options also have the greatest risk of failing to meet the required objectives unless ongoing<br />

maintenance is included. Therefore these options have a greater ongoing cost. Hard<br />

protections works have a high cost and high risk in terms of gaining consent approval. The<br />

reset option has a significant initial effect, but provides an option that could have no<br />

ongoing maintenance costs.<br />

Asset relocation and/or planning responses should be considered as part of any long term<br />

plan for this area.<br />

<strong>Jackett</strong> <strong>Island</strong> Long Term <strong>Erosion</strong> Management Preliminary Practicable Options Report T&T Ref. 27882-PPO-R2<br />

Tasman District Council November 2011