15.07.2014 Views

Post-Construction Ordinance

Post-Construction Ordinance

Post-Construction Ordinance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

N.C. Division of Water Quality<br />

June 2007: State approval received for all the Towns<br />

and County<br />

“The Division of Water Quality has reviewed the Phase<br />

II <strong>Post</strong>-<strong>Construction</strong> ordinance and believes that the<br />

ordinance, in conjunction with the technical design<br />

storm water specifications found in the Charlotte-<br />

Mecklenburg local storm water Best Management<br />

Practices 9BMP) Design Manual, collectively meet the<br />

requirements of the Phase II storm water program.”

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!