19.07.2014 Views

Contents Important Tools Required - National Cycle, Inc.

Contents Important Tools Required - National Cycle, Inc.

Contents Important Tools Required - National Cycle, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preparation<br />

Prior to<br />

Installation<br />

1.<br />

2.<br />

Place the motorcycle securely on its side stand.<br />

Remove the plastic caps, item a, from the<br />

frame (small screwdriver), they will not be<br />

reused. Figure 1.<br />

a<br />

Figure 1<br />

3.<br />

Remove the front floor board bolt, item b,<br />

one from each side of the motorcycle (14mm<br />

wrench). Set these bolts aside for reuse. Figure 2.<br />

b<br />

Figure 2<br />

4.<br />

Thread one M10 x 60 bolt, item A, through the<br />

tubular mount section on the right engine<br />

guard, item B, and into one end of the connection<br />

rod, item C. Leave very loose. Figure 3.<br />

C<br />

A<br />

B<br />

Figure 3<br />

Installation<br />

1.<br />

Insert the connection rod, item C, into the tube<br />

in the motorcycle frame. Figure 4.<br />

C<br />

B<br />

Figure 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!