Affordable Housing Mix<br />

3.37 The base assumption for the modelling exercise has been that 50% of the affordable housing built will<br />

be for social renting and 50% will be intermediate tenure. However, consideration has been given to<br />

the impact on viability of changing this proportion with options of 70% social rented/30% intermediate<br />

and 30% social rented/70% intermediate being tested.<br />

Homes and Communities Agency Grant Funding<br />

3.38 The base assumption for the modelling is that social housing grant is not available for affordable<br />

housing provision through Section 106 Agreements. However, it is important to understand the extent<br />

to which grant can enhance viability. In order to justify a higher percentage of affordable housing,<br />

SDC may have to approach the Homes and Communities Agency (HCA) to request additional grant<br />

funding for Section 106 Agreements. Generally, the HCA only fund Section 106 schemes where there<br />

is evidence of additionality and whilst there maybe some limited opportunities to access social<br />

housing grant, this has not been taken into account during the modelling process.<br />

Build Costs<br />

3.39 The build costs used in the viability model are taken from the average residential costs from BCIS 4 , re<br />

based using the local index for the Selby area. The assessment uses the build costs per square foot<br />

of gross internal area excluding external works and contingencies and with preliminaries is<br />

proportioned by cost. These were correct as at June <strong>2009</strong>, and have been tested through stakeholder<br />

consultation to ensure they are in line with the current market expectations. Ordinarily, build costs for<br />

affordable housing would be presumed to be higher than those for market sale units in order for them<br />

to meet the current design and space standards required by the HCA including the code for<br />

Sustainable Homes Level 4 and Lifetime Homes Standards. However, as this modelling assumes no<br />

grant is provided to the Section 106, and in line with evidence provided by the Local Authority,<br />

standard build products have been accepted on all Section 106 sites. As at June <strong>2009</strong>, any<br />

application for a Section 106 site would not have incurred additional costs associated to the standards<br />

above, as no grant would have been provided for these schemes. Therefore, for the basis of this<br />

valuation, the build costs are uniform across both private and affordable dwellings and it is assumed<br />

that all units will be delivered to Code for Sustainable Homes Level 3.<br />

3.40 On the basis set out above, build costs in the model are as follows:<br />

Flat - £95 psf<br />

House - £85 psf<br />

4 The Building Cost Information Services (BCIS) is the UK property market’s leading provider of construction<br />

cost and price information.<br />