Post-Construction Ordinance
Post-Construction Ordinance
Post-Construction Ordinance
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
N.C. Division of Water Quality<br />
June 2007: State approval received for all the Towns<br />
and County<br />
“The Division of Water Quality has reviewed the Phase<br />
II <strong>Post</strong>-<strong>Construction</strong> ordinance and believes that the<br />
ordinance, in conjunction with the technical design<br />
storm water specifications found in the Charlotte-<br />
Mecklenburg local storm water Best Management<br />
Practices 9BMP) Design Manual, collectively meet the<br />
requirements of the Phase II storm water program.”