<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>Pre</str<strong>on</strong>g> <str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <str<strong>on</strong>g>at</str<strong>on</strong>g> <str<strong>on</strong>g>0300</str<strong>on</strong>g> <str<strong>on</strong>g>hrs</str<strong>on</strong>g> <strong>on</strong> <strong>20.11.2012</strong> under <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

chairmanship <str<strong>on</strong>g>of</str<strong>on</strong>g> Joint Secretary (T), MoRTH rel<str<strong>on</strong>g>at</str<strong>on</strong>g>ing to tender issued for<br />

procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> technical equipment for <str<strong>on</strong>g>the</str<strong>on</strong>g> I&C Centre<br />

A <str<strong>on</strong>g>Pre</str<strong>on</strong>g> <str<strong>on</strong>g>Bid</str<strong>on</strong>g> meeting was <str<strong>on</strong>g>held</str<strong>on</strong>g> under <str<strong>on</strong>g>the</str<strong>on</strong>g> chairmanship <str<strong>on</strong>g>of</str<strong>on</strong>g> Shri Sanjay<br />

Bandopadhyay, Joint Secretary (T), MoRTH rel<str<strong>on</strong>g>at</str<strong>on</strong>g>ing to tender issued for procurement<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> technical equipment for <str<strong>on</strong>g>the</str<strong>on</strong>g> I&C Centre to be setup in 10 St<str<strong>on</strong>g>at</str<strong>on</strong>g>es <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> country.<br />

2. Joint Secretary (T), MoRTH welcomed <str<strong>on</strong>g>the</str<strong>on</strong>g> participants and explained <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

objective <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting. He st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Government has decided to set up 10<br />

model autom<str<strong>on</strong>g>at</str<strong>on</strong>g>ed I&C Centre <strong>on</strong>e each in <str<strong>on</strong>g>the</str<strong>on</strong>g> St<str<strong>on</strong>g>at</str<strong>on</strong>g>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Andhra Pradesh, Karn<str<strong>on</strong>g>at</str<strong>on</strong>g>aka,<br />

Gujar<str<strong>on</strong>g>at</str<strong>on</strong>g>, Maharashtra, Rajasthan, Himachal Pradesh, Haryana, Madhya Pradesh, U.P<br />

and Delhi <strong>on</strong> a pilot basis. ARAI, SIAM and ICAT have been identified as Executing<br />

Agencies by <str<strong>on</strong>g>the</str<strong>on</strong>g> MoRTH to install and oper<str<strong>on</strong>g>at</str<strong>on</strong>g>e <str<strong>on</strong>g>the</str<strong>on</strong>g> ‘Vehicle Test Lanes’. The layout<br />

has been approved for <str<strong>on</strong>g>the</str<strong>on</strong>g>se centres and <str<strong>on</strong>g>at</str<strong>on</strong>g> some <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> places <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> has<br />

been started. The tender has been issued for procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> technical equipments for<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> said tender. Thereafter, he requested Director (RS) to indic<str<strong>on</strong>g>at</str<strong>on</strong>g>e some <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

important queries sent by <str<strong>on</strong>g>the</str<strong>on</strong>g> prospective bidders.<br />

3. Director (RS) st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> Queries have been received from SGS, SYSTEC<br />

Intern<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong>al, MAHA India, COSBER Aces Infra India, IVESUR, Rosemerta, TUV<br />

SUD SA, Mustang, TUV Rheinland, Envir<strong>on</strong>mental Systems Products India Pvt. Ltd,<br />

AVL India etc. He fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> queries are rel<str<strong>on</strong>g>at</str<strong>on</strong>g>ed to extensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

time for submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> bid, providing <str<strong>on</strong>g>the</str<strong>on</strong>g> missing form including Form K, providing<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> details CCTV, digital camera, time <str<strong>on</strong>g>of</str<strong>on</strong>g> lane oper<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong>, etc. He fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed<br />

though Ministry had requested to send <str<strong>on</strong>g>the</str<strong>on</strong>g> queries l<str<strong>on</strong>g>at</str<strong>on</strong>g>est by 1700 hours <strong>on</strong> 16.11.2012,<br />

queries received till d<str<strong>on</strong>g>at</str<strong>on</strong>g>e will be clarified. The resp<strong>on</strong>se <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry will be<br />

uploaded <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> ministry website by 30.11.2012. Thereafter, Director (RS) read out<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> following general clarific<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong>s:-


(i) All missing forms including Form K will be uploaded <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> ministry’s<br />

website by 30.11.2012.<br />

(ii) The purchase order will be issued by <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry and <str<strong>on</strong>g>the</str<strong>on</strong>g> performance<br />

guarantee will be for 5 per cent for <str<strong>on</strong>g>the</str<strong>on</strong>g> value <str<strong>on</strong>g>of</str<strong>on</strong>g> purchase order.<br />

(iii) The L1 will be decided based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> quote for single shift oper<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> for 7<br />

years i.e. (2 years warranty and oper<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> and AMC for 3 rd ,4 th ,5 th ,6 th and 7 th<br />

years)<br />

(iv) Clarific<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> <strong>on</strong> all clauses for indemnity damage etc. will be put <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

website.<br />

(v) The d<str<strong>on</strong>g>at</str<strong>on</strong>g>e <str<strong>on</strong>g>of</str<strong>on</strong>g> submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> tender will be extended up to 21st December,<br />

2012.<br />

(vi) The lane oper<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> for two years will be included in <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tract. This<br />

includes c<strong>on</strong>sumables also.<br />

(vii) The layout for eight testing centres has been finalized and can be obtained<br />

from <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>cerned executing agency i.e. SIAM, ARAI and ICAT. The lay<br />

out for different centres may be different.<br />

(viii) The details and number <str<strong>on</strong>g>of</str<strong>on</strong>g> cameras and display units will be clarified. It is<br />

c<strong>on</strong>templ<str<strong>on</strong>g>at</str<strong>on</strong>g>ed to provide <strong>on</strong>e CCTV camera per lane and a c<strong>on</strong>nected<br />

display unit for <str<strong>on</strong>g>the</str<strong>on</strong>g> benefit <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> vehicle owner. Cameras are also<br />

c<strong>on</strong>templ<str<strong>on</strong>g>at</str<strong>on</strong>g>ed for each test lane to capture <str<strong>on</strong>g>the</str<strong>on</strong>g> vehicle details.<br />

(ix) The lane oper<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> s<str<strong>on</strong>g>of</str<strong>on</strong>g>tware al<strong>on</strong>g with its source code protocols will be <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

copyright <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry.<br />

(x) One set <str<strong>on</strong>g>of</str<strong>on</strong>g> calibr<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong> equipment is envisaged in <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tract which can<br />

c<str<strong>on</strong>g>at</str<strong>on</strong>g>er to both LD and HD lane equipments.<br />

(xi) The frequency and number <str<strong>on</strong>g>of</str<strong>on</strong>g> people to be trained will be specified.<br />

(xii) The networking hardware will be provided by <str<strong>on</strong>g>the</str<strong>on</strong>g> bidder and will be<br />

through RS485 and WiFi also.


4. Thereafter, JS (T) requested <str<strong>on</strong>g>the</str<strong>on</strong>g> bidders to put <str<strong>on</strong>g>the</str<strong>on</strong>g>ir questi<strong>on</strong>s, if any.<br />

(i) The represent<str<strong>on</strong>g>at</str<strong>on</strong>g>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> MAHA, Germany st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> in <str<strong>on</strong>g>the</str<strong>on</strong>g> tender document<br />

Comm<strong>on</strong> Equipment is for 10 centers but <str<strong>on</strong>g>the</str<strong>on</strong>g> individual equipment for LD and<br />

HD lanes is 19 nos. He fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r requested to clarify this. In resp<strong>on</strong>se, Shri D.J.<br />

Kulkarni, Sr. Dy. Director, ARAI st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> it has been envisaged th<str<strong>on</strong>g>at</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>re<br />

should be four lanes <str<strong>on</strong>g>at</str<strong>on</strong>g> every Centre. However <str<strong>on</strong>g>at</str<strong>on</strong>g> some centre due to land<br />

c<strong>on</strong>straint and o<str<strong>on</strong>g>the</str<strong>on</strong>g>r administr<str<strong>on</strong>g>at</str<strong>on</strong>g>ive reas<strong>on</strong>s, no. <str<strong>on</strong>g>of</str<strong>on</strong>g> lanes is less. He fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />

st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> as per clause 1.1. <str<strong>on</strong>g>of</str<strong>on</strong>g> Annexure I <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> tender document, <str<strong>on</strong>g>the</str<strong>on</strong>g> final<br />

quantity may vary by +/- 20% for all <str<strong>on</strong>g>the</str<strong>on</strong>g> Centres put toge<str<strong>on</strong>g>the</str<strong>on</strong>g>r.<br />

(ii) Shri Nitin Manaw<str<strong>on</strong>g>at</str<strong>on</strong>g>, Director, Envir<strong>on</strong>mental Systems Products India Pvt. Ltd.<br />

st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> in <str<strong>on</strong>g>the</str<strong>on</strong>g> tender document it has been menti<strong>on</strong>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> maximum three<br />

partners may form <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>sortium and out <str<strong>on</strong>g>of</str<strong>on</strong>g> three members, <strong>on</strong>e will be Lead<br />

Member. The Lead Member cannot be part <str<strong>on</strong>g>of</str<strong>on</strong>g> any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>sortium. In this<br />

background, he requested to clarify whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r remaining two members (except<br />

Lead Member) can be part <str<strong>on</strong>g>of</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>sortium. Shri Kulkarni, Sr. Dy.<br />

Director, ARAI clarified th<str<strong>on</strong>g>at</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>oretically it is yet but practically it may not be<br />

possible.<br />

(iii) The represent<str<strong>on</strong>g>at</str<strong>on</strong>g>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> M/s VINITEC st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> in Annexure-VIII which<br />

deals with payment clause, <str<strong>on</strong>g>the</str<strong>on</strong>g> payment through Letter <str<strong>on</strong>g>of</str<strong>on</strong>g> Credit (LC) is not<br />

clear. It needs to be clarified fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r. Subsequently, more bidders requested to<br />

make <str<strong>on</strong>g>the</str<strong>on</strong>g> payment through LC citing <str<strong>on</strong>g>the</str<strong>on</strong>g> reas<strong>on</strong> th<str<strong>on</strong>g>at</str<strong>on</strong>g> it is an intern<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong>al<br />

practice. Director (RS) st<str<strong>on</strong>g>at</str<strong>on</strong>g>ed th<str<strong>on</strong>g>at</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry will examine it in c<strong>on</strong>sult<str<strong>on</strong>g>at</str<strong>on</strong>g>i<strong>on</strong><br />

with Finance Wing before taking a decisi<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> m<str<strong>on</strong>g>at</str<strong>on</strong>g>ter.<br />

The meeting ended with a vote <str<strong>on</strong>g>of</str<strong>on</strong>g> thanks to <str<strong>on</strong>g>the</str<strong>on</strong>g> chair.<br />

*********


Annexure – I<br />

List <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> participants <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-bid meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <str<strong>on</strong>g>at</str<strong>on</strong>g> 03:00 PM <strong>on</strong> <strong>20.11.2012</strong><br />

to be rel<str<strong>on</strong>g>at</str<strong>on</strong>g>ing to tender issued for procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> technical equipment for<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> I&C Centre to be set up in 10 st<str<strong>on</strong>g>at</str<strong>on</strong>g>es <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> country<br />

Name & Desgn. Tel. No E-mail<br />

1. Shri Sanjay Bandopadhyay, Joint Secretary<br />

(T), MoRTH<br />

2. Shri Rajeev Lochan, Director (RS), MoRTH<br />

3. Shri K.C. Sharma, SE, MORTH<br />

4. Shri Mansoor Ul Haque, NIC, MoRTH<br />

5. Shri Shivakant Kumar, US (RS), MoRTH<br />

In <str<strong>on</strong>g>the</str<strong>on</strong>g> chair<br />

6. Sh. D. R. Arora, Dy. Commissi<strong>on</strong>er,<br />

9711579999<br />

Transport Dept., GNCT <str<strong>on</strong>g>of</str<strong>on</strong>g> Delhi<br />

Sh. Anil Chhikara, MLO, Transport Dept., 9810211908<br />

GNCT <str<strong>on</strong>g>of</str<strong>on</strong>g> Delhi<br />

7. Sh. Ashish Kumar, Dy. MHR, iCAT 9871949571<br />

8. Sh. Amita Baikerikar, Sr. Asst. Director,<br />

ARAI<br />

9. Sh. Harjot Singh Juneja, Engineer, iCAT 9990165401<br />

10. Sh. D. J. Kulkarni, Sr. Dy. Director, ARAI 9975492652 djkulkarni.dts@araiindia.com<br />

11. Mr. Jas<strong>on</strong> Yeo, Centre Manager, STS 6581881861 yeojas<strong>on</strong>@stengg.com<br />

12. Mr. CONRNEUS JAM LCCUWEH, VLT +31653<br />

13. Sh. Vishal Virmani, Vinitec (Director), VTL 9811540979<br />

14. ZERRYVAN LEEVWEN, Dy. Director , +31653925357<br />

VLT<br />

15. Sh. Devadas K., Head Automotive Services, +919867019050 k.devadas@sgs.com<br />

SGS<br />

16. Sh. Sumit Singh, Promoti<strong>on</strong> Manager, SGS 9871295369 sumit.sigh@sgs.com<br />

17. Sh. Bimal Jagasia, Director-Automotive 917738201787<br />

Services, SGS<br />

18. Sh. Anurag Jain, Sr. G.M.,Actia India (Actia +91-8826000330<br />

Muller)<br />

19. Sh. Rajendra K. Bandal, TUV Rheiulad, Pune 9158007801 bandal@ind.tuv.com<br />

20. Sh. Hemant S. Desai, TUV Rheiulad 9125887800 desai@ind.tuv.com<br />

21. Sh. Sanjiv Singh, SYSTECH, USA sanjiv.singh@systechportal.com<br />

22. Sh. Jaswant Singh, Rosmarta, technologies jaswant.singh@rosmart<str<strong>on</strong>g>at</str<strong>on</strong>g>ech.com<br />

23. Sh. Shahabuddin, Rosmarta syed.shahabuddin@rosmartaanto.<br />

com


24. Sh. Sudhir S<strong>on</strong>i, TUV India ss<strong>on</strong>i@tuv-nord.com<br />

25. Sh. Ashish Dand<strong>on</strong>a, COSBER, ACES<br />

ashishd@acesvisi<strong>on</strong>.net<br />

INFRA<br />

26. Sh. Alkansh Saxena, TUV, India, Pune 9595666550 aekansh@tuv-nord.com<br />

27. Sh. Liju Lekshmanan, Bosch Ltd. 9717155009<br />

28. Sh. Shyam Narayan, S<str<strong>on</strong>g>of</str<strong>on</strong>g>tware Engineers, 9818768560<br />

MUSTANG<br />

29. Sh. Sanjay Kr. Singh, AVL India 9871297047 sanjay.singh@avl.com<br />

30. Sh. Srinivasan, AASSMA Techno 9962866047,<br />

97155 8006578<br />

31. Mohd. Ashraf, Rep. JF Tech, Beijing, Aasma 9995888888 md@autograde.in<br />

Techno Produces<br />

32. Sh. Rengarajan, MAHA, India 9650744666 raj.rengarajan@maha-india.in<br />

33. Sh. Naveen M<str<strong>on</strong>g>at</str<strong>on</strong>g>too, ATS ELGILYD 9717294744<br />

34. Sh. Nitin Manaw<str<strong>on</strong>g>at</str<strong>on</strong>g>, Envir<strong>on</strong>ment Systems 9892263575<br />

Products India P. Ltd.<br />

35. Sh. Vinod Kumar, TUV-SUD, SA 9560833367<br />

36. Sh. J. K. Rajan, TUV SUD, SA 9871382551 jk.rajan@tuv-sud.in<br />

37. Sh. Sanjay Naithani, snap-<strong>on</strong> tools 9818798840 sanjay.naithani@sn<str<strong>on</strong>g>at</str<strong>on</strong>g>ian.com<br />

38. Sh. R. S. S. N. Raju, Snaps a India 0124-4599700<br />

39. Sh. Vinod Kumar, Snap-<strong>on</strong> 9811541200<br />

40. Sh. Siefans Zanas, VTTEQ +39 335230888