20.07.2014 Views

Summer Issue 2010 - cfmeu

Summer Issue 2010 - cfmeu

Summer Issue 2010 - cfmeu

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY ROUND UP<br />

with Peter Joshua<br />

Raine Square: Up and running again<br />

Well it’s been a year of mixed fortunes<br />

in the CBD. However things are<br />

starting to pick up with some projects<br />

due to come on line next year (new<br />

projects story this issue). Raine<br />

Square is finally back up and running<br />

after ProBuild stepped in to take it<br />

over from Salta. It’s great to see most<br />

of the workers back on the job just in<br />

time for Christmas. Most of the same<br />

subbies are on the site with a few<br />

small changes to the form work and<br />

steel fixers. Good to see you back<br />

boys!<br />

C2 or the BHP HQ as some call it is<br />

powering ahead with FORM 700<br />

getting ready to complete stripping<br />

the jumps. Tower Crane One has<br />

been jacked up to its final height of<br />

249m with ‘legend’ and proud<br />

CFMEU ‘craney’ Frankie Gangemi at<br />

the controls. Frank said his work on<br />

the tower will be a fitting end to a<br />

career that began on the 32-storey<br />

Allendale Square building, the tallest<br />

CBD skyscraper at the time.<br />

“I’ve been doing this for 37<br />

years and I never get sick of<br />

the view.”<br />

CFMEU ‘craney’<br />

Frankie Gangemi<br />

at the controls at C2<br />

At Inner City the main structure is<br />

almost up to height. Diploma’s Zenith<br />

Apartments have reached there final<br />

height with 1178 and Queens River<br />

also well and truly under way. The<br />

John Holland Performing Arts<br />

Complex has finally reached<br />

completion, not bad considering they<br />

started about the same time as the<br />

CBUS job. Ha! Ha! Ha!<br />

BGC: Wet<br />

behind<br />

the ears<br />

when it<br />

comes to<br />

safety!<br />

The same however can’t be said<br />

about BGC’s Perth Arena. By the time<br />

it opens half the acts it would’ve<br />

attracted will probably be dead!<br />

Thank heavens for the boys at Perth<br />

Rigging, otherwise our tax payer<br />

dollars would hurting even more on<br />

this job.<br />

On the subject of BGC, they have<br />

started at the new Police Station in<br />

Northbridge and are off to a ‘good’<br />

start as you can see from this photo.<br />

First day on the job. In the rain, site<br />

was flooded, making it dangerous to<br />

operate a boom lift, because you<br />

can’t see what your wheels are<br />

driving over.<br />

SHAM CONTRACTING:<br />

If you are working under sham<br />

contracting arrangements, you don’t<br />

have to put up with it. Take action and<br />

do something about it now. Get what<br />

you and your family are entitled too!<br />

See our story this issue on what you<br />

can do about it.<br />

RDO’S<br />

I know members love getting their<br />

pocket RDO calendars – there’s one<br />

in this journal for you, but you can<br />

also download and print a copy for<br />

your fridge or bar from our website at<br />

www.<strong>cfmeu</strong>wa.com. Just look in the<br />

calendars section for the 2011<br />

calendar.<br />

NO FREELOADERS!<br />

Encourage any non-union workmates<br />

to join the union for great benefits,<br />

wages and conditions in 2011.<br />

REMEMBRANCE DAY<br />

I would also like to thank all the<br />

workers who came out in the city<br />

to support Armistice Day with<br />

2 minutes silence on November 11.<br />

WELL DONE – our Diggers would<br />

be proud that you keep their<br />

heroics alive.<br />

Finally, I would like to thank all the<br />

workers and our delegates in the<br />

CBD for all their help and support<br />

this past year. I look forward to<br />

further servicing our members in<br />

2011 and most of all I ask everyone<br />

to drink, drive and work safe over<br />

the festive season. We want to see<br />

you all back next year! Stay strong!<br />

If I can be of assistance to any<br />

member or you have safety<br />

concerns about your site please<br />

call on me 0433410596 or email<br />

pjoshua@<strong>cfmeu</strong>wa.com<br />

Construction Worker – <strong>Summer</strong> <strong>2010</strong> Page 49<br />

CFMEU

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!