Conclusion and milestones<br />

A solid and confirmed progression <strong>of</strong> transport, installation<br />

interconnection rates as well as <strong>of</strong> quality assurance (mechanical,<br />

electrical, etc) and commissioning. The first sector (7-8) was pressure<br />

tested on Saturday-Sunday November 25. Some problem was found in<br />

<strong>the</strong> inner triplet but <strong>the</strong> whole arc was fully commissioned.<br />

The CERN has shown its ability to solve <strong>the</strong> various production and<br />

installation problems (e.g. DFB) it has encountered; <strong>the</strong> present ones<br />

(collimators) are being addressed and solved.<br />

The engineering run at 450 GeV for 2007 remains a top priority.<br />

However, to achieve it, <strong>the</strong> inner triplet problem must be solved quickly.<br />

<br />

Last magnet delivered November 2006<br />

Last magnet tested January 2007<br />

Last magnet installed March 2007<br />

<strong>Machine</strong> closed August 2007<br />

First collisions 450 GeV November 2007<br />

First Collisions 7 TeV June 2008<br />

L.R. <strong>Evans</strong> – EDMS Document 805670 39