Central Station <strong>Air</strong> <strong>Handler</strong><br />
K. Steam Heating Coils<br />
1. Steam supply, condensate return, and vacuum breaker connections shall be clearly labeled<br />
on unit exterior.<br />
2. Coils shall be non-freeze, steam distributing type. Coils shall be pitched in units for proper<br />
drainage of steam condensate from coils.<br />
3. Coils shall be proof tested to 300 psig and leak tested to 200 psig air pressure under water.<br />
4. Headers shall be constructed of cast iron.<br />
5. Tubes shall consist of 11/16 inch O.D., minimum 0.031 inch thick, copper inner tubes and 1<br />
inch O.D., minimum 0.031 inch copper or 0.049 inch red brass outer tubes. Fins shall be of<br />
aluminum or copper material.<br />
6. Inner tubes shall have orifices that ensure even steam distribution throughout the length of<br />
the outer tube. Orifices shall direct steam toward return connections to ensure steam<br />
condensate is properly drained from coils to prevent flashing of condensate.<br />
L. Refrigerant Cooling Coils<br />
1. Refrigerant suction and liquid connections shall be clearly labeled on unit exterior.<br />
2. Coils shall be proof tested to 450 psig and leak tested to 300 psig air pressure under water.<br />
After testing, insides of tubes shall be air dried, charged with dry nitrogen, and sealed to<br />
prevent contamination.<br />
3. Refrigerant suction and liquid headers shall be constructed of copper tubing. Suction and<br />
liquid connections shall penetrate unit casings to allow for sweat connections to refrigerant<br />
lines.<br />
4. Tubes shall be 1/2 inch O.D., minimum 0.016 or 0.025 inch thick copper. Fins shall be<br />
aluminum.<br />
5. Coils shall have equalizing type vertical distributors sized in conjunction with capacities of<br />
coils.<br />
2.08 Filters<br />
A. Provide factory-fabricated filter section of the same construction and finish as unit casings.<br />
Filter section shall have filter guides and access door(s) extending the full height of the casing<br />
to facilitate filter removal. Construct doors in accordance with Section 2.04. Provide fixed filter<br />
blockoffs as required to prevent air bypass around filters. Blockoffs shall not need to be<br />
removed during filter replacement.<br />
B. Filter type, MERV rating, and arrangement shall be provided as defined in project plans and<br />
schedule.<br />
C. Manufacturer shall provide one set of startup filters.<br />
***************************************************<br />
Choose the following paragraph if option applicable:<br />
***************************************************<br />
D. Each filter section shall be provided with a factory-installed, flush-mounted Dwyer dial-type<br />
differential pressure gauge piped to both sides of the filter to indicate status. Gauge shall<br />
maintain a +/- 5 percent accuracy within operating temperature limits of -20°F to 120°F. Filter<br />
sections consisting of pre- and post-filters shall have a gauge for each.<br />
13 <strong>Performance</strong> <strong>Climate</strong> Changer <strong>Air</strong> <strong>Handler</strong> CLCH-PRG003-EN