Post-Construction Ordinance
Post-Construction Ordinance
Post-Construction Ordinance
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Structural BMPs<br />
Structural BMPs are Wetland<br />
required Pond<br />
at between 10% & 24%<br />
BUA with either 85% Rain TSS Garden removal or both 85% TSS &<br />
70% TP removal depending on the Watershed District.<br />
Collect runoff and remove pollutants.