15.07.2014 Views

Post-Construction Ordinance

Post-Construction Ordinance

Post-Construction Ordinance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Structural BMPs<br />

Structural BMPs are Wetland<br />

required Pond<br />

at between 10% & 24%<br />

BUA with either 85% Rain TSS Garden removal or both 85% TSS &<br />

70% TP removal depending on the Watershed District.<br />

Collect runoff and remove pollutants.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!