<strong>Scope</strong> <strong>of</strong> <strong>Work</strong><br />

<strong>Full</strong>-<strong>Day</strong><br />

<strong>Kindergarten</strong><br />

November 27, 2012<br />

2/5/13 1


Recap <strong>of</strong> FDK Options<br />

Note: Based on Current First-Grade Numbers = 14 Sections<br />

1. Maintain Current Configuration<br />

2. Site-Based FDK<br />

• (Not feasible due to lack <strong>of</strong> space)<br />

<br />

3. Hybrid Option: Half-<strong>Day</strong> Site-Based & <strong>Full</strong>-<strong>Day</strong> at IES<br />

4. <strong>Full</strong> day at IES<br />

5. Half-<strong>Day</strong> Site-Based + 1 or 2 <strong>Full</strong>-<strong>Day</strong> at IES for Students<br />

at Risk<br />

2/5/13 2


Curriculum<br />

2013<br />

Jan.<br />

Feb.<br />

Mar.<br />

April<br />

May<br />

June<br />

July-<br />

Aug.<br />

HYBRID<br />

8 full day sections<br />

6 half-day sections<br />

• Meet with K teachers<br />

• Schedule PD dates<br />

• Meet with K teachers<br />

• Order review copies <strong>of</strong> materials<br />

• Meet with Special-Ed teachers<br />

• Materials cost: $70,000<br />

• Funding Source: 12-13<br />

Curriculum Fund (17)<br />

• Meet with K and Special-Ed<br />

teachers to finalize materials<br />

• Order materials<br />

• Order instructional materials<br />

based on registration<br />

• Parent meetings/tours at IES<br />

• PD/Curriculum Writing<br />

• Est. PD costs: $28,000<br />

• Funding Source: 12-13<br />

Curriculum Fund (17)<br />

• PD/Curriculum Writing<br />

FULL-DAY at IES<br />

2013<br />

Jan.<br />

Feb.<br />

Mar.<br />

April<br />

May<br />

June<br />

July<br />

Aug.<br />

14 sections<br />

SAME<br />

SCOPE<br />

OF<br />

WORK<br />

AS<br />

FULL<br />

DAY<br />

AT<br />

IES<br />

2013<br />

Jan.<br />

Feb.<br />

Mar.<br />

April<br />

May<br />

June<br />

July-<br />

Aug.<br />

STUDENTS AT RISK<br />

1-2 full-day sections<br />

• Determine selection process<br />

• Meet with K & special-ed teachers<br />

• SAME AS FULL DAY & HYBRID<br />

• Meet with K & spec-ed teachers<br />

• SAME AS FULL DAY & HYBRID<br />

SAME AS FULL DAY & HYBRID<br />

SAME AS FULL DAY & HYBRID<br />

SAME AS FULL DAY & HYBRID<br />

• PD/Curriculum Writing<br />

• Est. PD costs: $16,000<br />

• Funding Source: 12-13<br />

Curriculum Fund (17)<br />

SAME AS FULL DAY & HYBRID<br />

2/5/13 3


Technology<br />

HYBRID<br />

8 full day sections<br />

6 half-day sections<br />

FULL-DAY at IES<br />

14 sections<br />

STUDENTS AT RISK<br />

1-2 full-day sections<br />

2013<br />

2013<br />

2013<br />

May<br />

• Order technology<br />

equipment: Smartboard,<br />

LCD and 3 computers for<br />

each classroom<br />

• $5,000 each<br />

additional room.<br />

• Funding Source:<br />

Curriculum Fund (17)<br />

May<br />

June<br />

SAME<br />

SCOPE<br />

OF WORK<br />

AS FULL<br />

DAY AT<br />

IES<br />

May<br />

June<br />

SAME<br />

SCOPE<br />

OF WORK<br />

AS FULL<br />

DAY AT<br />

IES<br />

June<br />

• Installation <strong>of</strong> technology<br />

equipment<br />

2/5/13 4


Facilities<br />

HYBRID<br />

8 full day sections<br />

6 half-day sections<br />

FULL-DAY at IES<br />

14 sections<br />

STUDENTS AT RISK<br />

1-2 full-day sections<br />

2013<br />

Jun.-<br />

Aug.<br />

• Interior Finishes/<br />

Fixtures<br />

• 12 classrooms<br />

$120,000<br />

• Exterior Upgrades<br />

$80,000<br />

• Funding Source:<br />

2012-13 Capital<br />

Reserve Fund (32)<br />

2013<br />

Jan.<br />

Jun.-<br />

Aug.<br />

• Bid Multi-Purpose Modular<br />

$50,000<br />

• Funding Source: Capital<br />

Balance Fund (32)<br />

• Interior Finishes/Fixtures<br />

• 14 classrooms<br />

$120,000<br />

• Exterior Upgrades<br />

$80,000<br />

• Funding Source: 2012-13<br />

Capital Reserve Fund (32)<br />

2013<br />

Jun.-<br />

Aug.<br />

• Interior Finishes/Fixtures<br />

• 5 classrooms<br />

$50,000<br />

• Funding Source:<br />

2012-13 Capital Reserve<br />

Fund (32)<br />

2/5/13 5


Transportation<br />

ALL OPTIONS<br />

2013<br />

June<br />

July-<br />

Aug.<br />

Aug.<br />

• Enter kindergarten registration information into routing database<br />

• Establish bus routes based on registrations and final school assignments<br />

• Bus information sent to parents<br />

HYBRID<br />

Est. Cost:<br />

$49,154<br />

Funding Source:<br />

13-14 General Fund<br />

FULL DAY<br />

Est. Cost:<br />

$49,154<br />

Funding Source: 13-14<br />

General Fund<br />

STUDENTS AT RISK<br />

Est. Cost:<br />

$88,308<br />

Funding Source: 13-14<br />

General Fund<br />

2/5/13 6


2012-13<br />

Nov.<br />

Jan.<br />

2013<br />

Feb.-<br />

Mar.<br />

Student Services<br />

STUDENTS AT RISK<br />

1-2 full-day sections<br />

• Identify criteria by reviewing other districts’ criteria<br />

with kindergarten teachers, reading specialists, speech<br />

and language therapists, curriculum supervisors and<br />

principals<br />

• Implement the review process<br />

• Screen all students enrolling into kindergarten. Consider<br />

central location to ease administration<br />

• Utilize substitute teachers in kindergarten classrooms to<br />

allow kindergarten teachers to do screenings<br />

2013<br />

Apr.-<br />

June<br />

• Develop curriculum: curriculum supervisors and<br />

kindergarten teachers<br />

• Visit schools, review PDE pre-kindergarten and<br />

kindergarten standards, determine remedial programs.<br />

Long Term: Collect longitudinal data to determine if the Review<br />

Process is capturing the at-risk students<br />

2/5/13 7


Communications<br />

ALL OPTIONS<br />

2013<br />

Jan.-<br />

April<br />

• Communicate Details <strong>of</strong> FDK selection<br />

• Create, publish and distribute brochure<br />

• $2,000 12-13 Communications Budget<br />

• Webpage<br />

• Media outreach<br />

• Communicate Availability, Application Info, Registration Date<br />

• Website<br />

• Print advertisements<br />

• Email campaign<br />

• In partnership with Curriculum Department, advertise, conduct and<br />

record community information sessions<br />

July-<br />

Aug.<br />

Nov.-<br />

Dec.<br />

• Provide Communications support for launch <strong>of</strong> program<br />

• Feature story/photos on program’s first months; media outreach<br />

2/5/13 8


Human Resources<br />

2013<br />

Jan.-<br />

Mar.<br />

Feb.-<br />

Mar.<br />

Apr.-<br />

May<br />

June<br />

HYBRID<br />

11.8 FTEs required<br />

3 FTEs for half-day<br />

2.5 FTEs move to full-day<br />

5.5 FTEs add’l staffing<br />

.8 FTE for programming<br />

Recruiting<br />

• Advertise positions<br />

• Post positions<br />

• Attend job fairs<br />

Screening<br />

• Perform electronic screening<br />

• Conduct screening interviews<br />

Interviewing<br />

• First round<br />

• Second round<br />

• Demonstration lessons<br />

• Superintendent interviews<br />

Final Selection<br />

• Reference checks<br />

• Final Board approval<br />

Est. Add’l Cost:<br />

$567,000<br />

Funding Source: 13-14 General<br />

Fund Budget<br />

2013<br />

Jan.-<br />

Mar.<br />

Feb.-<br />

Mar.<br />

Apr.-<br />

May<br />

June<br />

FULL-DAY at IES<br />

16.2 FTEs required<br />

14 FTEs to staff 14 sections<br />

• 8.5 additional staff<br />

2.2 FTEs (add’l specialists)<br />

SAME<br />

SCOPE<br />

OF WORK<br />

AS FULL<br />

DAY AT<br />

IES<br />

Est. Add’l Cost:<br />

$765,000<br />

Funding Source: 13-14<br />

General Fund Budget<br />

STUDENTS AT RISK<br />

6.9 FTEs required<br />

4.5 FTEs for half-day<br />

1 FTE moves to full-day<br />

1 FTE add’l staffing<br />

.4 FTE for programming<br />

2013<br />

Jan.-<br />

Mar.<br />

Feb.-<br />

Mar.<br />

Apr.-<br />

May<br />

June<br />

SAME<br />

SCOPE<br />

OF WORK<br />

AS FULL<br />

DAY AT<br />

IES<br />

Est. Add’l Cost:<br />

$126,000<br />

Funding Source: 13-14<br />

General Fund Budget<br />

2/5/13 9


Survey Recap<br />

Highlights <strong>of</strong> Survey Results (541 Respondents)<br />

• Survey open from Feb. 14-26, 2012<br />

• <strong>Full</strong> <strong>Day</strong> <strong>Kindergarten</strong>?<br />

• 256: Yes, with costs included in budget<br />

• 82: Yes, with an additional charge for attendees<br />

• 61: Yes, with comments<br />

• 79: No<br />

• 69: Skipped<br />

85% “Yes”<br />

• FDK Should Be:<br />

• 221 (46%): Expected for all students<br />

• 142 (30%): Optional<br />

• 15 (24%): Doesn’t matter<br />

• 69: Skipped question<br />

• 89 Respondents: “Yes” they would be interested in FDK and they would not<br />

be influenced by whether the program is centrally located or site-based.<br />

• 95 Respondents: “Yes” they would be interested FDK and they would be<br />

influenced by whether the program is centrally located or site-based.<br />

• 117 Respondents: “Yes” they would be interested in FDK and they<br />

would be willing to have their child transported to another site.<br />

2/5/13 10


All Departments: Hybrid<br />

2012-2013<br />

NOVEMBER-JANUARY<br />

KEY: Curriculum | Human Resources | Facilities | Comm | Tech<br />

• Meet with K teachers<br />

• Schedule PD dates<br />

FEBRUARY-MARCH<br />

Recruiting: Advertise positions;<br />

Post positions; Attend job fairs<br />

Communication Campaigns<br />

Meet with K teachers; Order review<br />

copies <strong>of</strong> materials; Meet with Special-<br />

Ed teachers; Meet with K and Special-<br />

Ed teachers; Order materials<br />

APRIL-JUNE<br />

Screening: Perform electronic<br />

screening; Conduct screening<br />

interviews<br />

Communication<br />

Campaigns<br />

• Order instructional materials<br />

based on registration<br />

• Parent meetings at IES<br />

• PD/Curriculum Writing<br />

JULY-AUGUST<br />

Interviewing: First round; Second<br />

round; Demonstration lessons;<br />

Superintendent interviews<br />

Final Selection; Reference checks;<br />

Final Board approval<br />

Interior Finishes;<br />

Exterior Upgrades<br />

• Order technology<br />

equipment; install<br />

PD/Curriculum Writing<br />

NOVEMBER-DECEMBER<br />

Interior Finishes; Exterior Upgrades<br />

Communication Support<br />

Feature Story 2/5/13 11


All Departments: <strong>Full</strong>-<strong>Day</strong> at IES<br />

2012-2013 KEY: Curriculum | Human Resources | Facilities | Comm | Tech<br />

NOVEMBER-JANUARY<br />

• Meet with K teachers<br />

• Schedule PD dates<br />

FEBRUARY-MARCH<br />

Recruiting: Advertise positions;<br />

Post positions; Attend job fairs<br />

Bid Multi-Purpose Modular<br />

Communication Campaigns<br />

Meet with K teachers; Order review<br />

copies <strong>of</strong> materials; Meet with Special-<br />

Ed teachers; Meet with K and Special-<br />

Ed teachers; Order materials<br />

APRIL-JUNE<br />

Screening: Perform electronic<br />

screening; Conduct screening<br />

interviews<br />

Communication<br />

Campaigns<br />

• Order instructional materials<br />

based on registration<br />

• Parent meetings at IES<br />

• PD/Curriculum Writing<br />

JULY-AUGUST<br />

Interviewing: First round; Second<br />

round; Demonstration lessons;<br />

Superintendent interviews<br />

Final Selection; Reference checks;<br />

Final Board approval<br />

Interior Finishes;<br />

Exterior Upgrades<br />

• Order technology<br />

equipment; install<br />

PD/Curriculum Writing<br />

NOVEMBER-DECEMBER<br />

Feature Story<br />

Interior Finishes; Exterior Upgrades<br />

Communication Support<br />

2/5/13 12


All Departments: Students at Risk<br />

2012-2013 KEY: Student Services |Curriculum | HR| Facilities | Comm | Tech<br />

NOVEMBER-JANUARY<br />

Identify criteria by reviewing other districts’ criteria with various RTSD pr<strong>of</strong>essionals<br />

• Meet with K teachers<br />

• Schedule PD dates<br />

FEBRUARY-MARCH<br />

Recruiting: Advertise positions;<br />

Post positions; Attend job fairs<br />

Communication<br />

Campaigns<br />

Implement review process; Screen all students;<br />

Use subs in K to allow teachers to do screenings<br />

Perform electronic screening;<br />

Conduct screening interviews<br />

Comm<br />

Campaigns<br />

Meet with K teachers; Order review copies <strong>of</strong> materials; Meet with Special-Ed teachers; Meet<br />

with K and Special-Ed teachers; Order materials<br />

APRIL-JUNE<br />

Develop curriculum; Visit schools, Review PDE standards; Determine remedial programs<br />

• Order instructional materials<br />

based on registration<br />

• Parent meetings at IES<br />

• PD/Curriculum Writing<br />

JULY-AUGUST<br />

Interviewing: First round; Second<br />

round; Demonstration lessons;<br />

Superintendent interviews<br />

Final Selection; Reference checks;<br />

Final Board approval<br />

Interior Finishes;<br />

Exterior Upgrades<br />

• Order technology<br />

equipment; install<br />

PD/Curriculum Writing<br />

NOVEMBER-DECEMBER<br />

Interior Finishes; Exterior Upgrades<br />

Communication Support<br />

Feature Story 2/5/13 13