11.09.2014 Views

RESC11-12-02 Port Motueka Groyne-Jackett Island Erosion ...

RESC11-12-02 Port Motueka Groyne-Jackett Island Erosion ...

RESC11-12-02 Port Motueka Groyne-Jackett Island Erosion ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table of contents<br />

1 Introduction 1<br />

1.1 Current progress 1<br />

2 The current understanding of coastal processes 2<br />

3 Potential solutions 4<br />

3.1 Do nothing 4<br />

3.2 Asset relocation 4<br />

3.3 Planning responses 5<br />

3.4 Existing channel maintenance 5<br />

3.5 New small channel dredging (PMUG Option) 6<br />

3.6 Reset of channel position 7<br />

3.7 Training <strong>Groyne</strong>s with nourishment from existing channel maintenance 8<br />

3.8 Seawall (land protection) 8<br />

3.9 Alternative options 8<br />

3.10 Summary 9<br />

4 Applicability 10<br />

Appendix A: Changes to the Spit from 1993 to 2011<br />

Appendix B:<br />

Sketches of potential solutions<br />

<strong>Jackett</strong> <strong>Island</strong> Long Term <strong>Erosion</strong> Management Preliminary Practicable Options Report Job no. 27882-PPO-R2<br />

Tasman District Council November 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!