1 Introduction 1<br />
1.1 Current progress 1<br />
2 The current understanding of coastal processes 2<br />
3 Potential solutions 4<br />
3.1 Do nothing 4<br />
3.2 Asset relocation 4<br />
3.3 Planning responses 5<br />
3.4 Existing channel maintenance 5<br />
3.5 New small channel dredging (PMUG Option) 6<br />
3.6 Reset of channel position 7<br />
3.7 Training <strong>Groyne</strong>s with nourishment from existing channel maintenance 8<br />
3.8 Seawall (land protection) 8<br />
3.9 Alternative options 8<br />
3.10 Summary 9<br />
4 Applicability 10<br />
Appendix A: Changes to the Spit from 1993 to 2011<br />
Appendix B:<br />
Sketches of potential solutions<br />
<strong>Jackett</strong> <strong>Island</strong> Long Term <strong>Erosion</strong> Management Preliminary Practicable Options Report Job no. 27882-PPO-R2<br />