Government of India<br />

M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport and <strong>Highways</strong><br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong><br />

<strong>Road</strong> <strong>Sector</strong><br />

Not just roads... build<strong>in</strong>g a NATION


Index<br />

Executive Summary 4<br />

Current Scenario 5<br />

F<strong>in</strong>anc<strong>in</strong>g <strong>National</strong> Highway<br />

Projects 7<br />

Public Private Partnership <strong>in</strong><br />

Highway Development 10<br />

Revenue Risks and Mitigation 25<br />

Overview of Successful Projects 28<br />

Policy Framework 30<br />

Foreign Direct <strong>Investment</strong> Policy 32<br />

Tax Environment 34<br />

Repatriation of <strong>Investment</strong>s<br />

and Profits Earned <strong>in</strong> India<br />

40<br />

Adm<strong>in</strong>istrative Framework 42<br />

About NHAI 44<br />

Annexure 46<br />

KPMG <strong>in</strong> India<br />

<strong>for</strong><br />

<strong>National</strong> <strong>Highways</strong> Authority of India<br />

The <strong>in</strong><strong>for</strong>mation conta<strong>in</strong>ed here<strong>in</strong> is of a general nature and is not <strong>in</strong>tended to<br />

address the circumstances of any particular <strong>in</strong>dividual or entity. Although we<br />

endeavor to provided accurate and timely <strong>in</strong><strong>for</strong>mation, there can be no<br />

guarantee that such <strong>in</strong><strong>for</strong>mation is accurate as of the date it is received or that<br />

it will cont<strong>in</strong>ue to be accurate <strong>in</strong> the future. No one should act on such<br />

<strong>in</strong><strong>for</strong>mation without appropriate professional advice after a thorough<br />

exam<strong>in</strong>ation of the particular situation.


4<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Executive Summary<br />

The <strong>National</strong> Highway network of the country spans<br />

about 66,590 km.The <strong>National</strong> Highway Development<br />

Project (NHDP), cover<strong>in</strong>g a length of about 55,000 km<br />

of highways, is India's largest road development<br />

programme <strong>in</strong> its history. In many ways, this ambitious<br />

and path-break<strong>in</strong>g <strong>in</strong>itiative of the Government of<br />

India, which began <strong>in</strong> the last decade acknowledged<br />

the importance of private sector <strong>in</strong> India's<br />

<strong>in</strong>frastructure development.<br />

The consistent policy and <strong>in</strong>stitutional framework,<br />

which has been the backbone of the INR 3,00,000<br />

1<br />

Crore (USD 60 billion ) NHDP, also conveys the <strong>in</strong>tent<br />

and commitment of successive governments to<br />

encourage <strong>in</strong>creased private sector participation <strong>in</strong><br />

develop<strong>in</strong>g the arterial road network of the country to<br />

world class standards. More than 60 percent of the<br />

estimated <strong>in</strong>vestment requirement is expected to be<br />

privately f<strong>in</strong>anced.<br />

The early success of Public-Private-Partnerships (PPP)<br />

<strong>in</strong> the NHDP, arguably, set the tone <strong>for</strong> similar<br />

<strong>in</strong>itiatives <strong>in</strong> other <strong>in</strong>frastructure sectors and has<br />

provided the s<strong>in</strong>gle largest opportunity <strong>for</strong> private<br />

f<strong>in</strong>anc<strong>in</strong>g and management of <strong>in</strong>frastructure services.<br />

Build Operate Transfer ( BOT) concession contracts<br />

with an estimated value of USD 9.2 billion (<strong>in</strong>clud<strong>in</strong>g<br />

2<br />

BOT/DBFOT -Toll and BOT-Annuity contracts) have<br />

been awarded under various packages till date and<br />

these projects are expected to be fully operational by<br />

2015-16.<br />

With several key projects on the anvil (<strong>in</strong>clud<strong>in</strong>g 6-<br />

lan<strong>in</strong>g of 4-laned roads, expressways and port<br />

connectivity projects) and the <strong>in</strong>creas<strong>in</strong>g <strong>in</strong>terest<br />

ev<strong>in</strong>ced by domestic and <strong>for</strong>eign players <strong>in</strong> the sector,<br />

NHAI is happy to present to you, the <strong>Guidel<strong>in</strong>es</strong> <strong>for</strong><br />

<strong>Investment</strong> <strong>in</strong> the <strong>Road</strong> <strong>Sector</strong>, with specific focus on<br />

NHDP.<br />

NHAI believes that this document would serve as a<br />

useful guide <strong>for</strong> potential <strong>in</strong>vestors, developers and<br />

stakeholders <strong>in</strong>terested <strong>in</strong> participat<strong>in</strong>g <strong>in</strong> India's<br />

ambitious highway development programme.<br />

1. INR 50 = 1 USD : figures approximated<br />

2. Design Build F<strong>in</strong>ance Operate & Transfer<br />

(DBFOT)


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 5<br />

Current Scenario<br />

India has an extensive road network of 3.3 million km –<br />

the second largest <strong>in</strong> the world. The <strong>National</strong><br />

<strong>Highways</strong> have a total length of 66,590 km and serve<br />

as the arterial road network of the country. It is<br />

estimated that more than 70 per cent of freight and 85<br />

per cent of passenger traffic <strong>in</strong> the country is be<strong>in</strong>g<br />

handled by roads. While <strong>Highways</strong>/ Expressways<br />

constitute only about 2 per cent of the length of all<br />

roads, they carry about 40 per cent of the road traffic<br />

lead<strong>in</strong>g to a stra<strong>in</strong> on their capacity. The number of<br />

vehicles on roads has been grow<strong>in</strong>g at compounded<br />

annual growth rate (CAGR) of over 8% <strong>in</strong> the last 5<br />

years (2003-04 to 2008-09).<br />

The development of <strong>National</strong> <strong>Highways</strong> is the<br />

responsibility of the Government of India. The<br />

Government of India has launched major <strong>in</strong>itiatives to<br />

upgrade and strengthen <strong>National</strong> <strong>Highways</strong> through<br />

various phases of the NHDP. NHDP is one of the<br />

largest road development programmes to be<br />

undertaken by a s<strong>in</strong>gle authority <strong>in</strong> the world and<br />

<strong>in</strong>volves widen<strong>in</strong>g, upgrad<strong>in</strong>g and rehabilitation of<br />

about 55,000 km, entail<strong>in</strong>g an estimated <strong>in</strong>vestment<br />

of INR 3,00,000 Crore (USD 60 billion).<br />

The <strong>National</strong> <strong>Highways</strong> Authority of India (NHAI) is<br />

mandated to implement the <strong>National</strong> <strong>Highways</strong><br />

Development Project (NHDP). Most of the projects<br />

have been developed or are under development on<br />

Public Private Partnership (PPP) basis through Build<br />

Operate and Transfer (BOT)-Annuity and BOT-Toll<br />

mode (these have been expla<strong>in</strong>ed <strong>in</strong> detail <strong>in</strong> later<br />

section of the brochure). Typically, <strong>in</strong> an annuity<br />

project, the project IRR is expected to be 12-14% and<br />

equity IRR would be 14 -16%. For toll projects, where<br />

the concessionaire assumes the traffic risk, the<br />

project IRR is expected to be around 14-16% and<br />

3<br />

equity IRR around 18-20% .<br />

The NHDP is be<strong>in</strong>g implemented under several<br />

phases:<br />

4-lan<strong>in</strong>g of the Golden Quadrilateral (GQ) and North-<br />

South and East- West (NS-EW) Corridors-(NHDP I & II)<br />

Phase I ma<strong>in</strong>ly <strong>in</strong>volves widen<strong>in</strong>g (to 4 lanes) and<br />

upgrad<strong>in</strong>g of 7,498 km of the national highway<br />

network and has four component packages:<br />

1.<br />

2.<br />

3.<br />

4.<br />

Highway network l<strong>in</strong>k<strong>in</strong>g the four metropolitan<br />

cities <strong>in</strong> India i.e. Delhi-Mumbai-Chennai-Kolkata,<br />

cover<strong>in</strong>g a length of 5,846 km, popularly known<br />

as the Golden Quadrilateral (GQ) project.<br />

<strong>Highways</strong> along the North-South (NS) and East-<br />

West (EW) corridors, cover<strong>in</strong>g a length of 981 km<br />

Port connectivity projects cover<strong>in</strong>g a length of<br />

356 km; and<br />

Other highway projects, cover<strong>in</strong>g a length of 315<br />

km<br />

Phase-II <strong>in</strong>volves widen<strong>in</strong>g and improvement of the<br />

NS-EW corridors (not covered under Phase-I) cover<strong>in</strong>g<br />

a distance of 6,647 km, besides provid<strong>in</strong>g connectivity<br />

to major ports on the east and west coasts of India and<br />

some other projects. This <strong>in</strong>cludes 6,161 km of NS-EW<br />

corridors and 486 km of other highways. The total<br />

length of the NS-EW network under Phases I & II is<br />

about 7,200 km.<br />

4-lan<strong>in</strong>g of the GQ has almost been completed. Phase<br />

II is expected to be largely completed by December<br />

2010.<br />

3. CRISIL Research


6<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Upgradation of 12,109 km (NHDP-III)<br />

NHDP-III <strong>in</strong>volves upgradation of 12,109 km (ma<strong>in</strong>ly 4-<br />

lan<strong>in</strong>g) of high density national highways, through the<br />

Build, Operate & Transfer (BOT) mode at a cost of INR<br />

80,626 Crore (USD 16.1 billion).<br />

The project consists of stretches of <strong>National</strong><br />

<strong>Highways</strong> carry<strong>in</strong>g high volume of traffic, connect<strong>in</strong>g<br />

state capitals with the NHDP network under Phases I<br />

and II and provid<strong>in</strong>g connectivity to places of<br />

economic, commercial and tourist importance.<br />

2-lan<strong>in</strong>g of 20,000 km with paved shoulders (NHDP-IV)<br />

With a view to provid<strong>in</strong>g balanced and equitable<br />

distribution of the improved/widened highways<br />

network throughout the country, NHDP-IV envisages<br />

upgrad<strong>in</strong>g of 20,000 km of such highways <strong>in</strong>to 2-lane<br />

highways, at an <strong>in</strong>dicative cost of INR 27,800 Crore<br />

(USD 5.6 billion). This will ensure that their capacity,<br />

speed and safety match m<strong>in</strong>imum benchmarks <strong>for</strong><br />

national highways. The government has already<br />

approved strengthen<strong>in</strong>g of 5,000 km to 2-lane paved<br />

shoulders on BOT (Toll/ Annuity) under NHDP-IV A at a<br />

cost of INR 6,950 Crore (USD 1.4 billion).<br />

6-lan<strong>in</strong>g of 6,500 km (NHDP-V)<br />

Under NHDP-V, 6-lan<strong>in</strong>g of the 4-lane highways<br />

compris<strong>in</strong>g the GQ and certa<strong>in</strong> other high density<br />

stretches, will be implemented on BOT basis at an<br />

estimated cost of INR 41,210 Crore (USD 8.2 billion).<br />

These corridors have been 4-laned as part of the GQ <strong>in</strong><br />

Phase-I of NHDP. Implementation of <strong>in</strong>itial set of<br />

projects has already commenced and the entire<br />

package is expected to be completed by 2012. Of the<br />

6,500 km proposed under NHDP-V, about 5,700 km<br />

would be taken up <strong>in</strong> the GQ and the balance 800 km<br />

would be selected on the basis of predef<strong>in</strong>ed eligibility<br />

criteria.<br />

Development of 1,000 km of expressways (NHDP-VI)<br />

With the grow<strong>in</strong>g importance of urban centres of<br />

India, particularly those located with<strong>in</strong> a few hundred<br />

kilometers of each other, expressways would be both<br />

viable and beneficial. The Government has approved<br />

1,000 km of expressways to be developed on a BOT<br />

basis, at an <strong>in</strong>dicative cost of INR 16,680 Crore (USD<br />

3.3 billion). These expressways would be constructed<br />

on new alignments.<br />

Other Highway Projects of 700 km (NHDP-VII)<br />

The development of r<strong>in</strong>g roads, bypasses, grade<br />

separators and service roads are considered<br />

necessary <strong>for</strong> full utilisation of highway capacity as<br />

well as <strong>for</strong> enhanced safety and efficiency. For this, a<br />

programme <strong>for</strong> development of such features at an<br />

<strong>in</strong>dicative cost of INR 16,680 Crore has been approved<br />

by the Government. Apart from the high density<br />

corridors, a substantial part of the <strong>National</strong> <strong>Highways</strong><br />

network would also require development dur<strong>in</strong>g the<br />

11th Plan period. These sections are characterised by<br />

low density of traffic. Some of these stretches fall <strong>in</strong><br />

backward and <strong>in</strong>accessible areas and others are of<br />

strategic importance. The development of these<br />

categories of <strong>National</strong> <strong>Highways</strong> would be carried out<br />

primarily through budgetary resources.<br />

40000<br />

35000<br />

30000<br />

4<br />

Current Status of NHDP<br />

33505<br />

25000<br />

20000<br />

15000<br />

10000<br />

5000<br />

10912<br />

6175<br />

16418<br />

0<br />

Completed Work <strong>in</strong> Progress To be Awarded Total<br />

st<br />

4. As on 31 March, 2009.


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 7<br />

F<strong>in</strong>anc<strong>in</strong>g <strong>National</strong> Highway Projects<br />

Traditionally, f<strong>in</strong>anc<strong>in</strong>g <strong>for</strong> development of <strong>National</strong><br />

<strong>Highways</strong> <strong>in</strong> India was from the budgetary resources<br />

of the Government of India. In order to augment the<br />

available resources, loans have also been raised from<br />

multilateral agencies like World Bank, Asian<br />

Development Bank (ADB) and Japan Bank of<br />

International Cooperation (JBIC).<br />

NHAI has earlier received loans directly from<br />

multilateral agencies (highway project). These loans<br />

are expected to be repaid through the toll <strong>in</strong>come from<br />

the project. The <strong>in</strong>terest rate <strong>for</strong> the project is<br />

determ<strong>in</strong>ed accord<strong>in</strong>g to ADB's pool based variable<br />

lend<strong>in</strong>g rate system <strong>for</strong> US dollar loans. Around 80 per<br />

cent of the external assistance is provided to NHAI as<br />

a grant by the Central government. The balance is<br />

made available as long-term loans to NHAI, with the<br />

Centre bear<strong>in</strong>g the <strong>for</strong>eign exchange risk. Such loans<br />

are usually provided <strong>for</strong> 15-25 years with a moratorium<br />

of 5 years.<br />

Summary of Externally Aided Projects<br />

Category<br />

Awarded<br />

Awarded<br />

Completed<br />

No. of Contracts Length <strong>in</strong> km Cost (INR Crore) No. of Contracts Length <strong>in</strong> km<br />

World Bank Funded Projects<br />

NHDP Phase I<br />

18<br />

983<br />

5538<br />

12<br />

616<br />

GQ<br />

18<br />

983<br />

5538<br />

12<br />

616<br />

Others<br />

-<br />

-<br />

-<br />

-<br />

-<br />

NHDP Phase II EW Corridors<br />

12<br />

482<br />

3208<br />

-<br />

-<br />

Sub-Total A<br />

30<br />

1465<br />

8746<br />

12<br />

616<br />

ADB Funded Projects<br />

NHDP Phase I<br />

13<br />

766<br />

2436<br />

10<br />

616<br />

GQ<br />

12<br />

718<br />

2377<br />

9<br />

568<br />

Others<br />

1<br />

48<br />

59<br />

1<br />

48<br />

NHDP Phase II NS & EW Corridors<br />

31<br />

1636<br />

7565<br />

5<br />

365<br />

Sub-Total B<br />

44<br />

2402<br />

10001<br />

15<br />

981<br />

JBIC Funded Projects<br />

NHDP Phase I<br />

7<br />

150<br />

634<br />

7<br />

150<br />

GQ<br />

5<br />

111<br />

333<br />

5<br />

111<br />

Others<br />

2<br />

39<br />

301<br />

2<br />

39<br />

Sub-Total C<br />

7<br />

150<br />

634<br />

7<br />

150<br />

Grand Total (A+B+C)<br />

81<br />

4017<br />

19381<br />

34<br />

1747


8<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Presently, the development and ma<strong>in</strong>tenance of<br />

<strong>National</strong> <strong>Highways</strong> is f<strong>in</strong>anced by follow<strong>in</strong>g modes:<br />

1.<br />

2.<br />

3.<br />

4.<br />

Government's general budgetary sources<br />

Dedicated accruals under the Central <strong>Road</strong> Fund<br />

(by levy of cess on fuel)<br />

Lend<strong>in</strong>g by <strong>in</strong>ternational <strong>in</strong>stitutions:<br />

• World Bank<br />

• ADB<br />

• JBIC<br />

Private f<strong>in</strong>anc<strong>in</strong>g under PPP frameworks<br />

• Build Operate and Transfer/Design Build<br />

5<br />

F<strong>in</strong>ance Operate and Transfer (DBFOT) -<br />

<strong>Investment</strong> by private firm and return through<br />

levy and retention of user fee<br />

• Build Operate and Transfer (Annuity) - BOT<br />

(Annuity ) - <strong>Investment</strong> by private firm and<br />

return through semi-annual payments from<br />

NHAI as per bid.<br />

• Special Purpose Vehicle – SPV (with equity<br />

participation by NHAI)<br />

• Market Borrow<strong>in</strong>gs<br />

NHAI also has a provision <strong>for</strong> provid<strong>in</strong>g grant upto 40%<br />

of the project cost to make projects commercially<br />

viable. However, the quantum of grant is decided on a<br />

case to case basis and typically constitutes the bid<br />

parameter <strong>in</strong> BOT projects generally not viable based<br />

on toll revenues alone. The disbursement of such<br />

grant is subject to provisions of the project concession<br />

agreements (please refer CD <strong>for</strong> provisions <strong>in</strong> the<br />

Model Concession Agreement).<br />

st<br />

Approved F<strong>in</strong>anc<strong>in</strong>g Plan of NHDP (as on 31 March, 2009)<br />

Phase Particulars<br />

Projected For (Kms) INR Crore<br />

Cess and Market Borrow<strong>in</strong>gs<br />

18,846<br />

NHDP-I<br />

External Assistance<br />

BOT/SPV<br />

7862<br />

3592<br />

Total (At 1999 Prices)<br />

7498<br />

30300<br />

NHDP-II<br />

Cess and Market Borrow<strong>in</strong>gs<br />

External Assistance<br />

23420<br />

7609<br />

BOT/SPV<br />

Total (At 2002 Prices)<br />

6647<br />

3310<br />

34339<br />

NHDP-III<br />

Budgetary Support<br />

Cess and Market Borrow<strong>in</strong>gs<br />

12809<br />

17688<br />

BOT/SPV<br />

Total (At 2004 Prices)<br />

12109<br />

50129<br />

80626<br />

NHDP-IV A<br />

Private <strong>Sector</strong><br />

Government Spend<strong>in</strong>g<br />

4608<br />

2342<br />

Total (At 2006 Prices)<br />

5000<br />

6950<br />

NHDP-V<br />

Cess and Market Borrow<strong>in</strong>gs<br />

BOT/SPV<br />

Total (At 2006 Prices)<br />

6500<br />

5519<br />

35691<br />

41210<br />

NHDP-VI<br />

Cess and Market Borrow<strong>in</strong>gs<br />

BOT/SPV<br />

Total (At 2006 Prices)<br />

1000<br />

7680<br />

9000<br />

16680<br />

NHDP-VII<br />

Cess and Market Borrow<strong>in</strong>gs<br />

BOT/SPV<br />

Total (At 2007 Prices)<br />

700<br />

6302<br />

10378<br />

16680<br />

5. The developer has flexibility <strong>in</strong> project design so long as the build and service quality is <strong>in</strong> l<strong>in</strong>e with<br />

prescribed standards set out <strong>in</strong> the Standards and Specification Manuals .


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 9<br />

NHAI projects, with higher traffic volumes, have also been bid out on Negative Grant. However, under the<br />

revised MCA, projects under BOT/ DBFOT framework have also been awarded on a revenue share basis,<br />

where the bidder offer<strong>in</strong>g the highest revenue share (subject to technical qualification) is awarded the<br />

project.<br />

Projects awarded on Negative Grant<br />

<strong>Road</strong> Section<br />

Length (Km.)<br />

Estimated<br />

Cost<br />

(INR Crore)<br />

Estimated<br />

Cost<br />

(USD Million)<br />

Grant<br />

(INR Crore)<br />

Grant<br />

(USD Million)<br />

Delhi-Gurgaon<br />

28<br />

710<br />

169<br />

61<br />

12<br />

Rajkot Bypass-Jetpur<br />

36<br />

388<br />

92<br />

59<br />

12<br />

Panipat elevated <strong>Highways</strong><br />

10<br />

270<br />

64<br />

96<br />

19<br />

Salem- Karur<br />

42<br />

253<br />

60<br />

46<br />

9<br />

Krishnagiri - Thopurghat<br />

62<br />

372<br />

89<br />

140<br />

28<br />

T<strong>in</strong>divanam-Ulundurpet<br />

71<br />

480<br />

114<br />

152<br />

30<br />

Thirssur-Angamali<br />

40<br />

312<br />

74<br />

84<br />

17<br />

Jalandhar- Amritsar<br />

49<br />

263<br />

63<br />

7<br />

1<br />

Ambala-Zirakpur<br />

36<br />

298<br />

71<br />

106<br />

21<br />

Dhule-Pimpalgaon<br />

118<br />

556<br />

132<br />

59<br />

12<br />

Vadodara Bharuch<br />

83<br />

660<br />

157<br />

471<br />

94<br />

Bharuch-Surat<br />

65<br />

492<br />

117<br />

504<br />

101<br />

Projects awarded on Revenue Share Basis<br />

<strong>Road</strong> Section<br />

Length (Km.)<br />

Estimated<br />

Cost<br />

(INR Crore)<br />

Estimated<br />

Cost<br />

(USD Million)<br />

Revenue Share (%)<br />

Surat-Dahisar<br />

239<br />

2600<br />

619<br />

38%<br />

Gurgaon-Jaipur<br />

225<br />

1900<br />

452<br />

48%<br />

Panipat-Jalandhar<br />

291<br />

2200<br />

523<br />

20%<br />

Chennai-Tada<br />

42<br />

317<br />

76<br />

17%<br />

Vijayawada-Chilkaluripet<br />

85<br />

1173<br />

280<br />

2%


10<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Public Private Partnership <strong>in</strong><br />

Highway Development<br />

Public Private Partnerships (PPP) are go<strong>in</strong>g to be the<br />

ma<strong>in</strong> mode of delivery <strong>for</strong> future phases of NHDP.<br />

While there are a number of <strong>for</strong>ms of PPP, the<br />

common <strong>for</strong>ms that are popular <strong>in</strong> India and have been<br />

used <strong>for</strong> development of <strong>National</strong> <strong>Highways</strong> are:<br />

•<br />

•<br />

•<br />

Build, Operate and Transfer (Toll) Model<br />

Build, Operate and Transfer (Annuity) Model<br />

Special Purpose Vehicle (SPV) <strong>for</strong> Port<br />

Connectivity Projects<br />

NHAI is also propos<strong>in</strong>g to award projects under a long<br />

term Operations, Ma<strong>in</strong>tenance and Transfer (OMT)<br />

concession.<br />

BOT (Toll)<br />

Private developers/ operators, who <strong>in</strong>vest <strong>in</strong> tollable<br />

highway projects, are entitled to collect and reta<strong>in</strong> toll<br />

revenues <strong>for</strong> the tenure of the project concession<br />

period. The tolls are prescribed by NHAI on a per<br />

vehicle per km basis <strong>for</strong> different types of vehicles. The<br />

Government <strong>in</strong> the year 1995 passed the necessary<br />

legislation on collection of toll.<br />

A Model Concession Agreement (MCA) has been<br />

developed to facilitate speedy award of contracts. This<br />

framework has been successfully used <strong>for</strong> award of<br />

BOT concessions. The MCA has been revised recently<br />

and current projects are be<strong>in</strong>g awarded under the<br />

revised MCA (refer enclosed CD <strong>for</strong> overview of MCA<br />

framework).<br />

BOT (Annuity)<br />

The concessionaire bids <strong>for</strong> annuity payments from<br />

NHAI that would cover his cost (construction,<br />

operations and ma<strong>in</strong>tenance) and an expected return<br />

on the <strong>in</strong>vestment. The bidder quot<strong>in</strong>g the lowest<br />

annuity is awarded the project. The annuities are paid<br />

semi-annually by NHAI to the concessionaire and<br />

l<strong>in</strong>ked to per<strong>for</strong>mance covenants. The concessionaire<br />

does not bear the traffic/ toll<strong>in</strong>g risk <strong>in</strong> these contracts.<br />

Operate, Ma<strong>in</strong>ta<strong>in</strong> and Transfer (OMT) Concession<br />

NHAI has recently taken up award of select highway<br />

projects to private sector players under an OMT<br />

Concession. Till recently, the tasks of toll collection<br />

and highway ma<strong>in</strong>tenance were entrusted with toll<strong>in</strong>g<br />

agents/ operators and subcontractors, respectively.<br />

These tasks have been <strong>in</strong>tegrated under the OMT<br />

concession. Under the concession private operators<br />

would be eligible to collect tolls on these stretches <strong>for</strong><br />

ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g highways and provid<strong>in</strong>g essential<br />

services (such as emergency/ safety services).<br />

Special Purpose Vehicle <strong>for</strong> Port Connectivity<br />

Projects<br />

NHAI has also taken up development of port<br />

connectivity projects by sett<strong>in</strong>g up Special Purpose<br />

Vehicles (SPVs) where<strong>in</strong> NHAI contributes upto 30%<br />

of the project cost as equity. The SPVs also have equity<br />

participation by port trusts, State Governments or their<br />

representative entities. The SPVs also raise loans <strong>for</strong><br />

f<strong>in</strong>anc<strong>in</strong>g the projects. SPVs are authorised to collect<br />

user fee on the developed stretches to cover<br />

repayment of debts and <strong>for</strong> meet<strong>in</strong>g the costs of<br />

operations and ma<strong>in</strong>tenance.<br />

International Competitive Bidd<strong>in</strong>g Process<br />

General procedure <strong>for</strong> selection of concessionaires<br />

adopted by NHAI is a two-stage bidd<strong>in</strong>g process.<br />

Projects are awarded as per the model documents-<br />

Request <strong>for</strong> Qualification (RFQ), Request <strong>for</strong> Proposal<br />

(RFP) and Concession Agreement - provided by the<br />

M<strong>in</strong>istry of F<strong>in</strong>ance. NHAI amends the model<br />

documents based on project specific requirements.<br />

(Please refer CD <strong>for</strong> these model documents) . The<br />

processes <strong>in</strong>volved <strong>in</strong> both stages are set out as<br />

follows:<br />

Stage 1: Pre-qualification on the basis of Technical and<br />

F<strong>in</strong>ancial expertise of the firm and its track record <strong>in</strong><br />

similar projects which meets the m<strong>in</strong>imum criteria set<br />

out <strong>in</strong> the RFQ Document. The current process of pre-


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 11<br />

6<br />

qualification shortlists the top 6 applicants with<br />

highest technical score, based on the pre-qualification<br />

criteria. Notice <strong>in</strong>vit<strong>in</strong>g tenders is posted on the web<br />

site and published <strong>in</strong> lead<strong>in</strong>g newspapers.<br />

Development<br />

Projects<br />

Construction<br />

Toll<strong>in</strong>g<br />

<strong>Road</strong>s<br />

Urban<br />

Transportation<br />

Truck<strong>in</strong>g<br />

Tourism<br />

Stage 2: Commercial bids from pre-qualified bidders<br />

are <strong>in</strong>vited through issue of RFP. Generally, the<br />

duration between Stage 1 and 2 is about 30-45 days.<br />

Wide publicity is given to NHAI tenders so as to attract<br />

attention of lead<strong>in</strong>g contractors/ developers/<br />

consultants.<br />

BOT - Toll Equipment Services<br />

BOT -<br />

Annuity<br />

OMT<br />

SPV<br />

Material<br />

Technology<br />

Equipment<br />

Pvt Bus<br />

Service<br />

Perishables<br />

Conta<strong>in</strong>ers<br />

Bulk<br />

Luxury<br />

Buses<br />

The Government has put <strong>in</strong> place appropriate policy,<br />

<strong>in</strong>stitutional and regulatory mechanisms <strong>in</strong>clud<strong>in</strong>g a<br />

set of fiscal and f<strong>in</strong>ancial <strong>in</strong>centives to encourage<br />

<strong>in</strong>creased private sector participation <strong>in</strong> road sector.<br />

Ma<strong>in</strong>tenance<br />

Infrastructure Development<br />

Logistics & Services<br />

Opportunities <strong>for</strong> Private Investors/ Developers<br />

More than 60% of the projected <strong>in</strong>vestment<br />

requirement <strong>for</strong> the NHDP (USD 60 billion) is expected<br />

to be privately f<strong>in</strong>anced, primarily through the<br />

BOT/DBFOT (Toll) route, offer<strong>in</strong>g enormous<br />

opportunities. With a large number of new projects on<br />

offer under PPP <strong>in</strong> the road sector, there exists several<br />

<strong>in</strong>vestment opportunities <strong>for</strong> <strong>in</strong>vestors and companies<br />

with diverse bus<strong>in</strong>ess l<strong>in</strong>es such as eng<strong>in</strong>eer<strong>in</strong>g<br />

companies, civil work contractors, O&M contractors,<br />

toll operators, construction equipment manufacturers<br />

etc. and other stakeholders such as advisors,<br />

f<strong>in</strong>anciers and sector professionals. Only about 15 per<br />

cent of the total highways <strong>in</strong> India are 4-laned and the<br />

sheer potential <strong>for</strong> <strong>in</strong>vestments <strong>in</strong> this sector is likely<br />

to create opportunities <strong>in</strong> the core construction<br />

<strong>in</strong>dustry which may also be attractive <strong>for</strong> <strong>for</strong>eign<br />

players.<br />

The opportunity <strong>for</strong> private players <strong>in</strong> the road sector<br />

can be broadly categorised <strong>in</strong> two segments:<br />

a) Infrastructure Development<br />

b) Logistics and Services.<br />

Model Concession Agreement (MCA) <strong>for</strong> PPP<br />

Projects<br />

The highways sector <strong>in</strong> India has witnessed significant<br />

<strong>in</strong>vestment <strong>in</strong> recent years. For susta<strong>in</strong><strong>in</strong>g the <strong>in</strong>terest<br />

of private participants, a clear risk-shar<strong>in</strong>g and<br />

regulatory framework has been spelt out <strong>in</strong> the Model<br />

Concession Agreement (MCA). The MCA has been<br />

developed to facilitate speedy award of contracts. This<br />

framework has been successfully used <strong>for</strong> award of<br />

BOT concessions. The MCA has been revised recently<br />

and current projects are be<strong>in</strong>g awarded under the<br />

revised MCA. This framework addresses the issues,<br />

which are typically important <strong>for</strong> PPP, such as<br />

unbundl<strong>in</strong>g of risks and rewards, symmetry of<br />

obligations between the pr<strong>in</strong>cipal parties, equitable<br />

shar<strong>in</strong>g of costs and obligations, and risk mitigation<br />

options under various scenarios <strong>in</strong>clud<strong>in</strong>g <strong>for</strong>ce<br />

majeure and term<strong>in</strong>ation, under transparent and fair<br />

procedures.<br />

With the <strong>in</strong>troduction of the MCA, the risks <strong>in</strong>volved <strong>in</strong><br />

project and contractual issues, hitherto, have been<br />

assuaged, and the entire process from <strong>in</strong>vitation to bid<br />

to implementation of the project is transparent.<br />

MCA's risk framework is briefly discussed below:<br />

6. This may be subject to change pend<strong>in</strong>g review of the competent authority


12<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Risk Framework of Model Concession Agreement<br />

The MCA has been developed <strong>in</strong> consultation with all<br />

stakeholders based on <strong>in</strong>ternationally accepted<br />

pr<strong>in</strong>ciples and best practices. Throughout, it seeks to<br />

achieve reasonable balance of risks and rewards <strong>for</strong> all<br />

the participants.<br />

As an underly<strong>in</strong>g pr<strong>in</strong>ciple, risks have been allocated to<br />

the parties that are best suited to manage them.<br />

Project risks have, there<strong>for</strong>e, been assigned to the<br />

private sector to the extent it is capable of manag<strong>in</strong>g<br />

them. The transfer of such risks and responsibilities to<br />

the private sector would <strong>in</strong>crease the scope of<br />

<strong>in</strong>novation lead<strong>in</strong>g to efficiencies <strong>in</strong> cost and services.<br />

The commercial and technical risks relat<strong>in</strong>g to<br />

construction, operation and ma<strong>in</strong>tenance are<br />

allocated to the concessionaire, as it is best suited to<br />

manage them. Other commercial risks, such as the<br />

rate of growth of traffic, are also allocated to the<br />

concessionaire.<br />

Key Concessionaire Risk/Obligations<br />

• Construction Risk - The concessionaire is required<br />

to commence construction works when the<br />

f<strong>in</strong>ancial close is achieved or earlier date that the<br />

parties may determ<strong>in</strong>e by mutual consent. The<br />

concessionaire shall not be entitled to seek<br />

compensation <strong>for</strong> any prior commencement and<br />

shall do it solely at his own risk.<br />

• O & M Risk - Concessionaire to operate and<br />

ma<strong>in</strong>ta<strong>in</strong> the project facility (<strong>in</strong>cludes road and<br />

road <strong>in</strong>frastructure as specified <strong>in</strong> the concession<br />

agreement). Failure to repair and rectify any defect<br />

or deficiency with<strong>in</strong> specified period shall be<br />

considered as breach of responsibility.<br />

• F<strong>in</strong>ancial Risk -The concessionaire shall at its cost,<br />

expenses and risk make such f<strong>in</strong>anc<strong>in</strong>g<br />

arrangement as would be necessary to f<strong>in</strong>ance<br />

the cost of the project and to meet project<br />

requirements and other obligations under the<br />

agreement, <strong>in</strong> a timely manner.<br />

• Traffic Risk - The MCA provides <strong>for</strong> <strong>in</strong>crease or<br />

decrease of the concession period <strong>in</strong> the event the<br />

actual traffic falls short or exceeds the target<br />

traffic. NHAI stipulates the target traffic dur<strong>in</strong>g the<br />

year specified <strong>in</strong> project specific concession<br />

th<br />

agreement, which is usually around the 10 year<br />

from the date of sign<strong>in</strong>g of the agreement. The<br />

target traffic is determ<strong>in</strong>ed based on 5%<br />

Compounded Annual Growth Rate (CAGR) over<br />

the base year traffic <strong>for</strong> the project. MCA also<br />

provides <strong>for</strong> term<strong>in</strong>ation of the agreement if the<br />

average daily traffic <strong>in</strong> any account<strong>in</strong>g year<br />

exceeds the design capacity and cont<strong>in</strong>ues to<br />

exceed <strong>for</strong> three subsequent account<strong>in</strong>g years.<br />

Term<strong>in</strong>ation payments under this scenario will be<br />

commensurate to those applicable under an<br />

Indirect Political Event (See table <strong>in</strong> next section on<br />

page 26).<br />

An overview of revenue risks and mitigation<br />

(<strong>in</strong>clud<strong>in</strong>g Term<strong>in</strong>ation Payment) under the MCA is<br />

provided <strong>in</strong> the next section.<br />

Key NHAI Risk/Obligations<br />

• Land Acquisition Risk: NHAI is responsible <strong>for</strong><br />

acquir<strong>in</strong>g the requisite land <strong>for</strong> the project highway<br />

• Approvals: NHAI will provide all reasonable<br />

support and assistance to the concessionaire <strong>in</strong><br />

procur<strong>in</strong>g applicable permits required from any<br />

Government Instrumentality.<br />

Key Common Risk<br />

• Force Majeure Risk - Force Majeure shall mean<br />

occurrence <strong>in</strong> India of any or all of Non-Political<br />

Event(s), Indirect Political Event(s) and Political<br />

Event(s), which <strong>in</strong>clude the follow<strong>in</strong>g:<br />

Non-Political Event:<br />

• act of God, epidemic, extremely adverse<br />

weather conditions or radioactive contam<strong>in</strong>ation<br />

or ionis<strong>in</strong>g radiation, fire or explosion;<br />

• strikes or boycotts


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 13<br />

• the discovery of geological conditions, toxic<br />

contam<strong>in</strong>ation or archaeological rema<strong>in</strong>s on the<br />

Site; or<br />

• any event or circumstances of a nature<br />

analogous to any of the <strong>for</strong>ego<strong>in</strong>g.<br />

Indirect Political Event<br />

• an act of war, <strong>in</strong>vasion, armed conflict or act of<br />

<strong>for</strong>eign enemy, blockade, embargo, riot,<br />

<strong>in</strong>surrection, terrorist or military action,<br />

• civil commotion or politically motivated<br />

sabotage which prevents collection of toll/<br />

fees,<br />

• <strong>in</strong>dustry-wide or state-wide or India-wide<br />

strikes or <strong>in</strong>dustrial action which prevent<br />

collection of toll/ fees,<br />

• any public agitation which prevents collection<br />

of toll/ fees<br />

Political Event<br />

• Change <strong>in</strong> Law,<br />

• compulsory acquisition by any governmental<br />

agency of any project assets or rights of<br />

concessionaire or of the Contractors; or<br />

• unlawful or unauthorised or without jurisdiction<br />

revocation of or refusal to renew or grant<br />

without valid cause any consent or approval<br />

required by developer<br />

Salient features of the MCA<br />

• Substantial part of the project site free from<br />

encumbrances would be handed over to the<br />

concessionaire till the Appo<strong>in</strong>ted Date. Additional<br />

land <strong>in</strong> case of change of scope will need to be<br />

acquired by concessionaire on behalf of the<br />

Authority.<br />

• Additional tollway will not be commissioned<br />

with<strong>in</strong> a specified year, depend<strong>in</strong>g upon the<br />

concession period. M<strong>in</strong>imum user fee <strong>for</strong><br />

additional tollway will be at least 25% higher than<br />

the toll fee on project. Any alternate road,<br />

exceed<strong>in</strong>g 20% of the length of the project<br />

highway, shall not be considered as an additional<br />

tollway.<br />

• The concessionaire will be entitled to nullify any<br />

change of scope order if it causes the cumulative<br />

cost relat<strong>in</strong>g to all change of scope orders to<br />

exceed 5% of the Total Project Cost (TPC) <strong>in</strong> any<br />

cont<strong>in</strong>uous period of 3 years immediately<br />

preced<strong>in</strong>g the date of such Change of Scope<br />

order, or if such cumulative cost exceeds 20% of<br />

the TPC at any time dur<strong>in</strong>g the concession period.<br />

• F<strong>in</strong>ancial close is to be achieved with<strong>in</strong> 180 days<br />

from date of agreement. NHAI may allow<br />

additional period <strong>for</strong> f<strong>in</strong>ancial close on a project<br />

specific basis.


14<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

• Grant (upto 40% of TPC) to the concessionaire by<br />

way of equity support and operations &<br />

ma<strong>in</strong>tenance support <strong>in</strong> quarterly <strong>in</strong>stallments.<br />

• Concessionaire to pay nom<strong>in</strong>al fee of INR 1 (USD<br />

0.02) per annum throughout the concession<br />

period.<br />

• There is an optional provision <strong>for</strong> capacity<br />

augmentation of exist<strong>in</strong>g 4-lan<strong>in</strong>g to 6-lan<strong>in</strong>g. If<br />

capacity augmentation is not done with<strong>in</strong> the<br />

specified period, the concession period gets<br />

reduced to the number of years specified <strong>in</strong> the<br />

project specific agreement. The option to excuse<br />

from 6-lan<strong>in</strong>g of the Project Highway is available<br />

with both the concessionaire and the Authority<br />

be<strong>for</strong>e the pre-specified 6-lan<strong>in</strong>g date <strong>in</strong> the<br />

concession agreement.<br />

Implementation steps of Project<br />

• Completion of preparatory works <strong>for</strong> the identified<br />

projects<br />

• F<strong>in</strong>alisation of Bidd<strong>in</strong>g Documents<br />

• Invitation of Bids<br />

• Pre bid Conference<br />

• Evaluation of Bids<br />

• Award of Concession<br />

• Sign<strong>in</strong>g of the Agreement<br />

Dispute Resolution<br />

Any dispute aris<strong>in</strong>g out of or <strong>in</strong> relation to the<br />

concession agreement, between the parties is<br />

required to be resolved as per the Dispute Resolution<br />

Procedure (see below) prescribed <strong>in</strong> the Agreement. It<br />

specifies that the parties should attempt to resolve the<br />

dispute amicably and <strong>for</strong> this purpose, the mandate<br />

has been given to an Independent Eng<strong>in</strong>eer to<br />

mediate and assist the parties to arrive at a<br />

settlement. The procedure has been laid out <strong>in</strong><br />

sufficient detail there<strong>in</strong>.<br />

However, upon the failure of such conciliatory<br />

measure, the parties shall resort to Arbitration, which<br />

shall be held <strong>in</strong> accordance with Arbitration and<br />

Conciliation Act, 1996 (based on United Nations<br />

Commission on International Trade Laws -UNCITRAL


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 15<br />

model). The seat of arbitration <strong>for</strong> all concession<br />

agreements perta<strong>in</strong><strong>in</strong>g to <strong>National</strong> <strong>Highways</strong> shall<br />

ord<strong>in</strong>arily be at Delhi, however, the place may be<br />

changed by mutual consent of the parties. Each party<br />

is free to nom<strong>in</strong>ate its arbitrator who <strong>in</strong> turn, will<br />

appo<strong>in</strong>t a presid<strong>in</strong>g arbitrator. The Arbitration Tribunal<br />

so constituted can adjudicate any dispute referred to<br />

it, and any other question of law aris<strong>in</strong>g out of such<br />

dispute, <strong>in</strong>clud<strong>in</strong>g its own jurisdiction. The award<br />

passed by such Tribunal, has the sanctity of a 'Decree'<br />

under Indian Law and can be challenged on very<br />

limited counts.<br />

Dispute Resolution Procedure <strong>for</strong> projects under<br />

BOT and Consultancy<br />

• Mediation by the Independent Eng<strong>in</strong>eer: If any<br />

dispute arises between the parties, it is <strong>in</strong> the first<br />

place resolved by the mediation of the<br />

Independent Eng<strong>in</strong>eer. Any dispute, which is not<br />

resolved by mediation of the Independent<br />

Eng<strong>in</strong>eer, is resolved by amicable resolution.<br />

• Amicable Resolution: Any dispute, difference or<br />

controversy of whatever nature between the<br />

parties, aris<strong>in</strong>g under, out of or <strong>in</strong> relation to the<br />

project concession agreement (PCA) is attempted<br />

to be resolved amicably <strong>in</strong> accordance with the<br />

procedure set <strong>for</strong>th <strong>in</strong> the dispute resolution<br />

mechanism. Either party may require such dispute<br />

to be referred to the Chairman, NHAI and the Chief<br />

Executive Officer of the concessionaire <strong>in</strong> the<br />

<strong>in</strong>terim, <strong>for</strong> amicable settlement. Upon such<br />

reference, the two shall meet at the earliest<br />

mutual convenience and <strong>in</strong> any event not later than<br />

15 days of such reference to discuss and attempt<br />

to amicably resolve the dispute. If the dispute is<br />

not amicably settled with<strong>in</strong> 15 (fifteen) days of<br />

such meet<strong>in</strong>g between the two, either party may<br />

refer the dispute to arbitration <strong>in</strong> accordance with<br />

the provisions of the PCA.<br />

• Arbitration: Any dispute, which is not resolved<br />

amicably, shall be f<strong>in</strong>ally settled by b<strong>in</strong>d<strong>in</strong>g<br />

arbitration under The Arbitration Act. The<br />

arbitration shall be carried out by a panel of three<br />

arbitrators, one to be appo<strong>in</strong>ted by each party and<br />

the third to be appo<strong>in</strong>ted by the two arbitrators<br />

appo<strong>in</strong>ted by the parties. The party requir<strong>in</strong>g<br />

arbitration shall appo<strong>in</strong>t an arbitrator <strong>in</strong> writ<strong>in</strong>g,<br />

<strong>in</strong><strong>for</strong>m the other party about such appo<strong>in</strong>tment<br />

and call upon the other party to appo<strong>in</strong>t its<br />

arbitrator. If with<strong>in</strong> 15 days of receipt of such<br />

<strong>in</strong>timation the other party fails to appo<strong>in</strong>t its<br />

arbitrator, the party seek<strong>in</strong>g appo<strong>in</strong>tment of<br />

arbitrator may take further steps <strong>in</strong> accordance<br />

with the Arbitration Act.<br />

The Dispute Resolution Procedure <strong>for</strong> EPC<br />

Projects does not <strong>in</strong>volve amicable settlement.<br />

The disputes are referred to the Dispute Review<br />

Board.<br />

• Dispute Review Board: The Board shall comprise<br />

of three members, experienced with the type of<br />

construction <strong>in</strong>volved <strong>in</strong> road works, and with the<br />

<strong>in</strong>terpretation of contractual documents. If, dur<strong>in</strong>g<br />

the contract period, either of the parties is of the<br />

op<strong>in</strong>ion that the Dispute Review Board is not<br />

per<strong>for</strong>m<strong>in</strong>g its functions properly, they may<br />

together disband the Board and reconstitute it.<br />

• Dispute <strong>in</strong>volv<strong>in</strong>g Foreign Contractor(s): In the<br />

case of a dispute with a <strong>for</strong>eign contractor, the<br />

dispute shall be settled <strong>in</strong> accordance with the<br />

provisions of the UNCITRAL Arbitration Rules. The<br />

arbitral tribunal shall consist of three arbitrators,<br />

one each to be appo<strong>in</strong>ted by the employer and the<br />

contractor and the third arbitrator chosen by the<br />

two arbitrators so appo<strong>in</strong>ted by the parties, who<br />

shall further act as the Presid<strong>in</strong>g Arbitrator.<br />

A “Foreign Contractor” means a contractor who is<br />

not registered <strong>in</strong> India and is not a juridical person<br />

under Indian Law.<br />

General Trends <strong>in</strong> Dispute Resolution<br />

The Courts <strong>in</strong> India have been very neutral <strong>in</strong><br />

constru<strong>in</strong>g the documents, <strong>in</strong> the cases aris<strong>in</strong>g out of


16<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

tender processes and rely upon terms and conditions<br />

agreed between the parties under the tender<br />

documents. The provisions of the Contract Act and<br />

other legal provisions, cover<strong>in</strong>g the <strong>in</strong>tricate<br />

commercial aspects of the dispute are looked <strong>in</strong>to<br />

very m<strong>in</strong>utely be<strong>for</strong>e pass<strong>in</strong>g any order. The Courts<br />

have, however, been very cautious <strong>in</strong> pass<strong>in</strong>g any<br />

<strong>in</strong>junctive relief <strong>in</strong> disputes aris<strong>in</strong>g out of tender<br />

process and pays due regard to the fairness <strong>in</strong> the<br />

process of issu<strong>in</strong>g tender and selection of bidders,<br />

stage of <strong>in</strong>frastructure development and stakes<br />

(public money) <strong>in</strong>volved. Where complex f<strong>in</strong>ancial<br />

issues are <strong>in</strong>volved, the Courts also seek advice of an<br />

expert committee and consider various factors like<br />

price <strong>in</strong>dex, quality of work, past per<strong>for</strong>mance of<br />

parties, market reputation, etc. The decision <strong>in</strong> each<br />

case may however differ, depend<strong>in</strong>g upon facts of<br />

each case.<br />

OMT Concession Agreement<br />

• The OMT concession would be <strong>for</strong> a maximum<br />

period of 9 years<br />

• The private sector will be selected on the basis of a<br />

competitive bidd<strong>in</strong>g process. The successful<br />

bidder would be the one offer<strong>in</strong>g the highest<br />

7<br />

concession fee to NHAI .<br />

• The concessionaire is allowed a period of 45 days<br />

from the date of sign<strong>in</strong>g of the concession<br />

agreement to commence commercial operations.<br />

• The OMT concessionaire will pay a fixed<br />

concession fee to NHAI every month and<br />

undertake tasks of toll collection and mobilisation<br />

of funds <strong>for</strong> improvement, operation and<br />

ma<strong>in</strong>tenance of highways<br />

NHAI has identified six highway sections which are<br />

expected to be completed <strong>in</strong> the next 6 months to be<br />

awarded on OMT basis. The pre-qualification of<br />

bidders <strong>for</strong> two highway sections has already been<br />

completed and <strong>in</strong>vitations <strong>for</strong> participation have been<br />

sent out to bidders <strong>for</strong> the other stretches.<br />

7. The bidder offer<strong>in</strong>g the maximum amount of first year concession fee or m<strong>in</strong>imum<br />

amount of first year quarter O&M support (<strong>in</strong> case no bidder offers the concession fee).


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 17<br />

Opportunities <strong>for</strong> <strong>Investment</strong>-State-Wise Projects Under NHDP Phase II<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Assam<br />

1<br />

Udarband to Harangajo 54<br />

31<br />

202<br />

40<br />

STATE: Jammu & Kashmir<br />

1<br />

Banihal-Batole-Udhampur<br />

1A<br />

122<br />

1035<br />

207<br />

2<br />

Sr<strong>in</strong>agar-Khanbal-Banihal<br />

1A<br />

32<br />

129<br />

26<br />

3<br />

Two Tunnels on Udhampur-Banihal-<br />

Sr<strong>in</strong>agar Section<br />

1A<br />

19<br />

5000<br />

1000<br />

4<br />

Udhampur Jammu (0-66)<br />

1A<br />

86<br />

1011<br />

202<br />

STATE: Kerala<br />

120<br />

1<br />

Walayar-Badakkancherry<br />

47<br />

55<br />

600<br />

STATE: Maharashtra<br />

1<br />

Nagpur Bypass<br />

7<br />

21<br />

183<br />

37<br />

2<br />

MP/MH Border to Manasar<br />

7<br />

37<br />

158<br />

31<br />

3<br />

Manasar to Nagpur I/C<br />

Kamptee Kanoon<br />

7<br />

36<br />

227<br />

45<br />

STATE: Punjab<br />

1<br />

Jallandhar-Amritsar<br />

1<br />

20<br />

190<br />

36<br />

STATE: Tamil Nadu<br />

1<br />

Salem-Coimbatore Kerala<br />

Border Section<br />

47<br />

82<br />

540<br />

108<br />

STATE: Uttar Pardesh<br />

1<br />

Agra Bypass Km176-800 of NH-2 to<br />

Km 13.03.0 of NH-3<br />

2,3<br />

33<br />

345<br />

69


18<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Opportunities <strong>for</strong> <strong>Investment</strong>-State-Wise Projects Under NHDP Phase III-A<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Andhra Pradesh<br />

1<br />

Vijaywada-Machhlipatnam<br />

9<br />

65<br />

424<br />

85<br />

2<br />

Hyderabad-Vijaywada<br />

9<br />

176<br />

1141<br />

228<br />

3<br />

Tirupati-Tiruthani-Chennai<br />

205<br />

138<br />

900<br />

180<br />

STATE: Bihar<br />

1<br />

Patna-Muzaffarpur<br />

19 & 77<br />

60<br />

391<br />

78<br />

2<br />

Patna-Bakhtiarpur<br />

30<br />

53<br />

346<br />

69<br />

STATE: Delhi<br />

1<br />

Delhi-Meerut<br />

58<br />

46<br />

300<br />

60<br />

2<br />

Delhi-Hissar (Delhi Portion)<br />

10<br />

20<br />

130<br />

26<br />

STATE: Gujarat<br />

1<br />

Kandla-Mundra Port<br />

8A<br />

73<br />

476<br />

95<br />

STATE: Haryana<br />

1<br />

Rohtak-Hissar<br />

10<br />

80<br />

522<br />

104<br />

2<br />

Panipat-Rohtak<br />

71A<br />

73<br />

476<br />

95<br />

3<br />

Rohtak-Bawal<br />

71<br />

97<br />

632<br />

126<br />

STATE: Jharkhand<br />

1<br />

Hazaribag-Ranchi<br />

33<br />

75<br />

489<br />

98<br />

STATE: Karnataka<br />

1<br />

Mulbagal-Kamataka/AP Border<br />

4<br />

11<br />

72<br />

14<br />

2<br />

Bijapur-Hospet<br />

13<br />

194<br />

1265<br />

253<br />

3<br />

Balgaum-Goa/KNT Border<br />

4A<br />

84<br />

548<br />

110<br />

4<br />

Kundapur-Surathakal<br />

17<br />

71<br />

463<br />

93<br />

5<br />

Mangalore-KNT/Kerala Border<br />

17<br />

18<br />

117<br />

23<br />

STATE: Kerala<br />

1<br />

Charthalai-Paliakad<br />

47<br />

50<br />

329<br />

66<br />

2<br />

Pallakad-Thiruvananthapuram<br />

47<br />

123<br />

805<br />

161<br />

3<br />

Trivendrum-Kerala/Tamil Nadu Border<br />

47<br />

43<br />

280<br />

56<br />

4<br />

Kerala/Tamil Nadu Border Kanyakumari<br />

47<br />

70<br />

456<br />

91


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 19<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Maharashtra<br />

1<br />

Nagpur-Wa<strong>in</strong>ganga Br<br />

6<br />

60<br />

391<br />

78<br />

STATE: Orissa<br />

1<br />

Chandikhole-Duburi<br />

200<br />

39<br />

254<br />

51<br />

2<br />

Panikoili-Roxy<br />

215<br />

249<br />

1623<br />

325<br />

3<br />

Duburi-Talcher<br />

200<br />

98<br />

639<br />

128<br />

4<br />

Roxy-Rajamunda<br />

215<br />

20<br />

130<br />

26<br />

STATE: Punjab<br />

1<br />

Amritsar-Wagha Border<br />

1<br />

35<br />

228<br />

46<br />

2<br />

Chandigarh-Kurali<br />

21<br />

30<br />

195<br />

39<br />

3<br />

Parwanoo-Shimla (Punjab,<br />

Haryana and HP)<br />

22<br />

110<br />

717<br />

143<br />

STATE: Rajasthan<br />

1<br />

Reengus-Sikar<br />

11<br />

41<br />

267<br />

53<br />

2<br />

Tonk-Kota-Deoli<br />

12<br />

64<br />

417<br />

83<br />

3<br />

Deoli-Jhalawar<br />

12<br />

178<br />

1161<br />

232<br />

STATE: Tamil Nadu<br />

1<br />

Nagapatnam-Thanjavur<br />

67<br />

74<br />

482<br />

96<br />

2<br />

Krishnagiri-T<strong>in</strong>divaram<br />

66<br />

170<br />

1108<br />

222<br />

3<br />

Trichy-Puddukotai-Ramanathapuram<br />

210<br />

200<br />

1304<br />

261<br />

STATE: Uttaranchal<br />

1<br />

Muzaffernagar-Haridwar<br />

58 & 72<br />

77<br />

502<br />

100<br />

2<br />

Haridwar-Dehradun<br />

72<br />

69<br />

450<br />

90<br />

STATE: West Bengal<br />

1<br />

Barasat-Bangaon<br />

35<br />

60<br />

391<br />

78<br />

Total<br />

3346<br />

30441<br />

6083


20<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Opportunities <strong>for</strong> <strong>Investment</strong>-State-Wise Projects Under NHDP Phase III-B<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Andhra Pradesh<br />

1<br />

Hyderabad-Yadgiri<br />

202<br />

30<br />

196<br />

39<br />

STATE: Arunachal Pradesh<br />

1<br />

Itanagar-Arunachal Pradesh/<br />

Assam Border<br />

52A<br />

22<br />

143<br />

29<br />

STATE: Assam<br />

1<br />

Doboka-Assam/Nagaland<br />

Border-Dimapur<br />

36<br />

124<br />

808<br />

162<br />

2<br />

Baihata Chariali-Banderdewa<br />

52<br />

314<br />

2047<br />

409<br />

3<br />

Badardewa-Assam/<br />

Arunachal Pradesh Border<br />

52A<br />

9<br />

59<br />

12<br />

4<br />

Assam/Meghalaya Border to Assam/<br />

Tripura Boder<br />

44<br />

116<br />

756<br />

151<br />

5<br />

Silchar-Assam/Mizoram Border<br />

54<br />

50<br />

326<br />

65<br />

STATE: Bihar<br />

1<br />

Muzaffarpur-Sonbasra<br />

77<br />

89<br />

580<br />

116<br />

2<br />

Motihari-Raxaul<br />

28A<br />

67<br />

437<br />

87<br />

3<br />

Bakhtiarpur-Begusarai-Khagarai-Purnea<br />

31<br />

255<br />

1663<br />

333<br />

4<br />

Gopalganj-Chapra-Hajipur<br />

19 & 85<br />

153<br />

998<br />

200<br />

5<br />

Forbesganj-Jogwani<br />

57A<br />

13<br />

85<br />

17<br />

6<br />

Mokama-Munger<br />

80<br />

70<br />

456<br />

91<br />

7<br />

Patna-Buxar<br />

84<br />

130<br />

848<br />

170<br />

STATE: Chhatisgarh<br />

1<br />

Kumud-Dhamtari<br />

43<br />

23<br />

150<br />

30<br />

2<br />

Raipur-Simga<br />

200<br />

28<br />

183<br />

37<br />

STATE: Goa<br />

1<br />

Panaji-Goa/KNT Border<br />

4A<br />

69<br />

450<br />

90<br />

2<br />

Maharashtra/Goa Border-Panaji Goa/<br />

KNT Border<br />

17<br />

139<br />

906<br />

181


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 21<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Gujarat<br />

1<br />

Jetpur-Somnath<br />

8D<br />

127<br />

828<br />

166<br />

2<br />

Gujarat/Maharashtra Border-Surat<br />

6<br />

84<br />

548<br />

110<br />

3<br />

Gujarat/MP Border-Ahmedabad<br />

59<br />

210<br />

1369<br />

274<br />

STATE: Jammu & Kashmir<br />

1<br />

Sr<strong>in</strong>agar-Baramula-Uri<br />

1A<br />

101<br />

659<br />

132<br />

STATE: Kerala<br />

1<br />

KNT/Kerala Border-Khozikode-Eddapally<br />

17<br />

451<br />

2941<br />

588<br />

STATE: Maharashtra<br />

1<br />

Kalamboli-Mumbra (6 Lan<strong>in</strong>g)<br />

4<br />

20<br />

130<br />

26<br />

2<br />

Talegaon-Amravati<br />

6<br />

58<br />

378<br />

76<br />

3<br />

Pune-Sholapur<br />

9<br />

170<br />

1108<br />

222<br />

4<br />

Panvel-Indapur<br />

17<br />

84<br />

548<br />

110<br />

STATE: Madhya Pradesh<br />

1<br />

Bhopal-Rajmarg Cross<strong>in</strong>g-Jabalpur<br />

12<br />

297<br />

1936<br />

387<br />

2<br />

Bhopal-Sanchi<br />

86(Ext.)<br />

40<br />

261<br />

52<br />

3<br />

Indore-Jhabua-Gujara/MP<br />

59<br />

169<br />

1102<br />

220<br />

4<br />

Obaiduliaganj-Bheembetka<br />

69<br />

13<br />

85<br />

17<br />

5<br />

Jhansi-Khajuraho<br />

75<br />

100<br />

652<br />

130<br />

STATE: Manipur<br />

1<br />

Nagaland/Manipur Border-Imphal<br />

39<br />

140<br />

913<br />

183<br />

STATE: Mizoram<br />

1<br />

Assam/Mizoram Border-Aizawi<br />

54<br />

113<br />

737<br />

147


22<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Meghalya<br />

1<br />

Shillong (exclud<strong>in</strong>g Shillong Bypass)-<br />

Assam / Meghalaya Border<br />

44<br />

136<br />

887<br />

177<br />

STATE: Nagaland<br />

1<br />

Kohima-Nagaland-Manipur Border<br />

39<br />

28<br />

183<br />

37<br />

STATE: Orissa<br />

1<br />

Sambalpur-Baragarh-Chattisgarh/<br />

Orissa Border<br />

6<br />

84<br />

548<br />

110<br />

2<br />

Bhubaneshwar-Puri<br />

203<br />

59<br />

385<br />

77<br />

STATE: Punjab<br />

1<br />

Amritsar<br />

15<br />

101<br />

659<br />

132<br />

STATE: Rajasthan<br />

1<br />

Kishangarh-Ajmer-Beawar<br />

8<br />

82<br />

535<br />

107<br />

2<br />

Jaipur-Reengus<br />

11<br />

54<br />

352<br />

70<br />

3<br />

Jaipur-Tonk<br />

12<br />

86<br />

561<br />

112<br />

4<br />

Beawar-Pali-P<strong>in</strong>dwara<br />

14<br />

246<br />

1604<br />

321<br />

STATE: Uttar Pradesh<br />

1<br />

Muradabad-Bareilly<br />

24<br />

112<br />

730<br />

146<br />

2<br />

Bareilly-Sitapur<br />

24<br />

153<br />

998<br />

200<br />

3<br />

Ghaziabad-Aligarh<br />

91<br />

106<br />

691<br />

138<br />

STATE: Tirpura<br />

1<br />

Tripura/Assam Border to Agartala<br />

44<br />

195<br />

1271<br />

254<br />

STATE: Tamil Nadu<br />

1<br />

D<strong>in</strong>digul-Perigulam-Theni<br />

45(Ext.)<br />

73<br />

476<br />

95<br />

2<br />

Madurai-Ramnathpuram-<br />

49<br />

186<br />

1213<br />

243<br />

Rameshwaram-Dhanushodi<br />

3<br />

Coimbatore-Mettupalayam<br />

67(Ext.)<br />

45<br />

293<br />

59<br />

4<br />

Theni-Kumili<br />

220<br />

57<br />

372<br />

74<br />

Total<br />

6063<br />

37044<br />

7411


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 23<br />

Opportunities <strong>for</strong> <strong>Investment</strong>-State-Wise Projects Under NHDP Phase V<br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Andhra Pradesh<br />

1<br />

Chilkaluripet-Vijayawada-Elluru-<br />

Rajamundri<br />

5<br />

270<br />

1712<br />

342<br />

2<br />

Tada-Neliore Bypass<br />

5<br />

130<br />

824<br />

165<br />

3<br />

Vishakapatnam-Ankapalli-Rajamundri<br />

5<br />

200<br />

1268<br />

254<br />

4<br />

Srikakulam-Vishakhapattanm Ankapalli<br />

5<br />

100<br />

634<br />

127<br />

5<br />

Neliore-Chilkaluripet<br />

5<br />

184<br />

1167<br />

233<br />

6<br />

Icchapuram-Srikakulam<br />

5<br />

140<br />

888<br />

178<br />

STATE: Bihar<br />

1<br />

Aurangabad-Barwa Adda<br />

2<br />

70<br />

444<br />

89<br />

2<br />

Vanarasi-Aurangabad<br />

2<br />

140<br />

888<br />

178<br />

STATE: Gujarat<br />

1<br />

Ahmedabad-Vadodara Expressway<br />

NE-1<br />

95<br />

602<br />

120<br />

2<br />

Samaikhiali-Gandhidham<br />

8A<br />

56<br />

355<br />

71<br />

3<br />

Surat Dahisar (Gujarat portion)<br />

8<br />

120<br />

761<br />

152<br />

4<br />

Udaipur-Ahmedabad<br />

8<br />

140<br />

888<br />

178<br />

STATE: Jharkhand<br />

1<br />

Barwa Adda-Panagarh<br />

2<br />

100<br />

634<br />

127<br />

2<br />

Aurangabad-Barwa Adda<br />

2<br />

150<br />

951<br />

190<br />

STATE: Haryana<br />

1<br />

Gurgaon-Kotputli-Jaipur<br />

8<br />

126<br />

799<br />

160<br />

(Haryana portion)<br />

2<br />

Panipat-Jalandhar<br />

1<br />

116<br />

735<br />

147<br />

3<br />

Delhi-Ahmebad<br />

1<br />

140<br />

888<br />

178


24<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

S. No. Stretch NH<br />

Length<br />

(Km)<br />

Estimated Project Cost<br />

(INR Crore)<br />

(USD Million)<br />

STATE: Karnataka<br />

1<br />

Bangalore-Tumkur<br />

4<br />

65<br />

412<br />

82<br />

2<br />

Hubli-Chitradurga<br />

4<br />

200<br />

1268<br />

254<br />

3<br />

Chitradurga Bypass-Tumkur Bypass<br />

4<br />

145<br />

919<br />

184<br />

4<br />

Bangalore-Krishnagiri<br />

7<br />

55<br />

349<br />

70<br />

5<br />

Belgaum-Hubli<br />

4<br />

110<br />

697<br />

139<br />

6<br />

Kagal-Belgaum<br />

4<br />

77<br />

488<br />

98<br />

STATE: Madhya Pradesh<br />

1<br />

Indore-Dewas<br />

3<br />

55<br />

349<br />

70<br />

STATE: Maharashtra<br />

1<br />

Satara-Kagal-Belgaum<br />

4<br />

133<br />

843<br />

169<br />

2<br />

Pune Satara<br />

4<br />

145<br />

919<br />

184<br />

3<br />

Surat Dahisar (Maharashtra portion)<br />

8<br />

125<br />

793<br />

160


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 25<br />

Revenue Risks and Mitigation<br />

Revenue realisation <strong>in</strong> BOT-Toll projects is subject to<br />

some key risks <strong>in</strong>clud<strong>in</strong>g, but not limited to variation <strong>in</strong><br />

traffic, variation <strong>in</strong> toll rates, additional tollway,<br />

occurrence of premature term<strong>in</strong>ation on account of<br />

certa<strong>in</strong> events. The concession agreement provides<br />

<strong>for</strong> various risk mitigation mechanisms to the<br />

concessionaire <strong>in</strong>clud<strong>in</strong>g change <strong>in</strong> concession period,<br />

differential toll rates that are l<strong>in</strong>ked to cost of different<br />

road structures under the new toll rules (l<strong>in</strong>ear<br />

alignment, bridges, tunnels, bypasses etc.) to<br />

provid<strong>in</strong>g <strong>for</strong> term<strong>in</strong>ation payments under <strong>for</strong>ce<br />

majeure events.<br />

Variation <strong>in</strong> Traffic<br />

Type of Variation<br />

Actual Traffic <<br />

Target Traffic<br />

Actual Traffic ><br />

Target Traffic<br />

Change <strong>in</strong><br />

Concession Period<br />

For every 1%<br />

shortfall,concession<br />

period <strong>in</strong>crease by 1.5%<br />

For every 1% excess,<br />

concession period<br />

8<br />

reduction by 0.75%<br />

Cap on Concession<br />

Period Variation<br />

20%<br />

10%<br />

The concession agreement provides <strong>for</strong> extension or<br />

reduction of the concession period <strong>in</strong> the event the<br />

9<br />

actual traffic falls short or exceeds the target traffic , as<br />

10<br />

estimated on the target date .<br />

MCA also provides <strong>for</strong> term<strong>in</strong>ation of the agreement if<br />

the average daily traffic <strong>in</strong> any account<strong>in</strong>g year<br />

exceeds the design capacity and cont<strong>in</strong>ues to exceed<br />

<strong>for</strong> three subsequent account<strong>in</strong>g years. Term<strong>in</strong>ation <strong>in</strong><br />

such scenario will be deemed to happen on account of<br />

an Indirect Political Event.<br />

Variation <strong>in</strong> Toll rates (L<strong>in</strong>ked to WPI)<br />

The notification of the New <strong>National</strong> <strong>Highways</strong> Fee<br />

Rules (2008) has provided <strong>for</strong> a revision of toll rates<br />

and hence realisable toll revenues <strong>for</strong> all vehicle<br />

categories. The new toll rules are applicable <strong>for</strong> all new<br />

road projects.<br />

8. Waiver from concession period reduction can be obta<strong>in</strong>ed on payment of premium<br />

9. The method <strong>for</strong> calculat<strong>in</strong>g Actual Traffic and Target Traffic is detailed <strong>in</strong> the MCA<br />

10. Target Date is around 10 years from the date of the agreement <strong>in</strong> a 20 year concession period


26<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

The salient features of the new toll rules are:<br />

• Increase <strong>in</strong> base toll rates by 3% every year<br />

• Increase <strong>in</strong> toll charges to the extent of 40% of the<br />

<strong>in</strong>crease <strong>in</strong> WPI.<br />

• Toll charges <strong>for</strong> new structures (bridges,<br />

tunnels)/alignments (bypass, alternate section)<br />

determ<strong>in</strong>ed based on construction cost.<br />

• Round<strong>in</strong>g off fee to the nearest five rupees (earlier<br />

rounded off to nearest 1 Rupee).<br />

While the earlier toll<strong>in</strong>g rules prescribed a standard<br />

base toll rate on a per passenger car unit (pcu)/km<br />

basis <strong>for</strong> a highway project, the new rules prescribe<br />

base toll rates also <strong>for</strong> high-cost structures (such as<br />

bridges, bypass or tunnels) separately. The base toll<br />

rates <strong>for</strong> such high-cost structures are <strong>in</strong>dexed to the<br />

estimated project cost (on INR/vehicle/trip basis).<br />

Provided below is an illustration of toll revenues<br />

earned from a Light Motor vehicle and Multi Axle<br />

Vehicle (MAV of three to six axles) as per the<br />

applicable toll rates under the old and new toll rules<br />

respectively.<br />

The toll charge at the end of fifth year has been<br />

calculated under two project development scenarios.<br />

In Scenario 1, a l<strong>in</strong>early aligned highway stretch<br />

(without bypasses and bridges) of 100 km has been<br />

considered. In Scenario 2, the highway stretch<br />

<strong>in</strong>cludes a l<strong>in</strong>ear alignment of 80 km and bypass length<br />

of 20 km. The <strong>in</strong>crease <strong>in</strong> WPI is assumed to be 5%<br />

p.a.<br />

The table above shows that <strong>for</strong> a given base toll rate,<br />

the toll charges determ<strong>in</strong>ed by the new toll rules are<br />

higher. The toll charges are significantly higher <strong>in</strong><br />

Scenario 2, where higher construction cost of the<br />

bypass is reflected <strong>in</strong> the toll charges.<br />

Complete details of the new <strong>National</strong> Highway Fee<br />

(Determ<strong>in</strong>ation of Rates and Collection) Rules, 2008<br />

are provided <strong>in</strong> the enclosed CD<br />

Early Term<strong>in</strong>ation of Concession<br />

The concession may be term<strong>in</strong>ated be<strong>for</strong>e project<br />

completion <strong>in</strong> the event of the follow<strong>in</strong>g:<br />

• NHAI Event of Default: In the event of any of the<br />

defaults specified <strong>in</strong> the concession agreement<br />

which the Authority has failed to cure with<strong>in</strong> 90<br />

days or such longer period as has been specified <strong>in</strong><br />

the agreement, the Authority shall be deemed to<br />

be <strong>in</strong> default and concessionaire shall have the<br />

right to term<strong>in</strong>ate the agreement<br />

Old Toll Rate<br />

Rs./ trip (USD)<br />

11<br />

New Toll Rates<br />

Rs./ trip (USD)<br />

Event of<br />

Default<br />

Dur<strong>in</strong>g construction<br />

(after f<strong>in</strong>ancial<br />

closure)<br />

Dur<strong>in</strong>g operations<br />

Light Motor Vehicle Light<br />

Commercial Vehicle<br />

Scenario 1<br />

79<br />

(~1.57)<br />

128<br />

(~2.5)<br />

80<br />

(~1.6)<br />

130<br />

(~2.6)<br />

Concessionaire<br />

event of default<br />

NHAI event of<br />

default<br />

Force Majeure<br />

No payment<br />

a. the total Debt Due<br />

b. 150% of the Adjusted Equity.<br />

Payment equal to 90% of debt<br />

due less <strong>in</strong>surance claims if any.<br />

12<br />

Light Motor Vehicle Light<br />

Commercial Vehicle<br />

Scenario 2<br />

79<br />

(~1.57)<br />

120<br />

(~2.4)<br />

Non-Political<br />

Event<br />

Indirect Political<br />

13<br />

Event<br />

Payment equal 90%<br />

of the Debt Due less Insurance Cover<br />

a. Debt Due Less Insurance Cover<br />

b. 110% of the Adjusted Equity<br />

128<br />

(~2.5)<br />

185<br />

(~3.7)<br />

Political Event<br />

a. the total Debt Due<br />

b. 150% of the Adjusted Equity<br />

11. As per new toll<strong>in</strong>g rules, toll rate revision is determ<strong>in</strong>ed by the <strong>for</strong>mula - TR 1 = TR 0 (1+3%) + TR 0((1+3%)*%Variation <strong>in</strong> WPI*40%)<br />

12. Adjusted equity is equity funded <strong>in</strong> Indian Rupees adjusted suitably to reflect change <strong>in</strong> value of equity on account of depreciation and variations <strong>in</strong> WPI<br />

at different periods dur<strong>in</strong>g the Concession Period<br />

13. <strong>in</strong>clud<strong>in</strong>g term<strong>in</strong>ation due to breach of capacity as set out under traffic risk


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 27<br />

• Concessionaire Event of Default: In the event of<br />

any of the defaults specified <strong>in</strong> the concession<br />

agreement which the concessionaire has failed to<br />

cure with<strong>in</strong> the specified cure period, and where<br />

no such cure period has been specified, then<br />

with<strong>in</strong> the cure period of 60 days, the<br />

concessionaire shall be deemed to be <strong>in</strong> default<br />

and NHAI shall have the right to term<strong>in</strong>ate the<br />

agreement<br />

• Force Majeure Event: A <strong>for</strong>ce majeure event which<br />

lasts <strong>for</strong> less than 180 days will lead to a<br />

proportionate change <strong>in</strong> the concession period to<br />

compensate the concessionaire <strong>for</strong> losses dur<strong>in</strong>g<br />

such period.<br />

The concession is eligible to be term<strong>in</strong>ated (by<br />

either party) if the <strong>for</strong>ce majeure event subsists <strong>for</strong><br />

at least 180 days with<strong>in</strong> a cont<strong>in</strong>uous period of 365<br />

days<br />

Term<strong>in</strong>ation payments are made by NHAI to the<br />

concessionaire <strong>in</strong> the event of term<strong>in</strong>ation due to<br />

above mentioned reasons


28<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Overview of<br />

Successful Projects<br />

PPP is gradually prov<strong>in</strong>g to be a successful<br />

mechanism <strong>for</strong> develop<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the<br />

<strong>National</strong> <strong>Highways</strong>, as is evident from the <strong>in</strong>creased<br />

private sector participation <strong>in</strong> projects till date.<br />

Source: NHAI<br />

Number of Contracts<br />

BOT Toll<br />

Awarded 61<br />

3839<br />

Completed 18<br />

BOT DBFO<br />

821<br />

Awarded 8<br />

1034<br />

Completed<br />

BOT Annuity<br />

Awarded 25<br />

Completed 8<br />

1376<br />

561<br />

Cost <strong>in</strong><br />

INR Crore USD Billion<br />

28976<br />

5896<br />

7785<br />

9412<br />

2350<br />

Toll collection depends on two factors - traffic volume<br />

and toll<strong>in</strong>g rate. The toll rates are pre-specified by<br />

NHAI. Estimates of traffic growth <strong>for</strong> projects are also<br />

provided by NHAI based on detailed feasibility studies.<br />

However, bidders are advised to carry out<br />

<strong>in</strong>dependent due-diligence of the traffic and growth<br />

estimates. The profitability of tolled <strong>National</strong> <strong>Highways</strong><br />

has made the sector extremely competitive and<br />

attractive. In light of the <strong>for</strong>ecasts <strong>for</strong> traffic growth on<br />

important road corridors, the Government has given<br />

first preference to Build-Operate Transfer<br />

(BOT/DBFOT) toll projects.<br />

Jaipur- Kishangarh BOT Project –NH 8<br />

Jaipur-Kishangarh is one of the earliest projects<br />

implemented on BOT framework. The project <strong>in</strong>volved<br />

4-lan<strong>in</strong>g a length of approximately 91 km from Jaipur<br />

to Kishangarh (NH-8), <strong>in</strong> the state of Rajasthan at an<br />

estimated cost of INR 644 Crore (USD 129 million-<br />

NHAI estimate). NHAI provided a grant of INR 211<br />

Crore (USD 42 million) to the project. The concession<br />

period of the project is 20 years.<br />

6<br />

1<br />

2<br />

2<br />

1<br />

The project was completed 5 months ahead of its<br />

s ch e d u l e d c o m p l e t i o n d a t e ( 2 0 0 5 ) . Th e<br />

concessionaire also earned a bonus of INR 42.25<br />

Crore (USD 8.5 million) <strong>in</strong> the <strong>for</strong>m of early toll<strong>in</strong>g<br />

dur<strong>in</strong>g the period be<strong>for</strong>e scheduled completion date.<br />

Even today, the concessionaire is earn<strong>in</strong>g more<br />

revenues than those projected at the time of bidd<strong>in</strong>g.<br />

However, the excess revenue is be<strong>in</strong>g shared<br />

between the concessionaire and NHAI as per the<br />

revenue shar<strong>in</strong>g clause <strong>in</strong> the agreement.<br />

Belgaum – Maharashtra Border Section of NH-4<br />

(Annuity Project)<br />

The project <strong>in</strong>volved widen<strong>in</strong>g of exist<strong>in</strong>g two lanes to<br />

4-lane divided carriageway facility <strong>in</strong>clud<strong>in</strong>g the<br />

rehabilitation of exist<strong>in</strong>g 2-lanes on annuity basis. The<br />

estimated cost of this 78 km long road project is INR<br />

332 Crore (USD 66.4 million; NHAI Estimate). The<br />

section has two toll plazas.<br />

The project was awarded to the consortium of M/s<br />

ILFS, M/s Punj Lloyd Ltd. and M/s Consolidated Toll<br />

Network India Ltd. The concession period is 17 years<br />

and 6 months. The concessionaire completed the<br />

project <strong>in</strong> October 2004, two months earlier than the<br />

stipulated project completion date, and was paid a<br />

(per<strong>for</strong>mance) bonus of INR 42.16 Crore (USD 8.4<br />

million) on account of early completion.<br />

Second Vivekananda Bridge (now Sister Nivedita<br />

Bridge)- BOT Project <strong>in</strong> Kolkota:<br />

This bridge is one of the first BOT projects, undertaken<br />

by NHAI <strong>in</strong> 1995. The concession agreement was<br />

signed <strong>in</strong> September, 2002.The consortium members<br />

are from USA, U.K, Mauritius and India. Though the<br />

f<strong>in</strong>ancial close was delayed by one year, the


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 29<br />

construction thereafter was almost on time and the<br />

th<br />

bridge was commissioned on 4 July, 2007. This bridge<br />

also won the award of excellence <strong>for</strong> the year 2007<br />

under the Foreign Bridge Project Category from the<br />

American Segmental Bridge Institute. NHAI had<br />

provided a grant of INR 120 Crore (USD 24 million) out<br />

of the total project cost of INR 640 Crore (USD 128<br />

million). The concession period of the project is 30<br />

years.<br />

Jawaharlal Nehru Port Connectivity Project <strong>in</strong><br />

Maharashtra<br />

This project has been undertaken as part of a<br />

programme <strong>for</strong> adequate road connectivity to major<br />

ports through an SPV of NHAI (Jawaharlal Nehru Port<br />

<strong>Road</strong> Company Limited). Phase-1 of the project, with a<br />

length of 30 km <strong>for</strong> 4-lan<strong>in</strong>g of NH-4/4B, built at an<br />

estimated cost of INR 177 Crore (USD 35.4 million)<br />

was commenced <strong>in</strong> February 2002 and was<br />

completed <strong>in</strong> July 2005. This project is a symbolic<br />

representation of a successful venture of NHAI,<br />

Jawaharlal Nehru Port and State Government<br />

represented by City and Industrial Development<br />

Corporation of Maharashtra Ltd. (CIDCO). Phase-II of<br />

the project <strong>for</strong> 4-lan<strong>in</strong>g of 14 km and the 6-lan<strong>in</strong>g of<br />

Panvel Creek Bridge (length: 397m) at a cost of INR<br />

143 Crore (USD 29 million) has been taken up and<br />

likely to be completed soon. Encouraged by the<br />

results, Phase –III at a cost of INR 279 Crore (USD 56<br />

million), is also be<strong>in</strong>g taken up. The concession given<br />

to the SPV of NHAI is <strong>for</strong> 20 years from December<br />

2000. The SPV made profits (after tax) of INR 16.4<br />

Crore (USD 3.3 million), INR 20.3 Crore (USD 4 million)<br />

& INR 21.7 Crore (USD 4.3 million) <strong>in</strong> 2005-06, 2006 -<br />

07 & 2007-08 respectively.<br />

Participation of Foreign Contractors<br />

Foreign contractors started participat<strong>in</strong>g <strong>in</strong> NHDP<br />

contracts (and to a limited extent <strong>in</strong> state highway<br />

projects) from 2000-01. In 2000-01, there were about<br />

20 contracts <strong>in</strong> the NHDP, where <strong>for</strong>eign contractors<br />

participated either on their own or <strong>in</strong> jo<strong>in</strong>t ventures; the<br />

number grew to about 32 <strong>in</strong> 2003. The <strong>for</strong>eign<br />

contractors tak<strong>in</strong>g part were from Malaysia, Korea,<br />

Ch<strong>in</strong>a, Russia, Turkey, Indonesia, Iran and some niche<br />

contractors from Europe <strong>for</strong> specialised jobs. It is<br />

presently estimated that about a dozen <strong>for</strong>eign road<br />

contractors are operat<strong>in</strong>g <strong>in</strong> India.<br />

Foreign companies are execut<strong>in</strong>g 12 contracts<br />

exclusively and 35 contracts as jo<strong>in</strong>t venture partners<br />

with Indian companies. Foreign <strong>in</strong>vestors are allowed<br />

100 per cent <strong>for</strong>eign direct <strong>in</strong>vestment <strong>in</strong> road sector<br />

(Please refer section on page 32). The total value of<br />

contracts with <strong>for</strong>eign participation is estimated to be<br />

more than INR 12,000 Crore (USD 2.4 billion)<br />

Construction<br />

Firms<br />

No. of<br />

Foreign Firms<br />

No. of<br />

Projects<br />

Length<br />

(<strong>in</strong> km)<br />

BOT (Toll) 16 16 1680<br />

BOT (Annuity) 5 5 361<br />

EPC Contracts 34 71 3570<br />

Country wise breakup of Foreign and JV<br />

Companies <strong>in</strong>volved <strong>in</strong> development work of<br />

<strong>National</strong> Highway Projects<br />

S. No. Country<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

11.<br />

12.<br />

13.<br />

14.<br />

15.<br />

16.<br />

17.<br />

Ch<strong>in</strong>a<br />

Dubai<br />

Malaysia<br />

Iran<br />

S<strong>in</strong>gapore<br />

Saudi Arabia<br />

UK<br />

Indonesia<br />

Korea<br />

Spa<strong>in</strong><br />

Taiwan<br />

Thailand<br />

Turkey<br />

Philipp<strong>in</strong>es<br />

USA<br />

Russia<br />

Italy<br />

Total<br />

JV<br />

Contractors<br />

9<br />

1<br />

18<br />

1<br />

1<br />

1<br />

4<br />

1<br />

5<br />

5<br />

1<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

54<br />

Independent<br />

2<br />

0<br />

7<br />

0<br />

0<br />

0<br />

0<br />

1<br />

0<br />

0<br />

1<br />

1<br />

0<br />

0<br />

1<br />

1<br />

0<br />

14


30<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Policy Framework<br />

<strong>National</strong> <strong>Highways</strong> Policy Initiatives<br />

The government has adopted a road development<br />

policy sett<strong>in</strong>g out the guidel<strong>in</strong>es <strong>for</strong> <strong>in</strong>vestment <strong>in</strong><br />

highways. In order to meet the huge <strong>in</strong>vestment<br />

requirements <strong>in</strong> the sector, the government has taken<br />

a number of measures to attract private sector<br />

participation.<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

The government has permitted 100 per cent<br />

<strong>for</strong>eign equity <strong>in</strong> construction and ma<strong>in</strong>tenance of<br />

roads, highways, tunnels etc.<br />

Grant upto 40% of project cost to make project<br />

viable.<br />

100% tax exemption <strong>in</strong> any 10 consecutive years<br />

with<strong>in</strong> a period of 20 years after completion of the<br />

project.<br />

Agreements to avoid double taxation with a large<br />

number of countries<br />

Concession period upto 30 years<br />

Right to charge tolls on certa<strong>in</strong> (toll) projects.<br />

These tolls are <strong>in</strong>dexed to a <strong>for</strong>mula l<strong>in</strong>ked with<br />

the wholesale price <strong>in</strong>dex.<br />

The government permits duty free import of high<br />

capacity equipment required <strong>for</strong> highway<br />

construction.<br />

Government support <strong>for</strong> land acquisition,<br />

resettlement and rehabilitation.<br />

Simplified procedure <strong>for</strong> Land Acquisition<br />

MCA <strong>for</strong> BOT (Annuity) and OMT are be<strong>in</strong>g<br />

f<strong>in</strong>alised.<br />

New rules <strong>for</strong> collection of fee <strong>for</strong> use of sections of<br />

national highway, permanent bridges, bypasses and<br />

tunnels have been put <strong>in</strong>to place. The illustration of<br />

revenue collection <strong>for</strong> new projects under the new<br />

policy is provided <strong>in</strong> the earlier section.<br />

Viability Gap Fund<strong>in</strong>g Scheme ( VGF)<br />

The VGF scheme provides f<strong>in</strong>ancial support <strong>in</strong> the<br />

<strong>for</strong>m of capital grant <strong>for</strong> PPP projects <strong>in</strong> various<br />

<strong>in</strong>frastructure sectors. VGF Scheme is <strong>in</strong>tended to<br />

support projects which are commercially unviable but<br />

have high economic benefit.<br />

The Empowered Institution sanctions projects <strong>for</strong> VGF<br />

upto INR100 crore (USD 20 million) <strong>for</strong> each eligible<br />

project subject to the budgetary ceil<strong>in</strong>g <strong>in</strong>dicated by<br />

the F<strong>in</strong>ance M<strong>in</strong>istry. The Empowered Institution also<br />

considers other proposals and places them be<strong>for</strong>e the<br />

Empowered Committee. Fund<strong>in</strong>g upto 20% of the<br />

project cost is provided. If required, an additional 20%<br />

can be made available by the sponsor<strong>in</strong>g<br />

M<strong>in</strong>istry/agency.<br />

Proposals up to INR 200 Crore (USD 40 million) will be<br />

sanctioned by the Empowered Committee and<br />

amounts exceed<strong>in</strong>g INR 200 Crore will be sanctioned<br />

by the Empowered Committee with the approval of<br />

F<strong>in</strong>ance M<strong>in</strong>ister.<br />

Capital grant <strong>for</strong> all <strong>in</strong>frastructure projects under the<br />

VGF scheme is restricted to a maximum of 40% of the<br />

project cost (<strong>for</strong> projects upwards of INR 200 Crore).<br />

Grant provided by NHAI <strong>for</strong> highway projects under<br />

the BOT route may be f<strong>in</strong>anced through the VGF route.<br />

VGF fund<strong>in</strong>g will not be available over and above<br />

NHAI's grant <strong>for</strong> projects.<br />

The Government will carry out all preparatory works<br />

<strong>for</strong> the projects identified <strong>for</strong> private <strong>in</strong>vestment and<br />

meet the cost of follow<strong>in</strong>g items:<br />

• Detailed Feasibility Study


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 31<br />

•<br />

•<br />

•<br />

•<br />

Land <strong>for</strong> right-of-way and enroute facilities<br />

Clearance of the right-of-way land: Relocation of<br />

utility services, cutt<strong>in</strong>g of trees, resettlement and<br />

rehabilitation of the affected establishments<br />

Environment Clearances<br />

Clearance from Indian Railways to allow<br />

construction of Rail-Over-Bridges under their<br />

supervision.<br />

• Where design is left to the enterprise, giv<strong>in</strong>g<br />

details of standards and bore holes logs at bridge<br />

sites etc.<br />

Government Support <strong>for</strong> Major Clearances required <strong>for</strong> <strong>Road</strong> Projects<br />

CLEARANCES<br />

CLEARING AUTHORITY<br />

Cost Estimate<br />

Techno economic Clearances<br />

Pollution Clearance (water & air)<br />

M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport & <strong>Highways</strong> /Public Works Department<br />

/<strong>National</strong> <strong>Highways</strong> Authority of India (NHAI)<br />

M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport & <strong>Highways</strong>/ Public Works Department/<br />

<strong>National</strong> <strong>Highways</strong> Authority of India<br />

Central Pollution Control Board<br />

Forest Clearance<br />

M<strong>in</strong>istry of Environment & Forests<br />

Environmental Clearance<br />

M<strong>in</strong>istry of Environment & Forests<br />

Company Registration<br />

Rehabilitation & Resettlement of Displaced<br />

families<br />

Registrar of Companies<br />

M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport & <strong>Highways</strong>, State Governments and NHAI


32<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Foreign Direct <strong>Investment</strong><br />

(FDI) Policy<br />

Introduction<br />

The FDI regime has been progressively liberalised<br />

dur<strong>in</strong>g the course of the 1990s (particularly after 1996)<br />

with most restrictions on <strong>for</strong>eign <strong>in</strong>vestment be<strong>in</strong>g<br />

removed and procedures simplified. With limited<br />

exceptions, <strong>for</strong>eigners can <strong>in</strong>vest directly <strong>in</strong> India,<br />

either wholly by themselves or as a jo<strong>in</strong>t venture.<br />

Foreign <strong>Investment</strong> (<strong>in</strong> billion $)<br />

Direct Foreign <strong>Investment</strong><br />

Portfolio Foreign <strong>Investment</strong><br />

29.3<br />

India welcomes FDI <strong>in</strong> virtually all sectors, except<br />

those of strategic concern such as defence (opened to<br />

a limited extent), railway transport and atomic energy,<br />

where the exist<strong>in</strong>g and notified sectoral policy does<br />

not permit FDI beyond a certa<strong>in</strong> ceil<strong>in</strong>g.<br />

The major source of FDI <strong>in</strong> India is through the equity<br />

route, which accounted <strong>for</strong> 81% of the total FDI<br />

<strong>in</strong>flows <strong>in</strong> India. Re<strong>in</strong>vested earn<strong>in</strong>gs of FDI<br />

companies accounted <strong>for</strong> 18% of the total Direct<br />

<strong>Investment</strong>. Acquisitions accounted <strong>for</strong> 17% of total<br />

FDI.<br />

11.4<br />

5<br />

4.3<br />

1<br />

2002-03 2003-04<br />

Source: RBI<br />

8.5<br />

9.3<br />

7.7<br />

15.5<br />

12.5<br />

6<br />

7.1<br />

2004-05 2005-06 2006-07 2007-08<br />

Routes For Foreign Direct <strong>Investment</strong><br />

<strong>Investment</strong> Climate – FDI Current Situation<br />

FDI <strong>in</strong><br />

Automatic Route<br />

No prior government approval required<br />

Prior Permission (Foreign <strong>Investment</strong><br />

Promotion Board)<br />

Decision generally with<strong>in</strong> 4–6 weeks<br />

FDI equity limit-Automatic Route<br />

• <strong>Road</strong>s -100%<br />

• Insurance – 26%<br />

• Domestic airl<strong>in</strong>es – 49%<br />

• Telecom services – Foreign equity 74%<br />

• Private sector banks – 74%<br />

• Exploration and m<strong>in</strong><strong>in</strong>g of coal, lignite, diamonds and<br />

precious stones – 100%<br />

• Development of new airports – 100%<br />

• Development of exist<strong>in</strong>g airports – 74%<br />

• Trad<strong>in</strong>g -whole sale cash & carry & <strong>for</strong> exports-100%<br />

FDI Requir<strong>in</strong>g prior approval<br />

• Defense production -26%<br />

• FM broadcast<strong>in</strong>g – Foreign equity 20%<br />

• News and current affairs – 26%<br />

• Broadcast<strong>in</strong>g – cable, DTH, up-l<strong>in</strong>k<strong>in</strong>g – Foreign equity<br />

49%<br />

• Test market<strong>in</strong>g – 100%<br />

• S<strong>in</strong>gle Brand Retail<strong>in</strong>g 51%<br />

Other areas (100% - Auto Route): Pharma, Non Bank<strong>in</strong>g F<strong>in</strong>ancial Services, SEZs, Food Process<strong>in</strong>g


• Automatic Route - No prior Government approval<br />

is required if the <strong>in</strong>vestment to be made falls<br />

with<strong>in</strong> the sectoral caps specified <strong>for</strong> the listed<br />

activities. Only fil<strong>in</strong>gs have to be made by the<br />

Indian company with the concerned regional<br />

office of the Reserve Bank of India (“RBI”) with<strong>in</strong><br />

30 days of receipt of remittance and with<strong>in</strong> 30 days<br />

of issuance of shares<br />

•<br />

FIPB Route - <strong>Investment</strong> proposals fall<strong>in</strong>g outside<br />

the automatic route would require prior<br />

Government approval. Foreign <strong>Investment</strong><br />

requir<strong>in</strong>g Government approvals are considered<br />

and approved by the Foreign <strong>Investment</strong><br />

Promotion Board (“FIPB”). Decision of the FIPB is<br />

usually conveyed <strong>in</strong> 4-6 weeks. Thereafter, fil<strong>in</strong>gs<br />

have to be made by the Indian company with the<br />

RBI<br />

• CCFI Route - <strong>Investment</strong> proposals fall<strong>in</strong>g outside<br />

the Automatic Route and hav<strong>in</strong>g a project cost of<br />

INR 6,000 million (USD 120 million) or more would<br />

require prior approval of Cab<strong>in</strong>et Committee of<br />

Foreign <strong>Investment</strong> (“CCFI”) after obta<strong>in</strong><strong>in</strong>g the<br />

FIPB approval. Decision of CCFI is usually<br />

conveyed <strong>in</strong> 8-10 weeks. Thereafter, fil<strong>in</strong>gs have to<br />

be made by the Indian company with the RBI.<br />

<strong>Investment</strong> proposals fall<strong>in</strong>g with<strong>in</strong> the automatic<br />

route and hav<strong>in</strong>g a project cost of INR 6,000<br />

million or more do not require to be approved by<br />

CCFI


34<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Tax Environment<br />

Taxation System In India<br />

India has a well-developed tax structure with the<br />

authority to levy taxes divided between the central<br />

and the state governments. S<strong>in</strong>ce 1991 tax system <strong>in</strong><br />

India has undergone a radical change <strong>in</strong> l<strong>in</strong>e with<br />

liberal economic policy. Brief description of taxes<br />

prevalent <strong>in</strong> India is given below:<br />

Direct Taxes<br />

Central<br />

Personal Income Tax<br />

Wealth Tax<br />

Taxation <strong>in</strong> India<br />

Indirect Taxes<br />

Customs Duty<br />

Excise Duty<br />

State<br />

Other Taxes<br />

Professional Tax<br />

Indirect Tax<br />

Value Added Tax<br />

Entry Tax<br />

14<br />

Rates of Taxation<br />

Domestic Companies<br />

• Taxed at worldwide <strong>in</strong>come<br />

• Taxed at 30%<br />

• If taxable <strong>in</strong>come > INR<br />

10,000,000; Surcharge<br />

applicable @ 10% of tax.<br />

• Education cess of 3% of tax<br />

(and surcharge if applicable)<br />

• Dividend Distribution Tax<br />

(DDT) is levied @ 16.995%<br />

on the amount of dividend<br />

declared.<br />

Foreign Companies<br />

• Taxed at <strong>in</strong>come which is<br />

earned from a bus<strong>in</strong>ess<br />

connection <strong>in</strong> India or from a<br />

source/asset located <strong>in</strong><br />

India.<br />

• Taxed at 40%<br />

• If taxable <strong>in</strong>come > INR<br />

10,000,000; Surcharge<br />

applicable @ 2.5% of tax.<br />

• Education cess of 3% of tax<br />

(and surcharge if applicable)<br />

• No Dividend Distribution Tax<br />

(DDT)<br />

Corporate Tax<br />

Central Sales Tax<br />

Octroi<br />

Direct Taxation<br />

Service Tax<br />

Tax <strong>in</strong>centive <strong>for</strong> <strong>Road</strong>s<br />

100% tax holiday is available <strong>for</strong> those who are<br />

engaged <strong>in</strong> development of roads and highways. Such<br />

tax holiday can be availed <strong>for</strong> any consecutive period of<br />

10 years with<strong>in</strong> a block of 20 years start<strong>in</strong>g from the<br />

year when the person starts develop<strong>in</strong>g the<br />

roads/highways. Follow<strong>in</strong>g conditions needs to be<br />

fulfilled by such person:<br />

• There should be a company registered <strong>in</strong> India;<br />

• Such company is awarded a contract by the<br />

government or its agency to develop the<br />

roads/highways;<br />

• A certificate from an accountant certify<strong>in</strong>g the<br />

deduction.<br />

Both the companies may be liable to M<strong>in</strong>imum Alternate Tax (MAT) of 10% of<br />

the book profits if the tax liability under normal provisions is less than MAT. The<br />

above rates may be subject to more beneficial provisions conta<strong>in</strong>ed <strong>in</strong> a tax<br />

treaty entered <strong>in</strong>to between India and the country <strong>in</strong> which the taxpayer is<br />

resident.<br />

M<strong>in</strong>imum Alternate Tax (MAT)<br />

The tax law requires companies to pay a m<strong>in</strong>imum tax<br />

which is called as MAT on the basis of profits<br />

disclosed <strong>in</strong> the f<strong>in</strong>ancial statements. It is payable <strong>in</strong><br />

the event when tax liability under normal provision is<br />

less than the MAT. In such a case, companies are<br />

liable to pay 10% (plus applicable surcharge of 10% <strong>for</strong><br />

domestic companies and 2.5% <strong>for</strong> <strong>for</strong>eign companies<br />

and 3% education cess thereon <strong>for</strong> both) of book<br />

profits as MAT. Book profits <strong>for</strong> this purpose are<br />

computed by mak<strong>in</strong>g prescribed adjustments to the<br />

net profit disclosed by the corporations <strong>in</strong> their<br />

f<strong>in</strong>ancial statements.<br />

14. Subject to change <strong>in</strong> Budget proposals <strong>for</strong> 2009-10


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 35<br />

MAT paid by companies can be carried <strong>for</strong>ward <strong>for</strong> 7<br />

years and offset aga<strong>in</strong>st <strong>in</strong>come tax payable under the<br />

normal provisions of tax. The maximum amount that<br />

can be set off aga<strong>in</strong>st regular <strong>in</strong>come tax is equal to<br />

the difference between the tax payable on the total<br />

<strong>in</strong>come as computed under the Income Tax Act and<br />

the tax that would have been payable under the MAT<br />

provisions <strong>for</strong> that year.<br />

Dividend Distribution Tax (DDT)<br />

Dividend distributed by an Indian company is exempt<br />

from <strong>in</strong>come-tax <strong>in</strong> the hands of all shareholders.<br />

However, the Indian company is liable to pay a tax<br />

called Dividend Distribution Tax (DDT) of 16.995<br />

percent (i.e. <strong>in</strong>clusive of surcharge and education<br />

cess) on such dividends. This tax is <strong>in</strong> addition to the<br />

normal corporate tax liability (<strong>in</strong>come tax levied on the<br />

company). The amount of dividend declared by the<br />

parent company (i.e. hold<strong>in</strong>g more than 50 percent of<br />

capital) will be reduced by the amount of dividend<br />

received from its subsidiary company <strong>for</strong> the<br />

purposes of comput<strong>in</strong>g DDT payable by the parent<br />

company if:<br />

• Such dividend is received from its subsidiary;<br />

• The subsidiary has paid DDT on such dividend; and<br />

• The parent company is not a subsidiary of any<br />

other company.<br />

Such tax paid is a non-deductible expense.<br />

Fr<strong>in</strong>ge Benefit Tax (FBT)<br />

FBT has been <strong>in</strong>troduced <strong>in</strong> India from the <strong>in</strong>come<br />

year beg<strong>in</strong>n<strong>in</strong>g April 1, 2005. It is payable by a covered<br />

employer on the benefits provided or deemed to have<br />

been provided to past and present employees. The<br />

benefit need not be provided directly by the employer<br />

<strong>for</strong> FBT to apply. The FBT legislation has identified an<br />

exhaustive list of expenses which are deemed to be<br />

fr<strong>in</strong>ge benefits to the extent of 20% or 50% or 100%<br />

of the cost <strong>in</strong>curred or payment made by the<br />

employer. A concessional rate of 5% has also been<br />

prescribed <strong>in</strong> select <strong>in</strong>stances. Payment of FBT is not<br />

allowed as a deductible expense from the taxable<br />

<strong>in</strong>come. Further, FBT is payable irrespective of<br />

whether the employer has taxable <strong>in</strong>come <strong>in</strong> India or<br />

not.<br />

In case of a domestic company, FBT is payable at a rate<br />

of 33.99% (<strong>in</strong>clud<strong>in</strong>g 10% surcharge and 3%<br />

education cess). However, <strong>in</strong> case of a <strong>for</strong>eign<br />

company, FBT is payable at a rate of 31.6725%<br />

(<strong>in</strong>clud<strong>in</strong>g the 2.5% surcharge and the 3% education<br />

cess).


36<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Withhold<strong>in</strong>g tax<br />

Withhold<strong>in</strong>g tax compliance<br />

Tax withhold<strong>in</strong>g and deposit<br />

• Tax on payment is required to be deducted :-<br />

– When Income is taxable <strong>in</strong> India; and<br />

– At the time of credit or payment of such <strong>in</strong>come, whichever<br />

is earlier<br />

• Amount of tax withheld is required to be deposited with the<br />

government with<strong>in</strong> 7 days from the end of the months <strong>in</strong><br />

which tax was withheld<br />

Quarterly statement<br />

• Payment to residents: Quarterly statements <strong>for</strong> withhold<strong>in</strong>g tax<br />

are to be filed on or be<strong>for</strong>e July 15, October 15, Jan 15 and June<br />

15.<br />

• Payment to non-residents: Quarterly statements <strong>for</strong><br />

withhold<strong>in</strong>g tax is to be filed on or be<strong>for</strong>e July 15, October 15,<br />

Jan 15 and April 15*<br />

st<br />

* In case the tax is withheld on 31 March, details of such tax<br />

can be filed by 15 June<br />

Requisite Challan<br />

• Tax withheld has to be deposited <strong>in</strong> Form ITNS-281. With<br />

effect from 1 April 2008, all corporate will have to pay tax<br />

electronically<br />

• With effect from 1 July 2009, new compliance procedures are<br />

applicable<br />

Withhold<strong>in</strong>g tax certificate<br />

• Certificate <strong>in</strong> Form no. 16A to be issued to the payee with<strong>in</strong> 1<br />

month of from the end of the month <strong>in</strong> which the tax was<br />

withheld (certa<strong>in</strong> exceptions)<br />

• Certificate <strong>in</strong> Form 16 <strong>for</strong> tax withheld on salary to be issued<br />

with<strong>in</strong> 1 month from the end of the f<strong>in</strong>ancial year<br />

Determ<strong>in</strong>ation of Taxable Income<br />

Profit / Loss<br />

as per<br />

Accounts<br />

Deduct taxes already paid to<br />

arrive at net taxes payable /<br />

refundable<br />

Is amount<br />

positive?<br />

Y<br />

Net taxes payable<br />

Add: Expenses Disallowed<br />

as per Income Tax Act and<br />

considered <strong>in</strong> accounts<br />

Tax payable is equal to tax<br />

under normal provisions<br />

Y<br />

N<br />

Net taxes refundable<br />

Less: Expenses Allowed<br />

as per Income Tax Act but<br />

not considered <strong>in</strong> accounts<br />

Is Tax payable<br />

under normal<br />

provisions higher<br />

than tax payable<br />

under MAT?<br />

N<br />

Tax payable is<br />

equal to tax<br />

under MAT<br />

provisions<br />

Apply applicable tax rates<br />

(<strong>in</strong>clud<strong>in</strong>g Surcharge & Education<br />

Cess) to the taxable <strong>in</strong>come to<br />

arrive at gross tax payable under<br />

normal provisions.<br />

Calculated tax payable<br />

under ‘M<strong>in</strong>imum alternate<br />

Tax’ (MAT) provisions


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 37<br />

Double Tax Relief and Tax Treaties<br />

India has a comprehensive tax treaty network. Taxpayers have the option to choose between the provisions<br />

of the tax treaty or the Income Tax Act, whichever is beneficial to them. List of countries with which India has<br />

a Double Taxation Avoidance Agreements (DTAA)<br />

List of countries with which India has a DTAA<br />

Armenia<br />

Egypt<br />

Kazakhstan<br />

Netherlands<br />

Turkmenis<br />

UAE<br />

Australia<br />

F<strong>in</strong>land<br />

Kenya<br />

New Zealand<br />

Spa<strong>in</strong><br />

UAR (Egypt)<br />

Austria<br />

France<br />

Korea<br />

Norway<br />

Sri Lanka<br />

Uganda<br />

Bangladesh<br />

Germany<br />

Juwait<br />

Oman<br />

Sudan<br />

UK<br />

Belarus<br />

Greece<br />

Kyrgyz Republic<br />

Phillipp<strong>in</strong>es<br />

Sweden<br />

Ukra<strong>in</strong>e<br />

Belgium<br />

Hungary<br />

Libya<br />

Poland<br />

Syria<br />

USA<br />

Brazil<br />

Iceland<br />

Malaysia<br />

Qatar<br />

Tanzania<br />

Uzbekistan<br />

Bulgaria<br />

Indonesia<br />

Malta<br />

Romania<br />

Thailand<br />

Vietnam<br />

Canada<br />

Ireland<br />

Maruitius<br />

Russia<br />

Turkey<br />

Zambia<br />

Ch<strong>in</strong>a<br />

Israel<br />

Mongolia<br />

Saudi Arabia<br />

Tazakhistan<br />

Cyprus<br />

Italy<br />

Morcco<br />

S<strong>in</strong>gapore<br />

Portuguese Republic<br />

Czech Republic<br />

Japan<br />

Namibia<br />

Slovenia<br />

Tr<strong>in</strong>idad and Tobago<br />

Denmark<br />

Jordan<br />

Nepal<br />

South Africa<br />

Swiss Confederation


38<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Indirect Taxation<br />

Customs Duty<br />

Customs duty is payable on import of goods <strong>in</strong>to India.<br />

The rate of Customs duty is based on the Tariff<br />

classification of the goods be<strong>in</strong>g imported as per the<br />

Customs Tariff Act, 1975 ('Customs Tariff') [which is<br />

aligned with the Harmonised System of Nomenclature<br />

(HSN) followed <strong>in</strong>ternationally].<br />

Various concessions/ exemptions are available on the<br />

basis of nature of goods, usage, status of importer,<br />

country of import etc.<br />

Name of Duty / Cess<br />

Basic Customs Duty ('BCD')<br />

Additional Customs Duty <strong>in</strong> lieu of Execise duty ('CVD')<br />

Education Cess (<strong>in</strong>clud<strong>in</strong>g the Secondary Higher<br />

Education Cess of One percent)<br />

Additional duty of Customs <strong>in</strong> lieu of local taxes ('ADC')<br />

Incentives/Exemptions<br />

• Exemption <strong>for</strong> specified projects: An importer<br />

of specified goods is eligible to claim exemption<br />

16<br />

from payment of Customs duty on fulfillment of<br />

prescribed conditions <strong>in</strong>clud<strong>in</strong>g:<br />

i<br />

ii<br />

Rate<br />

15<br />

10%<br />

14.42%<br />

3%<br />

4%<br />

The goods are imported by M<strong>in</strong>istry of<br />

Surface Transport or a person who has been<br />

awarded contract <strong>for</strong> construction of roads <strong>in</strong><br />

India by NHAI, PWD, road construction<br />

corporation under the control of State/ Union<br />

Territory Government<br />

A person who has been named as a subcontractor<br />

<strong>in</strong> the contract between NHAI and<br />

the pr<strong>in</strong>cipal contractor <strong>for</strong> construction of<br />

roads<br />

• Project Import: As per the project import<br />

regulations, the benefit under project import<br />

would be available only to those goods which are<br />

imported aga<strong>in</strong>st the specific contracts registered<br />

with the appropriate authority. Under Project<br />

Import scheme, goods can be imported <strong>for</strong><br />

specified projects (<strong>in</strong>clud<strong>in</strong>g road development<br />

project <strong>for</strong> NHAI) at a concessional BCD rate of<br />

5%. An importer of specified goods is eligible to<br />

claim exemption from payment of Customs duty<br />

on fulfillment of prescribed conditions.<br />

• Projects funded by <strong>in</strong>ternational organisations:<br />

In terms of customs laws, goods imported from<br />

outside India <strong>for</strong> execution of projects funded by<br />

<strong>in</strong>ternational organisations (like World Bank, Asian<br />

Development Bank etc.) and approved by the<br />

Government of India are exempt from levy of<br />

Customs duty subject to prescribed conditions.<br />

• Foreign Trade Policy ('FTP'): The FTP provides<br />

certa<strong>in</strong> exemptions/benefits to specified supplies<br />

of such goods manufactured <strong>in</strong> India, where such<br />

supplies qualify as 'Deemed Exports'. As per the<br />

FTP, Deemed Exports refer to certa<strong>in</strong> transactions<br />

where<strong>in</strong> the goods supplied do not leave the<br />

country and payment <strong>for</strong> supplies is received <strong>in</strong><br />

Indian rupees or <strong>in</strong> free <strong>for</strong>eign exchange. Supplies<br />

made to various specified projects/ purposes<br />

qualify as deemed exports under the FTP <strong>in</strong>clud<strong>in</strong>g<br />

supplies under the follow<strong>in</strong>g categories:<br />

I. Supply of goods to projects f<strong>in</strong>anced by<br />

multilateral or bilateral agencies/funds<br />

notified by Department of Economic Affairs<br />

under International Competitive Bidd<strong>in</strong>g<br />

('ICB').<br />

ii.<br />

Supply of goods to any project or purpose <strong>in</strong><br />

respect of which import of goods is<br />

permissible at zero-rate of Customs duty.<br />

However, <strong>in</strong> order to be eligible <strong>for</strong> Deemed Export<br />

benefits, supplies under the a<strong>for</strong>ementioned<br />

categories should be made under ICB. Further, a subcontractor<br />

mak<strong>in</strong>g supplies directly to the ma<strong>in</strong><br />

contractor or directly to the designated projects/<br />

agencies would also be eligible <strong>for</strong> Deemed Export<br />

benefits subject to prescribed conditions <strong>in</strong> this<br />

regard.<br />

Excise duty<br />

Excise duty is levied by the Central Government on the<br />

manufacture of movable goods <strong>in</strong> India at the time of<br />

15. Capital goods can be imported at the general rate of 7.5 %<br />

16. Notification No. 21/2002-Cus, dated 1 March 2002


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 39<br />

removal of goods from the factory premise of the<br />

manufacturer. The Central Excise Act, 1944 ('the<br />

Excise Act') prescribes the rate of levy <strong>in</strong> the Excise<br />

Tariff Act, 1985 ('Excise Tariff'). The general rate of<br />

Excise duty <strong>in</strong> India is 14.42% (Basic Excise Duty 14%,<br />

Education Cess 3%). Credit of Excise duty paid is<br />

available aga<strong>in</strong>st the output Excise duty liability/output<br />

service tax liability.<br />

Incentives/Exemptions<br />

A supplier or a manufacturer of goods (that are<br />

supplied to a contractor/ sub-contractor engaged <strong>in</strong><br />

construction activities) would be eligible <strong>for</strong> exemption<br />

from payment of Excise duty if follow<strong>in</strong>g conditions<br />

are fulfilled:<br />

•<br />

•<br />

Goods are supplied aga<strong>in</strong>st ICB<br />

Goods be<strong>in</strong>g supplied/ manufactured are exempt<br />

from BCD, CVD and ADC when imported <strong>in</strong>to India<br />

Also, all goods supplied to projects f<strong>in</strong>anced by<br />

<strong>in</strong>ternational organisations (like World Bank, Asian<br />

Development Bank etc.) and approved by the<br />

Government of India are exempt from levy of Excise<br />

duty.<br />

Service Tax<br />

Service tax is a federal levy on provision of specified<br />

services <strong>in</strong> India. Service tax is currently leviable at the<br />

rate of 10.3%. Relevant taxable services category <strong>for</strong><br />

construction activities <strong>in</strong>clude:<br />

•<br />

•<br />

•<br />

•<br />

Commercial or <strong>in</strong>dustrial construction services<br />

Site <strong>for</strong>mation, clearance, excavation,<br />

earthmov<strong>in</strong>g and demolition services<br />

Works contract services<br />

Management, ma<strong>in</strong>tenance or repair services<br />

Incentives/Exemptions<br />

Construction of roads has been specifically exempted<br />

from levy of Service tax under the follow<strong>in</strong>g taxable<br />

categories:<br />

• Commercial or <strong>in</strong>dustrial construction services<br />

• Site <strong>for</strong>mation and clearance, excavation,<br />

17<br />

earthmov<strong>in</strong>g and demolition services<br />

• Works contract services<br />

Value Added tax ('VAT')<br />

VAT is a state specific levy on sale of goods with<strong>in</strong> the<br />

State. The rate of VAT varies from 4%/ 12.5%<br />

(depend<strong>in</strong>g upon the goods <strong>in</strong>volved). However, a<br />

higher or a lower rate of VAT may be notified by the<br />

respective State Government <strong>for</strong> specified goods.<br />

Multiple schemes <strong>for</strong> payment of VAT are available<br />

under the State VAT laws.<br />

Central Sales Tax ('CST')<br />

A transaction qualifies as an <strong>in</strong>ter-state sale, where the<br />

sale entails movement of goods from one State to<br />

another. Inter-state movement of goods is liable to<br />

CST under the Central Sales Tax Act, 1956 ('the CST<br />

Act') at the rate of 2 percent aga<strong>in</strong>st statutory<br />

declaration <strong>for</strong>m ('Form C'), which can be issued by<br />

the buyer <strong>for</strong> specified purposes, or at the VAT rate<br />

applicable on local sale of goods <strong>in</strong> the dispatch<strong>in</strong>g<br />

State (i.e. the State from which the movement of<br />

goods commences pursuant to the sale). The EPC<br />

contractor can issue Form 'C' <strong>for</strong> purchase of goods at<br />

the concessional rate.<br />

Further, it is pert<strong>in</strong>ent to note that the CST borne on<br />

account of <strong>in</strong>ter-state procurements and paid <strong>in</strong> other<br />

State will not be available as credit aga<strong>in</strong>st any output<br />

liability.<br />

Goods and Service tax - Proposed<br />

In the Union Budget 2008-09, the Government of India<br />

has signaled its <strong>in</strong>tention to <strong>in</strong>troduce a nation wide<br />

Goods and Service tax ('GST') with effect from 1 April<br />

2010. However, the road map <strong>for</strong> its implementation is<br />

still to be released. The f<strong>in</strong>al dest<strong>in</strong>ation of the re<strong>for</strong>m<br />

process would be <strong>in</strong>troduction of GST <strong>in</strong> lieu of Excise<br />

duty, VAT, CST and Service tax.<br />

As per recent media reports, the Empowered<br />

Committee of State F<strong>in</strong>ance M<strong>in</strong>isters are explor<strong>in</strong>g<br />

the possibility of a dual GST structure <strong>in</strong> India, one at<br />

the Central level and another at the State level. The<br />

committee further recommended a s<strong>in</strong>gle rate <strong>for</strong><br />

services and two rates <strong>for</strong> goods, at the Central and<br />

State level.<br />

17. Notification No. 17/2005-ST, dated 7 June 2005


40<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Repatriation of <strong>Investment</strong>s and<br />

Profits Earned <strong>in</strong> India<br />

Type of Income streams<br />

Dividend<br />

Interest<br />

Royalty<br />

Technical<br />

Fees<br />

Rates of<br />

taxation<br />

Domestic law<br />

(a)<br />

NIL<br />

Best treaty<br />

rate 10%<br />

Domestic law<br />

21.115%<br />

Best treaty<br />

rate 10%<br />

Domestic law<br />

10.56%<br />

Best treaty<br />

rate 10%<br />

Domestic law<br />

10.56%<br />

Best treaty<br />

rate Nil<br />

Notes:<br />

a. Tax free <strong>for</strong> all shareholders but Indian company declar<strong>in</strong>g the dividend is subject to Dividend Distribution Tax<br />

(DDT) at 16.995% of the dividend declared<br />

Ceil<strong>in</strong>g on Amount of repatriation (if any)<br />

Royalty/ Technical Fees under technical collaboration<br />

Brand Name Royalty without technical collaboration<br />

5% on local sales and 8% on exports and lump-sum payment not<br />

exceed<strong>in</strong>g USD 2 million or its equivalent<br />

1% of on local sales and 2% on exports sales<br />

• Royalties and Technical Know-how Fees:<br />

Indian companies that enter <strong>in</strong>to Technology<br />

Transfer Agreements with <strong>for</strong>eign companies are<br />

permitted to remit payments towards know-how<br />

and royalty under the terms of the <strong>for</strong>eign<br />

collaboration agreement, subject to limits.<br />

• Dividends: Dividends are freely repatriable after<br />

the payment of Dividend Distribution Tax by the<br />

Indian company declar<strong>in</strong>g the dividend. No<br />

permission of RBI is necessary <strong>for</strong> effect<strong>in</strong>g<br />

remittance, subject to specified compliances.<br />

• Interest: Payment of <strong>in</strong>terest borrowed from<br />

overseas would be governed by the regulation<br />

regard<strong>in</strong>g external commercial borrow<strong>in</strong>gs.<br />

• Buyback of shares: A maximum of 25% of<br />

equity share capital permitted to be repurchased<br />

<strong>in</strong> a f<strong>in</strong>ancial year. Buyback is possible only from<br />

free reserves, share premium and proceeds<br />

Dividends are not allowed as deduction. Royalty/ fee <strong>for</strong> technical services/ <strong>in</strong>terest are allowed as<br />

deduction subject to transfer pric<strong>in</strong>g norms


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 41<br />

Repatriation of capital<br />

Buy back of shares<br />

Redemption of<br />

preference share<br />

Capital Reduction<br />

Liquidation of company<br />

from fresh issue of shares. Post repurchase, debt<br />

owed by company should not to exceed 2 times<br />

of (capital + free reserves). There will be no tax<br />

implication <strong>in</strong> the hands of Indian company.<br />

However, s<strong>in</strong>ce buy back is considered as<br />

transfer of shares (capital asset), there<strong>for</strong>e,<br />

shareholder will be liable to capital ga<strong>in</strong> tax. No<br />

DDT to be paid by Indian company/ shareholders.<br />

• Redemption of preference shares: Foreign<br />

capital <strong>in</strong>vested <strong>in</strong> India is generally repatriable,<br />

along with capital appreciation, if any, after the<br />

payment of taxes due on them, provided the<br />

<strong>in</strong>vestment was on repatriation basis. Preference<br />

shares are similar to equity shares carry<strong>in</strong>g<br />

preferential right towards payment of dividend.<br />

Profits on redemption of preference shares<br />

taxed are to be taxed as capital ga<strong>in</strong>s. This may<br />

not be applicable <strong>for</strong> non-resident <strong>in</strong>vestors as<br />

preference shares can be redeemed only at par.<br />

DDT @ 16.995% would be payable on coupon on<br />

preference shares<br />

• Capital reduction: The company law provision<br />

provides <strong>for</strong> a detailed procedure where<strong>in</strong> the<br />

capital of company can be reduced and money<br />

can be repatriated back. A special<br />

permission/resolution is to be passed at general<br />

meet<strong>in</strong>g of shareholders authoris<strong>in</strong>g capital<br />

reduction process. Thereafter, a capital reduction<br />

process has to go through a court process which<br />

would could <strong>in</strong>volve obta<strong>in</strong><strong>in</strong>g creditors approval,<br />

no objection certificate from all creditors etc.<br />

Cash paid to the extent of accumulated profits<br />

(<strong>in</strong>clud<strong>in</strong>g capitalised profits) would be liable to<br />

DDT @16.995% <strong>in</strong> the hands of Indian company<br />

• Liquidation of company: Cash can be<br />

repatriated by way of liquidation of Indian<br />

company. Both the shareholders can exit out of<br />

the project simultaneously and get entire funds<br />

back. Liquidation is complicated and time<br />

consum<strong>in</strong>g


42<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Adm<strong>in</strong>istrative Framework<br />

The road sector <strong>in</strong> India is a concurrent subject. The<br />

jurisdiction of Central Government is limited to<br />

<strong>National</strong> <strong>Highways</strong>, while the jurisdiction of State<br />

Governments is across State <strong>Highways</strong>, Major District<br />

<strong>Road</strong>s, Village <strong>Road</strong>s and Other <strong>Road</strong>s. At the Central<br />

Level, the overall policy, programme development and<br />

plann<strong>in</strong>g is done by the Plann<strong>in</strong>g Commission <strong>in</strong><br />

consultation with the M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong><br />

Transport and <strong>Highways</strong> (MoSRTH) and M<strong>in</strong>istry of<br />

Rural Development (MoRD).<br />

At the State Level, the overall policy and programme<br />

development and resource plann<strong>in</strong>g is done by the<br />

State Plann<strong>in</strong>g Cell <strong>in</strong> consultation with Central<br />

Plann<strong>in</strong>g Commission and State M<strong>in</strong>istry <strong>in</strong> charge of<br />

<strong>Road</strong>s.<br />

Adm<strong>in</strong>istrative Framework by Category of <strong>Road</strong>s<br />

<strong>Road</strong> Network Coord<strong>in</strong>at<strong>in</strong>g Agency Connectivity To<br />

Expressways<br />

<strong>National</strong> <strong>Highways</strong><br />

State <strong>Highways</strong><br />

Major District <strong>Road</strong>s<br />

Rural and Other <strong>Road</strong>s<br />

M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport and<br />

<strong>Highways</strong> (MoSRTH), <strong>National</strong> Highway<br />

Authority of India (NHAI) and State <strong>Road</strong><br />

Development Corporations<br />

MoSRTH, NHAI, BRO<br />

(Border <strong>Road</strong>s Organisation)<br />

State Public Works Departments ( PWDs)<br />

State PWDs<br />

M<strong>in</strong>istry of Rural Development (MoRD)<br />

State capitals and tier 1 cities<br />

Union capital, state capitals, major ports,<br />

strategic locations<br />

State capitals, district centres, important<br />

towns, national highways, other states<br />

State Capitals, district centres,<br />

important towns, national highways<br />

Production centres, markets, highways,<br />

railway stations etc<br />

Project <strong>Road</strong>s<br />

State PWDs/Project Organisations<br />

Projects like irrigation, power, m<strong>in</strong>es, etc<br />

Urban <strong>Road</strong>s<br />

Municipal Corporations<br />

Intra city network<strong>in</strong>g<br />

Village <strong>Road</strong>s<br />

Zilla Parishads/State Governments<br />

Villages, district roads, highways,<br />

railway stations, riversides etc


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 43<br />

Adm<strong>in</strong>istrative Framework <strong>for</strong> <strong>Road</strong>s<br />

Institutional Advisory Framework<br />

Facilitated by<br />

Committee on Infrastructure<br />

Plann<strong>in</strong>g Commission<br />

F<strong>in</strong>ance M<strong>in</strong>istry/PPP Cell<br />

Central Level<br />

MoSRTH<br />

(allocation of funds <strong>for</strong> the development and<br />

ma<strong>in</strong>tenance of highways)<br />

MoRD<br />

(allocation of funds <strong>for</strong> the development<br />

and ma<strong>in</strong>tenance of rural roads )<br />

Department of <strong>Road</strong><br />

Transport & <strong>Highways</strong><br />

NHAI<br />

(NHDP implementation,<br />

operations and<br />

ma<strong>in</strong>tenance)<br />

Plann<strong>in</strong>g, Policy<br />

and Budget<strong>in</strong>g<br />

Secretary<br />

Panchayat Raj<br />

State Level<br />

State PWD<br />

(NH-W<strong>in</strong>g)<br />

State PWD<br />

State <strong>Highways</strong><br />

MDRs,ODRs, Village<br />

<strong>Road</strong>s<br />

Rural Redevelopment<br />

& Panchayat Raj<br />

(Rural <strong>Road</strong>s)<br />

<strong>Road</strong> Development Corporations<br />

(Construction, Ma<strong>in</strong>tenance and<br />

Operation of <strong>Road</strong>s)


44<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

About NHAI<br />

The <strong>National</strong> <strong>Highways</strong> Authority of India ( NHAI) was<br />

constituted by an act of Parliament, the <strong>National</strong><br />

<strong>Highways</strong> Authority of India Act, 1988. The Authority<br />

was operationalised <strong>in</strong> Feb, 1995.<br />

NHAI is the nodal agency responsible <strong>for</strong> the<br />

development, ma<strong>in</strong>tenance and management of<br />

<strong>National</strong> <strong>Highways</strong> entrusted to it and <strong>for</strong> matters<br />

connected or <strong>in</strong>cidental thereto. The USD 60 billion<br />

<strong>National</strong> <strong>Highways</strong> Development Project (NHDP) has<br />

been entirely managed by the NHAI under the<br />

mandate of the M<strong>in</strong>istry of Shipp<strong>in</strong>g, <strong>Road</strong> Transport &<br />

<strong>Highways</strong> (MoSRTH), Government of India.<br />

Besides implementation of the NHDP, NHAI is also<br />

concerned with implementation of road safety<br />

measures and environmental management and IT<br />

<strong>in</strong>itiatives <strong>in</strong> construction, ma<strong>in</strong>tenance and operation<br />

of <strong>National</strong> <strong>Highways</strong>.<br />

For projects related <strong>in</strong><strong>for</strong>mation k<strong>in</strong>dly contact :<br />

General Manager (F<strong>in</strong>ance)<br />

Phone : + 91(011)-25074100 & 25074200, Extn : 1418<br />

The charter of NHAI is set out <strong>in</strong> the <strong>National</strong><br />

<strong>Highways</strong> Act, 1956 and <strong>National</strong> <strong>Highways</strong> Authority<br />

of India Act, 1988:<br />

•<br />

•<br />

•<br />

•<br />

•<br />

Delegation of power and functions of the highway<br />

adm<strong>in</strong>istration to NHAI<br />

Enhanced powers <strong>for</strong> land acquisition<br />

Right to collect tolls <strong>for</strong> road projects on its own or<br />

through third parties <strong>in</strong> accordance with specified<br />

government guidel<strong>in</strong>es<br />

Authorisation to borrow from capital market<br />

through bonds, debentures and other <strong>in</strong>struments<br />

Situation where Central Government will have<br />

powers to override NHAI and its officials


<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong> 45<br />

Organisation Structure of NHAI is set out below:<br />

NHAI CORPORATE<br />

OFFICE<br />

NHAI<br />

Technical F<strong>in</strong>ance Adm<strong>in</strong>istration<br />

Project<br />

Management<br />

Corridor<br />

Management<br />

NHAI FIELD<br />

OFFICES<br />

Project<br />

Implementation Unit (PIU)<br />

Corridor<br />

Management Unit (CMU)<br />

The adm<strong>in</strong>istrative framework at the Head Office is set out below<br />

Chairman<br />

Central Vigilance<br />

Officer<br />

Member<br />

F<strong>in</strong>ance<br />

Member<br />

Adm<strong>in</strong>istration<br />

Member<br />

Technical (1)<br />

Member<br />

Technical (2) &(3)<br />

Member<br />

PPP<br />

CGM (F<strong>in</strong>ance)<br />

CGM (HR &<br />

Admn)<br />

CGM (LA)<br />

CGM (IT)<br />

CGM (CM)<br />

CGM (Legal)<br />

CGM (S R&D)<br />

CGM (Safety)<br />

CGM (Technical)-<br />

(2) & (3)<br />

CGM (PQ)


46<br />

<strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>Investment</strong> <strong>in</strong> <strong>Road</strong> <strong>Sector</strong><br />

Annexure<br />

List of CD Contents<br />

1. Overview of the Model Concession Agreement (BOT-Toll)<br />

2. Model document of Request <strong>for</strong> Qualification<br />

3. Model document of Request <strong>for</strong> Proposal<br />

4. Arbitration Act, 1996<br />

5. Central <strong>Road</strong> Fund Act<br />

6. Land Acquisition Act<br />

7. The Indian Tolls Act<br />

8. New <strong>National</strong> <strong>Highways</strong> Fee Rules<br />

9. Motor Vehicles Act<br />

10. NHAI Act, 1988<br />

11. Environment Protection Act<br />

12. Manual and Specification <strong>for</strong> 6-lan<strong>in</strong>g<br />

13. Manual and Specification <strong>for</strong> 4-lan<strong>in</strong>g<br />

14. Manual and Specification <strong>for</strong> 2-lan<strong>in</strong>g<br />

15. <strong>Road</strong> Transport Policy<br />

16. Reserve Bank of India Policy


Useful Addresses<br />

<strong>National</strong> <strong>Highways</strong> Authority of India<br />

G 5&6, <strong>Sector</strong>-10, Dwarka,<br />

New Delhi - 110 075<br />

Phone: 91-011-25074100 & 25074200<br />

Fax : 91-011-25093507, 25093514<br />

www.nhai.org<br />

M<strong>in</strong>istry of F<strong>in</strong>ance, Government of India /<br />

Department of Economic Affairs<br />

North Block, New Delhi<br />

www.f<strong>in</strong>m<strong>in</strong>.<strong>in</strong><br />

Department of <strong>Road</strong> Transport and <strong>Highways</strong><br />

Transport Bhavan<br />

1, Parliament Street<br />

New Delhi 110 001<br />

www.morth.nic.<strong>in</strong><br />

Department of Industrial Policy and Promotion<br />

Jo<strong>in</strong>t Secretary<br />

Secretariat <strong>for</strong> Industrial Assistance (SIA)<br />

M<strong>in</strong>istry of Commerce & Industry<br />

Udyog Bhavan, New Delhi-110 011, India<br />

www.dipp.nic.<strong>in</strong><br />

Reserve Bank of India (RBI)<br />

Foreign <strong>Investment</strong> Division,<br />

Shaheed Bhagat S<strong>in</strong>gh <strong>Road</strong>,<br />

Mumbai-400 001, India<br />

www.rbi.org.<strong>in</strong><br />

Registrar of Companies<br />

Department of Company Affairs<br />

M<strong>in</strong>istry of F<strong>in</strong>ance<br />

'B' Block, IInd Floor, Paryavaran Bhawan<br />

C.G.O. Complex, New Delhi-110 003, India<br />

www.dca.nic.<strong>in</strong><br />

Border <strong>Road</strong>s Organisation<br />

Seema Sadak Bhawan<br />

R<strong>in</strong>g <strong>Road</strong> Nara<strong>in</strong>a<br />

Delhi Cantt 110010<br />

www.bro.nic.<strong>in</strong><br />

Central Institute of <strong>Road</strong> Transport<br />

Bhosari, Pune - 411026, India<br />

www.cirt<strong>in</strong>dia.com<br />

<strong>National</strong> Portal of India<br />

www.<strong>in</strong>dia.gov.<strong>in</strong>/<br />

Directory of Indian Government Websites<br />

www.goidirectory.nic.<strong>in</strong>/<br />

Press In<strong>for</strong>mation Bureau (PIB)<br />

www.pib.nic.<strong>in</strong>/<br />

Foreign <strong>Investment</strong> Promotion Board<br />

M<strong>in</strong>istry of F<strong>in</strong>ance<br />

Government of India<br />

North Block, Lok Nayak Bhavan,<br />

New Delhi<br />