28.09.2014 Views

Performance Climate Changer™ Air Handler - Trane

Performance Climate Changer™ Air Handler - Trane

Performance Climate Changer™ Air Handler - Trane

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Central Station <strong>Air</strong> <strong>Handler</strong><br />

K. Steam Heating Coils<br />

1. Steam supply, condensate return, and vacuum breaker connections shall be clearly labeled<br />

on unit exterior.<br />

2. Coils shall be non-freeze, steam distributing type. Coils shall be pitched in units for proper<br />

drainage of steam condensate from coils.<br />

3. Coils shall be proof tested to 300 psig and leak tested to 200 psig air pressure under water.<br />

4. Headers shall be constructed of cast iron.<br />

5. Tubes shall consist of 11/16 inch O.D., minimum 0.031 inch thick, copper inner tubes and 1<br />

inch O.D., minimum 0.031 inch copper or 0.049 inch red brass outer tubes. Fins shall be of<br />

aluminum or copper material.<br />

6. Inner tubes shall have orifices that ensure even steam distribution throughout the length of<br />

the outer tube. Orifices shall direct steam toward return connections to ensure steam<br />

condensate is properly drained from coils to prevent flashing of condensate.<br />

L. Refrigerant Cooling Coils<br />

1. Refrigerant suction and liquid connections shall be clearly labeled on unit exterior.<br />

2. Coils shall be proof tested to 450 psig and leak tested to 300 psig air pressure under water.<br />

After testing, insides of tubes shall be air dried, charged with dry nitrogen, and sealed to<br />

prevent contamination.<br />

3. Refrigerant suction and liquid headers shall be constructed of copper tubing. Suction and<br />

liquid connections shall penetrate unit casings to allow for sweat connections to refrigerant<br />

lines.<br />

4. Tubes shall be 1/2 inch O.D., minimum 0.016 or 0.025 inch thick copper. Fins shall be<br />

aluminum.<br />

5. Coils shall have equalizing type vertical distributors sized in conjunction with capacities of<br />

coils.<br />

2.08 Filters<br />

A. Provide factory-fabricated filter section of the same construction and finish as unit casings.<br />

Filter section shall have filter guides and access door(s) extending the full height of the casing<br />

to facilitate filter removal. Construct doors in accordance with Section 2.04. Provide fixed filter<br />

blockoffs as required to prevent air bypass around filters. Blockoffs shall not need to be<br />

removed during filter replacement.<br />

B. Filter type, MERV rating, and arrangement shall be provided as defined in project plans and<br />

schedule.<br />

C. Manufacturer shall provide one set of startup filters.<br />

***************************************************<br />

Choose the following paragraph if option applicable:<br />

***************************************************<br />

D. Each filter section shall be provided with a factory-installed, flush-mounted Dwyer dial-type<br />

differential pressure gauge piped to both sides of the filter to indicate status. Gauge shall<br />

maintain a +/- 5 percent accuracy within operating temperature limits of -20°F to 120°F. Filter<br />

sections consisting of pre- and post-filters shall have a gauge for each.<br />

13 <strong>Performance</strong> <strong>Climate</strong> Changer <strong>Air</strong> <strong>Handler</strong> CLCH-PRG003-EN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!