In some regions of the world customers have<br />

neither Natural Gas nor Oil available, so we can<br />

offer several solutions <strong>for</strong> nearly all energy<br />

problems, either using different coals or other<br />

secondary fuels; that is also valid <strong>for</strong> creating own<br />

electrical energy within the plant area.<br />

Optionally we offer a wide range of<br />

additional equipment to run a cement<br />

plant. Either you have a special need of<br />

pyro-sourcing, neither oil nor gas available,<br />

or you face a lack of internal electricity, we<br />

find the right way out. You can choose<br />

between several facilities to produce a<br />

needed electrical power supply by a<br />

sufficient own power plant or you have<br />

Brown Coal availably only and need a coal<br />

firing system <strong>for</strong> the kiln. Anyway we find<br />

and install the right solution <strong>for</strong> you.<br />

There<strong>for</strong>e please get a separate quotation<br />

under filling a questionnaire. Please<br />

consider a sizable additional more price we<br />

have perhaps to setup. Fuel the plant by<br />

Gas or Oil is included in our standard offer.<br />

<strong>IRD</strong> <strong>Swiss</strong><br />

<strong>Cement</strong> Plants