THE PEOPLE BEHIND THE PROJECTS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>THE</strong> <strong>PEOPLE</strong> <strong>BEHIND</strong> <strong>THE</strong> <strong>PROJECTS</strong><br />
CELEBRATING 20 YEARS OF ENDURING RELATIONSHIPS & MEMORABLE <strong>PROJECTS</strong><br />
A collection of portraits, milestones and stories<br />
©2013 Project Management Advisors, Inc.
INTRODUCTION<br />
2013 marks a special anniversary for Project Management Advisors: 20 years in<br />
business. To commemorate this milestone, the company decided to publish a PMA<br />
Yearbook to honor past and present clients, peers, business partners, employees<br />
and friends.<br />
The book is aptly titled The People Behind the Projects in recognition of the fact that<br />
the bricks and mortar of PMA’s business is people – people who have hired them and<br />
people they have hired. PMA invited those same individuals to share their memories,<br />
which PMA asked me to capture, as the most fitting way to tell the company’s story.<br />
I was given only one instruction – no testimonials. Befitting of PMA’s culture and<br />
character, the focus of the interviews was to be on the relationship rather than a list<br />
of accomplishments.<br />
As a longtime consultant to the company, I knew I was in for an editorial challenge: to<br />
respect the client’s wishes while at the same time conveying facts about PMA as seen<br />
through the eyes of others. Fortunately, I have learned a lot from my PMA colleagues<br />
in terms of giving the client what they really need – not always what they initially<br />
request. So the yearbook is full of testimonials; however, the accolades run both<br />
ways. In order to appreciate integrity, trust, collaboration and respect in others, we<br />
must embody those characteristics ourselves, and there is no doubt those attributes<br />
are abundant within PMA’s circle.<br />
Worth noting in the following pages is how rarely the contributors mention buildings<br />
when reflecting on the success of the project. Their anecdotes almost always center<br />
on how work got done rather than reciting the details of a specific project. Soft skills<br />
mattered more than hard hats and the bottom line never compromised the company’s<br />
core values.<br />
PMA has cause to be pleased by the legacy of projects it has managed; but even<br />
more so, to be proud of the relationships it has built.<br />
Aleen Bayard<br />
Principal, MarketZing<br />
Friend & consultant since 2005<br />
3
FOUNDING PARTNERS<br />
“I think our greatest accomplishment as a company<br />
is that we’ve created a culture of trust. Trust means you<br />
can rely on people; you can believe people; and people have your back.<br />
If our clients can’t trust our staff, it is an issue. If we can’t trust one another,<br />
it is an issue. In a world where we seem to be measured by very tangible<br />
metrics – the bricks and mortar of the projects we oversee – it bears noting that<br />
our clients consistently mention trust, an intangible quality, as our primary asset.<br />
Trust is the foundation of everything we are doing, have done, and will do.<br />
When I think about our next 20 years, I have no idea about how PMA will look<br />
from the outside. I can’t predict the economy or the market or the size of the<br />
company. The only thing I know for certain is that if PMA is in business 20<br />
years from now, it will be because we have stayed true to our key values and<br />
continued to earn the trust of our employees, clients and business partners.”<br />
- GENE LITTERSKI<br />
“As a company, our greatest accomplishments are twofold,<br />
and they are related - we have consistently been able<br />
to form and maintain great people relationships, which<br />
have, in turn, resulted in us working on great projects.<br />
The quality of our relationships – with colleagues, clients and project teams – goes<br />
hand in hand with the positive project results. I think the bedrock to both is integrity.<br />
Through integrity and fair-dealing, the foundation for relationships of trust is formed,<br />
leading to the perfect client relationship and other excellent relationships with peers<br />
and colleagues. Without integrity, none of the other PMA core values matter.”<br />
- JEFF MARCOWITZ<br />
4
FOUNDING PARTNERS<br />
“There is an old adage that the secret to<br />
making money in real estate is location,<br />
location, location. In our case, it comes<br />
down to people, people, people and people.<br />
And in particular, people who never stop learning, challenging<br />
themselves, and understanding that collaboration is more than<br />
a word we have on our web site – it is the essence of how we do<br />
business, how we treat our partners, and how we treat each other.<br />
I am most proud that we have been able to attract and<br />
retain great people. That is foundational for the today and<br />
tomorrow of PMA. They are curious. They don’t accept face<br />
value, but want to push beyond the acceptable answer to<br />
the best solution. Those character attributes force the six of<br />
us to elevate the business to keep our staff engaged.”<br />
- MIKE TRACY<br />
Project Management Advisors, Inc. founded 1993<br />
1993<br />
5
The People Behind the Projects: 1993-1994<br />
“Mike Tracy gave me<br />
some personal development<br />
advice once. I was going to<br />
go fly fishing in Montana<br />
in October of 2011, just a<br />
month after the 911 attacks,<br />
and everybody thought<br />
the world was coming to<br />
an end. I invited Mike to<br />
join me for a couple of<br />
days. On the third day we<br />
end up with a real estate<br />
guy driving around looking<br />
at land. Mike gets<br />
me all revved<br />
up and keeps<br />
saying how it<br />
is important it<br />
is to enjoy life<br />
and live for the<br />
moment. I came<br />
home from that trip and<br />
had to explain to my wife<br />
how we ended up with 30<br />
acres of land in Montana.”<br />
- JOHN LAHEY<br />
JOHN C. LAHEY<br />
Chairman<br />
Solomon Cordwell Buenz<br />
RICHARD SINDELAR<br />
Owner<br />
Construction Analysts, Inc.<br />
DR. BENJAMIN QUILLIAN<br />
Executive Vice Chancellor<br />
& Chief Financial Officer<br />
California State University<br />
SANDY CROSSEY<br />
1994 | Vice President Finance<br />
Current Staff<br />
TRIVIA<br />
ANSWER IN BACK<br />
What is the loop officebuilding that<br />
appears inthe background of PMA’s<br />
first marketing photo?<br />
1993-1994<br />
First Office Opens on June 7th, 1993<br />
at 117 N. Jefferson, Chicago, IL<br />
First Project - Draper & Kramer,<br />
Gatx Relocation, Chicago, IL<br />
6<br />
CityFront Terrace Residential Development,<br />
San Diego, CA
The People Behind the Projects: 1994-1995<br />
RICK NASSAU<br />
Former Executive<br />
Vice President<br />
CC Industries, Inc.<br />
RICHARD STEIN<br />
Senior Managing Director<br />
Mesirow Financial Real<br />
Estate Consulting, LLC<br />
MIKE CLUNE<br />
Chairman<br />
Clune Construction<br />
Company<br />
EWA WEIR<br />
1995 | Project Manager<br />
Alumni Staff<br />
ROGER MCCARRON<br />
1995 | Principal<br />
Current Staff<br />
Apollo Travel<br />
Services Headquarters,<br />
Rolling Meadows, IL<br />
The Cradle Adoption Services,<br />
Evanston, IL<br />
1994-1995<br />
First California Projects<br />
California State University,<br />
Fresno School of Education<br />
Relocation and Campus Beautification,<br />
Fresno, CA<br />
First Public/Private<br />
Partnership<br />
California State<br />
University, Fresno<br />
Student Housing,<br />
Fresno, CA<br />
Fort Sheridan Redevelopment,<br />
Highland Park and Highwood, Illinois<br />
7
The People Behind the Projects: 1995-1996<br />
“Since the pool opened in 1999,<br />
our boys’ and girls’ water polo<br />
teams have both been state<br />
champions for their respective<br />
genders more than the rest of<br />
the state combined. We’ve sent<br />
over a dozen aquatic athletes<br />
to the national military service<br />
academies. One of our female<br />
swimmers has competed in<br />
the Paralympics, and our girls’<br />
basketball team has been state<br />
champion twice. Gene<br />
and Roger didn’t<br />
just help us build<br />
a new field house;<br />
they helped us to<br />
build a community<br />
of champions.”<br />
- JERRY LORDAN, PHD<br />
DAVID HETRICK<br />
Vice President<br />
Executive<br />
Construction Inc.<br />
RICK JOHNSON<br />
Executive Director, retired<br />
California Polytechnic<br />
State University San<br />
Luis Obispo - Associated<br />
Students, Inc.<br />
GERALD LORDAN<br />
Director of<br />
Development Operations<br />
Fenwick High School<br />
TONY LOBELLO<br />
Senior Associate<br />
Gensler Architects<br />
TRIVIA<br />
ANSWERS IN BACK<br />
Where was the<br />
first out-of-state<br />
satellite project<br />
office opened?<br />
1995-1996<br />
Alliance Francais<br />
de Chicago<br />
Mike Tracy opens<br />
Town of Fort Sheridan<br />
project office,<br />
Highland Park, IL<br />
CalPoly<br />
Sports Complex,<br />
San Luis Obispo, CA<br />
First Private K-12 School Project<br />
Fenwick High School<br />
New Field House<br />
and Renovations,<br />
Oak Park, IL<br />
8
The People Behind the Projects: 1997<br />
MARSHALL LEES<br />
Former Executive Vice President<br />
HCP, Inc.<br />
JIM CURTIN<br />
Design Principal<br />
Solomon Cordwell Buenz<br />
MIKE SCHULTZ<br />
Director of University<br />
Housing<br />
Southern Illinois<br />
University Edwardsville<br />
SUSAN GAONA<br />
1997 | Project Administrator<br />
Current Staff<br />
MIKE LOUGH<br />
Former Architect<br />
Solomon Cordwell Buenz<br />
Southern Illinois<br />
University Edwardsville,<br />
Prairie Hall Student Residence<br />
1997<br />
First Project for Slough Estates<br />
USA Inc.,<br />
Torrey Pines Science Center,<br />
La Jolla, CA<br />
9
The People Behind the Projects: 1997<br />
“...What stands out in my mind<br />
more than anything is the warm<br />
feeling of camaraderie that I felt<br />
working with PMA over nearly<br />
20 years, and the admiration<br />
that I have for the group of<br />
individuals who comprise this<br />
exceptional company.”<br />
“…Without<br />
question, our<br />
company could not<br />
have functioned<br />
without the strong<br />
partnership that<br />
we developed with<br />
PMA’s team, and<br />
equally important<br />
is that we had a<br />
lot of fun in the<br />
process.”<br />
- RANDY ROHNER<br />
RANDALL ROHNER<br />
Principal<br />
Life Science Development Group<br />
CHUCK HOPE<br />
President<br />
Hope Engineering<br />
JAY LEOPOLD<br />
Regional Manager<br />
DPR Construction Inc.<br />
BRAD WHITE<br />
1997 | Project Manager<br />
Alumni Staff<br />
Southern Illinois<br />
University Edwardsville,<br />
Cougar Village Apartments<br />
Torrey Pines Science Center,<br />
Lots 9, 10 & 11, La Jolla, CA<br />
TRIVIA<br />
ANSWERS IN BACK<br />
First PMA project<br />
to be broadcast<br />
hours after<br />
substantial<br />
completion?<br />
10
The People Behind the Projects: 1998-1999<br />
PHILIP PAPE<br />
Vice President<br />
Ferguson Pape<br />
Baldwin Architects<br />
JIM SCHNUR<br />
President and Managing Broker<br />
Integrated Real Estate Solutions<br />
PAUL GIBSON<br />
Executive Vice President<br />
exp U.S. Services, Inc.<br />
KEN RICHTER<br />
1999 | Principal<br />
Current Staff<br />
KEN KORNBERG<br />
President/Owner<br />
Kornberg Associates<br />
Architects<br />
1998-1999<br />
MAT<strong>THE</strong>W G. NEUMANN<br />
1998 | Project Manager<br />
Alumni Staff<br />
Torrey Pines<br />
Science Center,<br />
Agouron/Pfizer Campus,<br />
La Jolla, CA<br />
Slough Business Park,<br />
Elgin, IL<br />
Torrey Pines<br />
Science Center<br />
Lots 18 & 20,<br />
La Jolla, CA<br />
New office<br />
location opens<br />
in San Diego<br />
(La Jolla)<br />
Hewlett Packard St. Louis, St. Louis, MO<br />
11
12<br />
WHAT YOU SAID...
The People Behind the Projects: What You Said<br />
“Simply put, PMA rescued me. We were building a<br />
softball stadium and it was way behind schedule and quickly heading<br />
south. The issues were related to the people side of the project, not the<br />
budget or timeline. We had factions between the faculty and the athletic<br />
department, and my job was to maintain morale and give employees and<br />
faculty confidence that we’ll get through it all. I appreciated that same<br />
approach with the PMA team. PMA’s ability to work with people was as<br />
important as their technical skills.”<br />
- DR. BENJAMIN QUILLIAN<br />
“You sense something about someone<br />
from the first impression. Mike made direct eye contact,<br />
which really struck me. He knew more about the project than anyone<br />
else working on Fort Sheridan, and it was a massive undertaking. We<br />
had a lot of challenges working with the government agencies and<br />
municipalities and park districts – not to mention trying to manage all of<br />
the partners. Mike got us all to play together. He has a way of<br />
getting people to move forward and get over<br />
the petty stuff, and that’s what made it an<br />
enduring relationship.”<br />
“From the start, the partners were all workaholics.<br />
It was a standing joke that on 4 o’clock on a Friday, they would walk around the<br />
office saying to each of us ‘see you tomorrow?’ And I’d say ‘sure, if you’re going<br />
to show up and help me pull weeds in my garden.’ Back then it was just standard<br />
practice that everyone came in on the weekend. But they couldn’t break me.<br />
And they respected me for that.”<br />
- RICK NASSAU<br />
- EWA WEIR<br />
13
The People Behind the Projects: 2000<br />
“Our company recently<br />
celebrated our<br />
one-hundred year<br />
anniversary, and the<br />
characteristics inherent in<br />
our organization, which<br />
have taken us through<br />
three generations, are<br />
integrity and trust.<br />
We look at projects as a<br />
form of partnership.<br />
We don’t do one and done<br />
work. We always want<br />
to be asked back and we<br />
have found that operating<br />
with a high degree of<br />
professionalism and<br />
integrity to be essential,<br />
which underscores how<br />
PMA works. They<br />
don’t take short<br />
cuts. It is not a<br />
firm that says<br />
one thing and<br />
does another. That<br />
behavior fosters a level<br />
of trust and accounts for<br />
the success we have had<br />
working together.”<br />
- FRED BERGLUND<br />
2000<br />
FRED BERGLUND<br />
President<br />
Berglund Construction<br />
TOM SICINSKI<br />
Senior Vice President<br />
Berglund Construction<br />
The Dominicans,<br />
St. Pius Priory Master Plan<br />
Development & Renovations,<br />
Chicago, IL<br />
Beth Emet Synagogue,<br />
Evanston, IL<br />
JIM DYER<br />
Senior Vice President<br />
Berglund Construction<br />
TESSA DESHARNAIS<br />
2000 | Project<br />
Administrator<br />
Alumni Staff<br />
14
The People Behind the Projects: 2000<br />
JEFF PETERSON<br />
Principal<br />
Wilsey Ham<br />
DAVID BOWDEN<br />
Sr. Vice President,<br />
Chief Strategic Officer<br />
Hathaway Dinwiddie<br />
SARA CARMODY<br />
Project Executive<br />
Hathaway Dinwiddie<br />
BRUCE HEIMBACH<br />
2000 | Vice President<br />
Current Staff<br />
TOM GILMAN<br />
Principal<br />
DES Architects +<br />
Engineers<br />
TRACY SCARLETT<br />
2000 | Marketing<br />
Assistant<br />
Current Staff<br />
Britannia Oyster Point I<br />
Campus Development,<br />
So. San Francisco, CA<br />
First annual PMA<br />
company meeting,<br />
Chicago, IL<br />
Britannia East Grand Campus Development,<br />
So. San Francisco, CA<br />
15
The People Behind the Projects: 2001<br />
“Ours has been a circular-type<br />
relationship. The way they<br />
treat me as a client has made<br />
me treat others in an identical<br />
fashion - both personally and<br />
professionally. Just because<br />
they are a service provider<br />
doesn’t mean we can’t learn<br />
from them and how they do their<br />
business. As they have grown<br />
and evolved, so have we. They<br />
are our partner. They are not<br />
behind me; they are sitting next<br />
to me.” “The answer<br />
‘no’ is never the first<br />
answer; it is the last<br />
answer you come<br />
to after you explore<br />
all of the options.<br />
…The more times I<br />
can say yes to my<br />
client, the stronger<br />
our relationship<br />
is going to be.<br />
I see that same<br />
philosophy in PMA.<br />
- JON BERGSCHNEIDER<br />
JON BERGSCHNEIDER<br />
Executive Vice President<br />
HCP, Inc.<br />
JEFF SOBCZYK<br />
2001 | Vice President<br />
Current Staff<br />
ANDY PASHBY<br />
Partner<br />
Landmark Builders<br />
2nd California office opens in South San Francisco<br />
at the construction trailer on site<br />
at Britannia Oyster Point site<br />
PAUL PASHBY<br />
Partner<br />
Landmark Builders<br />
JILL TARBY<br />
2001 | Vice President<br />
Marketing<br />
Current Staff<br />
2001<br />
Maine Plastics Office<br />
Addition and Renovation,<br />
North Chicago, IL<br />
Tularik Tenant<br />
Improvements at<br />
Britannia Oyster Point I,<br />
So. San Francisco, CA<br />
16
The People Behind the Projects: 2001-2002<br />
CLINT PEPPER<br />
Former Associate<br />
Director of Engineering<br />
+Operations<br />
SkyePharma<br />
JOHANNA LACAMBRA<br />
Director of WorkPlace<br />
Services for the Region:<br />
Asia Pacific<br />
Agilent Technologies, Inc.<br />
“You can throw<br />
anything at<br />
PMA, they<br />
are just able<br />
to quickly<br />
understand<br />
what you need<br />
and deliver. I like<br />
bouncing things off them,<br />
because they don’t just<br />
give you the answer you<br />
want to hear, they stop<br />
you from doing the wrong<br />
thing. They push you<br />
forward with their hand<br />
on your back and guide<br />
you down the path.”<br />
- JOHANNA LAHAMBRA<br />
RON KLEMENIC<br />
Chairman and CEO<br />
Magnusson Klemencic Associates<br />
VALERIE FREIER<br />
2002 | Assistant Project Manager<br />
Current Staff<br />
2001-2002<br />
SkyePharma Bldg. 6<br />
Manufacturing Facility,<br />
San Diego, CA<br />
Agilent Technologies Office,<br />
Data and Lab Improvements,<br />
Roseville, CA<br />
First Bay Area Project Completion<br />
One Embarcadero South Apartments,<br />
San Francisco, CA<br />
One Rincon Hill<br />
Phase I High Rise<br />
Residential Tower,<br />
San Francisco, CA<br />
17
The People Behind the Projects: 2002<br />
KEN MILLER<br />
Consultant<br />
MICHAEL THOMAS<br />
Director of Public Works<br />
The City of Lake Forest, IL<br />
VINCE ROQUEBERT<br />
Design Manager<br />
Carollo Engineers, Inc.<br />
GREG PORT<br />
2002 | Senior Project<br />
Manager<br />
Current Staff<br />
ALLAN BULLEY III<br />
President<br />
Bulley & Andrews<br />
2002<br />
City of Lake Forest Illinois<br />
New Transmission Main & Water<br />
Treatment Plant Rehabilitation,<br />
Lake Forest, IL<br />
First United Methodist Church<br />
of Evanston Renovation, Evanston, IL<br />
18<br />
Milwaukee Intermodal Station<br />
Transit/Mixed-Use Redevelopment,<br />
Milwaukee, WI
The People Behind the Projects: 2003-2005<br />
JEFF JOZWIAK<br />
Principal<br />
Norcon Inc.<br />
BRANDON ROGALSKI<br />
Former Project Executive<br />
Norcon, Inc.<br />
LARRY WILEY<br />
Senior Project Manager<br />
Berglund Construction<br />
CHAD MATESI<br />
2004 | Senior Project<br />
Manager<br />
Current Staff<br />
DAMIAN JONES<br />
Assistant Principal<br />
Francis W. Parker School<br />
MIKE BARBERA<br />
2004 | Vice President<br />
Current Staff<br />
GREG N. GEHLEN<br />
2004 | Vice President<br />
Alumni Staff<br />
2003-2005<br />
1875 N. Orchard<br />
Luxury Single<br />
Family Residence,<br />
Chicago IL<br />
Francis W. Parker School<br />
Science Wing Renovation & Addition,<br />
Chicago, IL<br />
Francis W. Parker School<br />
Auditorium & Fine Arts Renovations<br />
Chicago, IL<br />
19
The People Behind the Projects: 2005<br />
“I got to know Ken long<br />
before PMA when he was<br />
the facility director at<br />
Scripps. One of the things<br />
DOUG HOERR<br />
Owner<br />
Hoerr Schaudt<br />
Landscape Architects<br />
KEN BALDWIN<br />
Principal<br />
Ferguson Pape<br />
Baldwin Architects<br />
ANNE VOSHEL<br />
Principal<br />
AVA Consultants<br />
we liked was he was<br />
very rigorous<br />
and clear, and he<br />
did a good job interfacing<br />
with research scientists<br />
at Scripps. When he<br />
announced he was going<br />
to PMA, it was an instant<br />
validation of the company<br />
(PMA) in our market. Ken<br />
has been the primary<br />
face of PMA locally and<br />
has done a great job of<br />
building a team of some<br />
of the best folks in town.”<br />
NORA ARMENTA<br />
WPS Site Manager,<br />
US Southwest Region<br />
Sites - Workplace Services<br />
Agilent Technologies, Inc.<br />
- KEN BALDWIN<br />
BERNIE BAKER<br />
2005 | Vice President<br />
Current Staff<br />
DANIELLE BERRY<br />
2005 | Project Administrator<br />
Current Staff<br />
2005<br />
Fourth Presbyterian Church<br />
of Chicago Sanctuary Improvements,<br />
Chicago, IL<br />
20<br />
Bressi Ranch Master<br />
Planning & Entitlements,<br />
Carlsbad, CA<br />
Agilent Technologies, Inc.<br />
Project ARK Relocation,<br />
Santa Clara, CA
The People Behind the Projects: 2005-2006<br />
DOUG LYONS<br />
Managing Director<br />
Pearlmark Real Estate<br />
Partners<br />
CECILIA MOWATT<br />
Attorney<br />
Strategies in Site, Inc.<br />
CHARLIE NORWESH<br />
Principal<br />
Norcon, Inc.<br />
SARAH ROXWORTHY<br />
Senior Project Manager<br />
Norcon, Inc.<br />
MAT<strong>THE</strong>W A. HINKLIN<br />
2005 | Project Manager<br />
Alumni Staff<br />
PAUL MONTGOMERY<br />
2005 | Project Manager<br />
Alumni Staff<br />
Episcopal Diocese of Chicago<br />
St. James Cathedral Renovations,<br />
Chicago, IL<br />
JEFF ZOGBY<br />
2005 | Project<br />
Manager<br />
Alumni Staff<br />
ERIC MOORE & VICTOR MOORE<br />
Principals<br />
Linden Tree Venture Corporation<br />
Episcopal Diocese<br />
of Chicago Office Improvements,<br />
Chicago, IL<br />
2005-2006<br />
Linden Tree Lane<br />
Residential Development,<br />
Glenview, IL<br />
San Diego office<br />
relocates from<br />
La Jolla to Solana Beach<br />
21
22<br />
WHAT YOU SAID...
The People Behind the Projects: What You Said<br />
“When you do work and you fail at it, that’s the test. It is what you<br />
do after that happens that makes a difference. There was a part of the project<br />
I thought was not done right – it was fairly minor related to the location of a duct in the plant. It was too<br />
low, and the team should have caught it. They had to raise it and it cost more money. They fixed it and<br />
paid for it – no questions asked. When I reflect on why I feel such confidence in PMA, they way they treat<br />
me when things go wrong is probably as important as the success stories.”<br />
- BOB RENDER<br />
President<br />
Maine Plastics<br />
“I worked with Jeff and Roger back in the early 90s when Cal Poly San Luis Obispo built the first<br />
recreation center in the entire state system. The fitness craze in this country was just beginning<br />
and at that point, either you were an “athlete” or you weren’t. There weren’t intramural teams<br />
or club sports, and the idea of a rec center was unheard of at the time. Nobody in the entire<br />
California state system had developed this type of facility - there was no model out there. There<br />
was no blueprint. You couldn’t go to a conference or get a set of best practices. So we knew we<br />
needed some help getting the program designed and scoped.<br />
I can clearly remember our first meeting. We are on the coast and this is an agriculture school.<br />
We’ve got cows and pigs running around, and hay trucks driving by and you can smell the dairy<br />
farm. I’m sitting across the table from two guys with heavy<br />
Midwestern accents wearing suits. I’m thinking to myself,<br />
‘What are they doing here?’ They seemed like nice people,<br />
but I could never figure out why we brought in these guys<br />
from Chicago. What soon became clear was what they<br />
brought to the table, and what they created. We found<br />
ourselves looking into the future and we knew it could be<br />
special if we put our heads together. The rec center has been open for 20<br />
years now, and we’ve grown from a facility that averaged 1,800 people a day to one that draws<br />
4,700. This rec center has literally changed lives, and it all began with PMA.”<br />
- RICK JOHNSON<br />
23
The People Behind the Projects: 2006-2007<br />
“We were at the end of<br />
the project, building a<br />
major research facility. The<br />
contractors had started<br />
taking down the barriers<br />
near the edge of the<br />
roof that would prevent<br />
someone from falling over.<br />
I did something I knew I<br />
wasn’t supposed to do.<br />
I leaned over the edge to<br />
take some photos, and Mike<br />
Barbera called me out. He<br />
actually reported me to<br />
the super and I had to take<br />
an 8-hour safety class or<br />
they wouldn’t let me back<br />
working on the job site.<br />
I can’t say<br />
enough<br />
about the<br />
professionalism<br />
and quality of<br />
PMA and Ken<br />
and Mike - even<br />
when it means<br />
challenging<br />
the client.”<br />
- BILL ZONDLER<br />
2006-2007<br />
CHIP VON WEISE<br />
Principal<br />
von Weise Associates<br />
DARYL DELLERA<br />
2006 | Project Manager<br />
Current Staff<br />
BILL ZONDLER<br />
former Vice President<br />
Burnham Institute for<br />
Medical Research<br />
Phase 1 Britannia East Grand<br />
R&D Campus completed<br />
and occupied in 2006,<br />
So. San Francisco, CA<br />
APRIL HEINZE<br />
Director<br />
Dept. of General Services<br />
County of San Diego<br />
JEFF REDLITZ<br />
Project Manager<br />
Dept. of General Services<br />
County of San Diego<br />
TED GIESING<br />
2006 | Senior Project<br />
Manager<br />
Current Staff<br />
San Diego County Operations<br />
Center Redevelopment Master Plan,<br />
San Diego, CA<br />
24<br />
Sanford-Burnham Medical Research<br />
Institute at Lake Nona, Orlando, FL
The People Behind the Projects: 2006-2007<br />
MIKE MCNERNEY<br />
Senior Vice President<br />
Lowe Enterprises<br />
DR. GLENN WAGNER<br />
Chief Medical Examiner<br />
County of San Diego<br />
CHRIS KNELL<br />
Managing Principal<br />
Harley Ellis Devereaux<br />
JAY FLAHERTY<br />
Chairman + CEO<br />
HCP, Inc.<br />
TIM SCHOEN<br />
Executive Vice President + CFO<br />
HCP, Inc.<br />
MIKE SWOFFORD<br />
Manager<br />
HCP, Inc.<br />
DORO<strong>THE</strong>E RING<br />
2006 | Project<br />
Administrator<br />
Current Staff<br />
ANDY ROSCOE<br />
2006 | Senior Project Manager<br />
Current Staff<br />
JENNIFER UCZEN<br />
2006 | Summer Intern<br />
Alumni Staff<br />
San Diego County<br />
Medical Examiner<br />
and Forensic Center,<br />
San Diego, CA<br />
The Old Globe<br />
Conrad Prebys<br />
Theatre Center,<br />
San Diego, CA<br />
The Argenta High Rise<br />
Condominiums,<br />
San Francisco, CA<br />
Slough Estates USA Inc.<br />
acquired by HCP in 2007.<br />
PMA remains as PM service<br />
provider on a portfolio of<br />
buildings and developable<br />
land in excess of $7 Mil sq.ft.<br />
25
The People Behind the Projects: 2007<br />
DAN STEWART<br />
Senior Associate<br />
RJC Architects<br />
MIKE BERRYHILL<br />
Vice President of Operations<br />
Suffolk-Roel<br />
RABBI LEONARD A. MATANKY, PH.D.<br />
Dean<br />
Ida Crown Jewish Academy<br />
KERRY LEONARD<br />
Former Principal<br />
Cannon Design<br />
REBECCA GALLEGOS<br />
2007 | Assistant Project<br />
Manager<br />
Current Staff<br />
OMAR RIHANI<br />
2007 | Project Manager<br />
Current Staff<br />
26<br />
2007<br />
Company<br />
LEED initiative:<br />
All project staff<br />
to earn LEED<br />
accreditation<br />
Oakbrook Square Mall Redevelopment<br />
Due Diligence & Feasibility,<br />
Oakbrook Terrace, IL<br />
Ida Crown Jewish Academy<br />
New High School Campus,<br />
Skokie, IL
The People Behind the Projects: 2008<br />
2008<br />
JACK KELLEY<br />
Director of Design<br />
McBride Kelley Baurer<br />
Architects/Planners<br />
“Thanks for Your Helping Hands<br />
- Project Management Advisors,<br />
Inc. has served as an invaluable<br />
resource to La Rabida Children’s<br />
Hospital. We are so grateful for<br />
your support and advice.<br />
PMA functions as an extra set<br />
of helping hands for us.<br />
We especially appreciate the<br />
expertise you offer and keen<br />
interest in what makes La<br />
Rabida unique. We’re glad to<br />
have the opportunity to thank<br />
PMA for going beyond the<br />
role of ‘hired hands.’ Rather<br />
your helping hands guide us<br />
to new heights in serving our<br />
patients and their families.”<br />
- TEAM LA RABIDA<br />
TRIVIA<br />
ANSWER IN BACK<br />
What was the First PMA<br />
Project to Become<br />
LEED Certified?<br />
La Rabida Children’s Hospital,<br />
Inpatient Wing Renovation,<br />
Chicago, IL<br />
San Diego County<br />
Operations Center<br />
Redevelopment<br />
project award,<br />
the largest public<br />
works project in the<br />
history of the County<br />
BUD HALL<br />
Senior Vice President of Construction<br />
Turnberry Associates<br />
First United Methodist<br />
Church of Evanston<br />
North Tower Renovations,<br />
Evanston, IL<br />
Turnberry Tower<br />
High Rise Condominium,<br />
San Francisco, CA<br />
RICK GUINN<br />
Senior Project Executive<br />
Rudolph & Sletten<br />
JOHN BUNJE<br />
Project Manager<br />
Rudolph & Sletten<br />
La Jolla Institute<br />
for Allergy & Immunology/<br />
Kirnin Pharma USA, Inc. at UCSD Science<br />
Research Park, Lab Buildout,<br />
La Jolla, CA<br />
27
The People Behind the Projects: 2008-2009<br />
DAVID NELSON<br />
Projects Director - Europe<br />
Merlin Entertainments Group<br />
DANI CHARLESON-GALLACHER<br />
Head of Projects - Hotels<br />
Merlin Entertainments Group<br />
JEANA TROST<br />
Vice President - Legal<br />
HCP, Inc.<br />
28<br />
2008-2009<br />
JIM FERGUSON<br />
President, Principal Architect<br />
Ferguson Pape Baldwin Architects<br />
LEGOLAND California<br />
Themed Resort Hotel,<br />
Carlsbad, CA<br />
Sanford-Burnham<br />
Medical Research Institute,<br />
Bldg. 10 Lab Renovations,<br />
La Jolla, CA<br />
ZACHARY PANNIER<br />
Project Manager<br />
DPR Construction Inc.<br />
Phase 2 Britannia<br />
East Grand completed<br />
and occupied,<br />
So. San Francisco, CA
The People Behind the Projects: 2009<br />
PAUL EILER<br />
Director of Facilities<br />
Takeda California, Inc.<br />
NANCY ESCANO<br />
Managing Principal<br />
DGA Architects<br />
LYNNE PARSHALL<br />
Chief Operating Officer +<br />
Chief Financial Officer<br />
Isis Pharmaceuticals<br />
SUSAN ESCHWEILER<br />
Principal<br />
DES Architects +<br />
Engineers<br />
Takeda San Diego<br />
Research Facility,<br />
San Diego, CA<br />
Isis Pharamceuticals<br />
R&D Headquarters<br />
Carlsbad, CA<br />
Pioneer Hi-Bred International, Inc.<br />
Tenant Improvement & New Greenhouse,<br />
Hayward, CA<br />
2009<br />
29
The People Behind the Projects: 2009<br />
“Working with Roger<br />
and his team is always<br />
intense and never short<br />
on nuance and detail. For<br />
the Sara Lee/Hillshire<br />
headquarters relocation<br />
in 2012, Leopardo, the<br />
general contractor, installed<br />
a remote-controlled flashing<br />
orange alarm buzzer in the<br />
field office to be used when<br />
the group needed a gentle<br />
reminder to stay focused<br />
on the big picture. It got<br />
a good-natured workout<br />
early in the project, but by<br />
the end we all forgot it was<br />
there. I attribute<br />
that a lot to<br />
PMA’s first rate<br />
management of<br />
a very complex<br />
and fast-moving<br />
job that turned<br />
out to be as<br />
much about<br />
managing<br />
relationships<br />
as it was about<br />
construction.”<br />
- PATRICK O’CONNOR<br />
30<br />
2009<br />
SCOTT GOODMAN<br />
Founding Principal<br />
Sterling Bay Companies<br />
FRANK TALBERT<br />
Managing Principal<br />
Proteus Group<br />
Archdiocese of San Francisco<br />
Facilities Condition Assesment<br />
Bay Area, San Francisco<br />
MARK MATURO<br />
Director of Design<br />
Proteus Group<br />
Burr Ridge Medical Office Building<br />
Loyola University Health System<br />
Medical Office Development<br />
Burr Ridge, IL<br />
PATRICK O’CONNOR<br />
Principal<br />
Sterling Bay Companies<br />
ROB HOLYOAKE<br />
2009 | Senior Vice<br />
President<br />
Current Staff
The People Behind the Projects: 2010<br />
TIMOTHY WADDICK<br />
Senior Project Manager<br />
William A. Randolph, Inc.<br />
TOM STANTON<br />
Superintendent<br />
William A. Randolph, Inc.<br />
ANTHONY RICCARDI, JR<br />
Vice President<br />
William A. Randolph, Inc.<br />
JANA GUNSUL<br />
Principal<br />
DES Architects +<br />
Engineers<br />
Village of Tinley Park Convention Center<br />
Expansion & Renovation, Tinley Park, IL<br />
2010<br />
TRIVIA<br />
ANSWER IN BACK<br />
What is the largest project<br />
(in sq.ft.) that PMA has managed<br />
as of the publication date of this book?<br />
McAfee Corporate Headquarters<br />
and Executive Briefing Center<br />
Santa Clara, CA<br />
31
32<br />
WHAT YOU SAID...
The People Behind the Projects: What You Said<br />
“We needed a new building opened by August 15. On March 15, it became clear to<br />
me that it wasn’t going to happen. I called Jeff – he had been a volunteer on our<br />
school board, and I explained the circumstances and gave PMA the responsibility<br />
of getting us back on track. Within 10 days, they had us back on track.<br />
That’s how I define performance. The result was we had 600 kids move into<br />
their new middle school that summer - on time.”<br />
- DOUG PARKS<br />
Former Super Intendant of Schools<br />
Aptakisic-Tripp CCSD 102<br />
“I distinctly remember my first meeting with PMA. I was<br />
thinking, ‘Who are these guys to make these suggestions?<br />
Why should I listen to them?’ That didn’t last too long. From those<br />
early conversations, Roger was on my wavelength. He understood his role was to make this thing<br />
better and easier to manage, but not that I was going to give him the keys and he was going to drive.<br />
As the client, I wanted a collaborative team approach and not somebody barking orders and telling<br />
us what to do…It had to be a complementary relationship.”<br />
- DALE SCHEPERS<br />
Public Works Director<br />
Villiage of Tinley Park, IL<br />
“The sense of partnership starts in the first interview. PMA has a very plainspoken<br />
approach. It is not a sales pitch. They’ve bred a culture of no ego. They are<br />
incredibly loyal to each other and there’s no internal competition or backbiting,<br />
which means I don’t have to think about who I’m talking to. PMA as a team gives<br />
me a base of common support so I don’t have to go to one specific person for<br />
one expertise. I get the same level of communication,<br />
involvement, and expertise from whomever I’m<br />
talking to at PMA. It’s not only more efficient, it<br />
makes for a higher-quality product.”<br />
- JEFF REDLITZ<br />
33
The People Behind the Projects: 2010<br />
“I think what made our<br />
project work boils down<br />
to trust. Having that trust<br />
really helps the conversation<br />
BOB MOBACH<br />
Practice Director,<br />
Data Center<br />
Logicalis<br />
especially when it gets<br />
tough. I’d rather<br />
somebody tell<br />
me I’m wrong<br />
and suggest<br />
what a better<br />
approach might<br />
be, rather than<br />
letting me<br />
bang my head<br />
against the wall<br />
and learning<br />
I’m wrong the<br />
hard way. They<br />
are an advocate for the<br />
project, which sometimes<br />
means having the tough<br />
conversations with the<br />
people involved.”<br />
TIM PUNTILLO<br />
Vice President,<br />
Educational and Institutional<br />
Bulley & Andrews<br />
SAM GELPI<br />
Director,<br />
Construction Engineering<br />
and Project Management<br />
Hewlett-Packard<br />
- FRANK TIEMANN<br />
Chief Technology Officer<br />
Ronin Capital, LLC<br />
BendBroadband<br />
Vault Collocation<br />
Data Center,<br />
LEED Gold Certified,<br />
Bend, OR<br />
Hewlett-Packard Palo Alto<br />
Headquarters Consolidation,<br />
Palo Alto, CA<br />
34<br />
2010 St. Josaphat<br />
K-8 School Addition,<br />
Chicago, IL<br />
Ronin Capital Trading Firm<br />
Headquarters Relocation,<br />
Chicago, IL<br />
Hewlett-Packard Moffett Towers,<br />
Sunnyvale, CA<br />
Hewlett-Packard<br />
Sunnyvale Palm Campus,<br />
Sunnyvale, CA
The People Behind the Projects: 2010<br />
TED HAUG<br />
Design Principal<br />
Legat Architects<br />
MARK SIWIK<br />
Legat Architects<br />
STACEY MILLIGAN<br />
Director, Executive Briefing Programs<br />
McAfee<br />
CRAIG BACKHUS<br />
2010 | Vice President<br />
Current Staff<br />
First international project awarded,<br />
McAfee Amsterdam Executive Business Center,<br />
The Netherlands<br />
Accretive Health<br />
Physician Advisory Services,<br />
Chicago, IL<br />
Village of Tinley Park<br />
80th Avenue Metra Station<br />
and Pedestrian Underpass,<br />
Tinley Park, IL<br />
Cibus Global Process Development Lab<br />
at Soledad Business Park,<br />
San Diego, CA<br />
35
The People Behind the Projects: 2011<br />
JASON WINKLER<br />
Senior Project Manager<br />
Executive<br />
Construction Inc.<br />
ALICIA GUERRA<br />
Partner<br />
Briscoe Ivester<br />
& Bazel LLP<br />
MATT BAUMGARTNER<br />
Project Manager<br />
Executive<br />
Construction Inc.<br />
JOSE LUIS<br />
DE LA FUENTE<br />
Principal<br />
STL Architects<br />
LUIS COLLADO<br />
Principal<br />
STL Architects<br />
TRACY SUSANNE<br />
SALVIA<br />
Principal<br />
STL Architects<br />
JOSE LUIS<br />
PEREZ-GRIFFO<br />
Senior Designer<br />
STL Architects<br />
BETH MURPHY<br />
Project Manager<br />
STL Architects<br />
2011<br />
Britannia Cove<br />
at Oyster Point,<br />
So. San Francisco, CA<br />
Lycée Francais de Chicago,<br />
K-12 School Campus, Chicago, IL<br />
Ronin Capital Trading Firm Headquarters Move Coordination,<br />
Chicago, IL<br />
36
The People Behind the Projects: 2011<br />
MICHAEL PEREIRA<br />
Global Program Manager,<br />
Workplace Solutions<br />
Polycom<br />
“As architects, we are very<br />
particular when it comes<br />
to aesthetics. Program<br />
managers often ask us<br />
to bend our thinking; but<br />
JESSE DODSON<br />
Associate<br />
DLA<br />
we can’t hold ourselves<br />
back. PMA really<br />
embraced that<br />
about us. They<br />
gave us room<br />
and a platform<br />
for us to express<br />
what we really<br />
think and then<br />
they helped<br />
bring the owner<br />
along. PMA<br />
understands it is not about<br />
REBEL ROBERTS<br />
President and COO<br />
VOA Associates Inc.<br />
PATTY LOOKER<br />
Principal<br />
Healthcare Practice Director<br />
VOA Associates Inc.<br />
SHERRYL WYNNE<br />
2011 | Administrative<br />
Assistant<br />
Current Staff<br />
the protocol, it is about<br />
finding the right solution.”<br />
- VOA ASSOCIATES INC.<br />
Polycom Corporate Headquarters<br />
and Executive Briefing Center,<br />
San Jose, CA<br />
2011<br />
La Rabida Children’s Hospital,<br />
Ambulatory Care Addition<br />
and Renovation, Chicago, IL<br />
37
The People Behind the Projects: 2011<br />
PATRICIA ROTONDO<br />
Associate Principal<br />
VOA Associates Inc.<br />
DOUGLAS KING<br />
Principal<br />
VOA Associates Inc.<br />
BRENDA BUSH-MOLINE<br />
Associate Principal<br />
VOA Associates Inc.<br />
<strong>THE</strong>RESA GORMAN<br />
Senior Vice President<br />
VOA Associates Inc.<br />
JENNA GOEBIG<br />
2011 | Summer Intern<br />
Alumni Staff<br />
TRIVIA<br />
ANSWERS IN BACK<br />
Which PMA project represented<br />
the tallest cast-in-place concrete<br />
structure built on the West Coast<br />
at the time of completion in 2009?<br />
2011<br />
Gelber Group<br />
Headquarters Relocation,<br />
Chicago, IL<br />
Tinley Park Village Hall<br />
and Building Department,<br />
Tinley Park, IL<br />
38
The People Behind the Projects: 2011<br />
DOUG MACGORMAN<br />
Director of Engineering,<br />
Construction and Carbon<br />
Management<br />
Celgene Corp.<br />
DUSTIN FIFE<br />
Project Architect<br />
VOA Associates Inc.<br />
LAUREN ANDRYSIAK<br />
Associate<br />
VOA Associates Inc.<br />
JEFF HANSEN<br />
Vice President,<br />
Design & Construction<br />
Hyatt Hotels Coproration<br />
ANN WALLIN<br />
Director of Internal Audit<br />
Hub Group<br />
JAY INGRAM<br />
Project Executive<br />
BNBuilders, Inc.<br />
Hub Group Comtrak<br />
Memphis Expansion,<br />
Memphis, TN<br />
Celgene Corporation Relocation<br />
and Expansion, San Diego, CA<br />
Hyatt Regency<br />
Long Beach<br />
Guestroom Renovation,<br />
Long Beach, CA<br />
39
The People Behind the Projects: 2011<br />
MICHAEL ROSENBERG<br />
Senior Associate,<br />
Senior Commissioning<br />
Engineer<br />
Syska Hennessey Group<br />
KELLY SCHREIHOFER<br />
Project Manager<br />
Proteus Group<br />
CARLOS TAMÉS<br />
2011 | Project Manager<br />
Current Staff<br />
NICK BASSING<br />
2011 | Assistant Project<br />
Manager<br />
Current Staff<br />
San Francisco Transbay District Blocks 6/7,<br />
San Francisco, CA<br />
40<br />
2011<br />
LinkedIn Campus Expansion<br />
at Britannia Shoreline<br />
Technology Park,<br />
Mountain View, CA<br />
Naperville Fertility Center,<br />
Naperville, IL
The People Behind the Projects: 2011<br />
JASON DEAN<br />
2011 | Assistant Project<br />
Manager<br />
Alumni Staff<br />
ADAM ENRIGHT<br />
2011 | Assistant Project<br />
Manager<br />
Current Staff<br />
BRIDGET FANTA<br />
2011 | Marketing<br />
Coordinator<br />
Current Staff<br />
ANTHONY BONIFACIO<br />
2011 | Senior Project<br />
Manager<br />
Current Staff<br />
TRIVIA<br />
ANSWER IN BACK<br />
Which PMA project obtained tier III<br />
certification from Uptime Institute,<br />
recognizing the facility’s capacity to<br />
protect against possible failures in<br />
the infrastructure?<br />
San Diego County<br />
Administration Center<br />
Waterfront Park,<br />
San Diego, CA<br />
BioMarin Corporate Headquarters, San Rafael, CA<br />
LBA Realty West Berkeley,<br />
Due Diligence<br />
Berkeley, CA 41
The People Behind the Projects: 2012<br />
REGINA STILP<br />
Director of Building Operations & Design<br />
Sterling Bay Companies<br />
PATRICK AYLWARD<br />
Project Manager<br />
Sterling Bay Companies<br />
BRYAN TUNISON<br />
Project Manager<br />
Proteus Group<br />
DIANA TOKAT<br />
Construction Administrator<br />
Sterling Bay Companies<br />
CRISTA SWAN<br />
2012 | Business Development/<br />
Assistant Project Manager<br />
Current Staff<br />
2012 Hillshire Brands Headquarters,<br />
Chicago, IL<br />
Lake and Forest<br />
Redevelopment Public<br />
Parking Component,<br />
Oak Park, IL<br />
42<br />
Park District of Oak Park,<br />
Ridgeland Common Facility Renovation, Oak Park, IL
The People Behind the Projects: 2012<br />
MATT CONCANNON<br />
2012 | Project Manager<br />
Current Staff<br />
CARRIE GENUALDI<br />
2012 | Assistant Project Manager<br />
Current Staff<br />
TONY FLORESCA<br />
Associate Project Manager<br />
DES Architects +<br />
Engineers<br />
NICK OCHOA<br />
2012 | Assistant Project<br />
Manager<br />
Current Staff<br />
DEWANE BRADFORD<br />
2012 | Project Manager<br />
Current Staff<br />
SONIA COOKE<br />
2012 | Vice President<br />
Human Resources<br />
Current Staff<br />
Takeda Pharmaceuticals<br />
East Lab Renovation,<br />
San Diego CA<br />
Central Florida Research Park<br />
Office Building, Orlando FL<br />
Capitol Medical Center Redevelopment,<br />
Sacramento, CA<br />
Point Eden Campus<br />
Hayward, CA<br />
43
The People Behind the Projects: 2013<br />
LEON CAMARDA<br />
2013 | Vice President<br />
Current Staff<br />
CARL PAYNE<br />
2013 | Assistant Project<br />
Manager<br />
Current Staff<br />
LORI ZIEMBA<br />
2013 | Assistant Project<br />
Manager<br />
Current Staff<br />
SONIA POPKE<br />
2013 | Administrative<br />
Assistant<br />
Current Staff<br />
Oak Forest Metra Station<br />
Commuter Rail Station & Site<br />
Oak Forest, IL<br />
DAWN FANARA<br />
2013 | Office Administrator<br />
and Marketing Assistant<br />
Current Staff<br />
20 Year Anniversary<br />
New Office Opening<br />
Orlando, Florida<br />
Physicians United Plan, Inc.<br />
Headquarters Relocation,<br />
Orlando, FL<br />
2013<br />
44<br />
PG&E Bishop Ranch<br />
Consolidation,<br />
San Ramon, CA<br />
399 Fremont Street<br />
Residential Apartment Development,<br />
San Francisco, IL
The People Behind the Projects: What you said / Trivia Key<br />
“The one thing that has drawn me to PMA<br />
is their honesty. In many cases when there is a problem, the<br />
owner’s rep points to the contractor as the responsible party. PMA takes<br />
responsibility for the problem itself.”<br />
-TIM PUNTILLO<br />
“Polycom had three offices moving into one office – it was a massive coordination job.<br />
PMA’s job was to ensure that all of my people had a place to sit and mine was that they were<br />
sitting in the right places. Our employees are not used to moving. When people<br />
were running around and saying ‘the world is coming to<br />
an end,’ PMA was good at saying, ‘I got it.’ ”<br />
TRIVIA ANSWER KEY<br />
-MICHAEL PEREIRA<br />
Pg 6<br />
Q: What is the loop office building that appears in the<br />
background of PMA’s first marketing photo?<br />
A: 150 S. Wacker Drive, the location of PMA’s Chicago office today.<br />
Pg 8<br />
Q: Where was the first out-of-state satellite project<br />
office opened?<br />
A: California State University, Fresno for Student Housing<br />
& Athletics Projects.<br />
Pg 10<br />
Q: First PMA project to be broadcast hours<br />
after substantial completion?<br />
A: California State University, Fresno new Softball Stadium on ESPN.<br />
Pg 27<br />
Q: What was the first PMA project to become LEED certified?<br />
A: San Diego Community College District, West City Continuing<br />
Education Campus, LEED Gold Certified, San Diego, CA.<br />
Pg 31<br />
Q: What is the largest project (in sq.ft.) that PMA has managed<br />
as of the publication date of this book?<br />
A: Hewlett-Packard Company Bay Area Metro Plan - 1.9 Mil sq.ft.<br />
Pg 38<br />
Q: Which PMA project represented the tallest cast-in-place<br />
concrete structure built on the West Coast at the time of<br />
completion in 2009?<br />
A: One Rincon Hill, San Francisco, CA.<br />
Pg 41<br />
Q: Which PMA project obtained Tier III certification from Uptime<br />
Institute, recognizing the facility’s capacity to protect against<br />
possible failures in the infrastructure?<br />
A: BendBroadband Vault Collocation Data Center, Bend, OR.<br />
45
The People Behind the Projects: Past Events<br />
46
The People Behind the Projects: Past Events<br />
47