>Education</strong> Adviser<br />
post), DFID’s involvement with Imbewu has reduced over time. This has lead<br />
<strong>to</strong> a perceptible loss <strong>of</strong> corporate reputation in the Eastern Cape.<br />
2.12. It is also timely <strong>to</strong> remember that most education systems take a long<br />
time <strong>to</strong> reform themselves. In both New Zealand and the UK it <strong>to</strong>ok 20 years<br />
<strong>to</strong> reform primary education and even now, systems in both countries are<br />
under constant review and change. Imbewu has been operating for much less<br />
time and in far less conducive circumstances.<br />
2.13. Finally, as this PCR is completed, it is important <strong>to</strong> note that attribution is<br />
always a complicated issue, especially <strong>to</strong> track attribution in an intervention<br />
this complex and in an ever-shifting, volatile context. The Imbewu programme<br />
became a s<strong>to</strong>ry <strong>of</strong> challenges, set backs and achievements . It become less a<br />
“brand” and over the past 3 years has embedded itself in <strong>to</strong> the <strong>Education</strong><br />
<strong>Department</strong>. It remains quite clear however that Imbewu has been a<br />
significant driving force/catalyst in the many reforms, taking place within the<br />
Eastern Cape <strong>Education</strong> system.(see para 2.9 )<br />
2.14. It is against this background that this assessment is made, as <strong>to</strong> how far<br />
Imbewu has succeeded in meeting its <strong>Purpose</strong> and contributed <strong>to</strong> the Goal,<br />
within the revised log frame (2006).<br />
3.1 The <strong>Review</strong><br />
Summary<br />
3.1.1 Overall the Programme has been assessed <strong>to</strong> have been largely<br />
achieved and has therefore scored an overall 2 for performance against the<br />
<strong>Purpose</strong>.<br />
3.1.2. The 2005 OPR judged <strong>Output</strong> 3 <strong>to</strong> have been fully achieved at pilot<br />
level, appreciating that budget cuts would affect the Provincial wide roll outs.<br />
As a result the review recommended that the Programme focus on <strong>Output</strong>s 1<br />
& 2 for the final 2 years. <strong>Output</strong>s 1 & 2 subsequently focussed on developing<br />
capacity in the system <strong>to</strong> ensure the process would continue post Imbewu.<br />
(Prism Doc 2005: Pg 9).<br />
3.1.3 <strong>Output</strong> 2 is judged <strong>to</strong> have been largely achieved but there are still some<br />
concerns remaining about <strong>Output</strong> 1 regarding the efficiency deficits in<br />
financial management, procurement and governance at the Provincial<br />
<strong>Department</strong> which prevent the programme from scoring a 1. There is<br />
documented evidence <strong>of</strong> significant and fundamental reform <strong>of</strong> the system<br />
which justifies the 2 rating. However, the extent <strong>of</strong> the challenge means that<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
3
y the end <strong>of</strong> Imbewu there will still be unmet targets, which is not surprising<br />
,given how long whole system change has taken even in developed countries.<br />
Detail:<br />
3.2. How far have project <strong>Output</strong>s made a contribution <strong>to</strong> the<br />
achievement <strong>of</strong> the <strong>Purpose</strong>?<br />
3.2.1. The <strong>Output</strong>s have contributed significantly <strong>to</strong> meeting the project<br />
<strong>Purpose</strong>. Imbewu has rolled out a huge training programme for people at all<br />
levels and functions <strong>of</strong> the system and concentrated on transferring skills and<br />
building organisational capacity<br />
3.3. <strong>Output</strong> 1: “<strong>to</strong> provide an efficient and appropriately staffed<br />
provincial <strong>Department</strong> <strong>of</strong> <strong>Education</strong> fulfilling a strategic role”.<br />
3.3.1. A significant amount <strong>of</strong> work has been done within the Provincial<br />
Headquarters <strong>to</strong> achieve this <strong>Output</strong>. Four areas <strong>of</strong> particular achievements,<br />
worth highlighting are:<br />
• Curriculum,<br />
• HIV/ Aids,<br />
• Moni<strong>to</strong>ring and Evaluation merged with Quality Promotion and<br />
Standards and Evidenced based planning.<br />
• Communications<br />
Curriculum:<br />
3.3.2. Imbewu assisted in the scoping and establishment <strong>of</strong> the new<br />
Direc<strong>to</strong>rate for the Curriculum which is at the core <strong>of</strong> education<br />
transformation. From being a mere unit, Curriculum became a Direc<strong>to</strong>rate,<br />
which was then subsequently upgraded <strong>to</strong> a full Chief Direc<strong>to</strong>rate. A decision<br />
is also pending, <strong>to</strong> make Curriculum a stand alone Branch, with its own<br />
Deputy Direc<strong>to</strong>r General. This is a highly significant organisational<br />
development. It clearly indicates the recognition ECDoE has given <strong>to</strong> the<br />
centrality <strong>of</strong> the Curriculum Management function, which Imbewu was<br />
striving for from the beginning <strong>of</strong> the programme. As Imbewu funding<br />
comes <strong>to</strong> an end ECDoE has underwritten the importance <strong>of</strong> the<br />
curriculum, by increasing the curriculum budget from R3 million <strong>to</strong> R31<br />
million annually plus, over the past 3 years.<br />
3.3.3. Imbewu also helped the ECoDE develop teaching and learning<br />
materials for the curriculum, through effective technical assistance. These<br />
materials have achieved national and international recognition and<br />
approbation. Few provinces have such a rich range <strong>of</strong> materials. Foundation<br />
phase materials are being used by other provinces, including Western Cape.<br />
The current Chief Direc<strong>to</strong>r acknowledges how vital Imbewu’s part was in<br />
establishing Curriculum work in the <strong>Department</strong> and building this high<br />
level <strong>of</strong> success.<br />
HIV and Aids<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
4
3.3.4. Imbewu encouraged the transition <strong>of</strong> the HIV and Aids Unit in the<br />
Provincial <strong>Education</strong> <strong>Department</strong> <strong>to</strong> full Direc<strong>to</strong>rate status. No other province<br />
has elevated HIV and Aids <strong>to</strong> this level <strong>of</strong> importance within the<br />
<strong>Education</strong> system. There is a provincial HIV and Aids strategy and each<br />
district and every school now has a strategy in place. In some schools these<br />
strategies are complemented by health promotion activities (It is estimated<br />
that some 7,346 educa<strong>to</strong>rs and learners died <strong>of</strong> illness last year in the<br />
province)<br />
Moni<strong>to</strong>ring and Evaluation merged with Quality Promotion and Standards and<br />
Evidence-Based Planning.<br />
3.3.5. The Comprehensive Evaluation Programme, involving 25 baseline<br />
surveys, was a further successful Imbewu intervention. Initially there was<br />
some incredulity that the Imbewu programme design had insisted on 5% <strong>of</strong><br />
the budget being allocated <strong>to</strong> evaluation. However this has clearly paid<br />
dividends. The province was able for the first time this year <strong>to</strong> publish a<br />
statistical pr<strong>of</strong>ile at the <strong>Department</strong>al Strategic Planning Session for the<br />
development <strong>of</strong> the 2006/2007 Annual Operating Plan.<br />
3.3.6. The evaluation and assessment instruments developed by Imbewu and<br />
being used by ECDoE are widely sought after. Many Universities, the Nelson<br />
Mandela Foundation and a range <strong>of</strong> national and international entities have<br />
been asking permission <strong>to</strong> use the instruments (See the Imbewu visi<strong>to</strong>rs<br />
request book used at the Commonwealth Minister’s Conference <strong>of</strong> December<br />
2006).<br />
3.3.7. These evaluation and assessment instruments also enabled:<br />
1. merging and integration <strong>of</strong> evaluation and moni<strong>to</strong>ring with the new<br />
Quality Promotion and Standards Direc<strong>to</strong>rate.(QPS) which is now<br />
integrated within the Planning Branch under its own Chief Direc<strong>to</strong>r;<br />
2. an annual quantitative survey <strong>to</strong> be undertaken which is fully owned by<br />
ECDoE.<br />
3.3.8. As a result, progress is now being moni<strong>to</strong>red and analysed in a<br />
comprehensive way. Cohorts <strong>of</strong> learners are being tracked from grade 1 up<br />
wards and annual assessments <strong>of</strong> all grades are taking place. A challenge for<br />
the future is <strong>to</strong> examine literacy standards in Grades 1-3 which give cause for<br />
concern. This is another area where ECDoE has recognised the<br />
importance <strong>of</strong> evaluation , research and quality promotion and has<br />
increased the budget for this work from R2 million <strong>to</strong> R15 million<br />
annually in line with Imbewu’s drive <strong>to</strong>wards evidence-based planning<br />
and budgeting, indicating another important programme impact.<br />
Communication:<br />
3.3.9. Imbewu also played a key role in bringing about more integrated<br />
planning within ECDoE and closer links between communications, moni<strong>to</strong>ring<br />
evaluation, research and policy and planning. This sounds like a smooth<br />
transition, but when Imbewu started each direc<strong>to</strong>rate was working in a ‘silo’<br />
and in a state <strong>of</strong> crisis. One comment made <strong>to</strong> the PCR review team was<br />
that, “planning has been taken <strong>to</strong> a higher level in the <strong>Department</strong>”. This<br />
has been exemplified by the fact that the 2006 Budget was generated<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
5
through an evidence-based strategic planning and costing process<br />
which was extended <strong>to</strong> district planning for the 2007 budget exercise.<br />
This also involves a drilling down <strong>to</strong> District and School level <strong>to</strong> inform<br />
planning and the initiation <strong>of</strong> research <strong>to</strong> provide feedback loops <strong>to</strong> track<br />
progress.<br />
3.3.10. One <strong>of</strong> the best pieces <strong>of</strong> evidence as <strong>to</strong> how systems improvement<br />
has taken place is <strong>to</strong> witness the manner in which management decision -<br />
making now operates. The minutes <strong>of</strong> the Programme Steering Committee<br />
(PSC) on June 21 st 2007 (annex 2) exemplifies how much progress has been<br />
made. The PSC has been a training ground for effective management<br />
pro<strong>to</strong>cols. Agendas and files were sent out 3 days before the meeting.<br />
Members brought their files <strong>to</strong> the meeting and each argued their own case<br />
for funding. This simple modality has played a significant role in<br />
establishing management accountability and has now been adopted by<br />
Top Management in the <strong>Department</strong>. This is a further important example<br />
<strong>of</strong> the influence and impact <strong>of</strong> the programme.<br />
3.3.11. Despite the efforts <strong>of</strong> the Imbewu work, there are 3 key areas where<br />
challenges still remain. They are recognised by the ECDoE as critical areas<br />
for reform, but the reform is still “in process”, rather than completed. The<br />
areas <strong>of</strong> concern are:<br />
• the distribution <strong>of</strong> Learning Support Materials, (LSM)<br />
• procurement,<br />
• financial management.<br />
LSM<br />
3.3.12. A full LSM Unit has been formed and intensive data capture is<br />
underway <strong>to</strong> inform distribution processes; a number <strong>of</strong> successful “out<br />
sourced” processes have been used, in previous years, but the ECDoE has<br />
not yet finally resolved how best <strong>to</strong> provide this vital service efficiently and<br />
cost effectively <strong>to</strong> schools.<br />
Procurement<br />
3.2.13. Although the necessary procurement structures have now been<br />
established, various issues still inhibit efficiency in this area, resulting in<br />
inordinate turnaround times. These include;-<br />
1. High vacancy rates in the procurement section (at both provincial and<br />
district <strong>of</strong>fices)<br />
2. Lack <strong>of</strong> the necessary skills at various levels as well as lack <strong>of</strong> clear<br />
procedure manuals<br />
3. Withdrawal <strong>of</strong> delegations or the lowering <strong>of</strong> some delegation ceilings<br />
at various levels (eg: Procurement above R200,000 requires full tender<br />
processes <strong>to</strong> be followed and also the approval <strong>of</strong> Provincial Treasury)<br />
All <strong>of</strong> these issues are in the process <strong>of</strong> being addressed by ECDoE and a<br />
comprehensive procurement tracking system is under discussion (Another<br />
example where institutional instability is impacting on expediting reform –<br />
Acting CFO & acting chief direc<strong>to</strong>r <strong>of</strong> supply chain management).<br />
Financial Management:<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
6
3.3.14. There is now a much healthier budgeting process in place than there<br />
was at the start <strong>of</strong> the programme (see para 3.12.1); for example, there is now<br />
a 4 day payment turn around, which represents an enormous improvement on<br />
past record where the turn around was in excess <strong>of</strong> 30 days. It is also<br />
significant that the recent audit opinion has been raised from” disclaimer” <strong>to</strong><br />
“adverse”, which at least means that the audi<strong>to</strong>rs had sufficient information <strong>to</strong><br />
make a judgement, which they did not have in the past. This is partly due <strong>to</strong><br />
the improvement in information and document management in both the Head<br />
Office and Districts. This has taken the form <strong>of</strong> improved systems and<br />
employment <strong>of</strong> registry personnel. Although there is tangible improvement<br />
there is still much more work <strong>to</strong> be done before ECDoE’s financial<br />
management processes could be described as a fully effective, functioning<br />
financial system. However, it needs <strong>to</strong> be acknowledged that any audit report<br />
is essentially a reflection <strong>of</strong> the ‘fair presentation’ <strong>of</strong> the financial statements <strong>of</strong><br />
an entity and not intended as an indication <strong>of</strong> performance – hence this OVI<br />
statement possibly not fully appropriate <strong>to</strong> assess performance <strong>of</strong> the financial<br />
management systems <strong>of</strong> the <strong>Department</strong>.<br />
3.3.15. It is not possible <strong>to</strong> verify that fully effective systems are in place,<br />
as these key areas identified above (ref: 3.3.11) are fundamental <strong>to</strong> an<br />
effective education system. The gains <strong>of</strong> any educational transformation<br />
programme such as Imbewu, would be negatively impacted upon if problems<br />
such as these persist. This output is therefore judged <strong>to</strong> have been partly<br />
achieved, and merits a score <strong>of</strong> 3.<br />
3.4 <strong>Output</strong> 2: “A fully functioning and self managing district structure<br />
providing quality support quality schools”.<br />
3.4.1. ECDoE gave priority <strong>to</strong> decentralisation through the appointment <strong>of</strong><br />
District Managers for each District. As part <strong>of</strong> that commitment, a decision<br />
was taken <strong>to</strong> appoint the District Managers at Direc<strong>to</strong>r Level, in order <strong>to</strong><br />
ensure the posts attracted high calibre staff. Imbewu played a significant part<br />
in the recruitment and induction <strong>of</strong> the 23 (originally 24) District Direc<strong>to</strong>rs,<br />
through an assessment centre process. Many <strong>of</strong> the poorest Districts lacked<br />
any place from which <strong>to</strong> operate and Imbewu assisted by providing some<br />
temporary infrastructure in four <strong>of</strong> the poorest districts in the province (six<br />
originally planned but reduced <strong>to</strong> four as a result <strong>of</strong> DFID budget reduction.)<br />
This provided pr<strong>of</strong>essional working space and enhanced service delivery <strong>to</strong><br />
schools.<br />
3.4.2. Eastern Cape received an increased proportion <strong>of</strong> national education<br />
budget over the past few years (mainly as a result <strong>of</strong> the improved equitable<br />
share formula which only recently received redress), as a result the budget for<br />
the districts has improved. Formally there was no money with which <strong>to</strong> fill<br />
vacancies. Now sufficient funds have been provided which have allowed the<br />
filling <strong>of</strong> vacancies and the provision <strong>of</strong> much needed curriculum and subject<br />
adviser posts. It is a major achievement that all <strong>of</strong> the <strong>Education</strong><br />
Development Officer (EDO) posts have been filled, and that there have<br />
been significant recent new appointments <strong>of</strong> subject advisers.<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
7
3.4.3. Much <strong>of</strong> the emphasis <strong>of</strong> the programme has been <strong>to</strong> build capacity at<br />
the District level through extensive training programmes for District staff and<br />
for School Governing Bodies. As a result, there is now better understanding <strong>of</strong><br />
roles and responsibilities at the District level, and how important it is for<br />
teachers <strong>to</strong> be supported in their classrooms, in order <strong>to</strong> improve learning.<br />
3.4.4.One empowering initiative has been <strong>to</strong> front load lap<strong>to</strong>p computers <strong>of</strong><br />
the EDOs and key subject trainers with all the education documentation they<br />
need <strong>to</strong> carry out their responsibilities and also <strong>to</strong> provide them with a<br />
CORETALK SMS package which enables them <strong>to</strong> be in close contact with<br />
their schools. 3G cards have also been provided <strong>to</strong> enable internet<br />
connection. It is significant that ECDoE have appointed 10 people in the<br />
Information Technology Direc<strong>to</strong>rate and are proposing appointments at<br />
District level <strong>to</strong> provide technical back up <strong>to</strong> sustain these initiatives and<br />
have allocated the budget required for this purpose. This is another<br />
important example <strong>of</strong> the influence and impact <strong>of</strong> the programme.<br />
3.4.5. Members <strong>of</strong> the Imbewu team have recently paid extensive District<br />
visits and reported back that the Imbewu Conference, held in Port Elizabeth in<br />
June 2007, succeeded in energising and mobilising District personnel. These<br />
personnel had never before had the opportunity <strong>to</strong> share the corporate vision<br />
<strong>of</strong> effective schooling or <strong>to</strong> participate in shaping the future for the <strong>Education</strong><br />
<strong>Department</strong> and <strong>to</strong> celebrate the successes <strong>to</strong> date. This has led <strong>to</strong> increased<br />
levels <strong>of</strong> motivation and energy at all levels.<br />
3.4.6. District management has been given increased focus. Formerly there<br />
was one District Chief Direc<strong>to</strong>r responsible for all Districts. Now Three Cluster<br />
Chief Direc<strong>to</strong>rs are mandated <strong>to</strong> moni<strong>to</strong>r and support their cluster <strong>of</strong> Districts.<br />
3.4.7. All this signifies that this <strong>Output</strong> has been highly successful, though<br />
there are regional variations and progress is not evenly distributed. It has also<br />
<strong>to</strong> be remembered that despite provincial progress 20% <strong>of</strong> people still have no<br />
running water and 30% are without electricity, so great inequalities still exist<br />
and are being addressed. This output is estimated <strong>to</strong> be 75% achieved<br />
and therefore justifies a score <strong>of</strong> 2.<br />
3.5. <strong>Output</strong> 3: “Schools, which having undergone whole school<br />
effectiveness process, are better able <strong>to</strong> provide improved learning<br />
opportunities for their learners”.<br />
3.5.1. This <strong>Output</strong> has been extremely successful. School transformation is at<br />
the core <strong>of</strong> the Imbewu design and is the element <strong>of</strong> the whole programme<br />
which has most influenced international thinking. The Imbewu School<br />
Transformation model is detailed at Annex 3 for ease <strong>of</strong> reference.<br />
3.5.2. A major triumph for Imbewu was the way in which the Transformation<br />
Model, developed in Imbewu Phase 1, was modified, institutionalised and<br />
“gazetted”. A modified version <strong>of</strong> the original Imbewu model became the<br />
<strong>of</strong>ficial Eastern Cape provincial school effectiveness model. Other donor<br />
projects, funded by the Swiss, the Americans and the Swedes, use both the<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
8
model and materials in all their schools. This gazetting or institutionalising<br />
is an excellent example <strong>of</strong> how Imbewu impacted on the education<br />
system and how this <strong>Output</strong> contributes <strong>to</strong> the <strong>Purpose</strong> <strong>of</strong> the<br />
programme.<br />
3.5.3. Management <strong>of</strong> schools has also been strengthened and support for<br />
schools increased. Extensive training has taken place. School Governing<br />
Bodies (SGBs) have been trained, and some are assuming responsibility for<br />
pedagogy in addition <strong>to</strong> their more traditionally recognised role. Codes <strong>of</strong><br />
conduct are in place in schools. Each school has an HIV and Aids strategy in<br />
place. There is a clear increase in learner/teacher attendance, a significant,<br />
but patchy, improvement in both the learning environment and learning<br />
outcomes and a decrease in dropout and repetition rates.<br />
3.5.6. The most significant achievement for the Province (which is still lagging<br />
in the Provincial leagues tables) but from which much comfort can be taken is<br />
the significant improvement in Grade 12 pass rates. There has been a 12%<br />
increase in the number <strong>of</strong> entrants and a 15% increase in pass rate from<br />
2001-2006. In Eastern Cape where poverty levels remain high, 1 in 3 children<br />
(645,060) are in receipt <strong>of</strong> social grants and there remain wide regional<br />
inequalities. There is now a database for schools which enables the<br />
<strong>Department</strong> <strong>to</strong> track under performing schools and seek <strong>to</strong> give them extra<br />
attention.<br />
3.5.7. This <strong>Output</strong> is judged <strong>to</strong> have been fully achieved and merits a<br />
score <strong>of</strong> 1.<br />
3.6. <strong>Output</strong> 4: “Improved Asset Management & Lower Cost School<br />
Buildings<br />
3.6.1. One <strong>of</strong> the achievements <strong>to</strong>tally ignored by the Final Evaluation <strong>Report</strong><br />
is the extent <strong>to</strong> which the infrastructure component brought about whole<br />
systems change. This component developed a needs assessment framework<br />
which developed the <strong>Education</strong> Facilities Management Information System<br />
(EFMS) platform and improved data collection for school buildings. Schools<br />
were separated in<strong>to</strong> quintiles <strong>of</strong> need, in order <strong>to</strong> identify repair and new<br />
building priorities. Community-centred construction was introduced and a<br />
modality for skills and resource mapping was introduced and demonstration<br />
models completed. The ramifications <strong>of</strong> how community skills were developed<br />
and how the celebrated ‘Bantwanana school’ came <strong>to</strong> be built are <strong>of</strong><br />
significance for economic rural growth. Infrastructure systems and financing<br />
was under scrutiny at the time <strong>of</strong> this PCR, but this in no way detracts from<br />
significant outcomes in this area, from which international learning is taking<br />
place. The 2005 OPR judged that the Bantwanana model was sufficient<br />
<strong>to</strong> demonstrate that <strong>Output</strong> 4 had been fully achieved and recommended<br />
that no further resources be spent on this <strong>Output</strong>; it was consequently<br />
subsequently removed from the logframe.<br />
3.7. The extent <strong>to</strong> which the Goal has been achieved?<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
9
The Goal <strong>of</strong> the programme was “<strong>to</strong> increase significantly the learning<br />
achievement <strong>of</strong> children from the Eastern Cape Province”<br />
3.7.1 By using the examinations results as a benchmark the Goal has clearly<br />
been achieved, though exam results are only ever an unsatisfac<strong>to</strong>ry proxy<br />
indica<strong>to</strong>r. Eastern Cape still has much <strong>to</strong> do <strong>to</strong> catch up with other Provinces.<br />
Other ways in which it can be demonstrated that Imbewu contributes <strong>to</strong> the<br />
Goal include the already mentioned emphasis on the curriculum, on standards<br />
and on evidence-based planning and budgeting, which address inequity <strong>of</strong><br />
service provision in the Province. These areas are being further strengthened<br />
through institutionalising knowledge products and learning in the Leadership<br />
Institutes and Teacher Resource Centres.<br />
3.8 Positive and negative impacts?<br />
3.8.1. Most <strong>of</strong> what can be said about the impact <strong>of</strong> Imbewu is positive.<br />
Repeatedly, existing and new members <strong>of</strong> the ECDoE and outsiders in the<br />
educational constituency remark on how Imbewu galvanised and supported<br />
activity and created “innovative space” which was then translated in<strong>to</strong> action.<br />
3.8.2. The FER suggests that the Imbewu intervention may have prevented<br />
the <strong>Department</strong> from taking full ownership. It is the PCR team’s view that this<br />
is not the case. Given the lack <strong>of</strong> capacity and lack <strong>of</strong> actual people on task at<br />
the beginning <strong>of</strong> Imbewu, no reforms would have taken place without the<br />
programme. A seamless transfer <strong>of</strong> power and responsibility <strong>to</strong> the<br />
<strong>Department</strong> has occurred during the Imbewu lifespan. This was cleverly<br />
managed by the Managing Consultants’ local representatives based in the<br />
Imbewu Office. It did not just happen; it was carefully orchestrated. An<br />
example <strong>of</strong> the success <strong>of</strong> the transfer is the fact that the Technical Assistant<br />
(TA) for Curriculum initially produced 7 curriculum guidelines, but since the<br />
appointment <strong>of</strong> the new Chief Direc<strong>to</strong>r Curriculum in 2005 and the<br />
development and acquisition <strong>of</strong> “in house“ expertise, the TA’s role for the 4<br />
latest guidelines has been purely advisory.<br />
3.9. Successes and challenges and lessons from the project that can be<br />
used <strong>to</strong> inform future activities<br />
3.9.1. Moving from project (Phase 1) <strong>to</strong> programme (Phase 2) requires a long<br />
preparation phase and careful, realistic design, which takes account <strong>of</strong><br />
prevailing ground realities. There will always be un-anticipated challenges and<br />
the important thing is <strong>to</strong> remain focussed, flexible and responsive. It is also<br />
important <strong>to</strong> recognise that the path from project <strong>to</strong> programme is not a linear<br />
development and may not always take you in the original direction <strong>of</strong> travel.<br />
3.9.2. Had there been more understanding at the beginning <strong>of</strong> Imbewu Phase<br />
II <strong>of</strong> what moving from project <strong>to</strong> programme actually implied, it would have<br />
been important <strong>to</strong> insist on aligning Imbewu funding with the ECDoE budget<br />
so that Imbewu was reflected as a supplementary budget.<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
10
3.9.3. Successful skills transfer is not easy <strong>to</strong> achieve and normally involves<br />
skilful local people working steadily over time alongside others, rather than<br />
international expertise, which has its place, but is not best suited for skills<br />
transfer activities which take time and effort and deep contextual<br />
understanding.<br />
3.9.4. The importance <strong>of</strong> building teams and relationships is an obvious aim <strong>of</strong><br />
any project, but does not always happen and requires a considerable<br />
investment <strong>of</strong> time and energy by all partners if a sufficient level <strong>of</strong> trust, open<br />
dialogue and genuine partnership is <strong>to</strong> occur.<br />
3.9.5. The development <strong>of</strong> the PSC is a qualitative s<strong>to</strong>ry <strong>of</strong> how people got<br />
better and better at estimating how much could be done and at what cost. It<br />
was a measure <strong>of</strong> how the PSC matured and how DFID and Arcadis BMB<br />
began <strong>to</strong> hand over responsibility, that these meetings which had been<br />
monthly, moved <strong>to</strong> two monthly and then <strong>to</strong> quarterly.<br />
3.9.6. This is a good moment <strong>to</strong> commend Imbewu management, for its<br />
organisational commitment <strong>to</strong> the transfer <strong>of</strong> skills which has underpinned the<br />
whole impetus <strong>of</strong> the programme and has been firmly built in<strong>to</strong> all technical<br />
assistance and characterises the success <strong>of</strong> this programme. One <strong>of</strong> the<br />
lessons <strong>to</strong> learn from successful skills transfer is the need <strong>to</strong> insist on named<br />
individuals <strong>to</strong> whom skills will be transferred. This represents another example<br />
<strong>of</strong> the important human resource commitment made by ECDoE <strong>to</strong> Imbewu<br />
which paid tremendous dividends.<br />
3.9.7. The development <strong>of</strong> an international network which was brought<br />
<strong>to</strong>gether for the highly acclaimed Imbewu Conference at Port Elizabeth is also<br />
<strong>of</strong> significance. The visits by teams from Bangladesh and Pakistan , Nigeria,<br />
China etc. and the subsequent visit by Eastern Cape <strong>to</strong> Kenya after the June<br />
2007 Conference, have been a lasting engagement, which may well<br />
continue beyond Imbewu’s life span. It demonstrates the importance <strong>of</strong> south<br />
<strong>to</strong> south dialogue in empowering people <strong>to</strong> take charge <strong>of</strong> their own reform<br />
processes. DFID can play a key role as an enabler <strong>of</strong> these kinds <strong>of</strong> activities<br />
which enrich programmes and understanding across the globe.<br />
3.9.8. One <strong>of</strong> the remaining curriculum challenges for the province will be the<br />
rollout <strong>of</strong> e-learning and multi media for which the ECDoE has indicated it will<br />
need external assistance. This was supposed <strong>to</strong> have been mediated through<br />
a national initiative which has been put on hold. Hopefully ECDoE will be able<br />
<strong>to</strong> source its own technical assistance in future on a specific needs basis.<br />
3.9.9. The 4 Higher <strong>Education</strong> Institutions; (ie; Fort Hare, Walter Sisulu,<br />
Rhodes, and Nelson Mandela Universities) have played a significant part in<br />
design, research and evaluation <strong>of</strong> Imbewu. The Imbewu Programme Coordina<strong>to</strong>r<br />
is meeting all the Deans <strong>of</strong> <strong>Education</strong> as part <strong>of</strong> the sustainability<br />
strategy. The Universities will play an important role in carrying the Imbewu<br />
legacy forward. Other programmes can learn from the importance <strong>of</strong> involving<br />
all the surrounding education institutions, in ambitious reform processes.<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
11
3.10. What are the lessons that should be learnt regarding design and<br />
implementation, including aspects <strong>of</strong> programme management, working<br />
with partner’s best practice and innovation?<br />
3.10.1. At the end <strong>of</strong> a programme it is easy <strong>to</strong> critique the logframe and find it<br />
over-ambitious. The lesson <strong>to</strong> learn is <strong>to</strong> keep design realistic and achievable<br />
and <strong>to</strong> realise how long things take <strong>to</strong> happen (this is very difficult for DFID<br />
programme staff, when arguing for funding in a policy environment where<br />
swift and visible results are required)<br />
3.10.2. Imbewu demonstrates how much successful outcomes depend on<br />
quality individuals, effective management, communications and exemplary<br />
standards. Personalities do matter. Imbewu has had outstanding people<br />
driving the transformation process, who have worked tirelessly and way<br />
beyond what would normally be expected.<br />
3.10.3. The work <strong>of</strong> other donors (though they are few and with small funding<br />
in Eastern Cape) has always been valued and incorporated in<strong>to</strong> Imbewu<br />
thinking and activity. It is generally acknowledged that a degree <strong>of</strong> donor<br />
coordination is desirable but it is not necessary <strong>to</strong> set up cumbersome<br />
coordination committees, if informal systems work effectively.<br />
3.10.4 Creating” innovative space” within programme design is essential for<br />
quality <strong>to</strong> emerge. For Imbewu this allowed both the school transformation<br />
and school community construction models <strong>to</strong> develop, but this concept has<br />
also resulted in other creative outputs.<br />
3.10.5. In the move <strong>to</strong> decentralisation it might have been politic <strong>to</strong> harness<br />
political leadership and the local municipality level <strong>to</strong> champion the<br />
transformation process and also <strong>to</strong> involve the teacher unions more<br />
proactively as they are a particularly powerful force in Eastern Cape.<br />
3.11. Has the programme been institutionalised?<br />
3.11.1. There is plenty <strong>of</strong> evidence that Imbewu has been mainstreamed.<br />
One piece <strong>of</strong> evidence is the willingness with which ECDoE has identified<br />
significant budget lines, which Imbewu has supported during the life <strong>of</strong> the<br />
programme, <strong>to</strong> ensure the work continues. These have already been<br />
mentioned in relation <strong>to</strong> the Curriculum and <strong>to</strong> Quality Promotion, Standards<br />
and IT.<br />
3.11.2. Much has been done <strong>to</strong> preserve the substantial Imbewu programme<br />
archive both in hard and s<strong>of</strong>t copies (on the Website). This will ensure that the<br />
institutional memory and s<strong>to</strong>ry line <strong>of</strong> how Imbewu unfolded [showing how<br />
things can be done and the materials with which <strong>to</strong> do them] is being written<br />
up and preserved.<br />
3.11.3. One <strong>of</strong> the most important legacies will be the Leadership Centres in<br />
East London, Mthatha and Port Elizabeth and the District resources centres<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
12
which are already being fully utilised and have already become dynamic<br />
centres for mutual learning and exchange.<br />
3.11.4. A question which has arisen is whether the values and relationships<br />
which Imbewu nurtured, will be maintained in the difficult political context,<br />
without specifically designated champions. Many <strong>of</strong> those interviewed spoke<br />
<strong>of</strong> their own personal and pr<strong>of</strong>essional growth through the Imbewu<br />
experience. The PCR team felt that sufficient champions now exist<br />
throughout the education system, and beyond, <strong>to</strong> ensure that the very culture<br />
which has characterised Imbewu will live on.<br />
3.12. How successfully were risks managed and what has been the<br />
impact on the programme?<br />
3.12.1. At the beginning <strong>of</strong> Imbewu the <strong>Education</strong> <strong>Department</strong> was in crisis.<br />
The Eastern Cape is now getting more money from national level. Valuable<br />
lessons were learned by the ECDoE in the area <strong>of</strong> planning and<br />
budgeting, particularly in the area <strong>of</strong> Activity Based Costing/Budgeting,<br />
which was also exemplified in PSC financial reports.<br />
3.12.2. Some <strong>of</strong> the risks related <strong>to</strong> this programme have been managed<br />
particularly effectively, for example:<br />
• Bringing the budget within control and allocating funding, post Imbewu,<br />
<strong>to</strong> activities which are key for sustainability.<br />
• Provincial HIV & Aids Strategy is now in place and being implemented<br />
in Districts and schools.<br />
• Increased budget allocation has enabled vacancies and new<br />
appointments <strong>to</strong> be made at Provincial and District level.<br />
• Capacity has been built and a skills and empowerment programme has<br />
ensured that people are in place <strong>to</strong> drive the transformation agenda<br />
forward.<br />
• Due <strong>to</strong> unforeseen, unplanned budget cuts in 2004, DFID’s funding<br />
was reduced from the original allocation <strong>of</strong> £22 million <strong>to</strong> £17 million.<br />
This required sensitive management and significant reprioritisation,<br />
which unfortunately meant there were some aspects <strong>of</strong> the original<br />
programme that could not be undertaken. Some examples <strong>of</strong> planned<br />
activities which were cut as a result <strong>of</strong> the budget reduction were:<br />
o Maintaining the high intensity level <strong>of</strong> the School Transformation<br />
Programme roll-out<br />
o Reduction from 6 <strong>to</strong> 4 <strong>of</strong> relief district <strong>of</strong>fice infrastructure<br />
3.12.3. Political and institutional instability was always going <strong>to</strong> be a risk,<br />
outside <strong>of</strong> the Imbewu domain <strong>of</strong> influence. This has resulted, as already<br />
indicated in suspensions, transfers etc <strong>of</strong> key people. It would have been<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
13
helpful if the ECDoE had used its own performance moni<strong>to</strong>ring system <strong>to</strong><br />
better effect in this regard so that drastic action was kept <strong>to</strong> a minimum. This<br />
risk has been somewhat mitigated by keeping the Imbewu focus, whatever<br />
challenges were being faced, strictly on programme outcomes, through the<br />
regular and balanced steer <strong>of</strong> the Programme Steering Committee.<br />
3.13. What is the likelihood <strong>of</strong> the sustainability <strong>of</strong> programme<br />
achievements beyond DFID support?<br />
3.13.1. There is overwhelming evidence that Imbewu has achieved a level <strong>of</strong><br />
such fundamental transformation, and significant impact, as indicated, that<br />
programme gains will be maintained. The best evidence for this is in the way<br />
in which post-Imbewu budget allocations have been made, and <strong>Output</strong>s<br />
institutionalised. The fundamental transformation is also evident in the fact<br />
that the ECDoE is now an integrated planning organisation which utilises<br />
evidence for long term strategic planning and budgeting and uses systemic<br />
evaluation, quality promotion, standards and research.<br />
3.13.2. The ECDoE should be congratulated for the way in which it has<br />
committed human resources <strong>to</strong> the Imbewu <strong>of</strong>fice from the outset, and <strong>to</strong><br />
many other initiatives that Imbewu started. ECDoE should also be<br />
congratulated for how, during the exit strategy, some <strong>of</strong> the necessary<br />
budgetary commitments have been made <strong>to</strong> specific key areas which are<br />
crucial for sustainability. In this sense the partnership with the <strong>Department</strong><br />
over time has grown in<strong>to</strong> a mature and genuinely equal relationship.<br />
3.14. Implementation <strong>of</strong> the recommendations <strong>of</strong> the 2006 Annual<br />
<strong>Review</strong>;<br />
Unqualified audit status<br />
3.14.1. An audit opinion alone is a poor indica<strong>to</strong>r <strong>of</strong> performance. The current<br />
audit opinion <strong>of</strong> ECDoE is an “adverse” opinion which means that the audi<strong>to</strong>rs<br />
have decided that the Annual Financial Statement (AFS) is materially<br />
inaccurate. This can be viewed both positively and negatively in that clearly it<br />
is negative that the AFS is considered wrong, but positive that the audi<strong>to</strong>rs<br />
were given sufficient information and documentation <strong>to</strong> enable them <strong>to</strong> reach<br />
an opinion. In previous years the audit opinion was a “disclaimer” which<br />
meant they were given insufficient evidence on which <strong>to</strong> form an opinion. So<br />
this could be interpreted as progress. However, the suspension <strong>of</strong> the Chief<br />
Financial Officer and other key <strong>of</strong>ficials, alongside recent changes in<br />
management styles, has left the ECDoE unprepared <strong>to</strong> adequately manage<br />
audit processes. Many <strong>of</strong> the items in the current audit report can be easily<br />
addressed but there are also valid audit remarks where ECDoE have fallen<br />
short <strong>of</strong> the required legislated mark. Without the necessary experienced and<br />
qualified staff it will be difficult for the <strong>Department</strong> <strong>to</strong> fully address the<br />
concerns raised.<br />
Communications strategy<br />
3.14.2. Imbewu assisted in the production <strong>of</strong> approximately ten issues per<br />
annum, <strong>of</strong> the Newsletter Umdibanisi, which is sent <strong>to</strong> all schools, District<br />
<strong>of</strong>fices and <strong>Department</strong>s, within the Provincial Headquarters, and has proved<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
14
a useful vehicle for celebrating success. The newsletter was re-launched in<br />
June 2007 in new corporate colours <strong>to</strong> present ECDoE as part <strong>of</strong> the<br />
Provincial corporate brand image. This is part <strong>of</strong> a move by the new Direc<strong>to</strong>r,<br />
<strong>to</strong> get people <strong>to</strong> understand their role as part <strong>of</strong> a whole system.<br />
3.14.3. A sister publication, showcasing all the new appointments, has also<br />
been published and circulated. The communication strategy has been<br />
integrated with concern for cus<strong>to</strong>mer care, which is being informed by public<br />
perception surveys. A remaining challenge for Communications is <strong>to</strong> develop<br />
a more proactive style and more positive relations with the media, <strong>to</strong> promote<br />
<strong>Education</strong> success s<strong>to</strong>ries. It is well known in Eastern Cape, how ready the<br />
media is <strong>to</strong> criticise and damage.<br />
3.14.4. The highly successful International Imbewu <strong>Review</strong> Conference in<br />
June 2007 was part <strong>of</strong> the Imbewu dissemination and communications<br />
strategy, which ensured wide distribution <strong>of</strong> knowledge and materials relating<br />
<strong>to</strong> Imbewu. The Conference left an impressive national and international<br />
footprint. Many <strong>of</strong> those who attended have since attested that this was one <strong>of</strong><br />
the best ever International events they had ever attended.<br />
The Communications Strategy <strong>to</strong> promote the Leadership Institute<br />
3.14.5. Three booklets have been published about programmes available at<br />
the Leadership Institute in East London and its two satellite centres at<br />
Mthatha and Port Elizabeth. There is attractive, institutional colour branding<br />
which includes the district Resource Centres. They are vibrant, enabling<br />
environments. A special ECDoE strategic planning session on the role and<br />
functioning <strong>of</strong> the Institutes was held and an important decision taken <strong>to</strong> place<br />
key people from particular wings <strong>of</strong> ECDoE at the Institute, <strong>to</strong> give gravitas<br />
and significance <strong>to</strong> the organisation. At present the Chief Direc<strong>to</strong>r <strong>of</strong> the East<br />
London Institute is a secondee from South African Development Institute<br />
(SAMDI), with an appointment <strong>to</strong> a permanent post pending.<br />
3.14.6. The Institute will house the considerable archive <strong>of</strong> materials produced<br />
by Imbewu, including more than ten evaluation studies <strong>of</strong> aspects <strong>of</strong> the<br />
programme, the training modules and is currently involved in providing<br />
resources for the district centres. In many senses these Institutes are seen as<br />
a significant part <strong>of</strong> the Imbewu legacy and as centres for formal and informal<br />
innovative and reflective educational space, as well as key training and<br />
capacity building centres. It is significant that ECDoE Top Management are<br />
already utilising this space.<br />
Amendment <strong>of</strong> purpose OVI<br />
3.14.7. The amendment <strong>of</strong> the OVI was agreed in November 2006 when the<br />
numbers relating <strong>to</strong> District <strong>of</strong>fices was reduced <strong>to</strong> 60% and whole school<br />
development was modified from all schools <strong>to</strong> a 300% increase in number <strong>of</strong><br />
schools going through the transformation process.<br />
Moni<strong>to</strong>ring and Evaluation<br />
3.14.8. Imbewu has been highly successful in raising the pr<strong>of</strong>ile and<br />
budgeting for Moni<strong>to</strong>ring and Evaluation within the ECDoE. The close-out<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
15
eport <strong>of</strong> the long term TA who has been working on Moni<strong>to</strong>ring and<br />
Evaluation indicates the high level <strong>of</strong> achievement in this area. The<br />
Comprehensive Evaluation programme started in 2003/4 and was later<br />
integrated in<strong>to</strong> the Quality Promotion and Standards Direc<strong>to</strong>rate. Twenty five<br />
baseline studies have been completed. An integrated multi level framework<br />
was developed during 2005/06 and refined in 2006/07, which ensured that the<br />
evaluation model would form part <strong>of</strong> the new ECoDE organogram for the<br />
dedicated Planning Branch under which strategic planning, moni<strong>to</strong>ring,<br />
evaluation, standards setting, research and policy would fall. This has all<br />
meant that the Direc<strong>to</strong>rate has been able <strong>to</strong> contribute meaningfully <strong>to</strong> the<br />
National Quality Assurance process and indeed influence national policy and<br />
direction.<br />
INSET strategy<br />
3.14.9. The Holistic strategy for pr<strong>of</strong>essional development and training was<br />
developed in 2007. This involved an audit <strong>of</strong> all the challenges facing different<br />
branches <strong>of</strong> the education system. Training has in the past been conducted<br />
under separate Direc<strong>to</strong>rates and has overlapped and caused some training<br />
fatigue and a lack <strong>of</strong> integrated coherence.<br />
3.14.10. The Higher <strong>Education</strong> Institutions, especially Fort Hare University<br />
(UFH), have played an important role with regard <strong>to</strong> In-service training . Thirty<br />
ECDoE <strong>of</strong>ficials and school based personnel who participated in the Imbewu<br />
sponsored UFH <strong>Education</strong> Leadership Management Development pilot are<br />
currently completing their Masters Degrees. The Nelson Mandela Institute at<br />
Fort Hare is playing a significant role in training School Governing Bodies and<br />
Financial Management Training has also been provided by another UFH<br />
based entity, Fort Hare Institute <strong>of</strong> Governance (FHIG).<br />
3.14.11. A major challenge for the smooth delivery <strong>of</strong> training appears <strong>to</strong> be<br />
accessing the skills levy <strong>to</strong> fund activities (Skills levy is an obliga<strong>to</strong>ry 1% <strong>of</strong><br />
personnel budget set aside for pr<strong>of</strong>essional development). The new<br />
integrated Inset strategy recommends more flexible and “bespoke” training,<br />
reflecting actual needs and urges more relevant, focussed and better quality<br />
training, particularly <strong>to</strong> prepare teachers for their role in a rapidly changing<br />
global context. It remains <strong>to</strong> be seen how far progress made by Imbewu and<br />
materials produced under this programme continue <strong>to</strong> fulfil that need. There<br />
will need <strong>to</strong> be a champion in the ECDoE <strong>to</strong> ensure training programmes are<br />
closely aligned <strong>to</strong> the findings <strong>of</strong> QPS Chief Direc<strong>to</strong>rate and kept under<br />
constant review.<br />
The Comprehensive <strong>to</strong>ol kit which contributes <strong>to</strong> institutionalising lessons<br />
learnt within Imbewu<br />
3.14.12. The learning kit <strong>to</strong> ensure all Imbewu lessons are institutionalised<br />
has been fully developed. Everyone has access <strong>to</strong> all knowledge products<br />
and information. In particular, as has already been mentioned , significant<br />
numbers <strong>of</strong> files have been loaded on<strong>to</strong> the lap<strong>to</strong>ps provided <strong>to</strong> the EDOs and<br />
Subject specialists.( especially in geography and e-learning) So they have all<br />
the information they require <strong>to</strong> support schools (eg EMIS data, disciplinary<br />
procedures <strong>to</strong>ol box, Policy Handbook including <strong>Education</strong> acts , School post<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
16
provisioning, Imbewu modules , Integrated Quality Management System<br />
(IQMS) training manual etc) In addition, the School Management Manual has<br />
been extensively revised and fully distributed <strong>to</strong> all schools in 2007.<br />
3.14.13. Fifteen research reports commissioned through Imbewu have been<br />
published and circulated <strong>to</strong> the MEC, SG all Senior <strong>Department</strong>al Managers<br />
and placed in the Archive and on the Website.<br />
3.14.14. The ECDoE website is now functional. It would have been extremely<br />
easy <strong>to</strong> establish an Imbewu website but a deliberate decision was taken by<br />
Imbewu management <strong>to</strong> assist the ECDoE in establishing a suitable<br />
<strong>Department</strong>al website in order <strong>to</strong> ensure long term ownership. All the research<br />
studies conducted by local Universities are on the site. There are still some<br />
concerns at the pace at which the webmaster is uploading the Imbewu<br />
archive and this may need <strong>to</strong> be a major thrust as Imbewu comes <strong>to</strong> closure.<br />
It has been suggested that the Managing Consultant should also upload all<br />
the documentation as a double insurance and provide a link <strong>to</strong> ECDoE<br />
website.<br />
3.14.15. A consultant is currently working on the production <strong>of</strong> an Imbewu<br />
DVD around the Programme <strong>Output</strong>s, which will enable the user <strong>to</strong> click on an<br />
output which will take them <strong>to</strong> clips and footage <strong>of</strong> archive material.<br />
3.15. Effectiveness <strong>of</strong> project moni<strong>to</strong>ring and reporting<br />
3.15.1. The project moni<strong>to</strong>ring and reporting process for Imbewu has been<br />
exemplary and completed timeously, as witnessed by the OPR reports which<br />
form a far more effective institutional record <strong>of</strong> the programme than the FER.<br />
Arcadis BMB have reported quarterly <strong>to</strong> DFID as per their TORS, but have not<br />
recently had feedback on their reports. Accounting has been highly effective<br />
and has generated excellent and accurate reports. The programme has<br />
currently spent over 98% <strong>of</strong> its budget and will be fully spent by the end <strong>of</strong><br />
November 2007.<br />
3.16. Use <strong>of</strong> technical assistance<br />
3.16.1. At the time the Imbewu Managing Consultants contract was agreed,<br />
DFID’s Procurement <strong>Department</strong> agreed <strong>to</strong> the earmarking <strong>of</strong> 4.2 million for<br />
broad technical assistance <strong>to</strong> Imbewu. The FER makes some curious and ill<br />
informed remarks about excessive use <strong>of</strong> technical assistance in a<br />
programme which was designed <strong>to</strong> be substantially about know-how and skills<br />
transfer. What the report fails <strong>to</strong> realise is, that the sums <strong>of</strong> money it bundles<br />
<strong>to</strong>gether as technical assistance, includes local service providers, training and<br />
materials production, as well as actual technical assistance.<br />
3.16.2. Technical assistance has been the backbone <strong>of</strong> Imbewu and has<br />
resulted in remarkable skills transfer which is rarely achieved in programmes<br />
<strong>of</strong> this kind. It has been particularly effective in Materials production and<br />
Curriculum development; Moni<strong>to</strong>ring and Evaluation; Infrastructure; District<br />
Development; Strategic Planning and the Development <strong>of</strong> the Leadership<br />
Institutes. It has been provided on the basis <strong>of</strong> need, and at the request <strong>of</strong><br />
Direc<strong>to</strong>rates, through the PSC and in full consultation over individual selection<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
17
(ECDoE also felt that they should have had more say over the initial choices<br />
<strong>of</strong> project management personnel).<br />
3.16.3. It is also important <strong>to</strong> note that the Managing Consultant rigorously<br />
capped local and international fee rates and kept international consultancy <strong>to</strong><br />
a minimum, thus ensuring maximum benefit from technical assistance <strong>to</strong> the<br />
<strong>Department</strong>.<br />
(The Management Consultancy also <strong>to</strong>ok no fee but only uplift from<br />
what ever technical assistance was requested and supplied. This<br />
resulted in their management cost being calculated by DFID audi<strong>to</strong>rs as<br />
only 14% <strong>of</strong> <strong>to</strong>tal costs as compared with 42% in another similar<br />
programme)<br />
3.17. Conclusion<br />
3.17.1. Imbewu has brought about a significant transformation <strong>of</strong> the<br />
<strong>Education</strong> system in the Eastern Cape, in a difficult political context <strong>of</strong> change<br />
and instability. This has led <strong>to</strong> the improvement <strong>of</strong> learning opportunities <strong>of</strong><br />
thousands <strong>of</strong> children. There is no doubt that without Imbewu, the substantial<br />
reforms in the ECDoE would not have taken place at the same pace. The<br />
documentation, which records the Imbewu legacy, is abundant and excellent.<br />
The personnel who have driven and guided the process are also <strong>of</strong><br />
unparalleled quality.<br />
3.17.2. However, in log frame terms, it is not possible <strong>to</strong> say that the <strong>Purpose</strong><br />
has been fully achieved. The outstanding concerns around financial<br />
management, procurement and governance, lead the PCR team <strong>to</strong> the view<br />
that the Provincial department has only been partly reformed, District and<br />
school development has only been largely achieved. Therefore, it is judged<br />
that the <strong>Purpose</strong> has been largely met and therefore merits a 2 score.<br />
Draft PCR Aide Memoire: 19 Oc<strong>to</strong>ber 2007<br />
18
Project Completion <strong>Report</strong> (PCR)<br />
o This document is the new template for Project Completion <strong>Report</strong> (PCR). It is not protected in any way<br />
so may be used as different departments see fit. It is divide in<strong>to</strong> four parts. (There is a separate form for<br />
Budgetary Support / SWAPS).<br />
o For a full explanation <strong>of</strong> information required please read Guidance on Scoring Projects & Programmes<br />
in PRISM.<br />
o See also notes for completion at end <strong>of</strong> this form.<br />
Project Completion <strong>Report</strong> (PCR) V1.0
Project Completion <strong>Report</strong> (PCR)<br />
Part A - Project Data<br />
Project<br />
Short Title<br />
Provincial, District and School Development Programme – Eastern Cape (IMBEWU)<br />
Benefiting Country / Region South Africa MIS code 059 550 097<br />
Current Project Officer Name Gillian Oroni Approved Commitment £22,000,000(reduced <strong>to</strong> £17,000,000<br />
in 2004)<br />
Actual Start Date<br />
(dd/mm/yyyy)<br />
Planned End Date<br />
(dd/mm/yyyy)<br />
19/04/2001 Spend To Date £16,891,703<br />
30/11/2007 Date <strong>of</strong> <strong>Review</strong> 2 – 5 Oc<strong>to</strong>ber 2007<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 1
Part B – Project Scoring Assessment<br />
Goal Statement Objectively Verifiable Indica<strong>to</strong>rs (OVIs)<br />
To increase significantly the learning achievement <strong>of</strong> children from Eastern 25% Improvements in completion rates over the baseline by the end <strong>of</strong> the<br />
Cape Province.<br />
programme.<br />
<strong>Purpose</strong> Statement Objectively Verifiable Indica<strong>to</strong>rs<br />
(OVIs )<br />
To develop an effective,<br />
efficient and affordable<br />
decentralized education<br />
system.<br />
• 60% <strong>of</strong> District <strong>of</strong>fices providing<br />
effective timely educational<br />
services and support <strong>to</strong> schools<br />
by programme end.<br />
• Whole School Development<br />
implemented in 60% <strong>of</strong> Eastern<br />
Cape Schools.<br />
• 300% increase in the number <strong>of</strong><br />
schools (compared <strong>to</strong> IMBEWU<br />
I) implementing the Imbewu<br />
model in the Eastern Cape by<br />
programme end.<br />
Progress Recommendations/Comments<br />
• 90% achieved<br />
• Achieved School<br />
effectiveness model gazetted<br />
and institutionalised<br />
• Achieved<br />
On the surface, the purpose level<br />
OVis have been met but the fact is<br />
that there are still efficiency deficits<br />
in the provincial headquarters<br />
around fundamental issues such as<br />
finance, procurement and Learning<br />
Support materials which make it<br />
impossible <strong>to</strong> affirm that the purpose<br />
is fully met. These outstanding<br />
issues are being addressed by the<br />
ECDOE but are unlikely <strong>to</strong> be<br />
resolved by the end <strong>of</strong> Imbewu.<br />
<strong>Purpose</strong> <strong>to</strong> Goal<br />
It is clear from the evidence that the Imbewu programme has contributed <strong>to</strong> achieving the Goal <strong>of</strong> the programme. Attribution is<br />
complex at this level given the fact that there have been nationally driven initiatives etc which have also impacted on the Goal but there<br />
remains significant evidence <strong>of</strong> the catalytic and systemic role played by Imbeu<br />
Project <strong>Purpose</strong> Rating- General /Overall progress assessment 2<br />
Justification<br />
Much <strong>of</strong> what has been most successful in Imbewu has focussed on school level improvement and on building capacity at District level<br />
<strong>to</strong> support schools. Documented evidence/data concerning systemic evidenced based planning also indicates that inequalities in<br />
service provision are being addressed and that exam entries and pass rates have improved<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 2
State how far the project has helped <strong>to</strong> deliver the objectives <strong>of</strong> the Country Assistance Plan (where appropriate)<br />
N/A<br />
<strong>Output</strong>s Objectively Verifiable Indica<strong>to</strong>rs<br />
(OVIs)<br />
1. An effective, efficient and<br />
appropriately staffed Provincial<br />
<strong>Department</strong> <strong>of</strong> <strong>Education</strong> fulfilling a<br />
strategic role<br />
• <strong>Department</strong>al Audit improves <strong>to</strong><br />
‘qualified’ by 2005/6.<br />
• ECED Procurement Board established<br />
and operational by end 2004.<br />
• Anti-corruption strategy written and<br />
being implemented by end 2004.<br />
• All Managers in SMS <strong>to</strong> have agreed<br />
personal development plans by end<br />
2004 and all above grade 9 <strong>to</strong> have<br />
pdps in place by end 2005.<br />
• Audit committee established by mid<br />
2004 and internal audit <strong>of</strong>fice fully<br />
operational by end 2004.<br />
• HR Plans in place during PY3 and<br />
critical posts (Direc<strong>to</strong>r and upwards)<br />
filled by PY4.<br />
• ECDoE actively participating in the<br />
planning and implementation<br />
processes <strong>of</strong> the Provincial Social<br />
Needs and Economic Clusters.<br />
• <strong>Department</strong>al HIV and AIDS strategy<br />
implemented by PY4 for staff and for<br />
schools/learners.<br />
• Payment backlogs reduced by 50% in<br />
PY4 and 80% by PY5 in relation <strong>to</strong><br />
March 2004 positions.<br />
• Performance Management Systems in<br />
Progress Score<br />
• Not Achieved. Some progress has been<br />
made as audit opinion has moved from a<br />
disclaimer <strong>to</strong> adverse which at least implies<br />
sufficient information was supplied <strong>to</strong> make<br />
a judgement<br />
• Achieved – the 3 required committees<br />
established. Corruption is being confronted.<br />
• Developed in 2005<br />
• System in place and making headway<br />
• External Audit Committee established in<br />
2004; Internal audit unit established in 2006<br />
• Achieved. Much activity <strong>to</strong> fill vacancies<br />
now that increased budget available, all<br />
critical now posts filled<br />
• This is happening through the Chief Direc<strong>to</strong>r<br />
planning who is coordinating the Cluster and<br />
driving a long term integrated strategic<br />
planning process<br />
• The HIV and Aids strategy is in place in all<br />
schools<br />
• There has been significant improvement<br />
here e.g. payments now turned around in 4<br />
days compared <strong>to</strong> 30 days in the past. 4-day<br />
3<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 3
place at all levels by PY3 (IQMS during<br />
PY4)<br />
• Functioning Moni<strong>to</strong>ring and <strong>Report</strong>ing<br />
Systems connecting province, districts<br />
and schools in place by PY5.<br />
• Achieved for Senior Management Service by<br />
end 2005; at Middle Man level by 2006;<br />
IQMS (PMS for educa<strong>to</strong>rs) implemented in<br />
2006.<br />
• Paper-based system in place and working<br />
effectively with plans for future electronic<br />
version subject <strong>to</strong> broader IT roll-out plan in<br />
the Province.<br />
2. A fully functioning and selfmanaging<br />
district structure providing<br />
quality support <strong>to</strong> schools.<br />
• Persal system cleaned, maintained and<br />
available as part <strong>of</strong> the management<br />
information system by end 2005.<br />
• All critical posts filled by PY2.<br />
• EDO’s and Subject Advisers more<br />
effectively involved in service <strong>of</strong><br />
schools<br />
• 50% <strong>of</strong> administrative systems<br />
operational <strong>to</strong> promote effectiveness<br />
and efficiency in bridging gaps between<br />
province and schools by PY2 and the<br />
remainder by PY4.<br />
• EMIS, PERSAL and FMS phased in<strong>to</strong><br />
districts by PY3.<br />
• Training, development and in-service<br />
opportunities for school based and<br />
other staff increased by 30% by<br />
• Persal system cleaned; partially achieve i.r.o<br />
being fully part <strong>of</strong> the MIS<br />
• 75% achieved <strong>to</strong> date. There have been 3<br />
organograms and a 4th one is under<br />
preparation which makes moni<strong>to</strong>ring this<br />
indica<strong>to</strong>r difficult. Despite this there has<br />
been a significant recruitment drive.<br />
• In Progress - EDO Induction completed in<br />
2006; capacity-bldg in progress; significant<br />
numbers <strong>of</strong> EDOs and SAs appointed<br />
recently and a range <strong>of</strong> empowering support<br />
systems put in place. This is now a<br />
mainstream ECDoE activity and will<br />
continue<br />
• The merging <strong>of</strong> systemic evaluation with<br />
Quality Promotion and Standards<br />
addressing this issue and studies carried out<br />
being provided so that district level planning<br />
can be informed by relevant data. Also SA-<br />
SAMS (South African School Administration<br />
& Management System) 3 rd yr <strong>of</strong> rollout;<br />
promotion schedule system in place and<br />
working effectively.<br />
• Achieved<br />
• The integrated holistic training strategy has<br />
2<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 4
programme end. been developed and intensive training<br />
carried out. The role <strong>of</strong> Higher <strong>Education</strong> in<br />
this not <strong>to</strong> be underestimated since they are<br />
the major provider <strong>of</strong> both initial and inservice<br />
education/training.<br />
3. Schools, which having undergone<br />
whole school effectiveness<br />
processes, are better able <strong>to</strong> provide<br />
improved learning opportunities for<br />
their learners.<br />
• Trained curriculum support<br />
structures/teams operational at district<br />
level.<br />
• Achieved in pilot schools. Provincially,<br />
Schools are being taken through the whole<br />
school effectiveness training through Imbewu<br />
and other donor initiatives<br />
• High quality materials and guidelines for<br />
teachers and resource centres being<br />
equipped <strong>to</strong> support learning<br />
• Recruitment <strong>of</strong> curriculum specialists and<br />
EDOs will support teachers in schools<br />
• Website and paper knowledge products<br />
being disseminated<br />
1<br />
• Trained management support<br />
structures/teams operational at district<br />
level.<br />
• Achieved. Ongoing training being provided<br />
with <strong>Education</strong> Leadership Institute playing a<br />
significant role. District training teams well<br />
established.<br />
• School Governing Bodies managing<br />
feeding programmes where appropriate.<br />
• Communities mobilized <strong>to</strong> become<br />
critically engaged with education<br />
decision makers and community level<br />
service providers.<br />
• Community mobilisation uneven but in places<br />
very effective<br />
• Negotiated code <strong>of</strong> conduct in place and<br />
disciplinary problems handled<br />
procedurally.<br />
• Code <strong>of</strong> conducts are in place with EDO’s<br />
equipped (e.g: legislation, policies and<br />
procedures on lap<strong>to</strong>ps) <strong>to</strong> support schools.<br />
• Schools <strong>to</strong> have developed HIV and<br />
AIDS strategy.<br />
• HIV & Aids strategy in place in all schools. In<br />
addition DFID Orphans & Vulnerable<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 5
Children programme in place <strong>to</strong> enhance and<br />
support the strategy.<br />
• Learner/Educa<strong>to</strong>r contact time<br />
increased.<br />
• MoVs used show clear increase in<br />
learner/teacher attendance.<br />
• Marked improvements in the learning<br />
environment in schools.<br />
• Steady progress noted, given very low<br />
baseline level. No-fee schools rolled out and<br />
budget <strong>to</strong> schools allocated on basis <strong>of</strong> perlearner<br />
allocation for the first time. Work<br />
continues on eradication <strong>of</strong> mud-structure<br />
schools.<br />
• Learners, carers and community<br />
members testify <strong>to</strong> improved learning<br />
opportunities by Programme end.<br />
• Testimony indicates that learning<br />
opportunities have improved; Refer <strong>to</strong><br />
“Siyimbewu” Book for seven testimonies.<br />
• Improvements in learning achievement<br />
above baseline by programme end.<br />
• Evidence indicates some improvement; e.g.<br />
decrease in dropout & repetition rates;<br />
Improvement in Gr12 pass rate<br />
Project <strong>Output</strong>s Rating- General /Overall progress assessment 2<br />
Justification<br />
The 2005 OPR accepted full achievement <strong>of</strong> <strong>Output</strong> 1 at pilot level, appreciating that budget cuts would affect the Provincial wide<br />
roll outs. As a result the review recommended that the Programme focus on output 1 & 2 for the final 2 years. <strong>Output</strong>s 1 & 2<br />
subsequently focussed on developing capacity in the system <strong>to</strong> ensure the process would continue post Imbewu. (Prism Doc 2005: Pg<br />
9) <strong>Output</strong> 2 is judged <strong>to</strong> have been largely achieved but there are still some concerns remaining about <strong>Output</strong> 1 regarding the efficiency<br />
deficits in financial management, procurement and governance at the Provincial <strong>Department</strong> which prevent the programme from<br />
scoring a 1. There is documented evidence <strong>of</strong> significant and fundamental reform <strong>of</strong> the system which justifies the 2 rating. However,<br />
the extent <strong>of</strong> the challenge means that by the end <strong>of</strong> Imbewu there will still be unmet targets, which is not surprising given how long<br />
whole systems change has taken even in developed countries<br />
<strong>Purpose</strong> Attribution<br />
The judgement made here has come from a combination <strong>of</strong> the research and evaluation data, including EMIS available and<br />
interviews with key ECDoE personnel<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 6
Project Completion <strong>Report</strong> (PCR) V1.0 Page 7
Part C – Risk Management<br />
Risk Category Low-Medium<br />
Has the Risk Category changed since the last review? If so explain why.<br />
No, if anything the political risk which is not within the purview <strong>of</strong> the programme <strong>to</strong> mitigate, has increased but the whole programme<br />
has been subject <strong>to</strong> political turbulence<br />
Key Risks<br />
How successful was the action taken <strong>to</strong> moni<strong>to</strong>r / manage these risks<br />
Many <strong>of</strong> the identified risks have been managed in an effective way. The political instability has also been skilfully managed by keeping<br />
the focus <strong>of</strong> the programme steadily on the outputs and not allowing Imbewu <strong>to</strong> be deflected. The role <strong>of</strong> the PSC in steering this<br />
course has been significant<br />
Method <strong>of</strong> Scoring – state the team composition, the methods used <strong>to</strong> conduct the review, how the scoring was agreed upon,<br />
and whether partners and stakeholders were involved.<br />
The team comprised Barbara Payne, Senior <strong>Education</strong> Adviser DFID Bangladesh, John Bartlett representing, the Eastern Cape<br />
<strong>Department</strong> <strong>of</strong> <strong>Education</strong> and Kate English Programme Manager, DFID Southern Africa, who was able <strong>to</strong> join the team for the final 3<br />
days. The scoring was undertaken in a fully participative fashion through consultation and qualitative discussion and was unanimous<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 8
Part D – Lessons Learned<br />
You can no longer input general lessons learned. You need <strong>to</strong> specify at least one <strong>of</strong> the categories <strong>of</strong> lessons learned in sections<br />
1,2 and 3 below.<br />
Lessons learned, and suggested dissemination.<br />
1. Working with Partners The partnership <strong>of</strong> donor, managing consultants and ECDoE has been genuine and<br />
based on mutual trust. This kind <strong>of</strong> engagement requires an investment <strong>of</strong> time and<br />
energy by all partners for it <strong>to</strong> be maintained with each partner making commitment and<br />
investment. Changing priorities within DFSA and the removal <strong>of</strong> the <strong>Education</strong> Adviser<br />
post diluted DFID’s engagement with Imbewu<br />
2. Best Practice / Innovation Imbewu created “innovative space” and trialled new ideas which led <strong>to</strong> successful<br />
development <strong>of</strong> models <strong>of</strong> excellence. To do this there has <strong>to</strong> be an element <strong>of</strong> risk<br />
taking and confidence in the quality <strong>of</strong> people and a high level <strong>of</strong> intellectual ability and<br />
creativity which drew, in Imbewu’s case on the wisdom <strong>of</strong> ordinary people in<br />
communities<br />
3. Project / Programme Management The programme management arrangements worked well. A deliberately small <strong>of</strong>fice<br />
embedded in and working along side the ECDoE proved a successful and non<br />
threatening way <strong>of</strong> transferring skills and power <strong>to</strong> the <strong>Department</strong>. The Back s<strong>to</strong>p <strong>of</strong> a<br />
Head Quarters overseas was unusual but worked because <strong>of</strong> the high investment <strong>of</strong><br />
time and energy, personal presence at critical moments and effective reporting and<br />
communication lines.<br />
Key Issues / Points <strong>of</strong> information<br />
Imbewu has brought about a significant transformation <strong>of</strong> the <strong>Education</strong> system in the Eastern Cape Province, in a difficult political<br />
context <strong>of</strong> change and instability. This has led <strong>to</strong> the improvement <strong>of</strong> learning opportunities <strong>of</strong> thousands <strong>of</strong> children. There is no doubt<br />
that without Imbewu, the substantial reforms in the ECDoE would not have taken place. The documentation, which records the Imbewu<br />
legacy, is abundant and excellent. The personnel who have driven and guided the process are also <strong>of</strong> unparalleled quality. However,<br />
despite significant achievements it is not possible <strong>to</strong> say that the <strong>Purpose</strong> has been fully achieved. The outstanding concerns around<br />
financial management, procurement and governance, lead the PCR team <strong>to</strong> the view that the Provincial department has only been<br />
partly reformed and District and school development has only been largely achieved.<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 9
If appropriate, please comment on the effectiveness <strong>of</strong> the institutional relationships involved with the project<br />
(eg comment on processes and how relationships have evolved)<br />
Imbewu is a s<strong>to</strong>ry <strong>of</strong> qualitative development and trust between partners though this was tested when DFID-SA cut funding and was<br />
unable <strong>to</strong> participate as fully as formerly in implementation<br />
What key documentary evidence is available <strong>to</strong> support the conclusions <strong>of</strong> this report? List any supporting documents<br />
annexed <strong>to</strong> this report.<br />
There are 20 documents used in evidence which are annexed. The Final Evaluation <strong>Report</strong> was deemed not <strong>to</strong> be entirely reliable so<br />
all other sources as listed were used in drawing <strong>to</strong> conclusions<br />
Notes for completion<br />
o Where ratings are required please consider the following:<br />
1. = Likely <strong>to</strong> be completely achieved. The outputs /purpose are well on the way <strong>to</strong> completion (or completed)<br />
2. = Likely <strong>to</strong> be largely achieved. There is good progress <strong>to</strong>wards purpose completion and most outputs have been<br />
achieved, particularly the most important ones.<br />
3. = Likely <strong>to</strong> be partly achieved. Only partial achievement <strong>of</strong> the purpose is likely and/or achievement <strong>of</strong> some<br />
outputs.<br />
4. = Only likely <strong>to</strong> be achieved <strong>to</strong> a very limited extent. <strong>Purpose</strong> unlikely <strong>to</strong> be achieved but a few outputs likely <strong>to</strong><br />
be achieved.<br />
5. = Unlikely <strong>to</strong> be achieved. No progress on outputs or purpose<br />
X. = It is impossible <strong>to</strong> say whether there has been any progress <strong>to</strong>wards the final achievement <strong>of</strong> outputs or<br />
purpose. This score should not be used unless they meet at least one <strong>of</strong> the following criteria:<br />
• Project is postponed because <strong>of</strong> conflict<br />
• External Constraints<br />
• Recruitment delays<br />
Other reasons: contact PRISM support<br />
Note for subsequent annual reviews you should not be using X unless you can justify using this X rating, it is unusual for<br />
projects running for 3 years or more <strong>to</strong> be scored X.<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 10
o Once the review is completed a small subset <strong>of</strong> the data gathered must be entered in<strong>to</strong> PRISM for analysis<br />
purposes. There is an online form within PRISM for entering this data. Under the Enter a <strong>Review</strong> screen /<br />
link click the ‘Add Performance <strong>Review</strong> Online’ link. The manda<strong>to</strong>ry parts required on the Online screen<br />
are marked on this form with an asterisk *.<br />
o Dates should be entered in the format dd/mm/yyyy e.g. 24/08/2004 .<br />
Project Completion <strong>Report</strong> (PCR) V1.0 Page 11
Province <strong>of</strong> the<br />
EASTERN CAPE<br />
DEPARTMENT OF EDUCATION<br />
IMBEWU 2 Programme: DFID <strong>Output</strong> <strong>to</strong> <strong>Purpose</strong> ANNUAL REVIEW REPORTS 2003-7