Overview <strong>of</strong> Subtasks <strong>and</strong> Schedule<br />
1. Develop Set<br />
<strong>of</strong> Scenarios<br />
2. Develop Set <strong>of</strong><br />
Metrics<br />
3. Develop List <strong>of</strong><br />
Critical Airports<br />
4. Analyze <strong>Airportal</strong> <strong>Capacity</strong><br />
Constraints<br />
Runway<br />
Constraints<br />
5. Analyze <strong>Airportal</strong> <strong>Environmental</strong><br />
Constraints<br />
Noise<br />
Constraints<br />
Taxiway<br />
Constraints<br />
Gates<br />
Constraints<br />
Emissions<br />
Constraints<br />
7. Analyze Shift to<br />
Metroplex<br />
Operations<br />
6. Catalog <strong>and</strong> Assess Tool Set<br />
Time<br />
Feb.<br />
2008<br />
Kick<strong>of</strong>f<br />
July<br />
2008<br />
Report, Version 1<br />
Jan.<br />
2009<br />
Report, Version 2<br />
June<br />
2009<br />
Report, Version 3<br />
Dec.<br />
2009<br />
Final Report<br />