02.10.2014 Views

Annual Report 2007/08 - Dedea

Annual Report 2007/08 - Dedea

Annual Report 2007/08 - Dedea

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Eastern Cape Province Department of<br />

Economic Development & Environmental Affairs<br />

<strong>Annual</strong> <strong>Report</strong> <strong>2007</strong>/<strong>08</strong>


ECONOMIC DEVELOPMENT &<br />

ENVIRONMENTAL AFFAIRS<br />

Published by:<br />

Department of Economic Development<br />

and Environmental Affairs<br />

Province of the Eastern Cape<br />

Private Bag X0054<br />

Bhisho 5605<br />

South Africa<br />

© Department of Economic Development<br />

and Environmental Affairs, 20<strong>08</strong><br />

Enquiries:<br />

Department of Economic Development<br />

and Environmental Affairs<br />

Province of the Eastern Cape<br />

Private Bag X0054<br />

Bhisho 5605<br />

South Africa<br />

Telephone: +27 40 609 3094<br />

Fax: +27 40 609 3219<br />

Sixolile Makaula<br />

Communications Manager<br />

Department of Economic Development<br />

and Environmental Affairs<br />

Tel: 040 609 3299<br />

Cell: <strong>08</strong>3 629 1533<br />

E-mail: sixolile.makaula@deaet.ecape.gov.za<br />

2


Foreword by the MEC for<br />

Economic Development and Environmental Affairs<br />

The Department has received a qualified audit for the year under<br />

review. The audit outcome is a result of a poor control environment<br />

in the finance and human resources components of the Department.<br />

However, measures have been taken to deal with issues raised by the<br />

Auditor General. In particular, a turnaround strategy has been drawn up,<br />

authority has been delegated to respective cost centres, and the CFO<br />

support programme is being implemented within the Department by<br />

the Provincial Treasury. Furthermore, the recruitment process is being<br />

outsourced in order to rapidly reduce the Department’s high vacancy<br />

rate. However, despite receiving a poor audit outcome, the Department managed to spend 97.5% of its<br />

allocated budget.<br />

During the year under review, the Department undertook to implement a number of projects and<br />

programmes. These include finalising the Provincial Industrial Strategy, reviewing legislation establishing<br />

some of its public entities, merging the Eastern Cape Parks Board (ECPB) and Eastern Cape Tourism<br />

Board (ECTB), developing a jobs barometer, developing a Provincial LED strategy as well as a provincial<br />

environmental IDP toolkit, reviewing the Provincial biodiversity strategy and action plans, and developing<br />

a Provincial cooperative strategy. The Department also undertook to work towards attracting investors<br />

into the Province’s two Industrial Development Zones (IDZs), strengthening the second economy, and<br />

improving the turnaround time for awarding records of decisions (RODs) in respect of projects requiring<br />

Environmental Impact Assessment. The Department has made progress towards achieving these<br />

objectives, despite experiencing a number of challenges. Most of the challenges relate to in sufficient<br />

capacity and global economic conditions.<br />

As we consolidate some of the gains of the financial year, we are mindful of the pressing needs of<br />

the rather populous Eastern half of the Province. Accordingly the Department recommit itself to work<br />

towards creating sustainable economic activities in the Umzimvubu Region of the Province, in line with<br />

the Provincial Growth and Development Plan (PGDP), the Provincial Industrial Strategy (PIDS) and the<br />

resolutions of the Growth and Development Summits (GDS).<br />

The Department realises that it will have to significantly improve its operational efficiency and enhance<br />

its effectiveness. To this end, the Department has, among other things, embarked on a process of<br />

implementing an ISO9001 certification programme, building the requisite capacity, developing a more<br />

apt organizational structure and strengthening governance arrangements with its Public Entities.<br />

Thank you<br />

PHUMULO MASUALLE<br />

MEMBER OF THE EXECUTIVE COUCNIL<br />

3


Table of Contents<br />

Foreword by the MEC for Economic Development and Environmental Affairs · · · · · 5<br />

Part 1<br />

GENERAL INFORMATION<br />

1.1 Submission of the <strong>Annual</strong> <strong>Report</strong> to the Executing Authority · · · · · · · · · 10<br />

1.2 Introduction by the Accounting Officer · · · · · · · · · · · · · · · · · 11<br />

1.3 Information on the Department · · · · · · · · · · · · · · · · · · · · 13<br />

1.4 Vision and Mission Statements · · · · · · · · · · · · · · · · · · · · 16<br />

1.5 Legislative Mandate · · · · · · · · · · · · · · · · · · · · · · · · · 17<br />

Part 2<br />

PROGRAMME PERFORMANCE<br />

2.1 Voted Funds · · · · · · · · · · · · · · · · · · · · · · · · · · · · 22<br />

2.2 Aim of the Vote · · · · · · · · · · · · · · · · · · · · · · · · · · 23<br />

2.3 Key Strategic Objectives · · · · · · · · · · · · · · · · · · · · · · · 24<br />

2.4 Departmental Revenue and Expenditure· · · · · · · · · · · · · · · · · 29<br />

2.5 Capital Investment, Maintenance and Asset Management Plan· · · · · · · · 31<br />

2.6 Programme Performance· · · · · · · · · · · · · · · · · · · · · · · 32<br />

Part 3<br />

ANNUAL FINANCIAL STATEMENTS<br />

3.1 <strong>Report</strong> by the Accounting Officer · · · · · · · · · · · · · · · · · · · · 102<br />

3.2 <strong>Report</strong> of the Auditor General · · · · · · · · · · · · · · · · · · · · · 117<br />

4.3 <strong>Report</strong> of the Audit Committee · · · · · · · · · · · · · · · · · · · · 124<br />

3.4. Appropriation Statement · · · · · · · · · · · · · · · · · · · · · · 126<br />

3.5 Notes to the Appropriation Statement · · · · · · · · · · · · · · · · · 137<br />

3.6 Statement of Financial Performance · · · · · · · · · · · · · · · · · · 140<br />

3.8 Statement of Changes In Net Assets · · · · · · · · · · · · · · · · · · 141<br />

3.7 Statement of Financial Position · · · · · · · · · · · · · · · · · · · · 141<br />

3.9 Cash Flow Statement · · · · · · · · · · · · · · · · · · · · · · · · 142<br />

3.10 Accounting Policies· · · · · · · · · · · · · · · · · · · · · · · · · 143<br />

3.11 Notes to the <strong>Annual</strong> Financial Statements · · · · · · · · · · · · · · · · 152<br />

3.12 Disclosure Notes to the <strong>Annual</strong> Financial Statements · · · · · · · · · · · 160<br />

3.13 Annexures to the <strong>Annual</strong> Financial Statements · · · · · · · · · · · · · · 165<br />

4


Part 4<br />

HUMAN RESOURCE MANAGEMENT<br />

4.1 Aim · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · 172<br />

4.2 Service Delivery · · · · · · · · · · · · · · · · · · · · · · · · · · 172<br />

4.3 Expenditure · · · · · · · · · · · · · · · · · · · · · · · · · · · · 173<br />

4.4 Employment and Vacancies · · · · · · · · · · · · · · · · · · · · · 176<br />

4.5 Job Evaluation · · · · · · · · · · · · · · · · · · · · · · · · · · · 178<br />

4.6 Employment Changes · · · · · · · · · · · · · · · · · · · · · · · · 179<br />

4.7 Employment Equity · · · · · · · · · · · · · · · · · · · · · · · · · 183<br />

4.8 Performance Rewards · · · · · · · · · · · · · · · · · · · · · · · · 186<br />

4.9 Foreign Workers · · · · · · · · · · · · · · · · · · · · · · · · · · 188<br />

4.10 Leave Utilisation for the Period 1 January <strong>2007</strong> to 31 December <strong>2007</strong> · · · · · 188<br />

4.11 HIV&AIDS and Health Promotion Programmes · · · · · · · · · · · · · · 190<br />

4.12 Labour Relations · · · · · · · · · · · · · · · · · · · · · · · · · · 191<br />

4.13 Skills Development · · · · · · · · · · · · · · · · · · · · · · · · · 193<br />

4.15 Utilisation of Consultants · · · · · · · · · · · · · · · · · · · · · · 195<br />

4.14 Injury on Duty· · · · · · · · · · · · · · · · · · · · · · · · · · · 195<br />

Acronyms · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · 197<br />

5


Part 1<br />

General Information<br />

6


1.1 Submission of the<br />

<strong>Annual</strong> <strong>Report</strong> to the Executing Authority<br />

Honourable P Masualle<br />

Member of the Executive Council for<br />

Economic Development and Environmental Affairs<br />

<strong>Report</strong> of the Accounting Officer of the Department of Economic Development and<br />

Environmental Affairs for the period 1st April <strong>2007</strong> to 31st March 20<strong>08</strong>.<br />

I have the honour of submitting the <strong>2007</strong>/<strong>08</strong> <strong>Annual</strong> <strong>Report</strong> of the Department of<br />

Economic Development and Environmental Affairs in terms of Section 40(1)(d) of the<br />

Public Finance Management Act, 1999.<br />

Dr E. Nkem-Abonta<br />

Accounting Officer<br />

Department of Economic Development and Environmental Affairs<br />

31 August 20<strong>08</strong><br />

7


1.2 Introduction by the Accounting Officer<br />

As we take stock of the department’s performance,<br />

highlighting the achievements for the year against a<br />

backdrop of limited resources, capacity challenges and<br />

budgetary constraints, we must in the same breath<br />

reaffirm our commitment to a vision where the provincial<br />

economy can make visible change to the quality of life of<br />

all for the better. In the same vein we undertake to always<br />

ensure that our natural environment is well managed in<br />

the interest of sustainable development which caters<br />

for future generations. The support of all stakeholders including our social partners,<br />

sister departments, national counterparts and above all the public in general – whose<br />

contributions made it possible for the department to realise the development milestones<br />

set for the year – is highly appreciated.<br />

The challenges of underdevelopment in our province continue to demand strategic<br />

deployment of resources as well as integration in planning, cooperation and cohesion<br />

in implementing development strategies. Our plans for the <strong>2007</strong>/<strong>08</strong> financial year were<br />

made cognisant of the need for a concerted effort within the department, collaboration<br />

with and amongst its constituent arms of delivery and in partnership with the external<br />

stakeholders under a shared purpose of existence. It is therefore not the intention of this<br />

report to lament the many hurdles we had to scale in pursuit of our development goals,<br />

but rather to highlight the social, environmental, economic and developmental value of<br />

our interventions. These are the key result areas which the department is mandated to<br />

address under various pieces of legislation within the context of a policy regime that<br />

primarily seeks to accelerate economic growth and development and where the natural<br />

environment is not compromised.<br />

It must be emphasised that the relationship between economic development and<br />

environmental management is symbiotic, and so is that between business and<br />

consumers. Consequently we are all compelled to accept the realities of these equations<br />

so that the citizens of the Eastern Cape Province may derive sustainable benefits from<br />

growth and development. These are the principles which underscore the functions of the<br />

Economic Development and the Environmental Affairs Programmes. The programmes<br />

are respectively charged with: (a) local economic development, trade promotion and<br />

investment attraction, enterprise and tourism sector development, regulation of the<br />

liquor, gambling and betting industries, as well as promotion of a responsible business<br />

environment in the interest of consumers; and (b) protection, development, regulation<br />

and management of natural resources (flora and fauna) for sustainable use.<br />

8


During the <strong>2007</strong>/20<strong>08</strong> financial year the department’s programmes made numerous<br />

achievements, some of which include:<br />

• An inflow of investment into the province.<br />

• Creation of more direct jobs.<br />

• Accessing of development finance by SSMEs<br />

• Funding of LED projects.<br />

• A record number of decisions issued in favour of business development applications as<br />

well as housing projects.<br />

These achievements are covered in more detail in the annual reports of our public entities<br />

and under the section on performance information in this document. However, we must<br />

hasten to acknowledge that there are challenges the department still needs to address<br />

in the areas of governance and financial accountability.<br />

This report has been prepared in line with the treasury guidelines, and covers four<br />

areas, namely: General Information, Programme Performance, Audited <strong>Annual</strong> Financial<br />

Statements and Human Resource Management.<br />

The General Information section provides insight into the operating environment of<br />

the department whilst the Programme Performance section gives a detailed analysis of<br />

work undertaken during the period under review. A perspective on matters relating to<br />

governance and accountability is the focus of the two remaining sections which comprise<br />

the Audited <strong>Annual</strong> Financial Statements and Human Resource Management.<br />

Thank you.<br />

Dr E. Nkem-Abonta<br />

Accounting Officer<br />

Department of Economic Development and Environmental Affairs<br />

9


1.3 Information on the Department<br />

The business of the department is directed from its Head Office in Bhisho and its<br />

operations are conducted through six (6) District Offices, five public entities (Eastern<br />

Cape Development Corporation [ECDC], Eastern Cape Tourism Board [ECTB], Eastern<br />

Cape Parks Board [ECPB], Eastern Cape Gambling and Betting Board [ECGBB] and Eastern<br />

Cape Liquor board [ECLB]) and the two Industrial Development Zones namely the East<br />

London Industrial Development Zone (ELIDZ) and the CEOGA Development Corporation<br />

(CDC). The district offices are located at Port Elizabeth (Cacadu District Municipality and<br />

Nelson Mandela Metro Municipality), East London (Amathole District Municipality),<br />

Mthatha (OR Tambo DM), Queenstown (Chris Hani DM), Aliwal North (Ukhahlamba DM)<br />

and Kokstad (Alfred Nzo DM). This arrangement allows the department a wider service<br />

delivery reach as well as providing an opportunity for the department’s officials to have<br />

a better understanding of issues on the ground, through direct interfacing with a wide<br />

range of stakeholders.<br />

During the period under review, the National Treasury gazetted standard programmes and<br />

objectives to which department complied. These mandatory requirements would have<br />

resulted in an increase in the total number of programmes from five (5) to thirteen (13).<br />

However, the two programmes for Economic Development and Environmental Affairs are<br />

under one department [DEDEA]. Only nine of the programmes could be implemented.<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-programme 1.1: Office of the MEC<br />

OBJECTIVE OF PROGRAMME/SUB-PROGRAMME<br />

• Provide leadership, strategic management in accordance<br />

with legislation, regulations, policies & ensure appropriate<br />

support service to all other programmes.<br />

• To effectively & efficiently manage & direct the activities of the MEC.<br />

Sub-programme 1.2: Office of the HoD<br />

Sub-programme 1.3: Financial Management<br />

Sub-programme 1.4: Corporate Services<br />

Programme 2:<br />

Integrated Economic Development Services [IEDS]<br />

• To manage & direct departmental transversal administrative<br />

programmes that give leadership to the department.<br />

• To effectively maintain an oversight function of the<br />

whole department’s mandate & function.<br />

• To provide an efficient financial management function.<br />

• To ensure implementation of the PFMA, other<br />

related regulations & policies.<br />

• To provide planning & budgeting support.<br />

• To ensure that risk management is …<br />

• The programme provides strategic support function to<br />

the department. This function is made up of Human<br />

Resource Management & Development, Labour<br />

Relations, Legal, IT & Corporate Communication<br />

• To sustain economic development through shared partnerships.<br />

Sub-programme 2.1: Enterprise Development [ED] • To support & develop business enterprises.<br />

Sub-programme 2.2:<br />

Local Economic Development [LED]<br />

• To promote economic growth & development of local<br />

economies in partnership with key stakeholders by aligning<br />

LED initiatives with Government Programmes<br />

10


PROGRAMME/SUB-PROGRAMME<br />

Sub-programme 2.3:<br />

Economic Empowerment [EE]<br />

Programme 3: Trade & Industry Development [TID]<br />

Sub-programme 3.1:<br />

Trade & Investment Promotion [TIP]<br />

Sub-programme 3.2: Sector Development [SD]<br />

Sub-programme 3.3: Industry Development [ID]<br />

Programme 4:<br />

Business Regulation & Governance [BRAG]<br />

Sub-programme 4.1: Corporate Governance<br />

Sub-programme 4.2: Consumer Protection<br />

Sub-programme 4.3: Liquor Regulation<br />

Sub-programme 4.4: Gambling & Betting<br />

Programme 5:<br />

Economic Planning, Research & Development<br />

Sub-Programme 5.1: Policy & Planning<br />

Sub-Programme 5.2: Research & Development<br />

Sub-Programme 5.3: Knowledge & Delepoment<br />

Sub-Programme 5.4: Monitoring & Evaluation<br />

Programme 6: Environmental Management<br />

and Sustainable Development Policy,<br />

Programme 7: International development cooperation<br />

Programme 8: Policy, Legislation, Coordination,<br />

Planning & Monitoring<br />

Programme 9: Planning, Impact, Pollution & Waste<br />

Management,<br />

Programme 10: Ecosystems, Biodiversity &<br />

National Heritage Planning<br />

Programme 11: Marine & Coastal Management<br />

Programme 12: Environmental Management &<br />

Sustainable Development Empowerment & Capacity<br />

Building Services<br />

Programme 13: Environmental Management &<br />

Sustainable Enterprise & Infrastructure Development.<br />

Programme 14: Environmental Management &<br />

Sustainable development & technical support<br />

services.<br />

Programme 15: Conservation of bio-diversity & the<br />

protection of the environment.<br />

OBJECTIVE OF PROGRAMME/SUB-PROGRAMME<br />

• To facilitate the process of empowerment & creation<br />

of an enabling business environment for PDIs.<br />

• To stimulate economic growth through industry<br />

development, trade & investment promotion<br />

• To facilitate trade, export promotion & attract investment.<br />

• To implement strategies for the positioning of the industrial<br />

sector as a key contributor to economic growth & development.<br />

• To facilitate the implementation of strategic programmes<br />

that will stimulate the competitiveness of priority sectors.<br />

• To ensure an equitable & a socially responsible<br />

environment that allows for predictability.<br />

• To lobby against & address barriers in the broader business<br />

environment which inhibits business development.<br />

• To develop, implement & promote measures that<br />

ensure the rights & interests of all consumers.<br />

• To promote & maintain an effective & efficient<br />

regulatory system for the liquor industry.<br />

• To promote & maintain an effective & efficient<br />

regulatory system for the gaming industry.<br />

• To inform economic planning & processes<br />

• To develop economic policies & strategies<br />

• To inform economic policy & planning processes<br />

• To centralise economic data as a common source of reference<br />

• Provide reliable economic indices<br />

• To ensure development of environmental policy<br />

legislation & compliance framework.<br />

• Not applicable<br />

• Consolidate provincial environmental legal framework<br />

• To promote cleaner production, waste minimization, reduction<br />

of air emissions & effective implementation of EIA regulation<br />

through integrated waste & air quality management planning.<br />

• Ensure that Provincial Biodiversity Strategy & Action Plan is finalized<br />

• Ensure that coastal development takes place in accordance<br />

with applicable policy & legal provisions<br />

• For <strong>2007</strong>/20<strong>08</strong> this program was integrated into Programs 6 to 11<br />

• For <strong>2007</strong>/20<strong>08</strong> this program was integrated into Programs 6 to 11<br />

• For <strong>2007</strong>/20<strong>08</strong> this program was integrated into Programs 6 to 11<br />

• Conserve the diversity of landscapes, ecosystems, habitats, biological<br />

communities, population, genes & species in the Eastern Cape<br />

11


The strategic areas of focus during the period under review were to:<br />

• Achieve better results from economic growth and development interventions through<br />

the Industrial Development Zone (IDZ) programmes<br />

• Improvement of SMME development through increased access to technical support of<br />

the Small Enterprise Development Agency (SEDA) and credit facilities provided by the<br />

Eastern Cape Development Corporation (ECDC)<br />

• Increase Foreign Direct Investment through the ECDC and IDZs interventions<br />

• Enhance consumers’ awareness about their rights and recourse with particular focus on<br />

the National Credit Act (NCA)<br />

• Reduce Environmental Impact Assessment (EIA) backlogs to facilitate responsible<br />

development and issue Records of Decision (ROD) in time<br />

• Improve regulatory frameworks and governance through legislative reviews and amendments.<br />

These milestones were realised despite the high average vacancy, limited operational<br />

capacity and budget available in these key areas of delivery.<br />

1.3.1 INSTITUTIONS REPORTING TO EXECUTING AUTHORITY<br />

Outlined below are provincial public entities accountable to the MEC for Economic<br />

Development and Environmental Affairs the boards of the public entities listed below<br />

are accountable to the office of the executing authority (MEC).<br />

• Eastern Cape Development Corporation (ECDC)<br />

• Eastern Cape Tourism Board (ECTB)<br />

• Eastern Cape Gambling and Betting Board (ECGBB)<br />

• Eastern Cape Liquor Board (ECLB)<br />

• Eastern Cape Parks Board (ECPB)<br />

1.3.2 BILLS SUBMITTED TO THE LEGISLATURE IN THE FINANCIAL YEAR<br />

• There were no Bills submitted for consideration by legislature during the period <strong>2007</strong><strong>08</strong>.<br />

1.3.3 MEMBER OF EXECUTIVE COUNCIL VISITS ABROAD<br />

PLACE DATE PURPOSE<br />

United Arab Emirates 09 – 17 November <strong>2007</strong> Study Tour – Infrastructure Development<br />

Brazil 01 - 09 March 20<strong>08</strong> LED Fact finding mission<br />

12


1.4 Vision and Mission Statements<br />

1.4.1 VISION<br />

The Department of Economic Development and Environmental Affairs strives for an<br />

Eastern Cape which is unified through integrated and sustainable economic, social and<br />

cultural development; thus providing an acceptable quality of life for all of its people in<br />

the context of a united, non-racial, non-sexist and democratic South Africa.<br />

1.4.2 MISSION<br />

To build a sound, growing and sustainable economy which facilitates economic<br />

empowerment and delivers an optimal quality of life for all citizens of the Province;<br />

especially through the efficient utilisation and management of environmental resources,<br />

the promotion of investment and the strategic deployment of the human and financial<br />

resources at its disposal. The Department’s core challenge is to grow the economy of the<br />

Eastern Cape and consequently, South Africa.<br />

13


1.5 Legislative Mandate<br />

The table below shows a summary of core mandates and derivative legislative frameworks:<br />

PROGRAMMES CORE FUNCTIONS ENABLING POLICY OR LEGISLATION<br />

Administration<br />

Economic<br />

Development<br />

Financial Management, Administrative &<br />

Planning Support<br />

• Public Finance Management Act (1) of 1999<br />

• Treasury Guidelines on Planning<br />

Information Management • Public Service Regulations, 1999<br />

• SITA Act 88 of 1998<br />

Monitoring & Evaluation of Programmes and • PFMA 1 of 1999<br />

Public Entities<br />

• Treasury Guidelines on Planning<br />

Economic Growth & Development Strategy<br />

Formulation and Implementation<br />

Marketing of the Eastern Cape, Trade<br />

Promotion and Investment Attraction,<br />

Development Finance, IDZ Programme<br />

Support , SMME Development and Support<br />

Tourism Sector Development<br />

• National Policy, Strategies and Legislation<br />

• Provincial Growth and Development Plan<br />

• Eastern Cape Development Corporation Act 2 of 1997<br />

• National Small Business Act of 1995<br />

• EC Tourism Act (8) of 2003:EC<br />

Gambling & Betting Regulation<br />

• National Gambling & Betting Act<br />

• Gambling and Betting Act (5) of 1997:EC<br />

Consumer Protection<br />

• Consumer Affairs Unfair Business<br />

Practices Act (5) of 1998:EC<br />

• Credit Agreement Act ( ) of ...<br />

Trade Inspection • Sales & Services Act 25 of 1965<br />

Environmental<br />

Affairs<br />

Regulation of The Liquor Industry • National Liquor Act 59 of 2003<br />

• EC Liquor Act 10 of 2003 (EC)<br />

Develop regulatory framework to promote • National Environmental Management<br />

conservation of biodiversity & protection Biodiversity Act (NEM:BA)<br />

of the environment for sustainable<br />

• National Environmental Management<br />

development in the Province<br />

Protected Areas Act (NEM:PAA)<br />

• Nature & Environmental Conservation<br />

Ordinance 19 of 1974<br />

• Ciskei Conservation Act 10 of 1987<br />

• Transkei Environmental Conservation Decree 9 of 1992<br />

• National Forest Act 84 of 1998<br />

• Veld & Forest Fire Act 101 of 1998<br />

• Marine Living Resources Act, 1998<br />

• Fencing Act 31 of 1963<br />

• Mountain Catchment Areas Act 63 of 1970<br />

• Sea Shore Act 21 of 1935<br />

• National Environmental Management Act 107 of 1998<br />

• National Environmental Management<br />

Air Quality Act (NEM: AQA)<br />

• Environmental Conservation Act 73 of 1989<br />

Manage & monitor implementation of policy. • EC Parks Board Act 12 of 2003:EC<br />

• Marine Living Resources Act, 1998<br />

• Problem Animal Control ordinance 26 of 1957<br />

14


1.5.1 FUNCTIONS/OBJECTIVES OF PUBLIC<br />

ENTITIES MANAGED BY THE DEPARTMENT<br />

This table below provides an overview of the establishment purpose of the each public<br />

entity and the core functions of the two IDZs:<br />

NAME OF THE ENTITY<br />

Eastern Cape Development Corporation<br />

(ECDC)<br />

Eastern Cape Tourism Board (ECTB)<br />

Eastern Cape Gambling and Betting Board<br />

(ECGBB)<br />

Eastern Cape Liquor Board (ECLB)<br />

Eastern Cape Parks Board (ECPB)<br />

Coega Development Corporation (CDC)<br />

East London Industrial Development Zone<br />

(ELIDZ).<br />

ESTABLISHMENT PURPOSE OR CORE FUNCTION<br />

To facilitate economic development in the Province by promoting investment,<br />

small business development and innovative development financing.<br />

Align and rationalise activities with the DTI SEDA programme in the Province.<br />

To facilitate tourism development in the Province through innovative product<br />

development, marketing and investment promotion.<br />

To regulate and manage the gambling and betting industry in the Province.<br />

To regulate the retail & micro manufacturing liquor industry in the Province.<br />

To establish efficient and effective environmental management systems in<br />

Protected Areas and to promote private sector investment opportunities in<br />

Protected Areas.<br />

To develop the Coega IDZ by investing in world-class infrastructure and to attract<br />

sustainable manufacturing investment.<br />

To develop the East London IDZ by investing in world-class infrastructure and to<br />

attract sustainable manufacturing investment.<br />

Important to note is that the status, funding relationships and ownership of the IDZ<br />

Programme could not be resolved during the course of <strong>2007</strong>/<strong>08</strong>, particularly in the<br />

context of the Regional Industrial Development Strategy (RIDS). The discussions on this<br />

issue once finalised may change the current status and funding arrangements.<br />

15


1.5.2 ACCOUNTABILITY<br />

Accountability of the public entities to the department is governed by the PFMA,<br />

covering establishment, legislations and protocols for good governance. This relationship<br />

is formalised through the shareholder compacts and service level agreements (SLAs)<br />

provided mainly for planning, structured reporting, performance monitoring and<br />

evaluation. These formal arrangements set out mechanisms for reporting, determining<br />

cycles and assigning of responsibilities to officials at different levels of accountability.<br />

The department is represented by senior officials on various boards of the public entities<br />

and a reporting conference is convened by the Executing Authority on a quarterly<br />

basis. Further, the department has an oversight responsibility over the two Industrial<br />

Development Zones (IDZs) in which ECDC is the majority shareholder on behalf of the<br />

Eastern Cape Provincial Administration with 100% in the Coega Development Corporation<br />

and 74% in the East London Industrial Development Zone, the balance of 26% is held by<br />

the Buffalo City Municipality.<br />

Lastly, the Economic Growth and Infrastructure Cluster (EG&IC) is a platform where all<br />

our public entities get a foothold into the decision making organs of the state. Plans<br />

and proposals are channelled through the Department to the cluster and ultimately<br />

the Cabinet Committee on Economic Growth and Infrastructure Cluster. This process<br />

enhances cooperation and accountability within the DEDEA Group.<br />

16


Part 2<br />

Programme Performance<br />

17


2.1 Voted Funds<br />

The total budget allocated to the department under Vote 9 (Department of Economic<br />

Development and Environmental Affairs) was R757,973m (seven hundred and fifty seven<br />

million nine hundred and seventy three thousand Rand) for the year under review as it is<br />

listed in the Provincial Treasury White Book. The breakdown was as follows:<br />

2.1.1 APPROPRIATION PER PROGRAMME<br />

Per Programme<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance<br />

Var. as a % of<br />

Final Appr.<br />

R’000 R’000 R’000 %<br />

1. Administration 85,624 78,814 6,810 7.9<br />

2. Integrated Economic Development Services 129,687 127,137 2,550 2.0<br />

3. Trade & industry Development 343,999 343,670 329 0.1<br />

4. Business Regulations & Governance 46,477 46,154 323 0.7<br />

5 Economic Planning 1,000 373 627 62.7<br />

6 Environmental Management 42,729 33,646 9,<strong>08</strong>3 21.3<br />

7 Planning, Impact Pol & Waste 4,522 3,425 1,097 24.3<br />

8 Ecosystems Bio & Nat Her Ma 102,748 102,372 376 0.4<br />

9 Marine & Coastal Management 1,187 726 461 38.8<br />

757,973 736,317 21,656<br />

NB: The table above reflects a bigger allocation for programmes 2-9, the bulk of which is<br />

transferred to Public Entities responsible for key strategic outcomes.<br />

18


2.2 Aim of the Vote<br />

The aim of the Department of Economic Development and Environmental Affairs (Vote 9)<br />

is to promote sustainable economic growth in the Eastern Cape Province and to ensure<br />

that adequate measures are taken to protect the natural environment and to facilitate<br />

the growth of a viable tourism industry.<br />

The Department of Economic Development and Environmental Affairs presents to the<br />

Provincial Legislature the programme performance in accordance with the Strategic<br />

and <strong>Annual</strong> Performance Plans as tabled in Parliament in March <strong>2007</strong>. The report gives<br />

an account of the Department’s activities and performance against service delivery<br />

objectives and targets outlined in its <strong>2007</strong>/<strong>08</strong> plans. It details achievements of the<br />

Department using resources allocated to it under vote 9 and other resources at its<br />

disposal during the same period.<br />

The Department subscribes to principles of good governance, transparency and public<br />

accountability in particular Section 27(4) of the PFMA which states the following:<br />

“When the annual budget is introduced in the National Assembly or a provincial<br />

legislature, the Accounting officer for each department must submit to Parliament or<br />

the provincial legislature, as maybe appropriate, measurable objectives for each main<br />

division within the department’s vote. The relevant Treasury may co-ordinate these<br />

submissions and consolidate them in one document.”<br />

19


2.3 Key Strategic Objectives<br />

These are the key strategic objectives of the Department:<br />

• to promote economic growth and development in the province,<br />

• develop and implement strategies to achieve specific policy objectives,<br />

• to improve the business environment in the interest of consumers,<br />

• to protect, develop, regulate and manage natural resources (flora and fauna) of the<br />

Eastern Cape Province, and<br />

• to manage marine and coastal resources and eliminate illegal coastal development activities<br />

2.3.1 PROGRAMMES<br />

The department has 15 programmes which are reflected in the table in 1.2 Introduction by<br />

the Accounting Officer, covering information on the Department.<br />

2.3.2 ACHIEVEMENTS<br />

The Department spent 97.5% of its <strong>2007</strong>/<strong>08</strong> allocated budget towards the realisation<br />

of achievements by the year end. Specific achievements of our Public Entities are listed<br />

in separate annual reports produced by these Public Entities. To this end we draw the<br />

attention of our stakeholders and the public to the notable achievements of the<br />

two programmes in their respective areas of responsibilities through the strategic<br />

interventions which yielded – amongst others – LED projects funded to a tune of R30m,<br />

mostly in rural parts of the province, and 2 000 records of decisions issued in favour of<br />

business development applications as well as housing projects.<br />

1.<br />

2.<br />

3.<br />

The following outputs were achieved in the <strong>2007</strong>/<strong>08</strong> financial year.<br />

Improved governance and accountability though shareholder compacts and quarterly<br />

reporting conferences between DEDEA and its public entities are now a feature of<br />

performance management by the Department. The Department, together with its public<br />

entities, was able to meet with political leaders, municipal managers, stakeholders and<br />

discuss projects funded by the Department.<br />

Boards of public entities have been stabilised and have been gender consolidated. Key<br />

management positions have been filled for efficient and effective execution of projects.<br />

Contributing to the MIDP, understanding/addressing challenges, communicating with<br />

government, infrastructure development plans (ports) and progress as well as identifying<br />

strategic areas for cooperation marketing. The DEDEA was one of the major funders of<br />

the first successful automotive week which was held in Port Elizabeth in September<br />

20


4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

<strong>2007</strong>. Other interventions for sector and industry developments included the Tourism<br />

Summit Agreement, GDS etc<br />

A draft Provincial cooperative strategy was developed in line with the National cooperative<br />

strategy. The strategy will be concluded in the second quarter of 20<strong>08</strong>/09 year.<br />

New Projects were initiated in line with the strategic intent of the Provincial Industrial<br />

Development Strategy. These include timber and forestry, agro-processing, business<br />

process outsourcing and tourism.<br />

Two final licences out of a total of five were issued in <strong>2007</strong> (Zone 4 & 5, Queenstown<br />

and Mthatha). The Queenstown Casino opened partially in December <strong>2007</strong> and was fully<br />

operational by early July 20<strong>08</strong>.<br />

The commercialisation process of key Provincial parks was started in <strong>2007</strong>. In addition<br />

more land was acquired in order to expand protected areas for conservation.<br />

The strategic focus of the Department was reviewed by top management. This resulted in<br />

the planning process being initiated for six key APEX projects aligned to the Department<br />

as identified by National Cabinet in June <strong>2007</strong>.<br />

The Department launched the highly successful “the green scorpions” to counter<br />

environmental violators in December <strong>2007</strong>.<br />

A backlog of 633 Environmental Impact Assessments (EIAs) generated within the old<br />

environment conservation act (ECA) was greatly reduced to 98 by end March 20<strong>08</strong>.<br />

Remaining backlogs should be cleared by the end of November 20<strong>08</strong>.<br />

2.3.3 OVERVIEW OF THE ORGANISATIONAL<br />

ENVIRONMENT FOR <strong>2007</strong>/<strong>08</strong><br />

A number of planning and review sessions were held to assess the impact of the<br />

organisational environment on the Department. Through these initiatives the department<br />

identified the key challenges to which it had to develop a structured response to address<br />

short to medium-term issues. Of primary importance was to appoint personnel at<br />

strategic management level, where a number of posts were occupied by officials in an<br />

acting capacity and to ensure that the boards of all public entities under the Department<br />

could operate at full capacity. To this end new members were appointed to all areas<br />

provided for by respective legislation including departmental representatives on each<br />

board. Despite these efforts the vacancy rate remains above acceptable levels as it is<br />

always difficult to attract new appointments at a rate which outperforms those of exits,<br />

let alone the ability to retain strategic skills in the public sector enevironment. Filling of<br />

vacant posts within 3 months has not been achieved due to challenges such as lengthy<br />

job evaluation processes, non-availability of job evaluation and interview panels.<br />

21


Despite all these challenges, the department was able to meet its targets with an<br />

average staffing-rate of 50%. The initiatives of the Office of the Executing Authority saw<br />

an improvement in stakeholder relationships through the establishment of forums for<br />

engagement with municipalities, with its extended arms of delivery, i.e. public entities,<br />

beneficiary communities and other members of the broader community through the<br />

outreach programme.<br />

The Department managed to complete the processing of employee trafers to the Eastern<br />

Cape Parks Board although there were delays in payment of their exit benefits.<br />

Staff development and training in respective areas of work showed significant improvement:<br />

• Performance of the IDZ programmes in areas of investment attraction was highly encouraging<br />

• SMME support was satisfactory compared to the previous year.<br />

2.3.4 OVERVIEW OF THE SERVICE DELIVERY<br />

ENVIRONMENT FOR <strong>2007</strong>/<strong>08</strong><br />

The new National Treasury programme budget structure, which was approved in<br />

<strong>2007</strong>/<strong>08</strong> financial year, resulted in the Department now having 13 programmes instead<br />

of the original 5. However, due to the hurried nature in which the announcement to<br />

implement the programmes was made, implementation by the DEDEA was only possible<br />

for 9 programmes.<br />

This report is based on performance measures and targets specified in the <strong>Annual</strong><br />

Performance Plan (APP) for <strong>2007</strong>/<strong>08</strong> to 2009/10 or, where more appropriate, from the<br />

Operational Plan for <strong>2007</strong>/<strong>08</strong>.<br />

There are a number of changes in the national regulatory environment which affected<br />

the make-up of the department’s programmes and the orientation of priority areas of<br />

focus, particularly on public awareness raising initiatives.<br />

No new laws were introduced or enacted in the year under review. At a national level, the<br />

most notable legislation and regulations were for the environmental sector which include:<br />

• Amendment of Section 20 of the Environment Conservation Act<br />

• Review of Environmental Impact Assessment Regulations<br />

• Promulgation of the Air Quality Management Act<br />

• Enforcement and Compliance Regulations in terms of the National Environmental<br />

Management Act (NEMA), 107/1998<br />

22


Business plans were developed for four of the six APEX programmes which were identified<br />

by the National Cabinet in June <strong>2007</strong> for implementation during the current term of<br />

government. Funding could not be secured for these programmes since the National<br />

Cabinet had largely expected reprioritisation of existing budgets and programmes.<br />

The Service Delivery Improvement Plan was updated in the <strong>2007</strong>/<strong>08</strong> financial year.<br />

Preliminary service standards were developed for both the Department and its public<br />

entities. During 20<strong>08</strong> consultations with DEDEA’s customers will be conducted in order to<br />

create credible service standards. A Departmental Service Charter will also be developed<br />

in the current financial year.<br />

2.3.5 STRATEGIC OVERVIEW AND KEY POLICY<br />

DEVELOPMENTS FOR THE <strong>2007</strong>/<strong>08</strong> FINANCIAL YEAR<br />

Policies and Strategies<br />

The Department of Economic Development and Environmental Affairs operates<br />

within the context of the PGDP which seeks to promote broad-based socio-economic<br />

development in the Province, supported by the overall principles of sound macroeconomic<br />

fundamentals at National levels. These fundamentals represent the outcome of<br />

diligent application, prudent spending and macro-economic discipline over several years,<br />

and constitute a foundation upon which to build regional and local initiatives towards<br />

growing the provincial economy. The PGDP is currently under review and adaptation and<br />

adoption of programmes will be made once information is made available.<br />

Linked to the PGDP is the Provincial Industrial Development Strategy and Action Plan.<br />

Nine sectors have been identified and approved by the Provincial Cabinet. An Industrial<br />

Action Plan is being finalised with the assistance of ECSECC in the current financial year.<br />

Some components of the Industry Action Plan are already being effected e.g. the Forestry<br />

and Timber Cluster, Agro-Processing, and BPO.<br />

Key operational programmes are implemented by our public entities and consequently,<br />

key operational functions are developed and managed by the ECDC, ECTB, and the ECPB.<br />

Essential regulatory and advisory services are provided by the ECGBB and the ECLB.<br />

The Department facilitates the strengthening of developmental local government based<br />

on Local Economic Development (LED) initiatives to create sustainable job opportunities<br />

and viable revenue bases. A trip to Brazil, with the support of Thina Sinako, was undertaken<br />

in order to learn about LED programmes in that country.<br />

23


Components of the Economic Transformation of the Eastern Cape as expressed by the<br />

ruling party earlier in the year, as well as the ASGISA priorities, have been prioritised and<br />

initiated by the Department.<br />

Legislative Changes<br />

New laws introduced or enacted by the Provincial Legislature affecting the Department<br />

during in the course of the year under review as well as approval of ammendmends to<br />

certain pieces of legislation and bills by the National Parliament are indicated below:<br />

• Amendment of Section 20 of the Environment Conservation Act<br />

• Promulgation of the Air Quality Management Act<br />

• Enforcement and Compliance Regulations in terms of the National Environmental<br />

Management Act (NEMA), 107/1998<br />

• The National Credit Act (0) of <strong>2007</strong> became effective<br />

Apart from the abovementioned developments at the National Level there were no new laws<br />

tabled before legislature by the Department nor enacted uopn in the year under review.<br />

24


2.4 Departmental Revenue and Expenditure<br />

2.4.1 COLLECTION OF DEPARTMENTAL REVENUE<br />

The table below presents a summary of amounts collected, transferred or retained<br />

for own revenue.<br />

Description 2004/05<br />

Actual<br />

2005/06<br />

Actual<br />

2006/07<br />

Actual<br />

<strong>2007</strong>/<strong>08</strong><br />

Target<br />

<strong>2007</strong>/<strong>08</strong><br />

Actual<br />

% deviation<br />

from target<br />

R’000 R’000 R’000 R’000 R’000 %<br />

Tax Revenue 55,918 64,318 81,447 87,503 92,554 -5.8<br />

Sales of Goods and Services<br />

539 512 437 3,787 463 87.8<br />

other than capital assets<br />

Interest, dividends and rent<br />

1 161 152 218 388 -77.9<br />

on land<br />

Financial transactions in<br />

assets and liabilities<br />

9,613 28,777 8,589 - 6 151 -<br />

Total 66,071 93,768 90,625 91,5<strong>08</strong> 99,556 -8.8<br />

Tariffs<br />

The Provincial Treasury has completed a study on tariffs and rates for the Province and<br />

its public entities. This information will be made available and channelled appropriately<br />

before any changes and implementations can be effected.<br />

Income from Protected Areas<br />

Open tender processes are followed by the Eastern Cape Parks Board with regard to the<br />

hunting and culling of game. An annual game auction is also held.<br />

Provision of Tourist Facilities<br />

Wherever possible tourist facility rates are market related. These are reviewed from time<br />

to time.<br />

Free Services<br />

The Department renders statutory free services related to the functions of the Department<br />

in respect of consumer affairs. No significant income would be generated from these<br />

services as most of the people served are in the low-income bracket.<br />

Public services provided by Programmes 6 - 13 in relation to Environmental Impact<br />

Management do not generate any revenue for the Department.<br />

25


2.4.2 DEPARTMENTAL EXPENDITURE<br />

The total spending is R 736, 3 million which represents 97.14% of the total budget. There<br />

is an improvement in comparison to the 96.3% and 95.7% spent in the 2006/07 and<br />

2005/06 financial years respectively.<br />

Programme<br />

The table below shows the expenditure for the year:<br />

Final Appropriation<br />

R’000<br />

Roll-<br />

Overs<br />

R’000<br />

Virement<br />

R’000<br />

Total<br />

Voted<br />

R’000<br />

Actual<br />

Expenditure<br />

R’000<br />

Variance<br />

R’000<br />

Variance<br />

as a %<br />

of Final<br />

Appropriation<br />

R’000 R’000 R’000 R’000 R’000 R’000 R’000<br />

1 Administration 85,624 – – 85,624 78,814 6,810 7.9<br />

2 Integrated Economic Development Services 129,687 – – 129,687 127,137 2,550 2.0<br />

3 Trade & industry Development 343,999 – – 343,999 343,670 329 0.1<br />

4 Business Regulations & Governance 46,477 – – 46,477 46,154 323 0.7<br />

5 Economic Planning 1,000 – – 1,000 373 627 62.7<br />

6 Environmental –Management 42,729 – – 42,729 33,646 9,<strong>08</strong>3 21.3<br />

7 Planning, Impact Pol & Waste 4,522 – – 4,522 3,425 1,097 24.3<br />

8 Ecosystems Bio & Nat Her Ma 102,748 – – 102,748 102,372 376 0.4<br />

9 Marine & Coastal Management 1,187 – – 1,187 726 461 38.8<br />

Total 757,973 - - 757,973 736,317 21,656 2.9<br />

2.4.3 TRANSFER PAYMENTS<br />

The bulk of our budget is transferred to our public entities as per the vote. These transfers<br />

are for economic development related programmes.<br />

INSTITUTION AMOUNT R’000<br />

Eastern Cape Development Corporation [ECDC] 180 210<br />

Eastern Cape Gambling and Betting Board [ECGBB] 20 233<br />

Eastern Cape Liquor Board [ECLB] 22 305<br />

Eastern Cape Parks Board [ECPB] 99 407<br />

Eastern Cape Tourism Board [ECTB] 22 500<br />

Coega Development Corporation [CDC] 25 200<br />

East London Industrial Development Zone [ELIDZ] 192 000<br />

Total Amount Transferred 561 855<br />

Alfred Nzo District Municipality 5 250<br />

Amathole District Municipality 3 000<br />

Chris Hani District Municipality 5 250<br />

UKhahlamba District Municipality 5 250<br />

Nelson Mandela Bay Metropolitan 3 000<br />

OR Tambo District Municipality 5 250<br />

Cacadu District Municipality 3 000<br />

Total Amount Transferred 30 000<br />

26


INSTITUTION AMOUNT R’000<br />

Nelson Mandela University 1 000<br />

Inkayeni Event Organisers 4 000<br />

National Business Initiative (NBI) 4 000<br />

Total 600 855<br />

2.5 Capital Investment,<br />

Maintenance and Asset Management Plan<br />

2.5.1 CAPITAL INVESTMENT<br />

Capital expenditure during <strong>2007</strong>/<strong>08</strong> amounted to R6.907 million comprising machinery<br />

and equipment.<br />

2.5.2 MAINTENANCE<br />

The Department incurred R105 000 towards maintenance, repairs and running costs.<br />

2.5.3 ASSET MANAGEMENT<br />

The Department has an Asset Management Policy which is aligned to the requirements<br />

of the National Treasury guidelines. However the Asset Management Policy could not<br />

be fully implemented during <strong>2007</strong>/<strong>08</strong> financial year resulting in the qualification of the<br />

audit report. No assets have been disposed of during <strong>2007</strong>/<strong>08</strong> and the Department is<br />

in the process of identifying redundant/obsolete assets to be disposed during 20<strong>08</strong>/09<br />

financial year.<br />

27


2.6 Programme Performance<br />

2.6.1 PROGRAMME 1: ADMINISTRATION<br />

Office of Head of Department<br />

Purpose<br />

To co-ordinate relationships within the Department and between the Department and<br />

relevant institutions at the different levels of government, as well as directly managing<br />

those functions and sub-programmes which fall directly under the Office of the HOD.<br />

Measurable Objectives<br />

Key measurable objectives for the Office of the HOD are linked to the efficient coordination<br />

of the following relationships:<br />

• The relationship between the different programmes of the Department, and between<br />

the Head Office and District Offices of the Department<br />

• The relationship between the Department and its Public Entities, especially with regard<br />

to the transfer of funds, the drawing of service level agreements and the accountability<br />

of the entities to the Provincial Legislature<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.1: Office of the MEC<br />

STRATEGIC GOAL<br />

• To provide effective, efficient political oversight and ensure operational and<br />

budgetary alignment between the Department’s activities and the PGDP are<br />

established in accordance with the priorities decided by the Economic Growth<br />

and Infrastructure (EG&I) Cabinet and Cluster Committees.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Provide policy and leadership<br />

support, and oversight to the work<br />

of the Department<br />

Oversee the strategic direction of<br />

the department linked with the<br />

organization’s political mandate<br />

Setting of strategic leadership and policy for the year<br />

Provide support for the entire department and its public entities<br />

28


• The relationship between the Department and its national equivalents, the Department<br />

of Trade and Industry and the Department of Environment and Tourism<br />

• The relationship between the Department and the Office of the Premier, including<br />

the Office of the Director-General, and the efficient performance of all responsibilities<br />

assigned to the Department by the Office of the Premier<br />

• The performance of the Economic Growth and Infrastructure Cluster of which the<br />

Department of Economic Development and Environmental Affairs is the lead department<br />

• Measurable objectives of Strategic Planning, Communications and the Special Programmes<br />

Unit are specified below.<br />

Analysis of Constraints and measures planned to overcome them<br />

• Key personnel shortages are a constraint to efficient and effective service delivery. The<br />

prolonged vacancy rate at middle management level reflects a need to improve approach<br />

to recruitment efforts so as to attract competent personnel. Based on an analysis of PGDP<br />

responsibilities reflected in the Five-Year Strategic and Performance Plan, the Department’s<br />

functional organisational structure will be reviewed to improve operational performance.<br />

• Service delivery will be strengthened by establishing a fully-fledged Procurement<br />

Management System in accordance with Provincial standards and Supply Chain<br />

Management procedures<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Presentation of Policy Speech and<br />

tabling of Strategic as well as<br />

<strong>Annual</strong> Performance Plans for the<br />

20<strong>08</strong>/09 financial year.<br />

Monthly meetings with Top<br />

Management & weekly meetings<br />

with HOD<br />

<strong>Report</strong>ing conference with Public<br />

Entities and PEDF meetings<br />

20<strong>08</strong>/09 Policy Speech presented<br />

and Strategic & <strong>Annual</strong><br />

Performance Plans tabled at<br />

Legislature<br />

Meetings held with the HOD & Top<br />

Management.<br />

3rd Quarter reporting conference<br />

held.<br />

PEDF meeting did not take place.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Delays in finalization of the<br />

Departmental Plans and late<br />

submission by Public Entities.<br />

Departmental commitments.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Ensuring constant and<br />

effective monitoring of<br />

the planning process.<br />

Meeting was scheduled to<br />

take place in April 20<strong>08</strong>.<br />

29


PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.2: Office of the HOD<br />

STRATEGIC GOAL<br />

• Provide effective and efficient administrative support<br />

service and leadership for the department.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Provide effective and efficient<br />

strategic leadership and support to<br />

the department<br />

Efficient management of financial<br />

resources within the budget<br />

Spending within the budget<br />

Developing and ensuring<br />

implementation of the integrated<br />

strategic plan<br />

Quarterly <strong>Report</strong>s and <strong>Annual</strong> <strong>Report</strong> in accordance with the<br />

planning and budgeting cycle<br />

Unqualified audit report<br />

Number of turnaround strategies/initiatives implemented<br />

Enhanced service delivery at<br />

regional level<br />

Number of reports submitted and exceptions identified and<br />

dealt with<br />

A Public Entity established to<br />

enhance tourism development<br />

Established merger between the Eastern Cape Parks Board and<br />

Eastern Cape Tourism Board<br />

Provide effective and efficient<br />

strategic leadership and support to<br />

public entities<br />

Enhanced tourism, environmental<br />

and economic development<br />

Effective relationship with entities, control monitoring and<br />

evaluationsystems and procedures in place<br />

30


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Spending on target for each<br />

quarter<br />

Performance in accordance with<br />

the Detailed Implementation Plan<br />

of <strong>2007</strong>/8<br />

Ensure policies are in place in line<br />

with the departmental mandate<br />

Adjust operational plan in<br />

accordance with recommendations<br />

made and implement, monitor &<br />

evaluate audit improvement plan<br />

Monitor and evaluate regional<br />

offices in line with the operational<br />

plan as per programmes executed<br />

Provision of the necessary support<br />

to assist with the merger process in<br />

accordance with the merger office<br />

plan of action.<br />

Monitor, evaluate and review the<br />

achievements of the public entities<br />

in line with the strategic objectives<br />

and Provincial Growth and<br />

Development Plan priorities<br />

Implementation of the funding<br />

and reporting protocols in line<br />

with public entities shareholders<br />

compact<br />

Departmental spending not 100%<br />

on target for each quarter<br />

Departmental performance not<br />

100% in accordance with detailed<br />

implementation plan of <strong>2007</strong>/8<br />

Departmental policies are in place<br />

in line with the Departmental<br />

mandate<br />

Operational plan partly adjusted in<br />

accordance with recommendations<br />

made<br />

Regional Offices of the Department<br />

monitored according to quarterly<br />

reports submitted to the Office of<br />

the Head of the Department<br />

The necessary support to assist<br />

with the merger was provided,<br />

given the alteration of HODs of the<br />

Department which complicated<br />

continuous support.<br />

Public Entities were reviewed on<br />

a quarterly basis by means of<br />

quarterly conferences chaired<br />

by the Member of the Executive<br />

Council of the Department<br />

The funding and reporting<br />

protocols were implemented<br />

during <strong>2007</strong>/8<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Capacity constraints in the<br />

Department complicated 100%<br />

spending on planned target per<br />

quarter<br />

Capacity constraints in the<br />

Department complicated 100%<br />

spending on planned target per<br />

quarter<br />

No significant challenges<br />

experienced<br />

Concept document of turnaround<br />

strategy for the Department<br />

established in April 20<strong>08</strong><br />

Due to capacity constraints in<br />

the Strategic Management and<br />

Monitoring and Evaluation Unit of<br />

the Department, thorough analysis<br />

of reports was not feasible<br />

The alteration of the HODs of<br />

the Department complicated<br />

continuing of this project<br />

Due to capacity constraints in<br />

the Strategic Management and<br />

Monitoring and Evaluation Unit of<br />

the Department, thorough analysis<br />

of reports was not feasible<br />

Not applicable<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Capacity constraints will<br />

be addressed as a matter<br />

of urgency during 20<strong>08</strong>/9<br />

financial year<br />

Capacity constraints will<br />

be addressed as a matter<br />

of urgency during the<br />

20<strong>08</strong>/9 financial year<br />

Not applicable<br />

Robust expansion of<br />

the Monitoring and<br />

Evaluation Unit is planned<br />

for the 20<strong>08</strong>/9 financial<br />

year<br />

Robust expansion of<br />

the Monitoring and<br />

Evaluation Unit is Planned<br />

for the 20<strong>08</strong>/9 financial<br />

year.<br />

Not applicable<br />

31


Strategic Management<br />

Purpose<br />

The Strategic Planning Sub-Programme establishes, maintains and extends an internal<br />

strategic planning function to monitor progress related to the Department’s Five-Year<br />

Strategic and Performance Plan and to ensure that appropriate alignment linkages are<br />

developed with relevant aspects of the PGDP, ASGISA, IDP, and PIDS processes.<br />

Measurable Objectives<br />

• To develop, manage and administer Information Communication Technology systems in<br />

the Department as specified in the DGITO responsibilities<br />

• To establish and maintain a comprehensive economic, environmental and tourismrelated<br />

information management system and to ensure that adequate electronic and<br />

other systems are in place for the efficient utilisation and dissemination of information,<br />

including a GIS facility<br />

• To promote and facilitate the establishment of a comprehensive, integrated Provincial<br />

Information Management System<br />

• To establish a broad understanding regarding the principles of strategic planning systems<br />

in the Department and its public entities<br />

• To ensure that appropriate actions are taken within each Programme so as to adhere to<br />

the procedures required for efficient and effective strategic planning<br />

• To establish workable Key Performance Indicators (KPIs) for all Programmes as well as<br />

their Sub-Programmes.<br />

Strategic Planning and Management is designed to strengthen internal systems and<br />

procedures related to strategic planning, reporting, monitoring and evaluationas well as<br />

associated information management for the Department.<br />

This programme involves the management and co-ordination of comprehensive strategic<br />

management systems designed to ensure that appropriate procedures are maintained<br />

in the Department and its Public Entities which includes the following:<br />

• Alignment with strategic planning procedures in other Provincial Government<br />

Departments and Agencies which are part of the Economic Growth and Infrastructure<br />

Cluster arrangement<br />

• Alignment with planning, organisation, budgeting, implementation and M&E procedures<br />

linked to the Provincial Growth and Development Plan (PGDP)<br />

• Alignment with planning and implementation procedures associated with the Municipal<br />

Integrated Development Plans (IDPs), particularly at District and Metro Municipality levels<br />

32


Specified policies, priorities and strategic objectives<br />

Requirements of various key information users – notably the Provincial Treasury, the<br />

Portfolio Committee on Economic Affairs Environment and Tourism, the Office of the<br />

Premier, and the Presidency – are all linked to the strategic planning portfolio. The unit<br />

ensures there is convergence in terms of the vision, mission, key performance areas,<br />

performance measures and budgets for all key stakeholders of the Department. Key<br />

alignment instruments such as the PGDP, the NSDP, the EG&I’ HIPPs, IDPs, NSDP and other<br />

current policies are used to align the work of the Department and its Public Entities.<br />

The priorities of the programme are to ensure that shareholder compacts and reporting<br />

protocols between the DEDEA and Public Entities are fully established and functional. The<br />

programme will also ensure relevant information and data is sourced for consideration<br />

by various programmes to assist with planning.<br />

Progress analysis<br />

Every year the Department conducts a review of its plans to ensure they are in line with<br />

key demands, policies and priorities of the Province. The last strategic review session was<br />

conducted from 9 – 11 January 20<strong>08</strong>. Key participants included the Hon. MEC Sogoni,<br />

senior management and regional directors of the Department.<br />

The programme is still understaffed with only one person responsible for the whole strategic<br />

planning and M&E component in the Directorate. A deputy director for planning was only<br />

appointed in December <strong>2007</strong>. Other posts were being processed through the job evaluation<br />

system while others had to be re-advertised when no suitable candidates were found.<br />

Analysis of constraints and measures planned to overcome them<br />

For effective planning to take place, quality data and information from operations should<br />

be readily available. Presently the Department relies on ad hoc data from Statistics South<br />

Africa, the Reserve Bank, Global Insights, ECSECC and other third parties. The Department<br />

does not have a data repository system. Performance measures are poorly defined for all<br />

programmes which make reporting problematic.<br />

In the 20<strong>08</strong>/09 financial year, a number of projects have been planned to address some<br />

of the shortcomings. These include:<br />

• Conducting an organisational performance assessment<br />

• Conducting and M&E assessment in preparation for a DEDEA M&E strategy and action<br />

plan and reviewing DEDEA strategy<br />

• Development of logic models<br />

• Refining the balanced score card<br />

33


• Management training on budgeting, strategic planning, defining key objectives and measures.<br />

• Restructuring the strategic management component to give it capacity.<br />

Interactions with key role players will be intensified to ensure more useful information<br />

for planning is available. The programme will conduct several sessions with managers of<br />

each sub-programme to ensure quality indicators are developed.<br />

The planning cycle need to be synchronised to ensure timely completion of tasks at hand.<br />

This requires more personnel to be engaged within the strategic planning and management<br />

portfolio. All outstanding posts will be advertised in the 20<strong>08</strong>/09 financial year.<br />

Description of planned quality improvement measures<br />

DEDEA will adhere to the Treasury planning instruments and ensure that reporting is<br />

premised on the Operational Plan for the year under review. DEDEA plans to develop a<br />

group plan upon which all divisions and public entities of the department derive their<br />

strategic objectives, measures and initiatives. Sessions to develop measures will be<br />

conducted in line with reporting instruments of the Provincial Adminsitration, National<br />

Treasury and Programme of Action.<br />

Information Technology<br />

The Departmental Government Information Technology Office (DGITO) Sub-Programme<br />

which is part of strategic management consists of three separately budgeted projects<br />

managed by the DGITO:<br />

• Systems Development: GIS, Web Solutions and Business Analysis<br />

• ITM & Automation<br />

• Knowledge Management: Resource Centre<br />

Progress analysis:<br />

Systems Development<br />

• The Sharepoint server which was piloted at head office and launched in December 2005<br />

was reviewed and is due for upgrade in the 20<strong>08</strong>/09 financial year.<br />

• The Master Systems Plan has been reviewed and developed.<br />

• The unit assisted environmental affairs to launch NEAS which is maintained under IT<br />

• GIS awareness sessions conducted throughout DEDEA’s regional offices<br />

• The process of reviewing the intranet and internet was started in the year under review.<br />

ITM & Automation<br />

• Monitoring of service response rate by SITA and delivery through Action Request System<br />

(ARS) so as to improve the quality of service was conducted.<br />

34


• Cabling and networking of East London office was done<br />

• MS EA upgrades implemented for servers and desktops<br />

Knowledge Management<br />

• Continued support to the EDMS project including scanning and indexing of documents<br />

done on a continuous basis<br />

• Document policy compiled and is yet to be approved<br />

• Registry procedure compiled<br />

• User awareness and change management sessions done<br />

Resource Centre<br />

• Library collection increased after purchase of books<br />

• Computers bought for resource centres not yet installed due to shortage of office<br />

accommodation in the regional offices.<br />

General<br />

Staff attended relevant ICT conferences, courses and workshops so as to improve skills<br />

and keep up to date with latest technologies.<br />

Analysis of constraints and measures planned to overcome them<br />

• Aligning ICT Organogram with MSP<br />

• Recruitment of staff to deliver services<br />

• Roll out of Back Office and Desktop software as per Microsoft Enterprise Agreement<br />

• SITA procurement procedures have caused delays in delivering services to Department<br />

and payment delays. The IT component will work with SITA to ensure improvement in<br />

service delivery. Meetings to be held monthly with SITA to address concerns. SITA has<br />

given firm commitment to enhance delivery<br />

• SITA skills levels: on-site Microsoft specialist included in current SLA<br />

• About 12 posts have not yet been filled. These will be advertised by the corporate services<br />

unit in the 20<strong>08</strong>/09 financial year.<br />

• Shortage of space for new recruits<br />

• Problems experienced with suppliers on procurement issues<br />

Description of planned quality improvement measures<br />

• The department will continue to make use of SITA services.<br />

• The signing of the MS EA is a step towards standardising the environment within the<br />

Department and thus stabilising Information Communication Technologies<br />

• Maintain close monitoring of Service Level Agreements to ensure that more efficient<br />

services are rendered<br />

35


PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.2.1:<br />

Strategic Planning & Management<br />

STRATEGIC GOAL<br />

• Comprehensive strategic management systems are established and<br />

maintained to ensure that appropriate procedures are developed in the<br />

Department and its Public Entities with respect to strategic planning,<br />

information management and monitoring and evaluation.<br />

• Appropriate organizational systems, policies and internal arrangements<br />

are established and maintained to manage and administer the financial,<br />

operational, human resources, information management, communications<br />

and legal resources in the Department and in its associated Public Entities.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Establish and update sound<br />

Strategic Planning systems in the<br />

Department, including linkages to<br />

Public Entities and Provincial and<br />

National sector Departments<br />

DEDEA Strategic Plan complies<br />

with Treasury specifications.<br />

Availability of DEDEA planning<br />

calendar and key decision making<br />

points.<br />

Public Entity Strategic & business<br />

plans aligned with DEDEA Strategic<br />

Plan.<br />

% compliance of strategic plan, annual performance plan and<br />

operational plan to treasury regulations<br />

% availability of updated departmental calendar<br />

% alignment of public entities strategic and business plans to<br />

DEDEA’s plans.<br />

Co-ordination between Strategic<br />

Plan and Sector Department<br />

Strategic Plans.<br />

Improvement in Organizational<br />

Performance<br />

Number of EG&I cluster meetings attend<br />

Completion of Organization performance assessment<br />

Service Standards Monitoring & communication plan<br />

Policy outputs from DTI and DEAT<br />

included in the ECDC and DEDEA<br />

Strategic Plans and aligned with<br />

PGDP/IDPs.<br />

DTI and DEAT Strategic Plans assessed and linkages established.<br />

% alignment of DEDEA Strategic Plan, APP and OP<br />

New 5-year Strategic Planning cycle<br />

is established.<br />

% completion of data collection for planning from key partners<br />

Provide framework for monitoring<br />

and evaluation of core programmes<br />

Number of logic models developed<br />

DEDEA Strategic Plan is linked<br />

to PGDP expectations and<br />

specifications.<br />

Degree of DEDEA plans alignment with PGDP and HIPPs<br />

36


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

100% 100% Responses and inputs from<br />

programmes still weak.<br />

100% 100% Adherence to planned dates is a<br />

challenge.<br />

N/A<br />

N/A<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

90% 40% Capacity to scrutinize report not<br />

available.<br />

Public Entities to be<br />

invited to DEDEA<br />

planning and vice versa.<br />

12 5 Meetings clashed with other<br />

priorities.<br />

N/A<br />

Assessment <strong>Report</strong><br />

Terms of reference issued.<br />

Recommendations not carried<br />

through<br />

HoD felt consultants had limited<br />

capacity<br />

Set of Service Standards Set of service standards developed No significant challenges<br />

experienced.<br />

DEDEA plans reviewed and<br />

adjusted in line with DTI and DEAT<br />

plans<br />

DEDEA plans partly incorporated<br />

(Industrial strategy, bpo, forestry &<br />

timber)<br />

Capacity to assess and incorporate<br />

limited.<br />

Re-advertise in Q1 20<strong>08</strong>.<br />

N/A<br />

To employ short term<br />

staff.<br />

Plans aligned & linked with clear<br />

objectives and measures that talk<br />

to each set of plan<br />

100% alignment No significant challenges<br />

experienced.<br />

N/A<br />

100% 10% data collection Limited staff capacity To employ short term<br />

staff to assist with<br />

data and information<br />

collection.<br />

5 Logic models developed 0 Terms of reference developed and<br />

dispatched. Recommendations not<br />

carried forward.<br />

90% 80% Limited staff capacity could not<br />

allow the project to be conducted.<br />

N/A<br />

N/A<br />

37


PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.2:<br />

Strategic Planning & Management<br />

Sub-Programme 1.2.2: DGITO<br />

STRATEGIC GOAL<br />

• Establish and maintain appropriate organizational systems to<br />

manage and administer the financial, operational, information<br />

management, communications and legal resources in the<br />

Department and in its associated institutional structures.<br />

• Establish and maintain appropriate organizational systems,<br />

HR policies and practices to administer, manage, develop<br />

and retain the human capital in the Department.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To establish, manage and<br />

maintain efficient and effective<br />

mechanisms and procedures to<br />

meet departmental and legislative<br />

requirements for information<br />

management and information<br />

technology systems<br />

Users in the department have<br />

access to relevant services on the<br />

LAN and WAN<br />

% availability of LAN connectivity<br />

% of users connected to the LAN<br />

% of managers/users with mobile access to services on the LAN<br />

% of users connected at 100mb speed<br />

Approved Business Continuity<br />

Extent of DRP implemented (none, limited, substantial, full)<br />

%of desktop computers with up to date antivirus software<br />

%of servers with up to date antivirus software<br />

Extent of security policies implemented (none, limited,<br />

substantial, full)<br />

% of users who have signed the Acceptable Use Policy<br />

Master Information Systems Plan<br />

fully implemented and updated<br />

Extent of MISP implementation<br />

Number of MISP updates, revisions completed<br />

Provide ICT governance framework<br />

Percentage involvement within the provincial ICT governance<br />

structures (PGITOC & Committees)<br />

SANS 27001 certification achieved<br />

Provide effective transversal<br />

systems<br />

Percentage availability of Persal to users in relation to normal<br />

office hours<br />

Percentage availability of BAS to users in relation to normal<br />

office hours<br />

Approved e-Gov strategy<br />

implemented<br />

Percentage availability of e-mail to users in relation to normal<br />

office hours<br />

%availability of Intranet services to users<br />

38


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

98% 98% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

80% 80% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

80% 80% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

50% 50% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

Substantial Substantial No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

100% 100% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

100% 100% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

Substantial Substantial No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

100% 100% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

Implement the first year targets<br />

from the MISP<br />

MISP is up to date with current<br />

trends and technologies<br />

100% PGITOC, PNIC, PSS, Transversal,<br />

Hardware meetings attended<br />

Investigate advantages and costing<br />

of certification<br />

MSP submitted for signature. MSP<br />

not yet signed.<br />

- Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

- - Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

3 X PGITOC, 3 X PNIC, 3 X PSS, 1 X<br />

Transversal, 3 X Hardware, 3 X e-Gov,<br />

3 X GIS meetings attended<br />

Investigation continuing.<br />

No staff to conduct this duty.<br />

Awaiting job evaluations of post.<br />

Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

98% 98% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

98% 98% Problem with getting new codes<br />

tables to the regions. No Manager<br />

or Assistant Manager.<br />

Meet with SITA and<br />

Finance to plan way<br />

forward.<br />

98% 98% No Manager or Assistant Manager. Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

98% 98% None Employment of staff in<br />

20<strong>08</strong>/09 financial year.<br />

39


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

% availability of Departmental Internet website<br />

% of comments received about the website are positive<br />

Number of electronic services offered to users/citizens<br />

Provide Departmental Spatial data<br />

ensuring alignment with provincial<br />

standards<br />

Extent of relevant departmental information spatially<br />

referenced in accordance to Provincial standards<br />

% of available departmental spatial information updated<br />

annually<br />

Level of awareness of Geographic Information Systems (GIS) to<br />

all levels of management within the department<br />

Level of usage by users according to their function within the<br />

department<br />

Knowledge management<br />

strategy developed and system<br />

implemented<br />

% Of user profiles updated<br />

% of EDMS operational in regions<br />

Provide an effective records<br />

management system<br />

% of documents/records scanned and filed<br />

% of documents indexed<br />

% of old documents scanned and filed<br />

Provide resource centre services<br />

% of requests processed within stipulated time<br />

% of classified and catalogued materials within a six month<br />

period<br />

% of sourcing and subscribing to electronic content completed<br />

% of linkages established with public entities and other<br />

government departments<br />

40


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Investigate advantages and costing<br />

of certification<br />

Investigate advantages and costing<br />

of certification<br />

98% 98% None<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

We do not have control over the<br />

Internet site it falls under Office of<br />

the Premier. Updates and changes<br />

are forwarded to them<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

A new website is in<br />

the process of being<br />

developed which will be<br />

under our control.<br />

98% Works order has been received from<br />

Microsoft and waiting for proposal<br />

from SITA.<br />

Waiting for proposal from SITA.<br />

98% - - -<br />

Continue contacting all<br />

relevant stakeholders to<br />

get the proposal.<br />

98% - - -<br />

All new versions of software loaded<br />

and tested<br />

New EIA system fully deployed<br />

All regional office GIS awareness<br />

completed.<br />

Full system not delivered yet.<br />

Access has been given. Department<br />

conducting tests of functionality.<br />

None<br />

Systems not delivered yet.<br />

100% of all new users created 90% updated No designated administrator, the<br />

department relies on Waymark<br />

100% of software installed EDMS not rolled out to the regional No budget for the servers that were<br />

need for the task<br />

80% of documents scanned and<br />

filed as they arrive<br />

100% scanning and filing No significant challenges<br />

experienced.<br />

50% of documents indexed daily 90% of documents indexed No significant challenges<br />

experienced.<br />

60% of old records filed 70% of old documents indexed No significant challenges<br />

experienced.<br />

100% of all books and materials<br />

requested available<br />

100% of books catalogued and<br />

classified every six months<br />

Have unlimited access to electronic<br />

content<br />

% of library catalogues, annual<br />

reports, strategic plans obtained<br />

from public entities and other<br />

government institutions<br />

100% procurement No significant challenges<br />

experienced.<br />

100% of books catalogued and<br />

classified every six months<br />

Users allowed on SABINET<br />

database<br />

No activity<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

Official assigned to a different task<br />

(file plan for the office of the MEC<br />

which was drafted, sent to the<br />

Provincial Archivist for Approval<br />

and was approved. The file plan has<br />

been loaded on t he EDMS)<br />

Numerous reminders to<br />

consultants have been<br />

sent and access has been<br />

given for department<br />

to test.<br />

EDMS administrator<br />

position has been sent to<br />

HR for advertisment<br />

Servers will be prioritized<br />

in first Q1 20<strong>08</strong><br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

41


PROGRAMME/SUB-PROGRAMME<br />

Programme1: Administration<br />

Sub-Programme 1.2:<br />

Strategic Planning & Management<br />

Sub-Programme 1.2.3:<br />

Monitoring & Evaluation<br />

STRATEGIC GOAL<br />

• Comprehensive strategic management systems are established and<br />

maintained to ensure that appropriate procedures are developed in the<br />

Department and its Public Entities with respect to strategic planning,<br />

information management and monitoring and evaluation.<br />

• Appropriate organizational systems, policies and internal arrangements<br />

are established and maintained to manage and administer the financial,<br />

operational, human resources, information management, communications<br />

and legal resources in the Department and in its associated Public Entities.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To inform communities of practice<br />

for information, actioning and<br />

decision making purposes.<br />

Establish sound, effective<br />

and efficient participatory<br />

departmental monitoring and<br />

evaluation capacity, systems and<br />

reporting.<br />

Institutional arrangements in place for monitoring and<br />

evaluation.<br />

Fully functional and rolled-out electronic M&E system for the<br />

department, meeting user needs and used by department and<br />

public entities.<br />

M&E capacity study conducted, recommendations approved<br />

and implemented in the department.<br />

M&E Training modules developed. Training sessions conducted<br />

in the Department.<br />

Relevant aspects of the national programme of action and other<br />

priority programmes co-ordinated and refined.<br />

M&E Audits and <strong>Report</strong>s of the outputs of the PGDP<br />

Assist in the timeous and speedy<br />

identification and resolution of<br />

various service delivery challenges.<br />

Increased departmental and<br />

public entity awareness and<br />

communication via various media<br />

from monitoring information and<br />

data<br />

Well co-ordinated and attended M&E meetings and agreed<br />

resolutions made and implemented<br />

A number and type of service delivery challenges identified,<br />

location of these challenges and the extent thereof, a number<br />

of challenges successfully resolved.<br />

Monthly update on DEDEA and Public Entities performance<br />

Develop database, core data sets; populate GIS<br />

Quarterly reports; half-yr reports; PoA; PGDP reports; end-yr<br />

reports<br />

Newsgroups; learning networks; structured communique; share<br />

point portal<br />

Economic, Environment & Tourism Series;<br />

Formative & Impact Evaluation of 3 Programmes (E,E,T); Strat &<br />

APP evaluation<br />

Refine data collection instruments incl. balanced score card &<br />

KPIs<br />

M&E Assessment & Strategy for the Department<br />

Framework for mid-term & end-term evaluation<br />

42


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

<strong>Report</strong>s with new system. <strong>Report</strong>s with new system. Managers not adhering to<br />

reporting protocols.<br />

All units in the Department fully<br />

utilize the system<br />

Terms of reference developed for<br />

circulation to service providers.<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Clear communication on<br />

reporting to be developed<br />

and shared with<br />

Managers.<br />

N/A<br />

None No action required for this quarter No significant challenges<br />

experienced.<br />

N/A<br />

Training completed None No capacity in the department. N/A<br />

Departmental POA report Departmental POA report No significant challenges<br />

experienced.<br />

1 programme evaluated/ reviewed None No inputs from relevant<br />

Programme Managers<br />

At least 2 meetings attended. 2 meetings attended Clash with other important<br />

meetings.<br />

2 service delivery challenges<br />

identified and resolved<br />

None<br />

Responsibility placed with each<br />

component.<br />

N/A<br />

A formal review/<br />

evaluation programme<br />

to be presented to<br />

Management<br />

1 1 No significant challenges<br />

experienced.<br />

N/A<br />

20% of DEDEA indicators georeferenced<br />

None<br />

Function given to IT unit<br />

DEDEA Consolidated <strong>Report</strong>(s) DEDEA Consolidated <strong>Report</strong>(s) No significant challenges<br />

experienced.<br />

N/A<br />

2 new newsgroups None Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

1 expert series meeting held 0 Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

1 formative evaluation conducted 0 Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

30% Data collection instruments<br />

modified.<br />

M&E plan for the Department and<br />

Public Entities<br />

0 Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

None Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

Mid-term review None Staff shortage. Revise organogram to accom.<br />

more personnel in M&E.<br />

43


Financial Management<br />

Purpose<br />

To manage limited financial resources in order to ensure effectiveness, efficiency and<br />

appropriateness in the delivery of outputs required for financial planning, management<br />

and control of the Department.<br />

Measurable Objectives<br />

• Promote and monitor efficient financial management systems within the department<br />

• Review and align departmental financial regulations in relation with National and<br />

Provincial regulations<br />

• Facilitate the establishment of an internal control unit<br />

• Facilitate and monitor the introduction of Supply Chain Management and its processes<br />

• Liaise with key role players and facilitate a process for smooth change over to General<br />

Recognised Accounting Practices (GRAP)<br />

• Facilitate the integration of SPU programs within departmental core programmes<br />

• Develop and manage the communication strategy of the department<br />

• Promote and market the department’s core business, challenges and successes<br />

Service delivery objectives and indicators<br />

Progress Analysis<br />

Planning, Budgeting and Revenue Management<br />

• Alignment of the budget with the departmental strategic plan<br />

• Alignment of budget to SCOA requirements<br />

• Approval of revised revenue tariffs<br />

Supply Chain Management<br />

To improve the processes within the Supply Chain Management Unit as well as to ensure<br />

compliance with Supply Chain Management Regulations, the department procured an<br />

electronic procurement and asset management system<br />

Sound Expenditure and Liability Management<br />

• Payroll Management<br />

• Appointment of personnel for banking services and deduction office<br />

• Management of fleet vehicles<br />

Accounting and <strong>Report</strong>ing Requirements<br />

• Clearing of BAS suspense accounts, monthly<br />

• Successfully closed the books for the financial year end<br />

• PERSAL/BAS Reconciliation<br />

• Production of commitment/creditors reconciliation<br />

44


General<br />

• Continuous development and training of staff to improve financial management skills<br />

and implementation of Supply Chain Management Frameworks<br />

• Use of management letters and internal audit reports on an ongoing basis to address<br />

issues of compliancy and to improve performance<br />

• Introduction and implementation of an electronic supply chain management system<br />

continues to contribute to quality management<br />

• Treasury Circular No. 11 of 2004 was adhered to and underpins our financial discipline<br />

which prevents fruitless and wasteful expenditure<br />

Analysis of constraints and measures planned to overcome them<br />

Planning, Budgeting and Revenue Management<br />

Lack of integration and alignment of strategic planning processes, lack of capacity for<br />

decision making and procurement processes largely contributed to under-spending<br />

Supply Chain Management<br />

• Limited capacity to implement the Supply Chain Management processes<br />

• Training programmes have been put in place to alleviate this on an on-going basis<br />

Accounting and <strong>Report</strong>ing Requirements<br />

• Migration from hard copy to electronic systems continues to raise audit queries from the AG.<br />

• The new approved organogram provides for a unit to be populated that will assist the<br />

Programme Managers in monitoring and evaluating compliance by the public entities in<br />

terms of PFMA and Treasury Regulations<br />

Description of planned quality improvement measures<br />

• Implementation of iBudget and eMapp systems as management tool to assist in budget<br />

planning as well as expenditure management<br />

• Upgrading of the electronic Asset Management System<br />

• Implementation of the electronic Procurement System<br />

• DEDEA to engage Treasury to persuade the Auditor General to accept validated and<br />

authenticated electronic information<br />

• Various practice notices distributed to correct procedures and processes<br />

• Formulation of Risk Management Strategy<br />

• Projection of PERSAL/BAS allocation linkages to accommodate changes in Standard Chart<br />

of Accounts (SCOA) allocations<br />

• Roll out of security system to regions<br />

45


PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.3.1: Financial Management<br />

STRATEGIC GOAL<br />

• Provide an effective financial management function in<br />

line with the PFMA and other related financial regulations<br />

and policies at minimum risk to the Department<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To provide an effective Financial<br />

planning function<br />

Ensure sound and credible creditors<br />

management<br />

Payment of creditors within 30 days<br />

Controlling and maintaining<br />

of suspense and bookkeeping<br />

accounts in the Department<br />

Month end closure<br />

Efficient cash management<br />

Ensure funds are available in the PMG account<br />

PROGRAMME/SUB-PROGRAMME<br />

STRATEGIC GOAL<br />

Programme 1: Administration<br />

Sub-Programme 1.3: Financial Management<br />

Sub-Programme 1.3.2: Budget & Revenue Management<br />

• Appropriate organizational systems, policies and internal arrangements<br />

are established and maintained to manage and administer the financial,<br />

operational, human resources, information management, communications<br />

and legal resources in the Department and in its associated Public Entities<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To provide Budget & Revenue<br />

Management function<br />

Preparation and monitoring<br />

of credible budgets for the<br />

Department.<br />

Effective and efficient In-Year-<br />

Monitoring.<br />

Alignment of budget with strategic plan. Timely submission<br />

of budget to Treasury. Capturing of approved budget by 30th<br />

March. Implementation of budget policy. Budget monitoring<br />

evaluation on monthly basis.<br />

Monthly compilation of credible IYM.<br />

Effective revenue management.<br />

Ensuring effective and efficient<br />

salary management<br />

Ensuring effective rebates office<br />

functioning.<br />

Monthly revenue reports<br />

IYM revenue projections.<br />

Maximize revenue collection.<br />

Salary related expenditure as per salary run, normal and<br />

supplementary<br />

Tax reconciliations<br />

46


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Ongoing process. Visit main<br />

suppliers to built sound<br />

relationships and perform<br />

statement reconciliations..<br />

All relevant suspense accounts to<br />

be cleared by month end. Activity to<br />

be performed weekly<br />

Weekly/Monthly submissions in<br />

compliance with Circular 18<br />

Cash flow management report<br />

Partially performed. Suppliers<br />

visited<br />

All suspense accounts cleared on a<br />

monthly basis.<br />

Files signed off by CFO -<br />

preparations for audit.<br />

Weekly/Monthly cash flow<br />

submissions done.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Capacity gaps identified during<br />

reconciliation process<br />

Problems experienced in clearing<br />

some debtors' accounts. Persal-BAS<br />

reconciliation performed on a<br />

monthly basis.<br />

Payment authorizations done after<br />

cash flow submission deadline.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Training conducted to<br />

address capacity gaps.<br />

Awaiting approval for<br />

write-offs. No challenges<br />

experienced.<br />

Utilization of<br />

disbursement report to<br />

correct cash flow requests<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

BAS reports. Budget Committee<br />

reports.<br />

Budget loading.<br />

Budget Committee established.<br />

Budget loaded<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Not yet functional<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Dates have been<br />

scheduled.<br />

IYM report submissions<br />

Cash flow Management report.<br />

<strong>Annual</strong> cash flow submission<br />

Revenue evaluation report.<br />

Prepared final revenue cash flow<br />

for next financial year.<br />

IYM report submitted on time.<br />

Monthly business plans per<br />

programme submitted.<br />

<strong>Annual</strong> cash flow submitted before<br />

the 1st of April.<br />

Revenue evaluation report<br />

submitted.<br />

Prepared final revenue cash flow<br />

for next financial year submitted.<br />

No challenges experienced.<br />

Actual expenditure much less than<br />

cash flow projections and variances<br />

not satisfactorily explained.<br />

No alignment between monthly<br />

spending an projections.<br />

No challenges experienced.<br />

Files ready for audit Files ready for audit Awaiting for tax directives for<br />

benefits above R30 000.00<br />

Final annual reconciliations<br />

Tax Reconciliations submitted<br />

Files signed off by CFO -<br />

preparations for audit.<br />

Final annual reconciliations<br />

performed.<br />

Tax Reconciliations not yet<br />

submitted.<br />

Payrolls signed.<br />

No challenges experienced.<br />

Capacity gaps identified<br />

Introduction of<br />

procurement plans for all<br />

programmes.<br />

Introduction of<br />

procurement plans for all<br />

programmes.<br />

Pro-forma tax directives<br />

requested from SARS.<br />

Training in progress.<br />

47


PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.3: Financial Management<br />

Sub-Programme 1.3.3: Compliance & Risk Management<br />

STRATEGIC GOAL<br />

• Provide an effective compliance and risk management function<br />

in line with the PFMA and other related financial regulations<br />

and policies at minimum risk to the Department<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To improve internal financial<br />

controls<br />

Organizational performance<br />

through good governance practices<br />

and all risks are managed<br />

Combating risks within the department; Management of all<br />

losses<br />

Provide Internal Control Services<br />

Ensure compliance with PFMA, Treasury Regulations<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.3: Financial Management<br />

Sub-Programme 1.3.4: Supply Chain Management<br />

STRATEGIC GOAL<br />

• Provide an effective supply chain management in line with the PFMA and other<br />

related financial regulations and policies at minimum risk to the Department<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Demand Management<br />

Integrated Procurement Plan<br />

Acquisition Management<br />

Contract Management<br />

The equitable engagement of suppliers / end-users in a<br />

transparent, competitive and cost effective manner<br />

Effective administration and management of all contracts<br />

within DEDEA.<br />

Asset Management<br />

Departmental electronic asset register<br />

Customized Departmental Asset Management Policy<br />

Logistics Management.<br />

Memorandum of understanding (MOU) with service providers.<br />

Sound Stores management<br />

48


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Management of risks.<br />

Monitor the progress.<br />

Preparation for audit readiness.<br />

Risk strategy framework developed.<br />

Risk Management Committee<br />

established. Risk register updated.<br />

Anti-corruption and fraud<br />

prevention plan developed.<br />

Register of relevant prescripts to be<br />

complied with developed.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Risk assessment not performed.<br />

Plan developed but not yet<br />

implemented.<br />

The pre-audit is not fully functional<br />

at some cost centers.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Risk management reports<br />

to be generated.<br />

Policy review and<br />

awareness sessions.<br />

Facilitate for full<br />

implementation of preaudit<br />

function.<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Revision of procurement plan for<br />

20<strong>08</strong>/09 financial year<br />

Monitoring and Evaluation of the<br />

procurement system - review<br />

Population of an electronic data<br />

base<br />

Monitoring and evaluation of the<br />

contract database<br />

Training of staff on new contract<br />

management system<br />

Monitoring and evaluation of an<br />

electronic asset register.<br />

Updating of electronic asset<br />

register.<br />

Monthly reconciliation of Fleet<br />

Africa and subsidized vehicles\<br />

Stock taking<br />

20<strong>08</strong>/09 procurement plan<br />

submitted.<br />

Reviewal performed.<br />

Register of lease contracts<br />

developed and updated.<br />

Electronic contract database not<br />

yet implemented as there were no<br />

contracts awarded above<br />

R 100 000.00<br />

Electronic asset register developed,<br />

populated and finalized.<br />

Electronic asset register updated.<br />

Full Maintenance Lease vehicles<br />

reconciliation performed.<br />

Stocktaking performed on the 31<br />

May 20<strong>08</strong> as per requirement<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No challenges.<br />

PPPFA not implemented in<br />

procurement system.<br />

Signed contracts not reviewed by<br />

Legal Advisor<br />

No challenges<br />

Opening balances for the previous<br />

years.<br />

No challenges experienced.<br />

Payment of invoices within seven<br />

days in line with the signed<br />

contract.<br />

No challenges<br />

N/A<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Centralization of SCM<br />

activities.<br />

All signed contracts to<br />

be submitted to Legal<br />

Advisor for reviewal<br />

Team assigned to correct<br />

on the opening balances<br />

of the previous years.<br />

No remedial action.<br />

49


Corporate Services<br />

Purpose<br />

To establish and maintain appropriate organisational systems, HR policies and practices<br />

to administer, manage, develop and retain human capital within the department.<br />

Measurable objectives<br />

• Identify and introduce initiatives designed to develop the skills and competencies<br />

required by staff to meet business needs<br />

• Facilitate, assist and monitor and advise on performance management and development<br />

system for better planning and improved performance<br />

• Promote and maintain effective relations with management, staff and Trade Unions and<br />

manage change effectively<br />

• Review and analyse staff roles and responsibilities and realign in relation to legislative mandates<br />

• Promote quality and best planning and practices in Human Resource Management<br />

• Analysis of impact of HIV/AIDS and related diseases on the current skills base and<br />

organisational performance and provide interventions<br />

• Enhance customer care services<br />

• Facilitate and assist in the development of departmental personnel delegations in line<br />

with the PSR<br />

Achievements for the Year <strong>2007</strong>/<strong>08</strong><br />

• A comprehensive orientation programme over a period of two days was held<br />

• Increase in the number of contracted interns and their ultimate permanent appointment<br />

within the department<br />

• Issuing bursaries to learners in economic, business and environment related fields<br />

• Awareness workshops/sessions on all HRM issues conducted in all regions and at Head office<br />

• An Employee Wellness Day was held in Bhisho<br />

• Complete transfer of employees to Eastern Cape Parks Board and Ezemvelo KZN Wildlife<br />

• Active population of the new organogram<br />

Operational Achievements<br />

1. Filling of critical vacant posts<br />

The following critical funded posts were filled:<br />

• Assistant Manager – EAP<br />

• Manager – LED<br />

• Senior Manager – Western Region<br />

• Chief Director – Environmental Affairs<br />

• Manager – Expenditure Management<br />

• Network Controllers<br />

50


• Senior Manager – Strategic Planning<br />

• Manager – Waste and Air Quality<br />

• Regional Manager – Environmental Affairs (Chris Hani)<br />

• Assistant Manager – HRD<br />

2.<br />

Organizational Structure<br />

A new organisational structure was approved and partially implemented during the<br />

<strong>2007</strong>/<strong>08</strong> financial year.<br />

3.<br />

Labour Relations<br />

24 misconduct cases have been finalised and dealt with within the prescribed time<br />

frames. 3 out of 5 have been finalised. Roadshows have been conducted in all regions to<br />

update managers and employees on grievance procedures and misconduct matters.<br />

4.<br />

Performance Management System<br />

Great improvement has been noted in terms of submissions of signed workplans.<br />

Quarterly reviews were conducted and the payment of incentives linked to performance<br />

was done in accordance with the correct measures and tools as specified in the<br />

Performance Management and Development System.<br />

5.<br />

Skills Development<br />

The department had an intake of 33 interns during this financial year and 29 of these<br />

interns were later appointed permanently within the department. There were 53 new<br />

bursary intakes in the Environmental, Tourism and Economics fields. An orientation<br />

session was conducted for all new employees.<br />

6.<br />

Service Benefits<br />

For the financial year <strong>2007</strong>/<strong>08</strong>, a total of 305 leave gratuities and 43 Pension payouts<br />

were processed. There was a great improvement in turnaround time for the processing<br />

of service benefits for those employees that left the department through attrition. Leave<br />

gratuities were able to be processed and paid out within 1 month and pension payouts<br />

within 60 days.<br />

7.<br />

Employee Wellness Programme<br />

An EAP Assistant Manager and EAP Practitioner were appointed. Awareness Workshops<br />

and Election sessions for safety representatives were conducted in all the regions.<br />

Training has been conducted.<br />

51


8.<br />

Collective agreements<br />

Staff transfer to Ezemvelo KZN Wildlife and Eastern Cape Parks Board took place in<br />

<strong>2007</strong>/<strong>08</strong>. These agreements assisted in the smooth transition and transfer of employees<br />

to the relevant institutions.<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.4: Corporate Services<br />

Sub-Programme 1.4.1:<br />

Human Resources Management<br />

STRATEGIC GOAL<br />

• To promote effective Human Resources planning and HR practices<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To provide effective and sound<br />

human resource management<br />

To manage staff in the department<br />

Facilitate sessions on HIV and AIDS and other health related<br />

illnesses<br />

Coordinate and facilitate training of wellness role players<br />

Provide a team that will drive the employee wellness<br />

programme at Head Office and Regions<br />

Having a workplace that will look into the safety of its<br />

employees<br />

Skills Audit<br />

Workplace Skills Plan<br />

Induction Programme<br />

52


Analysis of constraints and measures planned to overcome them:<br />

Challenges for the Year <strong>2007</strong>/<strong>08</strong><br />

• Delays in turnaround time to fill in the vacant posts and the finalisation<br />

• Finalisation and payment of long outstanding exit benefits backlogs<br />

• Reluctance of officials to adapt and comply with demands of the PMDS processes.<br />

• Due to some trained job evaluation panellists leaving the department, there were delays<br />

in finalising job evaluation processes which had an impact on the filling of critical posts.<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Employees empowered to manage<br />

their illnesses<br />

Identification of Wellness<br />

Committee members<br />

Availability of first Aid kit, fire<br />

extinguishers and condoms<br />

Assessment of gaps and training<br />

needs<br />

Monthly sessions held<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Lack of commitment from trained<br />

peer educators who are supposed<br />

to drive the awareness program.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Volunteers to be sought<br />

and trained to support<br />

the existing peer<br />

educators<br />

Not done No budget for accommodation To arrange training<br />

per region to avoid<br />

expenditure on<br />

accommodation<br />

Wellness committee meeting was<br />

held in EL<br />

All regions have condoms<br />

Skills audit was done to all regions<br />

/Programmes at Head Office to<br />

asses training needs and gaps<br />

Training and Development courses have taken place as follows<br />

3 persons for Contract Management<br />

3 persons for Data Quantitative Technology<br />

BUSARIES<br />

8 Completed their studies , 3 interested in our internship<br />

35 external candidates for 20<strong>08</strong>/09 awarded bursaries<br />

INTERNSHIP<br />

14 absorbed by the department<br />

3deceased<br />

61 currently<br />

Skills Development Committee meeting has been convened for awarding<br />

of bursaries , which will be completed on the 10: 04:20<strong>08</strong><br />

90 new appointees including interns were inducted on the 26 and 27<br />

February 20<strong>08</strong>.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

Programmes are having their own<br />

training programmes not involving<br />

HRD or submitting reports<br />

Some of the courses selected<br />

ended up not being attended due<br />

to lack of cooperation between<br />

departments and service provider.<br />

This resulted in lack of addressing<br />

skills gap identified through PDP’s.<br />

Skills Development Committee<br />

partially dysfunctional<br />

The PERSAL report generated does<br />

not specify previous employer for<br />

MIP purpose.<br />

N/A<br />

N/A<br />

N/A<br />

53


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Career Expo<br />

To promote sound labour relations<br />

Effective Management of Grievances in the Department<br />

Effective management of discipline in the Department<br />

maintained<br />

Effective Management of disputes maintained<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.4: Corporate Services<br />

Sub-Programme 1.4.2:<br />

Organizational Development<br />

STRATEGIC GOAL<br />

• To facilitate coordination of service delivery initiatives, efficiency services,<br />

skills development programmes and management of PMDS.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To improve individual and<br />

organizational performance<br />

Departmental establishment<br />

Managed<br />

Employees are in correct responsibilities and objectives on<br />

Persal<br />

Realignment of activities to components<br />

54


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Visited Nkonkobe Municipality which hosted their careers day on the 29<br />

March 2009<br />

The sub-directorate is in possession of 7 grievances from the staff which<br />

are currently handled between the unit and all the concerned parties<br />

The sub-directorate is in possession of<br />

5 grievance in January & February 20<strong>08</strong>.<br />

1 grievance in March 20<strong>08</strong>.<br />

8 Misconduct cases were handled in January.<br />

1 misconduct case was handled in February.2 misconduct cases were<br />

received in March. Disciplinary<br />

Hearings have been held for 3 of them with one waiting for the<br />

appointment of presiding officer and employer representative.<br />

One suspension has been effected during this reporting period<br />

6 disputes are currently handled in the unit of which 3 of them will be<br />

conciliated and arbitrated in the month of April.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Department of Education<br />

has tendency of not taking<br />

responsibility as mother body of<br />

this exercise.<br />

No significant challenges<br />

experienced.<br />

The unit is still having a capacity<br />

gap in the pool of presiding and<br />

investigating officers that we have<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Training of identified<br />

managers management<br />

of discipline,grievances<br />

,appeals,incapacity and<br />

substance abuse has<br />

been arranged and is<br />

continuing.<br />

N/A<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Establishment maintained on<br />

Persal<br />

Activities are correctly aligned to<br />

component<br />

Done for the previous financial year<br />

Alignment of incorrect<br />

responsibilities and objectives<br />

completed in January 20<strong>08</strong>.<br />

Reviewal of exception report and<br />

correction where necessary was<br />

done in February 20<strong>08</strong>.<br />

Done, regular monitoring is<br />

maintained<br />

Realignment of activities to<br />

components finished in January<br />

20<strong>08</strong>.<br />

Exception report corrected where<br />

necessary in February 20<strong>08</strong>.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Awaiting for BAS linking codes, to<br />

update establishment for current<br />

financial year<br />

Poor interaction between OD and<br />

Financial Management<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

To improve working<br />

relations<br />

N/A<br />

55


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Correctness of pay points<br />

Development of job descriptions<br />

All DEDEA employees must have standard job description<br />

Job Evaluations<br />

All Jobs evaluated and updated on the Persal system<br />

Norms and standards<br />

Office Accommodation<br />

Specifications<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.4: Corporate Services<br />

Sub-Programme 1.4.3: Office Management<br />

STRATEGIC GOAL<br />

• To enhance office administration and customer care services<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To provide efficient and up to date<br />

office management function<br />

To provide logistical support to<br />

all staff<br />

% staff with requisite office space and equipment<br />

56


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

All the employees on the correct<br />

paypoints<br />

All job descriptions for employees<br />

are in their files<br />

All employees place on the correct<br />

salary levels<br />

Norms and standards for office<br />

accommodation in place<br />

Specification for office furniture<br />

and equipment in place<br />

Ukhahlamba region has not yet<br />

created pay point, still attached to<br />

Chris Hani Region<br />

Address for Ukhahlamba region will<br />

be available on the 1st May 20<strong>08</strong><br />

80% of job descriptions developed<br />

by end February.<br />

60% of Identified posts have been<br />

evaluated<br />

Identified gaps and shortcomings<br />

in January 20<strong>08</strong>.<br />

Classification of occupational<br />

classes in February 20<strong>08</strong>.<br />

Reviewal of existing and<br />

development of new standards<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No address for Ukhahlamba, It is<br />

continuing problem of employee<br />

to be on wrong pay points, whilst<br />

we have provided HR Panning with<br />

newly created pay points<br />

Managers/Supervisors do not<br />

release subordinate to attend JD<br />

work session<br />

Job evaluation is regarded as an<br />

additional responsibility<br />

Official not aware of office<br />

standards<br />

Availability of concerned line<br />

managers<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

HR Planning must consult<br />

OD when they hire new<br />

appointee/s<br />

Awareness campaign on<br />

the importance of having<br />

job descriptions for<br />

contracting<br />

Nomination and<br />

appointment of enough<br />

Panel Members and<br />

Analysts.<br />

Inclusion of Job<br />

Evaluation on the<br />

performance agreement<br />

of managers<br />

Working of departmental<br />

officials<br />

Workshop managers<br />

on the importance<br />

of occupational class<br />

specifications<br />

Maintenance<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

In HOD’s office partitioning of<br />

offices is finished.<br />

Painting of offices is still in process.<br />

Fitting of carpet tiles at 2nd floor<br />

and 3rd floor receptions is finished.<br />

Built in cupboards and ceramic tiles<br />

at the 2nd floor kitchen is finished .<br />

Office space:<br />

Bisho Business Village Block 13<br />

Partitioning of front part of open<br />

plan space and made it a secured<br />

office is finished.<br />

Partitioning of open plan space into<br />

4 smaller offices is still in process.<br />

Air conditioning units :<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Office accommodation is a big<br />

challenge not only at Head Office<br />

and also in the regional offices and<br />

parking bays as well.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

This problem needs to be<br />

addressed at a high level<br />

in the Province.<br />

Office Space Provide adequate office space Inadequate office space DPW approached for a<br />

bigger office space<br />

57


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Efficiency of cleaning services (yes/no/sometimes)<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 1: Administration<br />

Sub-Programme 1.4: Corporate Services<br />

Sub-Programme 1.4.4: Special Programmes<br />

STRATEGIC GOAL<br />

• Appropriate organizational systems, policies and internal arrangements<br />

are established and maintained to manage and administer the financial,<br />

operational, human resources, information management, communications<br />

and legal resources in the Department and in its associated Public Entities<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Policy implementation, monitoring<br />

and advocacy<br />

Compliance by the department<br />

in implementing policies and<br />

legislation with regards to<br />

the groups. To monitor the<br />

implementation of policy<br />

imperatives in respect of Youth &<br />

Gender<br />

All departmental policies and guidelines are reviewed and<br />

comply with legislation with regards to the marginalized<br />

groups.<br />

Each DEAET programme supports a project of marginalized<br />

groups.<br />

58


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

New installations<br />

6x under ceiling air conditioning<br />

units will be supplied and installed<br />

on Monday 07 / 04 /<strong>08</strong>.<br />

Faults and repairs of air<br />

conditioning units:<br />

8 x Air conditioning units were<br />

faulty and repaired.<br />

Affected offices were 321, 307 ,<br />

335,158 , 216 , 206B , MEC’s Office<br />

and server room.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

N/A<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Telecommunications<br />

New telephone installations:<br />

2x Eggo line telephones in offices<br />

226 and 303.<br />

7x Baseline telephones in the<br />

following offices<br />

2 x in office 158.<br />

2x in office 154A<br />

1x in office 166<br />

1x in office 206B<br />

1x 2nd floor reception.<br />

Pin Codes:<br />

14 pin codes received from Treasury.<br />

Telephone faults and repaired:<br />

10x telephone extensions repaired<br />

including fax lines.<br />

Replacement of fused fluorescent<br />

tubes were done in the 1st floor<br />

,2nd floor and 3rd floor offices.<br />

No significant challenges<br />

experienced.<br />

N/A<br />

Housekeeping and Messenger<br />

Services<br />

2nd floor and 3rd floor toilet<br />

leakages have been fixed by<br />

Department of Public Works.<br />

Toilet leaks at the Bisho Business<br />

Village Block 13 have been done by<br />

the private company.<br />

No significant challenges<br />

experienced.<br />

N/A<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

To facilitate the process of<br />

appointment of the Consultant for<br />

the development of the Gender<br />

Policy Guidelines.<br />

Appointment of the Consultant<br />

for the development of the<br />

Gender Policy Guidelines has been<br />

approved.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Processes have been delayed due<br />

to the end of the financial year as<br />

well as the fact that R500 000 was<br />

taken from the unit’s budget for<br />

use in another project.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Allocation of funds in the<br />

new year.<br />

System will accommodate<br />

the new budget.<br />

59


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Celebration of Institutionalized and<br />

awareness days with an intention<br />

of disseminating information<br />

about departmental policies and<br />

programmes<br />

Information on departmental<br />

policies and programmes are<br />

disseminated through these<br />

activities<br />

Institutionalized days are celebrated and information on<br />

departmental policies and programmes is disseminated. All the<br />

celebrations will be based on the department’s core business.<br />

Departmental awareness raising sessions<br />

SMME support and development<br />

SMME are organized and supported<br />

with information on how to start<br />

and sustain their initiatives<br />

SMME structures in their development needs. Capacity building<br />

workshops held in each district including the metro. Meetings<br />

with partners and agencies to seek their support. Women are<br />

exposed with entrepreneurship opportunities<br />

PROGRAMME/SUB-PROGRAMME<br />

STRATEGIC GOAL<br />

Programme 1: Administration<br />

Sub-Programme 1.4: Corporate Services<br />

Sub-Programme 1.4.5: Communications<br />

• To develop a comprehensive departmental communication<br />

strategy in line with the GCIS Handbook<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Media Liaison Media Monitoring & Liaison Media Management; Quarterly Media plan<br />

60


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

2 staff members to attend Gender<br />

Audit Training session. 1 to attend<br />

training on Disciplinary procedures<br />

The Draft roll out plan in<br />

preparation for the launch of<br />

the Youth Development and<br />

Empowerment Plan.<br />

Development of a Data base of<br />

Co-operatives for Women Youth<br />

and Disabled People in the Alfred<br />

Nzo region<br />

Draft of the departmental plan will<br />

be completed on the 12th March<br />

20<strong>08</strong><br />

Infrastructural Accessibility Audit<br />

report on the 8th April 20<strong>08</strong><br />

Institutionalized days were<br />

celebrated<br />

2 staff members attended Gender<br />

Audit Training session. 1 attended<br />

training on Disciplinary procedures<br />

A draft roll out for Youth<br />

Development and Empowerment<br />

Plan has been completed and<br />

forwarded to Manger for inputs.<br />

Developed a draft data base of<br />

Co-operatives for Women Youth<br />

and Disabled People in the Alfred<br />

Nzo region<br />

The draft has been completed<br />

All Public Entities were visited and<br />

the audit was done<br />

Institutionalized days were<br />

celebrated<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

Most projects funded by the<br />

department do not mainstream<br />

youth.<br />

There is no consolidated data base<br />

in the local municipalities and the<br />

dept. It had to be sourced through<br />

the local structures i.e. Youth<br />

Council and Disabled forum which<br />

are doing voluntary work and are<br />

not paid for the job they are doing.<br />

Some of the activities are not<br />

speaking to the mandate of the<br />

Department<br />

The report has to be integrated<br />

with the Departmental Audit<br />

verification has to take place as it<br />

was done in 2006<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

Direct interaction with<br />

Programmes with a view<br />

of influencing them<br />

to plan using gender,<br />

disability and youth<br />

lenses.<br />

Have an arrangement<br />

with Enterprise<br />

Development<br />

Will be aligned to both<br />

HIV and AIDS Provincial<br />

Strategic Plan and the<br />

Departmental Policy<br />

Speech<br />

Will communicate with all<br />

SPU in regions<br />

N/A<br />

Workshops and meetings held. Workshops and meetings held. No significant challenges<br />

experienced.<br />

N/A<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Media briefing session (SMS & CEO<br />

Public Entities)<br />

Institutionalized days and<br />

departmental events<br />

No meeting has taken place<br />

Not achieved<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No meeting<br />

Waiting for the approval of the<br />

Draft Communication Strategy.<br />

Lack of information sharing<br />

platform and willingness to utilize<br />

Publications from the Directorates<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

To prepare for the next<br />

meeting.<br />

An approval of the<br />

Communication Strategy<br />

61


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Publications Marketing & Publicity Updating website with current information. Radio, publication<br />

and print advertising. Compile a branding strategy. Design and<br />

compile newsletter<br />

Events Management Calendar of events Consultation with all the Directorates<br />

Communication Strategy Develop a Communication Strategy Develop a fully consulted Communication strategy<br />

2.6.2 PROGRAMME 2: INTEGRATED<br />

ECONOMIC DEVELOPMENT SERVICES<br />

Purpose<br />

The Economic Development Programme is responsible for facilitating and supporting<br />

economic growth and development in the province. This objective is pursued in a context<br />

of high unemployment, endemic poverty and huge backlogs in social and economic<br />

infrastructure, on the one hand, and the imperative to seek advantages from the dynamics<br />

of economic globalization, on the other. The work of the Programme stems from a<br />

wide range of national and provincial pieces of legislation, strategies and programmes<br />

which are related to economic development, sector development, liquor and gambling<br />

regulatory functions, consumer protection, and business practice regulation.<br />

The functions of the Economic Development Programme are conducted through the<br />

following sub-programmes:<br />

• Integrated Economic Development Services<br />

• Trade and Industry Development<br />

• Business Regulation and Governance<br />

• Economic Planning<br />

62


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Publicity on Women Empowerment<br />

Seminar and Tourism Summit<br />

Publicity of the departmental<br />

activities<br />

Awaiting for direction from OTP<br />

Consultation with all the<br />

Directorates<br />

Develop a Draft Communication<br />

strategy<br />

Publicity on the Women<br />

Empowerment Seminar and<br />

Tourism Summit took place as<br />

planned.<br />

Publicity of the departmental<br />

activities namely Women’s<br />

Empowerment Seminar and<br />

Tourism Summit.<br />

Branding Strategy- not approved<br />

at OTP.<br />

Process of compiling the newsletter<br />

Consultation with all the<br />

Directorates<br />

Develop a Draft Communication<br />

strategy<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No challenge, one through Media<br />

Releases only (free radio publicity).<br />

Done through assistance with<br />

ECTB.<br />

Women’s Seminar-Delay on<br />

procurement<br />

Tourism Summit –done through<br />

radio & print.<br />

Strategy –not yet approved by<br />

Cabinet/ Legislature.<br />

Currently compiled 70% of the<br />

content.<br />

Proper coordination of the activities<br />

from various Directorates<br />

A Draft Communication Strategy<br />

has been compiled and circulated<br />

electronically to SMS for inputs.<br />

No feedback as yet.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Not applicable<br />

Publicity took place<br />

through free community<br />

radio interviews (Unitra<br />

fm).<br />

Not applicable<br />

To receive direction from<br />

OTP.<br />

To be completed before<br />

end Oct <strong>2007</strong>.<br />

Forwarded to IT for<br />

intranet placement<br />

Presentation to SMS<br />

meeting for inputs<br />

Through these sub-programmers, the core business of Programme 2 is centred on the<br />

activities listed below:<br />

• Development of key sectors of the economy<br />

• Facilitate local economic development<br />

• Contribute to the formulation of economic policy development and articulate the<br />

economic development strategy for the Eastern Cape<br />

• Facilitate the increase in trade between the province and other economic regions;<br />

• Promote fixed investment into the province<br />

• Promote economic development through the championing of public-private partnerships<br />

• Promote and facilitate economic empowerment programmes<br />

• Promote SMME development<br />

• Promote technological innovation and increasing competitiveness in key sectors of the economy<br />

• Champion initiatives which improve the province’s logistics capabilities and enhance key<br />

supply chains<br />

• Provide integrated economic project support for selected categories of projects<br />

• Provide an effective and efficient consumer protection service<br />

• Ensure effective and prudent business regulation in the province<br />

63


Regional Offices are strategically located to facilitate, co-ordinate and monitor the<br />

implementation of targeted programmes and interventions. Public entities which are the<br />

implementing arms of some of the programmes’ key delivery areas, such as the ECDC,<br />

the CDC, ELIDZ, ECTB, ECGBB and ECLB are aligned to specific sub-programmes, with<br />

the aim of achieving operational effectiveness. In line with their respective mandates,<br />

public entities are responsible for the implementation of industry development, trade<br />

and investment promotion, sector development, tourism development, economic<br />

empowerment, regulation of liquor, gambling and betting activities and other economic<br />

growth responsibility programmes. SLAs are entered into for performance-based<br />

monitoring and evaluation with all implementing institutions.<br />

Through the Head Office, Public Entities, and the Regional Offices, the Economic<br />

Development Programme coordinates a number of economic instruments, in pursuit<br />

of sustained interventions to promote growth and development, through its Integrated<br />

Economic Development Services Unit. The Programme seeks to exploit the province’s<br />

regional comparative advantages through enterprise development and local economic<br />

development as well as economic empowerment. The interventions in this programme<br />

are necessarily sensitive to the dualistic nature of the province and its spatial diversity.<br />

Our interventions are aimed at building and enhancing the economic competitiveness<br />

of local economies, in order to encourage sustainable growth that is inclusive of local<br />

government, the private sector and non-government sectors. The work which is done in<br />

this Programme is strategic in linking the second economy to the first, in stimulating local<br />

economies to grow, compete and create more jobs. To date, our main areas of focus have<br />

been the provision of financial and programmatic support aimed at stimulating economic<br />

activity and the development of strategies and frameworks to enable such interventions.<br />

The Programme also focuses on Trade and Investment Promotion as a targeted approach<br />

to growth sectors that have been identified – based on the province’s current competitive<br />

advantage. This function is discharged through the ECDC. Apart from the Tourism Sector,<br />

the Programme has had limited focus in the area of Sector Development. This however is<br />

changing very rapidly with the focus on an Industrial Development Strategy for Province,<br />

to be launched in the 20<strong>08</strong>/2009 financial year.<br />

To date, in the area of and Industrial Development, the province has invested heavily in<br />

the development of the two Industrial Development Zones through the CDC and the<br />

ELIDZ. In addition to the ECTB, whose mandate is to develop products and market the<br />

province as a preferred tourist destination, the Tourism Unit in the Department focuses<br />

on creating an enabling environment for the sustainable growth and development of<br />

64


the tourism industry in the Eastern Cape. Another area that has received limited focus<br />

in terms of resourcing and capacitation is the Economic Planning function of the<br />

programme. This function should analyse policy, identify key intervention areas based on<br />

empirical research, and analyse the impacts of our programmes. There are plans in place<br />

to recruit personnel in the 20<strong>08</strong>/2009.<br />

The final delivery area of Programme 2 is Business Regulation and Consumer Protection. In<br />

this area, the programme aims to develop an efficient, equitable, and socially responsible<br />

business regulatory environment by promoting consumer rights, good corporate<br />

governance, and compliance with business regulations whilst protecting consumer<br />

rights. The programme also seeks to maintain an effective and efficient regulatory system<br />

for the liquor and gambling industry, through the ECLB and ECGBB.<br />

Measurable Objectives<br />

• Development of the Provincial SMME and Co-operatives Strategy<br />

• Increase the contribution of SMME’s to the growth of the economy<br />

• Inform Policy, Legislative Framework and Promote Dialogue<br />

• Inform IDPs to Reflect Provincial Economic Growth and Development Priorities<br />

• Sound Institutional Linkages To Enhance The Development of Local Economies<br />

• Ensure The Strategic Alignment of LED Initiatives To Government Programmes<br />

• Keep Track Of Investment Performance Trends<br />

• Stimulate Growth and Development in Investments<br />

• Enhance Sector Performance and Develop Sectors Competitiveness<br />

• Inform industrial growth & development strategies<br />

• Eastern Cape Tourism Master Plan review for <strong>2007</strong>-2011<br />

• Tourism Sector Summit for stakeholder engagement and participation.<br />

• 2010 Tourism Readiness Project Plan focusing on entrepreneurial opportunities associated<br />

with hosting the 2010 FIFA World Cup. Investments in the identified projects.<br />

• Formulate a national tourism skills development strategy<br />

• Establish partnerships and assist emerging entrepreneurs.<br />

• Operate An Efficient Consumer and Business Support Programme<br />

• Raise awareness and promote compliance<br />

Progress analysis<br />

During the year under review, R30 million was allocated to LED Projects throughout the<br />

province, in support of IDP aligned interventions in municipalities. This translated to 16<br />

projects in the 6 District Municipalities and the Nelson Mandela Bay Municipality. The<br />

convergence framework was developed by DEDEA, the Department of Local Government<br />

and Traditional Affairs (DLGTA) and Thina Sinako, i.e. “convergence team”. A Pilot project in<br />

65


Amathole DM to evaluate LED Projects and ascertain impact on local economies was also<br />

conducted and is to be completed in the next financial year.<br />

Linkages have also been strengthened with the local sphere of government, wherein<br />

various workshops were hosted by the Programme to inform on LED, BEE and Cooperatives.<br />

The Programme also co-funded the conference and the workshop on the Small Towns<br />

Regeneration Strategy hosted by the Amathole Economic Development Agency (AEDA),<br />

and a Tourism Summit.<br />

The LED Unit undertook a benchmarking study visit in the Department of Economic<br />

Development (DED) and the Gijima LED Support Programme in KwaZulu-Natal. In terms<br />

of funding, training and academic institutions, both the LED and Enterprise Development<br />

units engaged some potential partners, and this is to culminate into signed MOUs in the<br />

next financial year.<br />

The programme also reviewed and developed a strategy to improve the image and the<br />

effectiveness of the Office of the Consumer Protector, in order the be more visible to<br />

the public. 28 consumer affairs officials received training by an NCR accredited trainer,<br />

and 30 officials, responsible for consumer advice and compliance, were trained in usage<br />

and application of the Integrated System (Resource File), and on handling of complaints<br />

arising out of the credit agreements by the NCR. Research surveys on implications of<br />

apparent shortcomings in the processing and management of court orders on the<br />

credit market and consumers were also conducted, and a Consumer Rights Day was<br />

successfully hosted.<br />

In the areas of tourism, a situational analysis report of the Tourism Master Plan was<br />

completed, and a report on the 2010 Tourism Readiness Study was also completed.<br />

Analysis of constraints and measures planned to overcome them<br />

The Economic Development Programme has had a consistent challenge with the<br />

filling of critical posts in the year under review, in virtually all the sub-programmes. The<br />

position of Programme Manager has been largely vacant, only to be filled in March 20<strong>08</strong>.<br />

This instability in such a critical position has affected other areas of delivery. Also, the<br />

Department at large, has had challenges in optimizing efficiencies in oversight over<br />

its delivery arms, namely, the regional offices and the public entities. As a shareholder<br />

department, the monitoring tools and systems are not intact and well applied.<br />

As a province which is in need of development, the responsiveness of the provincial<br />

government to second economy interventions must be optimised. We have become<br />

66


aware that the business support needs of SMMEs and co-operatives have increased<br />

dramatically, but the Department has not been responsive enough in terms of the<br />

capacity required to respond to these needs. In local economic development, the main<br />

constraint stems from inadequate monitoring and project management systems, as<br />

well as limited financial resources made available to LEDs to actually make a sustainable<br />

impact on local economies. Apart from the interventions on tourism, the Department<br />

has also not been responsive to the needs of other critical sectors in the province in order<br />

to assist them to be competitive both locally and internationally.<br />

Description of planned quality improvement measures<br />

Plans for the 20<strong>08</strong>/2009 financial year are to significantly change the face of the<br />

programme in terms of building all the requisite skills and capacity needed. The<br />

Department is also reviewing its delivery model, and plans are in place to enhance both<br />

the effectiveness of regional representation as well as oversight over public entities. Plans<br />

are also in place to finalise within the next financial year a number province-specific<br />

economic frameworks and strategies which will guide the province in implementing<br />

economic tools that have a visible and a sustainable impact. The plans that are in place<br />

will ensure that Department is adequately capacitated to be an economic reference point<br />

in the province, has increased its ability to provide leadership and direction and control<br />

to and over its public entities and has the capability to develop, implement and monitor<br />

effective strategies.<br />

At sub-programme level, the plan is to finalise LED, Cooperatives, SMME, and BEE<br />

strategies. The Sector Development sub-programme will produce sector plans aligned<br />

to the PIDS. The sub-programme will also introduce the cluster system and processes to<br />

support emerging cluster participants.<br />

We will also facilitate the participation of SMMEs and BEE companies in the mainstream<br />

of targeted value-chain sectors.<br />

Strategic Goal<br />

Effective programmes, procedures and systems are established which will generate higher<br />

levels of economic growth and employment creation and which will assist in reducing<br />

spatial and racial inequalities in the Province. Effective advisory services to promote and<br />

protect the rights of consumers are established and maintained. Appropriate institutional<br />

structures established and maintained to administer and regulate the gambling and<br />

liquor industries in accordance with prevailing national and provincial legislation. Sectorfocused<br />

Public Entities are established, financed and monitored to ensure that quality<br />

services are available and delivered to all citizens of the Province.<br />

67


PROGRAMME/SUB-PROGRAMME<br />

Programme 2:<br />

Integrated Economic Development Services<br />

Sub-Programme 2.1: Enterprise Development<br />

STRATEGIC GOAL<br />

• Develop an Integrated and Sustainable Pro-Poor Provincial Economy<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To Sustain Economic Growth and<br />

Development Through Shared<br />

Partnerships<br />

Development of the Provincial<br />

SMME Strategy<br />

Development of the Provincial Cooperatives<br />

Strategy<br />

Inputs and policy proposal<br />

Full participation in National, Provincial and Local initiatives<br />

pertaining to Co-operatives, Enterprise and Industrial<br />

Development<br />

Increase the contribution of<br />

SMME’s to the growth of the<br />

economy<br />

Quarterly Workshops/ seminars/<br />

Coordinate Institutional Support<br />

for Enterprise Development<br />

Integrated institutional<br />

development support<br />

<strong>Report</strong>s on SMME financial and non-financial support rendered<br />

Institutional co-operation on socioeconomic<br />

research and enterprise<br />

development<br />

Coordinated framework for Research and Development of<br />

Enterprises<br />

PROGRAMME/SUB-PROGRAMME<br />

STRATEGIC GOAL<br />

Programme 2:<br />

Integrated Economic Development Services<br />

Sub-Programme 2.2: Local Economic Development<br />

• To Sustain Economic Growth and Development Through Shared Partnerships<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To Promote Economic Growth and<br />

Development of Local Economies in<br />

Partnership with Key Stakeholders<br />

by Aligning LED Initiatives with<br />

Government Programmes<br />

Inform Policy, Legislative Framework<br />

and Promote Dialogue<br />

Inputs Towards Provincial LED Policy Development Processes<br />

68


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Initiation of the project in terms of<br />

Development of TORs<br />

Hold 6 consultative workshops,<br />

inclusive of NMM<br />

Approved provincial Cooperatives<br />

strategy<br />

1 Business opportunities workshop<br />

to inform potential SMMEs of<br />

opportunities in order for them to<br />

make informed decisions.<br />

1 BBBEE workshop on awareness<br />

about codes of good practice<br />

ECDC and SEDA reports<br />

TORs completed, and process of<br />

procurement initiated<br />

3 District workshops held<br />

Strategy process not completed,<br />

but in process<br />

1 workshop held at Ukhahlamba<br />

District Municipality<br />

Workshop was successful, and time<br />

specific resolutions were taken on<br />

key sectors: tourism; agriculture,<br />

and agro-processing. There will be<br />

a follow-up reporting session in 6<br />

months on the progress made<br />

Data on Financial and non-financial<br />

support rendered not yet analyzed<br />

due to late submission of reports<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

Remainder of 3 workshops affected<br />

by delays due to end of FY 07/<strong>08</strong><br />

SLA’s signed late and that impacted<br />

on service delivery<br />

1 BBBEE workshop was postponed<br />

on request by the business forum<br />

in Kokstad<br />

The absence of agreed reporting<br />

guidelines in terms of deadlines<br />

has resulted in unclear<br />

expectations<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

3 workshops have been<br />

rescheduled to first<br />

quarter of FY <strong>08</strong>/09. The<br />

strategy development<br />

process will be completed<br />

in the first quarter of FY<br />

<strong>08</strong>/09<br />

A new date has been set<br />

for 21 May 20<strong>08</strong><br />

The Department will<br />

specify protocols of<br />

reporting, including<br />

target dates in the SLA<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Participate in LED Planning<br />

Sessions with DLGTA and<br />

Thina Sinako in preparation<br />

for the LED Consultative and<br />

Planning Workshops in 6 District<br />

Municipalities and the Metro,<br />

in order to promote coherent<br />

provincial LED hands-on support to<br />

municipalities.<br />

LED Planning Sessions with DLGTA<br />

and Thina Sinako were successfully<br />

convened. The roadmap for<br />

the consultative and planning<br />

workshops was conceived in these<br />

sessions.<br />

LED Consultative and Planning<br />

workshops successfully in 6 district<br />

municipalities and NMM.<br />

Stakeholders were updated on<br />

the convergence framework,<br />

performance and expected future<br />

plans towards LED support<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Poor attendance by some<br />

stakeholders<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Programme meeting with<br />

LED units in all regions<br />

to discuss challenges in<br />

implementation to be<br />

arranged<br />

The LED Consultative<br />

and Planning Workshop<br />

<strong>Report</strong> to be presented in<br />

the PEDF, MUNMEC and<br />

EXCO, where challenges<br />

will be discussed and<br />

clarified<br />

69


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Participation in all LED and PEDF forum meetings<br />

Integrated Strategy and Implementation Processes Practiced<br />

Inform IDPs to Reflect Provincial<br />

Economic Growth and<br />

Development Priorities<br />

Participate and make inputs in the IDP review processes<br />

and status reports around ISRDP and URP to reflect on<br />

Departmental priorities<br />

Existence of policy aligned provincial & district plans and<br />

related projects<br />

Enhanced Department Institutional Capacity<br />

Record Of Year To Year improvement and accelerated service<br />

delivery<br />

Research and Development Support Programme. Enhanced<br />

support to HIV & AIDS victims and communities<br />

Sound Institutional Linkages To<br />

Enhance The Development of Local<br />

Economies<br />

Ensure The Strategic Alignment<br />

of LED Initiatives To Government<br />

Programmes<br />

Existence of purpose-driven structures: well functioning forum<br />

for proper assessment and channeling of LED-related issues<br />

Programmes aligned with the priorities of the NSDP / PGDP /<br />

IDP / ASGISA / Thina Sinako<br />

70


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Provincial LED Strategy Guidelines<br />

finalized and distributed.<br />

These guidelines are developed to<br />

inform provincial LED Strategy and<br />

municipal LED strategies and plans<br />

Obtain policy direction on the<br />

implementation of the National<br />

LED Framework by participating in<br />

the National LED Forum<br />

DEDEA funded LED Projects<br />

evaluated to ascertain impact in<br />

the local economies.<br />

Develop TORs for project on<br />

Funding Criteria that will inform<br />

credible business plans, and<br />

possible continuous funding for<br />

projects, taking into consideration<br />

the MTEF<br />

The Draft document of the<br />

Provincial LED Strategy Guidelines<br />

has been done.<br />

The National LED Forum meeting<br />

not attended, but the report from<br />

the forum meeting will be tabled at<br />

the next PCG meeting<br />

ToR criteria developed and service<br />

provider identified<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Delayed submission of the final<br />

document by the Service Provider<br />

has affected the deadline<br />

Challenges with staff availability<br />

constraints.<br />

Resultantly, the outcomes of the<br />

Provincial LED Consultative and<br />

Planning workshops were not<br />

presented at the Forum.<br />

Identified service provider not<br />

yet registered in Departmental<br />

database<br />

- - - -<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

The Convergence Team<br />

(DEDEA, DLGTA and Thina<br />

Sinako) to decide on a<br />

new deadline.<br />

Recruitment process<br />

to enhance the staff<br />

complement of the LED<br />

sub-programme will be<br />

initiated.<br />

Internal Project Steering<br />

Committee (PSC)<br />

established to review the<br />

inception report on 16<br />

April 20<strong>08</strong>.<br />

Service provider now<br />

registered.<br />

Undertake benchmarking study<br />

visits to other provinces<br />

Terms of Reference (ToR) for District<br />

and NMM Municipal Capacity<br />

Assessment developed<br />

National Business Initiative<br />

(NBI) Workshop for training and<br />

mentorship engagement to<br />

strengthen PPI and Leadership<br />

Benchmarking study visit to DED<br />

in KZN undertaken and report<br />

submitted and circulated<br />

ToRs developed and service provider<br />

appointed to pilot in CDM, NMBM<br />

and ADM<br />

NBI Workshop attended and<br />

mentor allocated<br />

None<br />

Delays due to Acquisition of the<br />

required quotations from service<br />

providers<br />

Only one (1) NBI mentor allocated<br />

- - - -<br />

None<br />

Invite service providers to<br />

provide quotations<br />

Follow-up with HRM<br />

Develop a Project Implementation<br />

Plans in collaboration with<br />

University of Fort Hare (UFH) on<br />

HIV & AIDS R&D<br />

Walter Sisulu University (WSU)on<br />

rural development<br />

CSIR on natural fibers and plant<br />

fibers<br />

Service Level Agreement (SLA)<br />

submitted by UFH<br />

MOU with WSU commented on<br />

MOU discussed<br />

Project Proposal by CSIR considered<br />

for funding<br />

None<br />

Delays in the finalization of MOU<br />

None<br />

Consistent<br />

communication with WSU<br />

None<br />

Partnerships developed<br />

Developed partnership with DBSA<br />

in collaboration with DLGTA and<br />

Thina Sinako<br />

No significant challenges<br />

experienced.<br />

N/A<br />

LED Projects finalized<br />

Input in the PGDP review process<br />

List of LED projects submitted for<br />

consideration and approval by the<br />

Executive Authority<br />

DEDEA inputs considered and<br />

accepted by the PGDP Review<br />

Committee or Reference Group<br />

Delayed submission of documents<br />

from some regions<br />

Objective 2 of the PGDP (Agrarian<br />

Transformation and Food Security<br />

now changed to Household<br />

Security)<br />

Programme meeting with<br />

LED units in all regions<br />

to discuss challenges in<br />

implementation to be<br />

arranged<br />

PGDP Review Committee<br />

or Reference Group<br />

has replaced Nutrition<br />

Security with Household<br />

Security<br />

71


PROGRAMME/SUB-PROGRAMME<br />

Programme 2:<br />

Integrated Economic Development Services<br />

Sub-Programme 2.3: Economic Empowerment<br />

STRATEGIC GOAL<br />

• To Sustain Economic Growth and Development Through Shared Partnerships<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

The Programme for Integrated Economic Development Service does provide for its three sub-programmes although the sub-programme for<br />

Economic Empowerment is assigned to the ECDC and as such would be accounted for by the ECDC.<br />

2.6.3 PROGRAMME 3: TRADE & INDUSTRY DEVELOPMENT<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 3: Trade & Industry Development<br />

Sub-Programme 3.1: Trade & Investment Promotion<br />

STRATEGIC GOAL<br />

• To Sustain Economic Growth and Development Through Shared Partnerships<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To Facilitate Trade, Export<br />

Promotion And Attract Investment<br />

To Strategically Position Industries<br />

In Support Of Economic Growth<br />

And Development<br />

To Facilitate Implementation Of<br />

Strategic Programmes That Will<br />

Stimulate The Competitiveness Of<br />

Priority Sectors<br />

Realize Benefit From Investment<br />

Opportunities<br />

Keep Track Of Investment<br />

Performance Trends<br />

Growth in Investments, Jobs Saved<br />

and Created [ECDC Assignment]<br />

Enhance Sector Performance<br />

Develop Sectors Competitiveness<br />

[ECDC Assignment]<br />

Inform industrial growth &<br />

development strategies<br />

Stimulate Growth and<br />

Development<br />

Trade and Investment Plan, Value of Investment Realized (Net<br />

investment, income, jobs, and equity)<br />

Record of periodic sector performance<br />

Number of jobs created<br />

Sector profiles, development plans and performance reports<br />

Sector support programmes developed<br />

Existence of and Alignment Provincial Strategies With RIDS<br />

alignment<br />

Facilitate industrial growth and development<br />

72


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

The Programme for Integrated Economic Development Service does provide for its three sub-programmes although the sub-programme for<br />

Trade & Investment Promotion is assigned to the ECDC and as such would be accounted for by the ECDC.<br />

73


PROGRAMME/SUB-PROGRAMME<br />

Programme 3: Trade & Industry Development<br />

Sub-Programme 3.2: Sector Development<br />

STRATEGIC GOAL<br />

• The development and marketing of tourism to aid sustainable<br />

development in the Eastern Cape Province.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Inform policy and strategy.<br />

Eastern Cape Tourism Master Plan<br />

review for <strong>2007</strong>-2011.<br />

A Tourism Master Plan completed.<br />

Tourism Sector Summit for<br />

stakeholder engagement and<br />

participation.<br />

A Tourism Sector Summit conducted<br />

Tourism Product Development and<br />

Investment.<br />

Tourism Skills Development.<br />

2010 Tourism Readiness Project<br />

Plan focusing on entrepreneurial<br />

opportunities associated with<br />

hosting the 2010 FIFA World Cup.<br />

Investments in the identified<br />

projects.<br />

A national tourism skills<br />

development strategy is being<br />

formulated.<br />

A study on the state of tourism in the three focal areas [KSDM,<br />

NMBM & BCM] has been presented. A report is produced.<br />

A Tourism Sector Skills Plan<br />

Black Economic Empowerment<br />

-Transformation of the tourism<br />

sector.<br />

Establish partnerships and assist<br />

emerging entrepreneurs.<br />

Number of partnerships developed<br />

Promotion of tourist safety and<br />

security.<br />

A safe and secure environment for<br />

local people and visitors.<br />

A Provincial Safety and Awareness Strategy is developed<br />

74


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Tourism Master Plan completed<br />

Tourism Summit Agreement<br />

developed<br />

A report on the 2010 Tourism<br />

Readiness Study<br />

Situational Analysis <strong>Report</strong> of the<br />

Tourism Master Plan completed<br />

Tourism Sector Summit Agreement<br />

developed and signed by the<br />

Summit participants<br />

A report on the 2010Tourism<br />

Readiness Study completed<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Delay in the payment of the first<br />

milestone due to flaws in the<br />

tendering processes<br />

Inability to generate the Tourism<br />

Summit <strong>Report</strong> timeously resulted<br />

in the delay in the implementation<br />

of Tourism Summit Action Plans<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Milestones have been<br />

revised and addendum<br />

to the original Service<br />

Level Agreement has been<br />

drawn to reflect revised<br />

time frames<br />

Meeting for all<br />

signatories of the Tourism<br />

Summit Agreement is<br />

scheduled to discuss<br />

the implementation the<br />

Action Plans<br />

N/A<br />

Participation in the National Skills<br />

Development Forum<br />

Partnerships established<br />

A Provincial Safety and Awareness<br />

Strategy developed<br />

A National Sector Skills Plan is in<br />

place<br />

No partnership established in<br />

terms of BBBEE<br />

Strategy not in place<br />

The Province does not have a<br />

sector skills plan as the Provincial<br />

Skills Audit is being conducted<br />

and will only be done once this is<br />

completed.<br />

Initiatives towards addressing the<br />

advancement of Black Economic<br />

Empowerment were only started<br />

late in the year and no considerable<br />

progress has been made.<br />

The process was only started<br />

in January 20<strong>08</strong> and has been<br />

planned for the 20<strong>08</strong>/09 Financial<br />

Year.<br />

The National Skills Sector<br />

Plan is being used a guide<br />

to the implementation of<br />

skills development<br />

A good working<br />

relationship has been<br />

established with the<br />

Tourism Empowerment<br />

Council of South Africa<br />

where the tourism<br />

program is participating<br />

in the Provincial BEE focal<br />

points – an information<br />

sharing platform on<br />

tourism BBBEE across the<br />

provinces.<br />

The development of this<br />

strategy is underway<br />

in consultation with<br />

Department of Safety and<br />

Liaison<br />

75


2.6.4 PROGRAMME 4: BUSINESS REGULATION & GOVERNANCE<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 4: Business Regulation & Governance<br />

Sub-Programme 4.1:<br />

Corporate Governance & Consumer Protection<br />

STRATEGIC GOAL<br />

• Accessible Advisory and Support Services To Promote<br />

Consumer And Business Interests<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

To Lobby Against And Address<br />

Barriers In The Broader Business<br />

Environment Which Inhibit<br />

Business Development<br />

Influence Policy, Strategy and<br />

Legislation<br />

An Enabling Regulatory Framework and Operational<br />

Environment That Supports Business Development. - Record of<br />

sessions held & submission made on policy and legislation<br />

Record of inputs and submissions made<br />

Record of briefing sessions held on national legislation<br />

Operate An Efficient Consumer<br />

and Business Support Programme<br />

Record of training and status of services rendered by BRAG<br />

Integration in planning, harmonization of systems and coherent<br />

implementation of consumer support services<br />

Integrity of information, data quality and status<br />

Raise awareness & promote<br />

compliance<br />

Number of targeted awareness promotion conducted<br />

76


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Proposed draft amendments ready<br />

for consideration by the Executing<br />

Authority<br />

5 workshops on the Consumer<br />

Protection Bill conducted<br />

1 briefing session on<br />

implementation of the National<br />

Credit Act held<br />

All officials responsible for<br />

consumer advice and business<br />

compliance trained so as to render<br />

accredited services by year end.<br />

Development of systems and<br />

training of consumer affairs<br />

personnel on application of<br />

developed system.<br />

Release official statistics by end 4th<br />

quarter<br />

Panel discussion & radio<br />

campaigns<br />

Proposed 10% increase to fees &<br />

taxes by amending the Eastern<br />

Cape Gambling and Betting Act<br />

The proposed amendments to 1st<br />

draft have not yet been integrated<br />

None<br />

A briefing session on the NCR was<br />

held as rearranged and Joint plan<br />

has been developed<br />

28 consumer affairs officials<br />

received training by an NCR<br />

accredited<br />

13 met 80% passing mark<br />

30 officials responsible for<br />

consumer advice and compliance<br />

were work shopped by the NCR on<br />

handling of complaints arising out<br />

of the credit agreements<br />

30 officials responsible for<br />

consumer advice & compliance<br />

were trained usage and application<br />

of the Integrated System (Resource<br />

File)<br />

Commissioned two research<br />

surveys on implications of apparent<br />

shortcomings in the processing<br />

and management of court<br />

orders on the credit market and<br />

consumers<br />

Awareness Raising Coverage:<br />

Day session with sector regulators<br />

and business delegates hosted - 85<br />

delegates<br />

Print/Radio - 980 000<br />

15 March Consumer Rights Day held<br />

- 600 delegates<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

The original cabinet memo<br />

accompanying amendment<br />

proposals of 10% increase in fees<br />

and taxes was not fully compliant<br />

with specimen of the legislature<br />

Draft 1 Proposed Amendments not<br />

yet incorporated<br />

Public hearing on the Consumer<br />

Protection Bill never materialized<br />

during the year due to delays<br />

in the processing of the Bill by<br />

National Government - therefore<br />

no workshops were held<br />

Time delays in implementing<br />

plans that are contingent upon<br />

performance by sister departments<br />

such as the sister the dti and other<br />

partners the NCR<br />

Apart from the delays related to<br />

explanation given above, it later<br />

transpired that accreditation<br />

requirements are not limited to<br />

training.<br />

Limited resources in relation to<br />

number of personnel involved<br />

Limited resources in relation to<br />

project scope<br />

Exposure and coverage below<br />

expectation due to weather<br />

conditions and logistical problems<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Cabinet Memo was<br />

modified to fully<br />

comply with legislature<br />

requirements and resubmitted<br />

Actual drafting of all<br />

pieces of legislation needs<br />

is specialized service and<br />

has to be outsourced to a<br />

competent legal firm.<br />

Public awareness<br />

workshops on the<br />

Consumer Protection<br />

Bill (Act) have been<br />

rescheduled for 20<strong>08</strong>/9<br />

Financial Year.<br />

Joint plan of action have<br />

been agreed to with the<br />

NCR and the dti will be<br />

engage for the same<br />

purpose.<br />

The plan referred to above<br />

will be implemented<br />

during the next financial<br />

year and covers issues<br />

pertaining to supporting<br />

qualifying officials toward<br />

registering as accredited<br />

debt counsellors.<br />

Training was staggered so<br />

as to afford everyone at<br />

different stages.<br />

An in-depth research<br />

on the topic is critical<br />

in assessing whether<br />

the NCA of broadening<br />

participation in the credit<br />

market will be realised<br />

without addressing<br />

the related consumer<br />

problems.<br />

More budget needed to<br />

secure prime time slots<br />

for effectiveness<br />

77


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Render general and problem<br />

specific advice to consumers<br />

Number of consumers advised and benefit<br />

Maintain acceptable levels of trade<br />

and business compliance<br />

Number of businesses inspected and compliance levels<br />

Complaints settled by negations section (11) & (12)<br />

Optimize perform<br />

Implement targeted partnership campaigns<br />

2.6.5 PROGRAMME 5: ECONOMIC PLANNING<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 5: Economic Planning<br />

Sub-Programme 5.2: Research And Development<br />

STRATEGIC GOAL<br />

• Develop and facilitate focused economic research, policy alignment and<br />

strategy development to ensure integration into national policy frameworks.<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Lead Research on economic growth<br />

and Development<br />

Monitoring and evaluation of led<br />

projects - 2003/04 to <strong>2007</strong>/<strong>08</strong> FYs<br />

To evaluate DEDEA funded LED projects and consolidate<br />

information on these projects with effect from 2003/04 to<br />

<strong>2007</strong>/<strong>08</strong> financial years to serve as a basis for further analysis<br />

of their viability and impact<br />

Institutional capacity assessment<br />

of district municipalities and the<br />

metro<br />

To identify areas requiring technical assistance and/or capacity<br />

support<br />

List of led projects for the 20<strong>08</strong>/09<br />

FY<br />

To collate projects’ documents to ensure that grants to<br />

municipalities are disbursed at the beginning of the financial<br />

year<br />

78


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Respond and render appropriate<br />

advice to all consumer enquires<br />

General advice calls 1 700<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Monitoring and recording of results<br />

remains a challenge<br />

21 businesses per month Inspections = 123 limited personnel and capacity of<br />

regulators<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Self recording systems<br />

such as call centers are a<br />

viable proposition<br />

Partnerships are for now<br />

viable options<br />

Policy awareness<br />

Develop integrated tools and<br />

systems<br />

Received = 177<br />

Settled = 93<br />

Referred = 21<br />

Pending = 63<br />

The one day session on court orders<br />

with a bearing on the credit life of<br />

ordinary people served this purpose<br />

The Resource Manual is a useful<br />

tool for quick referral and decision<br />

making.<br />

limited personnel and capacity of<br />

regulators<br />

Participation of business remains<br />

less that expectation albeit with<br />

slight improvement<br />

Data sourcing and information<br />

management remain one of the<br />

biggest challenges<br />

Alternative forms of<br />

publicity are explored<br />

Recommendations to<br />

the IT to automate and<br />

improve data processing<br />

and validation<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

<strong>Report</strong> on completed study<br />

<strong>Report</strong> on completed study<br />

Piloting has begun in Amathole<br />

District Municipality (ADM) by ENB<br />

Trade Solutions<br />

Inception <strong>Report</strong> to be dealt with<br />

on Friday, 04 April 20<strong>08</strong><br />

Payment of R64,000 effected<br />

NMMU contracted to undertake<br />

task in ADM, Cacadu District<br />

Municipality (CDM) and NMBM<br />

Inception <strong>Report</strong> to be dealt with<br />

on Friday, 04 April 20<strong>08</strong><br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Acquisition of the required<br />

quotations because the service<br />

providers do not respond in time<br />

The Inception <strong>Report</strong> has not been<br />

discussed<br />

Acquisition of the required<br />

quotations because the service<br />

providers do not respond on time<br />

The Inception <strong>Report</strong> has not been<br />

discussed<br />

<strong>Report</strong> on completed study Submissions made by four districts Project Matrices; SLAs; and Letter of<br />

Compliance<br />

NMBM has not submitted by some<br />

districts.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Review existing Terms of<br />

Reference to incorporate<br />

the revised threshold of<br />

R500,000<br />

The Inception <strong>Report</strong> will<br />

be dealt with on 16 April<br />

20<strong>08</strong><br />

Review existing Terms of<br />

Reference to incorporate<br />

the revised threshold of<br />

R500,000<br />

Direct transfer of<br />

project funds to local<br />

municipalities (LMs).<br />

The LED Consultative and<br />

Planning Workshop on 13-<br />

14 February 20<strong>08</strong> at Barkly<br />

East clarified a number<br />

of issues.<br />

79


2.6.6 PROGRAMME 6: ENVIRONMENTAL AFFAIRS<br />

Purpose<br />

The mandate of the Chief Directorate: Environmental Affairs is to ensure – through<br />

legislation – equilibrium between the need for economic, social and spatial development<br />

on the one hand, and sustainable use of renewable natural resources on the other, as<br />

well as the mitigation of negative impacts of development activities on the environment.<br />

The main goal is to ensure the conservation of biodiversity and the protection of the<br />

environment for sustainable development in the Eastern Cape Province.<br />

The Chief Directorate consist of 4 directorates, which accurately reflect the programme<br />

of Environmental Affairs. The four directorates are:<br />

• Directorate of Environmental Impact Management,<br />

• Air Quality and Waste Management,<br />

• Biodiversity Conservation and Coastal Management and<br />

• Compliance and Enforcement.<br />

The General Manager is the strategic leader of the programme giving the overall<br />

executive direction to the four directorates and the monitoring role to the Eastern Cape<br />

Parks Board parastatal.<br />

The above structure is reflected in the five regions of the province, where each region is<br />

headed by the regional manager and the assistant managers.<br />

Strategic Objectives<br />

• To provide strategic leadership and coordination of the Chief Directorate and Eastern<br />

Cape Parks Board.<br />

• To conserve the diversity of landscapes, ecosystems, habitats, biological communities,<br />

populations, species and genes in the Eastern Cape.<br />

• To promote conservation and sustainable utilisation of natural resources for the benefit<br />

of all.<br />

• To protect and enhance the quality of the environment for the benefit of humanity.<br />

• To promote environmental awareness<br />

• To ensure compliance and enforcement of the environmental legislations.<br />

Progress analysis<br />

• Review and consolidate the Eastern Cape Environmental Management Legislation.<br />

• Eastern Cape Biodiversity Conservation Plan developed<br />

80


• Environmental Awareness activities celebrated include::<br />

• Eastern Cape Cleanest Town Competition<br />

• National Clean-up Week<br />

• National Marine Day<br />

• Clean Industry Awards and<br />

• World Wetlands Day.<br />

• Launch of Compliance & Enforcement Directorate (Green Scorpions)<br />

• ECA EIA Backlog significantly reduced<br />

• Environmental IDP Toolkit developed<br />

• GEF funding for the Wild Coast Programme through ECPB as an implementing agent.<br />

• Maloti Drakensberg Transfrontier Project (SA -Lesotho Transfrontier) in progress<br />

Analysis of constraints and measures planned to overcome them<br />

Constraints<br />

• Insufficient budget allocation to the Programme<br />

• Delay in filling critical vacant funded posts<br />

• High staff turnover<br />

Measures to overcome constraints<br />

• Sufficient budget allocation in line with the mandate<br />

• Appointment of staff to improve operations<br />

• Dedicated legal support for the Programme<br />

Description of planned quality improvement measures<br />

• Strengthening partnerships with various stakeholders<br />

• Dedicated support for the Chief-Directorate<br />

• Appointment of qualified candidates within acceptable time-frames<br />

• Recruitment and Retention strategy to be implemented for critical scarce skills<br />

Measurable Objectives<br />

Measurable Objectives, Performance Measures, Target and Actual Performance for<br />

<strong>2007</strong>/<strong>08</strong> are indicated below:<br />

81


PROGRAMME/SUB-PROGRAMME<br />

Programme 6: Environmental Management<br />

Sub-Programme 6.1: Ecosystems, Biodiversity And<br />

Natural Heritage Resource Use, Scientific Investigation<br />

& Authorization<br />

STRATEGIC GOAL<br />

• Biodiversity Conservation Management<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Efficient and effective Ecosystems,<br />

Biodiversity and Natural Heritage<br />

management through planning,<br />

monitoring and reporting<br />

Development of a Provincial<br />

Biodiversity Strategy and Action<br />

Plan<br />

Provincial Strategy and Action Plan<br />

Participation in the National Law<br />

Reform Process<br />

Provincial Comments<br />

Implementation of Bioregional<br />

Programmes (MDTP, STEP,<br />

CAPE, SKEP, National Grassland<br />

Biodiversity Programme)<br />

Participation and financial commitments<br />

Implementation of the Endangered<br />

Species Conservation Project<br />

Provincial Strategy on Latifrons conservation<br />

Protected Area establishment,<br />

regulation and monitoring<br />

Aquatic and freshwater Ecosystems<br />

Management<br />

Sustainable management of<br />

Provincial Protected Areas<br />

Development of Freshwater Fisheries project<br />

Implementation and compliance monitoring of the Service<br />

Level Agreement<br />

Ecosystem, Biodiversity and<br />

Natural Resource use, Scientific<br />

Investigation and Authorization<br />

Effective and uniform permit<br />

administration<br />

Installation of computerized permit system and use thereof by<br />

all staff<br />

82


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Develop maps of Provincial<br />

Biodiversity Strategy and Action<br />

Plan<br />

Participation in MinTech Working<br />

Group 1<br />

Identification of key species<br />

and habitats for biodiversity<br />

conservation including<br />

rehabilitation<br />

Conduct awareness and revitalize<br />

stewardship programmes<br />

Engagement with stakeholders<br />

and finalization of the Provincial<br />

Strategy on Latifrons conservation<br />

Submission of monthly and<br />

quarterly reports and attendance of<br />

quarterly board meetings<br />

Effective administration,<br />

compliance , monitoring and<br />

enforcement<br />

Launch of the Eastern Cape<br />

Biodiversity Plan held<br />

Training of Amathole District<br />

Municipality Officials on using<br />

ECBCP<br />

PEPC Meeting attended<br />

International Professional Hunting<br />

shows attended in USA with<br />

meaningful participation and<br />

assistance to Eastern Cape Hunting<br />

Outfitters<br />

1 Eastern Cape Implementation<br />

Committee (ECIC) meeting<br />

conducted<br />

Proposal by NMMM to initiate the<br />

process of publishing Bioregion<br />

presented and welcome by ECIC<br />

Continuous involvement and<br />

financial commitment in the MDTP<br />

implementation<br />

1 meeting held to formalize the<br />

Cycad Forum<br />

World Wetlands Day Celebrations<br />

held in Matatiele-Khoapa Location<br />

Meeting with ECP to table<br />

progress on the development of<br />

Management Plans<br />

Dwesa/Cwebe Workshop held<br />

with all the stakeholders including<br />

Dwesa/Cwebe Land Trust to re-look<br />

at the Settlement agreement<br />

Meeting held with MCM, DWAF,<br />

ECP to finalise Dwesa/Cwebe<br />

Management Plan<br />

People and Parks Workshop<br />

attended<br />

Permits issued<br />

CITES: 310<br />

Non- CITES: 538<br />

Professional Hunting: 58<br />

TOPS:61<br />

Hunting Contractors: 16<br />

Professional Hunting Registers<br />

sold : 13<br />

CAE’s: 47<br />

Hunting: 125<br />

Others: 442<br />

TOTAL NUMBER OF PERMIT<br />

ISSSUED: 1610<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Capacity for implementation of the<br />

Provincial Strategy and Action Plan<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

Purchase of compatible computers<br />

for HO permit administration office<br />

delayed<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Establishment of<br />

Planning Unit within the<br />

Chief Directorate<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

83


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Development, review and<br />

implementation of effective<br />

Operational Guidelines<br />

Approved Operational Guidelines<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 6: Environmental Management<br />

Sub-Programme 6.2: Coastal Management<br />

STRATEGIC GOAL<br />

• Sustainable utilization of Coastal Resources<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Coastal Zone Management - to<br />

ensure that the coast is managed<br />

according to national sustainability<br />

principles<br />

Inclusive & transparent coastal<br />

management<br />

Level of stakeholder participation in CM<br />

Number of policy guidelines produced<br />

Number of programs and projects facilitated<br />

Regulate Coastal resource use in<br />

accordance with sustainability<br />

principles<br />

Extent to which coastal planning aligns with national policy<br />

provisions<br />

Efficiency & effectiveness of ORV regulatory system<br />

Extent to which Coastal Conservation Area has been<br />

demarcated<br />

Efficiency & effectiveness of regulatory system for structures<br />

below the HWM<br />

84


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Active involvement with<br />

Biodiversity Management<br />

Committee and drawing up of<br />

guidelines and public participation<br />

Ongoing interaction with<br />

stakeholders on biodiversity<br />

resource use management.<br />

TOPS Road shows conducted in<br />

Cacadu, Chris Hani and Amathole<br />

Regions to receive permit<br />

applications.<br />

Biodiversity Technical Committee<br />

meetings held to develop<br />

TOPS Regulations Delegations.<br />

Delegations developed and<br />

approved<br />

Monthly TOPS Working sessions<br />

held to evaluate progress on TOPS<br />

Regulations implementation<br />

Fencing specifications operational<br />

guidelines approved<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Maintain optimal functioning of<br />

PCC & RCWG’s<br />

Formulation of CM operational<br />

guideline & decision-making<br />

support systems<br />

Facilitate & coordinate programs<br />

Facilitate integration of pertinent<br />

coastal planning provisions into<br />

municipal planning frameworks<br />

Ongoing licensing &<br />

recommendations to DEAT on<br />

permitting; awareness raising,<br />

monitoring & compliance<br />

enforcement<br />

Surveying implementation &<br />

erection of beacons & signage<br />

Ongoing permitting, awareness<br />

raising, monitoring & compliance<br />

enforcement<br />

PCC did not meet<br />

RCWG’s generally<br />

None facilitated or coordinated<br />

Hamburg and Qolora Site visits for<br />

Aquaculture were conducted<br />

Ad hoc achievements & progress<br />

but no systematic approach<br />

1 Jetty in Cacadu Alan – Krom<br />

authorized by the General Manager<br />

Environmental Affairs<br />

1 CCA building permit issued<br />

for Mdumbi in line with EIA<br />

authorizations – Regional Manager<br />

O.R. Tambo<br />

1 Off Road Vehicle Permit issued<br />

to Round Table at Xora Mouth –<br />

Regional manager O.R. Tambo – for<br />

Recreational Venture<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Due to resignation of Manager<br />

Coastal Zone Management<br />

O.R. Tambo and Cacadu continue to<br />

meet but Cacadu has a challenge<br />

of shortage of personnel.<br />

O.R. Tambo with the support of<br />

Inter – Departmental support and<br />

working group they were able<br />

to carry out the monitoring and<br />

patrols over the Easter Week-end<br />

successfully<br />

This will only be effective after the<br />

Integrated Coastal Management<br />

Bill is Enacted<br />

On target<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Appoint a Manager and<br />

officers in CZM. Adverts<br />

are out for EO’s posts will<br />

be filled soon<br />

N/A<br />

85


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Eliminate illegal coastal<br />

development activities<br />

Extent of proliferation of illegal coastal developments<br />

Capacity Building and Training Number of officers trained Interpretation and implementation of the applicable tools in<br />

the Coastal Zone Management<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 6: Environmental Management<br />

Sub-Programme 6.3:<br />

Environmental Impact Management<br />

STRATEGIC GOAL<br />

• Environmental quality management<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Administration of EIA Regulations<br />

Administer NEMA applications as<br />

per regulations<br />

Applications processed within guideline time-frames<br />

Finalize outstanding ECA<br />

applications<br />

Outstanding applications finalized<br />

86


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Review of legal strategy. Surveying<br />

and demarcation of Coastal<br />

Conservation Area in line with<br />

legislation<br />

Skill transfer<br />

1 X Cacadu illegal Jetty Construction<br />

handed to Compliance and<br />

Enforcement<br />

1 X at Ndlambe construction in<br />

the dune and a warning letter<br />

was issued by Regional Manager<br />

in consultation to C& E. Meeting<br />

held under cooperative governance<br />

spirit and awaiting response in<br />

committing to ROD conditions.<br />

Illegal Construction of a house at<br />

Ndlambe was stopped and the case<br />

has been handed over to C&E.<br />

O.R Tambo they have put a notice<br />

to demolish by end April a hut at<br />

Mpande Forest within the Dune.<br />

Case opened for illegal<br />

establishment of a Campsite<br />

within CCA against Owen Themba<br />

Ngudle.<br />

Demolition of illegal cottages by<br />

cottage owner as per High Court<br />

Order is being implemented<br />

and monitored closely by O.R.<br />

Tambo (Dakane, Black Sands and<br />

at Manteke only one owner has<br />

adhered to orders)<br />

Sand mining at Cwebeni and<br />

Mngazi within the CCA has<br />

been stopped and a meeting is<br />

scheduled for April <strong>08</strong>.<br />

3 Interns were exposed to Coastal<br />

Awareness exposure at Cacadu at<br />

the Kouga Region.<br />

4 O.R. Tambo Interns and 1 officer<br />

were exposed in CZM through<br />

Easter Weekend Activities and<br />

patrols.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

N/A<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Site visits, review of reports and<br />

issuing of authorizations<br />

A serious backlog threatened in<br />

Cacadu Region<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

The organizational structure of<br />

that region is not adequate to deal<br />

with its workload<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

An intervention to assist<br />

the region was designed<br />

and is being implemented<br />

Monitor service provider on the<br />

processing of ECA EIA application<br />

backlog within stipulated<br />

timeframe<br />

The number of ECA applications<br />

with Ninham Shand has been<br />

reduced to 93. Ninham Shand’s<br />

current contract ended in February<br />

20<strong>08</strong><br />

Remaining applications are<br />

difficult to finalize due to gaps in<br />

key information and often poor<br />

processes.<br />

Motivation was made<br />

to DEAT to extend the<br />

Ninham Shand contract.<br />

DEAT has agreed and new<br />

contract will be concluded<br />

in April 20<strong>08</strong>.<br />

87


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Co-ordination of appeals from<br />

regions<br />

Drafting responses to appeals for the MEC’s approval and<br />

liaising with the Regional offices<br />

Input in guideline development<br />

Guidelines developed<br />

Installation of electronic EIA system<br />

with all regional offices<br />

Web-generated electronic reports and Statistics<br />

Management of potentially<br />

negative impacts of developments<br />

not listed under EIA Regulations.<br />

Development of self-regulation<br />

mechanisms<br />

Environmental Management Frameworks developed<br />

Strengthen Environmental<br />

Management through co-operative<br />

Governance<br />

Establish, maintain and participate<br />

in key structures and forums<br />

IGR, Environmental Management Forum, REMDEC<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 6: Environmental Management<br />

Sub-Programme 6.3: Air Quality & Waste Management<br />

STRATEGIC GOAL<br />

• Environmental quality management<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Administration and<br />

implementation of Waste<br />

Management legislative framework<br />

Status quo report regarding waste<br />

site compliance<br />

Preliminary inspection report on waste sites in region<br />

Development of Provincial<br />

Integrated Waste Management<br />

Plans<br />

Roll-out of Waste Information<br />

System<br />

Provincial support to local Waste Management Planning<br />

Regional participation<br />

88


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Handling of appeals<br />

Participation and input on internal<br />

working group meetings<br />

Establishment of EIA database/<br />

register<br />

Identification of sensitive<br />

environments for limited<br />

developments<br />

Consultation with external and<br />

internal stakeholders<br />

Comment to planning processes<br />

and linkage with planning<br />

departments<br />

Five appeal reviews have been<br />

done , with 2 submitted to MEC.<br />

A submission was submitted<br />

regarding an appeal system for<br />

DEDEA<br />

5 draft guidelines were developed<br />

which needs to go through<br />

consultation processes in the 1st<br />

quarter of 20<strong>08</strong>/2009<br />

During the quarter NEAS was<br />

implemented on a trial basis. It<br />

became clear that the Department<br />

generally lacks the capacity to<br />

implement effectively.<br />

The Great Kei to Boknes EMF is<br />

on track. There is good public<br />

participation, except for key<br />

economic development drivers.<br />

Although some forums were<br />

attended, this objective was not<br />

achieved, compared to previous<br />

high standards<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Some appeals are legally very<br />

complex and time-consuming to<br />

review properly.<br />

IEM Working Group had to be<br />

postponed due to procurement<br />

obstacles.<br />

Power outages, insufficient<br />

network access, lack of<br />

administrative staff.<br />

Economic development drivers not<br />

adequately involved<br />

Procurement difficulties. Large<br />

number of forums that we are<br />

expected to attend.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

Complex appeals with<br />

legal implications will be<br />

discussed by an internal<br />

task team in April 20<strong>08</strong>.<br />

A submission has been<br />

made to HOD for a<br />

3-day working group<br />

session in the 1st quarter<br />

20<strong>08</strong>/2009<br />

It is clear that a revised<br />

implementation strategy<br />

will need to be devised<br />

in the 1st quarter of<br />

20<strong>08</strong>/2009. This will need<br />

to include assistance from<br />

SITA.<br />

A submission has been<br />

made to the HOD<br />

regarding a DEDEA driven<br />

workshop to address this<br />

issue.<br />

An analysis was done<br />

of current forums<br />

and submitted to<br />

Environmental Affairs<br />

Management Meeting.<br />

Decisions will be taken at<br />

the April 20<strong>08</strong> meeting<br />

ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Site visits and monitoring<br />

Facilitate the development and<br />

review of Integrated Waste<br />

Management Plans (IWMP)<br />

Roll-out of Waste Information<br />

System<br />

Follow-up on waste management<br />

complaints in Maletswai<br />

Municipality (Dukathole), Elundini<br />

Landfill site (Maclear) and<br />

Amahlathi Landfill site vs Amatola<br />

Abattoir (Stutterheim).<br />

Process to restart in the new<br />

financial year due to the revised<br />

delegations.<br />

Regular reporting of participating<br />

industries and municipalities done<br />

and waste statistics submitted to<br />

DEAT<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

N/A<br />

N/A<br />

89


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Strengthening environmental<br />

support to Local Authorities,<br />

industry and environmental<br />

organizations regarding waste<br />

management<br />

Participation in Cleanest<br />

Town Competition and waste<br />

management conferences<br />

Inter-sectoral information sessions & meetings<br />

Waste Management intervention<br />

in Mnquma & KSD Municipalities<br />

Significant initial clean-up of Butterworth and launch of CTC in<br />

OR Tambo<br />

Co-operative governance<br />

Input to planning processes and establish links with national<br />

development initiatives at local authority level<br />

Administration and<br />

implementation of Air Quality Act<br />

to facilitate improved air quality<br />

management<br />

Promote Clean Production<br />

Technology<br />

Low levels of pollution<br />

Strengthening environmental<br />

support to Local Authorities &<br />

industry re AQM<br />

Identify and implement effective interventions where<br />

municipalities require support<br />

Integrate Climate Change Response<br />

Strategies<br />

Provincial Climate Change Strategy<br />

90


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Prepare presentations and papers<br />

for information sessions with<br />

stakeholders<br />

Complete and submit SLA and<br />

Business Plan and establish PSC<br />

Participate in reviewing Air Quality<br />

and Waste related EIA applications<br />

and provincial appeal process.<br />

Facilitate development of pollution<br />

prevention plans(PPP) by targeted<br />

industries<br />

Participation in national air quality<br />

planning framework intervention.<br />

Announcement of the Provincial<br />

CTC winner done during a<br />

Gala Dinner event held at the<br />

Queenstown Indoor Sports<br />

Centre. The winners are Inkwanca<br />

LM, Mhlontlo and Amahlathi<br />

Municipalities<br />

Clean-up operations conducted<br />

in Mnquma (Butterworth).<br />

Significant progress is observed on<br />

the cleanliness of the target areas<br />

and the project has submitted a<br />

proposal to extend the duration of<br />

the clean-up and move to second<br />

phase to rehabilitate the illegal<br />

waste disposal site.<br />

Participation on the review of the<br />

provincial appeal process of EIA<br />

applications and submission of<br />

input relating to Health Care Risk<br />

Waste (HCRW) and undertakers in<br />

rural areas. Participation in DEAT<br />

WGII on Waste and Air Quality<br />

discussions.<br />

Pollution and Waste Action<br />

Plans drawn in partnership<br />

with EC Branch of IWM-SA to<br />

conduct Industry Environmental<br />

Interventions in relation to the<br />

Clean Industry Awards conducted<br />

in the last quarter.<br />

Regular meetings with the<br />

established Provincial / Municipal<br />

Air Quality Forum and National<br />

/ Provincial Air Quality Officers<br />

Forum were held<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

Communication with various<br />

stakeholders and public interest<br />

groups<br />

Bilateral and site visit to Western<br />

Cape Department planned for May<br />

20<strong>08</strong><br />

No significant challenges<br />

experienced.<br />

N/A<br />

91


2.6.8 PROGRAMME 8: PLANNING, IMPACT,<br />

POLLUTION AND WASTE MANAGEMENT,<br />

PROGRAMME/SUB-PROGRAMME<br />

Programme 8: Environmental Management<br />

Sub-Programme 8.1 Compliance & Enforcement<br />

STRATEGIC GOAL<br />

• Compliance, Enforcement and Rehabilitation<br />

STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Ensure effective compliance and<br />

enforcement for environmental<br />

quality management (EIA, waste<br />

and air quality)<br />

Reduction in incidents of<br />

environmental crime<br />

Number of cases in crime register and actions taken<br />

92


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Information gathering<br />

Compiling Information gathering<br />

<strong>Report</strong>s<br />

Evaluate Information reports<br />

Compile and Execute Reaction Plan<br />

for poaching of Elephant and Rhino<br />

Rhino horn theft at Amathole<br />

Museum,<br />

Albany Museum,<br />

Ezulu Private Game Reserve<br />

Bedford, threat of rhino poaching<br />

on reserves, Cape parrot poaching<br />

Stutterheim, Cape Parrot illegal<br />

trade Port St Johns investigated in<br />

partnership with SAPS<br />

Outstanding complaints<br />

a)- Compliant from US Client of<br />

bad treatment during hunt in the<br />

Bedford district.<br />

b)-Illegal acting as Hunting<br />

Outfitter- several complaints Glen<br />

Connor/Kirkwood from United<br />

Kingdom<br />

c)-Poaching and Game theft<br />

Mathola Private Game Reserve<br />

Komghad)-<br />

The dockets for illegal trade in<br />

cycads in Berlin and Pelargonium is<br />

with the discussed and the Senior<br />

Advocate<br />

Illegal hunting of rhino or elephant<br />

plan compiled.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

Posts not funded<br />

Regional Offices have no dedicated<br />

enforcement officials<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

National Job Evaluation<br />

process for Environmental<br />

cadreship completed<br />

Staff appointment in<br />

20<strong>08</strong>/09 FY<br />

Civil or criminal action<br />

Kenton on Sea Eco Estate –pre<br />

compliance notice issued<br />

No significant challenges<br />

experienced.<br />

N/A<br />

Aliwal North sewage spillage and<br />

pollution –warning issued<br />

Rainbow Valley – register criminal<br />

case<br />

Wild Coast Sewage spillages – issue<br />

warning letters to WCCOA and<br />

WCHA<br />

Kudus Kop – investigate reported<br />

contraventions<br />

93


STRATEGIC OBJECTIVE MEASURABLE OBJECTIVE PERFORMANCE MEASURE/ INDICATOR<br />

Capacity building and training of<br />

staff<br />

Cooperative governance and<br />

stakeholder consultation (DEAT,<br />

SAPS, DPP, NPA, ECT, RESG, etc.)<br />

Minutes of meetings<br />

Accredited training<br />

Trained officials<br />

Internal training workshops<br />

Trained officials<br />

94


ACTUAL PERFORMANCE AGAINST TARGET<br />

TARGET FOR <strong>2007</strong>/<strong>08</strong> ACTUAL FOR <strong>2007</strong>/<strong>08</strong><br />

Consolidation of monthly crime<br />

statistics<br />

Submission to national<br />

Compiled Environmental Crime<br />

Statistics for the province for the<br />

past year and submitted to DEAT.<br />

CHALLENGES/REASONS FOR NON<br />

PERFORMANCE<br />

No significant challenges<br />

experienced.<br />

PLANS TO ADDRESS<br />

CHALLENGES/NON-<br />

PERFORMANCE<br />

N/A<br />

Consultation with SAPS, State<br />

Prosecutors, Director Of Public<br />

Prosecutions Offices and<br />

Municipality<br />

The Rhino horn trade Moratorium<br />

submitted by the Eastern Cape<br />

Department<br />

Professional Hunting<br />

Several meetings were held with<br />

the Provincial Head of Organized<br />

Crime in Zwelitsha.<br />

A consultation session was held<br />

with the Buffalo city Municipality<br />

on pollution management.<br />

Moratorium approved by MINTEC<br />

for submission to MINMEC<br />

Presented lectures on Professional<br />

Hunting Legislation at PH schools<br />

in Tarkastad Supervised the<br />

compulsory exams.<br />

Attended SCI Hunting Conventions<br />

in USA to ensure compliance<br />

EMI Training<br />

Assistant manager completed the<br />

six months EMI course Assistant<br />

Manager completed firearm<br />

competency testing successfully.<br />

Awaiting the formal<br />

Competency certificates from<br />

the national Fire arm Register in<br />

Pretoria.<br />

Coordinate and monitor regional<br />

compliance<br />

A session held with Cacadu<br />

Regional Office<br />

No significant challenges<br />

experienced.<br />

N/A<br />

95


Part 3<br />

<strong>Annual</strong> Financial Statements<br />

96


3.1 <strong>Report</strong> by the Accounting Officer<br />

To the Executive Authority and Parliament/Provincial Legislature of the Republic of<br />

South Africa. (Where the information required hereunder is included in another part of<br />

the financial statements, reference should be made between this report and that section<br />

of the financial statements.)<br />

1 GENERAL REVIEW OF THE STATE OF FINANCIAL AFFAIRS<br />

Important policy decisions and strategic issues facing the department<br />

Programme structure changes to align the departmental programmes with the National<br />

gazetted structures significantly changed the allocations to various programmes. 13<br />

Programmes replaced the previous 5 programmes during the accounting year under<br />

review of which four (4) programmes were not budgeted for in the year under review as<br />

they relate to national competencies. Starting in <strong>2007</strong>/<strong>08</strong>, the name of the department<br />

changed from the Department of Economic Affairs, Environment and Tourism to the<br />

Department of Economic Development and Environmental Affairs. This however did not<br />

mean that tourism was no longer a priority, but that it had been incorporated under<br />

Sector Development of the Economic Development Programme.<br />

During the year <strong>2007</strong>/<strong>08</strong>, like the previous year, the department participated actively in<br />

consolidating its work in line with National, Provincial and Local Government priorities.<br />

To this end, the department embraced the resolutions from National Cabinet in June<br />

<strong>2007</strong> which were relevant to this Department. The priorities were listed as 24 APEX<br />

Programmes of Government. The Department also undertook to implement priority<br />

projects emanating from the Provincial Legkotla of August <strong>2007</strong>. During the greater part<br />

of <strong>2007</strong>, this Department was actively searching for information and data to enhance<br />

its performance. This culminated in a strategic planning session in early January 20<strong>08</strong>,<br />

which took a deeper view of the mandate of the department in line with constant<br />

changes in the environment. Some of these changes have been in response to the review<br />

of the Provincial Growth and Development Plan (PGDP), the key outcomes of the Growth<br />

and Development Summits (GDs), emerging trends and programmes at DEAT and the<br />

Department of Trade and Industry (DTI) and key decisions of our Provincial Cabinet and<br />

Cluster priorities. It is within this context that we see the work of <strong>2007</strong>/<strong>08</strong> as value<br />

accruing to our customers and stakeholders.<br />

97


Comment on significant events that have taken place during the year<br />

The department has been active in the development of a Provincial Industrial Development<br />

Strategy, which will be launched during the first half of 20<strong>08</strong>. The accompanying sector<br />

action plans will be developed thereafter. Ongoing collaboration with ASGISA Pty Ltd<br />

during <strong>2007</strong>/<strong>08</strong> set the stage for intensifying departmental efforts to share resources<br />

with the rest of the Province after successfully implementing two huge industrial<br />

platforms in the form of Coega and the East London Industrial Development Zone. The<br />

two zones have notched significant investments in the year under review. High-level<br />

commitment to inter-sectoral participation at District, Provincial and National levels was<br />

evident during <strong>2007</strong>/<strong>08</strong> which contributed to the sharing, planning, implementation<br />

and monitoring of our stakeholders’ priorities. The progress which the department made<br />

during <strong>2007</strong>/<strong>08</strong> has been persistent despite obstacles and challenges.<br />

The year under review witnessed many changes and achievements in the Department<br />

including the following:<br />

• The execution of a comprehensive outreach programme in June <strong>2007</strong> covering all corners<br />

of the Eastern Cape;<br />

• The signing of shareholder compacts and reporting protocols between the Department<br />

and its Public Entities;<br />

• The co-hosting of the automotive week in Port Elizabeth in September <strong>2007</strong>;<br />

• The successful hosting of the Tourism Summit in September <strong>2007</strong>;<br />

• The investments in the industrial development zones;<br />

• The expansion of Provincial nature reserves; and<br />

• The issuing of gambling and betting licences in Queenstown and Mthatha.<br />

• The offices in Bhisho - Head Office were burgled in February 20<strong>08</strong> and among the items<br />

stolen were computers and documents.<br />

• The department initiated the appointment of a firm of forensic auditors to investigate<br />

alleged violation of internal controls.<br />

Comment on major projects undertaken or completed during the year<br />

The strategic objectives of <strong>2007</strong>/<strong>08</strong> made an attempt to embrace the priorities of the<br />

Provincial Cabinet, Economic Growth and Infrastructure Cluster, 24 APEX programmes<br />

of National Cabinet, ASGISA, and the revised PGDP and importantly the Provincial<br />

Industrial Development Strategy. These performance areas were planned through the 13<br />

programmes of the Department which were headed by Programme Managers and their<br />

respective Senior Managers. The Department was active in fostering development in all<br />

the Districts of the Province. This is evident through the Economic Development Forum<br />

which is chaired quarterly by the MEC. Early in <strong>2007</strong>/<strong>08</strong> financial year, R30 million was<br />

released to District Municipalities for LED projects in all the Districts of the Eastern Cape.<br />

98


In delivering services in the Province, the department worked closely with all seven Public<br />

Entities which it supports financially. The bulk of the departmental budget was transferred<br />

to these Public Entities. Consequently it was important that the department provided an<br />

appropriate monitoring and evaluation support mechanism. During <strong>2007</strong>/<strong>08</strong>, the need<br />

was recognized that partnerships with other institutions must be created in order to<br />

improve departmental operations.<br />

The call for reassessing legislation governing the operations of Public Entities was<br />

furthermore identified as a mechanism to enhance the work of the department. This will<br />

be done in phases over the coming financial years. The past twelve months is proof that<br />

the work of the Public Entities is strengthened by the shareholder compacts which were<br />

put in place during the previous financial year.<br />

Some programmes were initiated in the <strong>2007</strong>/<strong>08</strong> financial year, such as:<br />

• Funding and reporting protocols (standard reporting structures and schedules developed)<br />

were introduced and implemented and were integrated into the shareholder compacts<br />

in <strong>2007</strong>/<strong>08</strong>;<br />

• Provincial Economic Development Forum-meetings took place according to schedule<br />

• Public entities have been stabilized at both management and board levels.<br />

• Functional Internal control unit.<br />

• Infrastructure development at both IDZs (Coega and ELIDZ) reached their schedule<br />

resulting in investments in excess of R40 billion at Coega and R1.7 billion at ELIDZ.<br />

• The year saw the introduction of the rationalization plan for the Eastern Cape Parks and<br />

Tourism Boards which will usher a merged institution by 20<strong>08</strong>/09.<br />

• National Treasury budget programme structure was introduced and the Department’s<br />

programmes aligned to that structure.<br />

• The PGDP is under review with DEDEA playing a key role in its key performance areas.<br />

• Legislation of the liquor board is under review.<br />

• A concerted recruitment process was initiated in July <strong>2007</strong> to fill outstanding critical posts.<br />

• Key systems have been implemented such as Proqure & Proquote System, iBudget and<br />

eMapp to improve the operational efficiency of the Department Financial Management.<br />

Spending trends<br />

The total adjusted budget for the Department is R757, 973 million in <strong>2007</strong>/<strong>08</strong> financial<br />

year. The total spending is R 736, 3 million which represents 97.14% of the total budget.<br />

There is an improvement in comparison to the 96.3% and 95.7% spent in the 2006/07<br />

and 2005/06 financial years respectively.<br />

99


The table below shows the budget, expenditure, variance and percentage over or underspending<br />

for the year.<br />

Per Programme<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance<br />

Variance as<br />

% of final<br />

Appropriation<br />

R’000 R’000 R’000 %<br />

1. Administration 85,624 78,814 6,810 7.9<br />

2. Integrated Economic Development Services 129,687 127,137 2,550 2.0<br />

3. Trade and Industry Development 343,999 343,670 329 0.1<br />

4. Business Regulation and Governance 46,477 46,154 323 0.7<br />

5. Economic Planning 1,000 373 627 62.7<br />

6. Environmental Management 42,729 33,646 9,<strong>08</strong>3 21.3<br />

7. Planning Impact, Pollution and Waste Magt 4,522 3,425 1,097 24.3<br />

8. Ecosystems, Bio-diversity and Natural Herit Mngt 102,748 102,372 376 0.4<br />

9. Marine and Coastal Management 1,187 726 461 38.8<br />

Totals 757,973 736,317 21,656<br />

Per Economic Classification<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance<br />

Variance as<br />

% of final<br />

Appropriation<br />

R’000 R’000 R’000 %<br />

Current payment: 154,724 128,555 26,169 12.7<br />

Compensation of employees 95,344 79,459 15,885 16.7<br />

Goods and services 59,380 49,096 10,284 17.3<br />

Transfers and subsidies: 594,386 600,855 (6,469) -1.1<br />

Departmental agencies and accounts 560,386 561,855 (1,469) -0.9<br />

Public corporations and private enterprises 4,000 (4,000) -1.0<br />

Universities - 1,000 (1,000) 0.0<br />

Non-profit institutions 34,000 34,000 - 0.0<br />

Payments for capital assets: 8,863 6,907 1,956 22.1<br />

Machinery and equipment 8,863 6,907 1,956 22.1<br />

Totals 757,973 736,317 21, 656<br />

Reasons for under/over spending.<br />

The Department experienced problems in recruiting staff during the year. While we did<br />

not experience significant losses at management level, the brain drain was more apparent<br />

at operational level posts. Since we were still implementing the organogram that was<br />

approved in May 2006, we continued to face challenges with respect to job evaluations.<br />

Impact on programmes and service delivery<br />

The non-filling of the approved vacant funded post had a negative impact on the expenditure<br />

under economic classification Goods and Services and Capital. The problem was noticeable<br />

in the Environmental Affairs Programme where environmental impact assessments had to<br />

100


e conducted. Lack of capacity also meant that we were not able to provide the necessary<br />

monitoring and oversight role over our agencies and all our operations.<br />

Actions taken or planned to avoid recurrence.<br />

A new electronic Environmental Impact Assessment (EIA) register has been developed<br />

to provide monthly statistics that are reported to the National DEAT on a quarterly basis.<br />

The Environmental Conservation Act (ECA) EIA backlogs have been reduced from 633 (Q1<br />

<strong>2007</strong>/<strong>08</strong>) to approximately 91 cases by the end of the financial year using an appointed<br />

service provider, Ninham Shand.<br />

Development & Implementation of Integrated Waste Management Plans in most Districts<br />

was facilitated and finalized while the Air Quality management plans process started<br />

in the second half of 2006/07 Financial Year. Provincial Hazardous Waste Management<br />

Plans bidding process was initiated.<br />

Virement:<br />

There were no virements made between main divisions or between economic<br />

classification items in main divisions by the department during the year under review.<br />

Any other material matter<br />

(including description of the reasons for unauthorised, fruitless and wasteful expenditure<br />

and the amounts involved as well as steps taken to address and prevent a recurrence.)<br />

There has been a reprinting of <strong>Annual</strong> <strong>Report</strong>s for 2006/07 financial year which resulted<br />

to fruitless and wasteful expenditure amounting to R 149,499.60. The incident has been<br />

reported to the Head of Department.<br />

2 SERVICE RENDERED BY THE DEPARTMENT<br />

The Department provides the following services:<br />

• Economic development:<br />

• Enterprise Development,<br />

• Local Economic Development,<br />

• Economic Empowerment,<br />

• Trade and Investment Promotion,<br />

• Industry Development,<br />

• Tourism Development,<br />

• Corporate Governance,<br />

101


• Consumer Protection,<br />

• Liquor Regulation,<br />

• Gambling and Betting,<br />

• Monitoring & Evaluation,<br />

• Environmental Management and Sustainable Development Policy,<br />

• Legislation, Coordination, Planning, Impact,<br />

• Pollution and Waste Management,<br />

• Ecosystems, Biodiversity and National Heritage Planning;<br />

• Marine and Coastal Management;<br />

• Environmental Management and Sustainable Development Empowerment and Capacity<br />

Building Services;<br />

• Environmental Management and Sustainable Enterprise and Infrastructure<br />

Development.<br />

• Conservation of bio-diversity and the protection of the environment.<br />

• Strategic planning and management and Information management services.<br />

In addition the department was responsible for oversight responsibilities for goods and<br />

services offered by our Public Entities (five public entities and 2 subsidiary public entities)<br />

in the Province.<br />

Tariff policy<br />

The tariff structure of the Department is determined through submissions made and<br />

approved by the MEC.<br />

Current <strong>2007</strong>/<strong>08</strong> approved tariff structure of the Department is listed as follows:<br />

DESCRIPTION<br />

FEE<br />

ENVIRONMENTAL AFFAIRS<br />

Hunting License (RSA)<br />

Hunting License (Ciskei)<br />

R 20.00 per year*<br />

R 10.00 per year*<br />

Permit to act as a Professional Hunter R 50.00 per year *<br />

License to sell protected flora R 20.00 per year *<br />

Professional Hunting register<br />

R 90.00 per register<br />

Fresh water angling licences R 2.00 per year *<br />

Off Road Vehicle permit<br />

Boat launching site<br />

As per Marine and Coastal Management Task<br />

Team recommendation<br />

R5,000 for a three year period from date of issue<br />

EASTERN CAPE LIQUOR ACT, 10/2003<br />

LODGEMENT FEES<br />

102


DESCRIPTION<br />

FEE<br />

Lodgement fees: Temporary registration R 100.00<br />

Lodgement fees: Registration R 300.00<br />

Lodgement fees: To procure a controlling interest in the business to which the<br />

registration relates<br />

R 150.00<br />

Lodgement fees: Transfer of a certificate of registration R 200.00<br />

Lodgement fees: Removal certificate R 200.00<br />

Lodgement fees: For a copy of a registration certificate and<br />

conditions thereto or of any application<br />

R 100.00<br />

Lodgement of an Appeal R 200.00<br />

Registration fees payable in respect of a new registration<br />

Section 20(a) – Retail sale of liquor for consumption off the premises R2,000<br />

Section 20(b) – Retail sale of liquor for consumption on the premises R1 000.00<br />

Section 20(c) – Retail sale and consumption of liquor on and off the premises<br />

(shebeen/tavern)<br />

R 300.00<br />

Section 20 (d) – Retail sale and consumption of liquor at special events R1,000<br />

FEES PAYABLE IN RESPECT OF THE TRANSFER OR REMOVAL OF A REGISTRATION<br />

Section 20(a) – Retail sale of liquor for consumption off the premises R 750.00<br />

Section 20(b) – Retail sale of liquor for consumption on the premises R 500.00<br />

Section 20(c) – Retail sale and consumption of liquor on and off the premises<br />

(shebeen/tavern)<br />

R 100.00<br />

ANNUAL LICENCE FEES<br />

Section 20(a) – Retail sale of liquor for consumption off the premises R1,000<br />

Section 20(b) – Retail sale of liquor for consumption on the premises R 500.00<br />

Section 20(c) – Retail sale and consumption of liquor on and off the premises<br />

(shebeen/tavern)<br />

R 200.00<br />

GENERAL:<br />

Private photostat copies<br />

Private telephone calls<br />

Private faxes send<br />

Official Housing<br />

Domestic services<br />

Contract tariffs<br />

Post Office tariffs<br />

Post Office tariffs<br />

As per tariffs as determined by Department<br />

of Public Works<br />

Actual costs<br />

Note: * These tariffs are linked to the Provincial Legislation and can therefore not be<br />

altered until such time as new Legislation is gazetted.<br />

Liquor Licences<br />

The Eastern Cape Liquor Act no 10 of 2003 regulates the tariffs charged.<br />

103


Gambling Fees and Licences<br />

Free Services<br />

The Department renders statutory free services. These are related to the functions of the<br />

Department in respect of Consumer Affairs. No significant income would be generated<br />

from these services as most of the people served are in the low-income bracket.<br />

Inventories<br />

Inventories are recorded on BIN cards at cost, on receipt of the item. Cost of the inventory<br />

is defined as the total cost of acquisition.<br />

Inventory on hand at year end is valued at R715, <strong>08</strong>8.60 made up as follows:<br />

DESCRIPTION<br />

AMOUNT<br />

Stationery and printing (including computer consumables) 480,801.93<br />

Domestic consumables 184,499.98<br />

Fuel, oil and gas –<br />

Food supplies 12,989.17<br />

Crockery 7,016.19<br />

Others 29,781.33<br />

Total 715,<strong>08</strong>8.60<br />

3 CAPACITY CONSTRAINTS<br />

The Department reviewed the organizational structure, which was approved in May<br />

2006. Immediately thereafter, a process of job evaluation was implemented. This process<br />

is still continuing for all posts above level 8 and the recruitment process is ongoing.<br />

Furthermore challenge was experienced with regard to the retention of staff due to the<br />

competitiveness in employee benefits between Municipalities and the Public Sector,<br />

specifically with regard to scarce skills within key programmes of the Department.<br />

However we also noted that the current organogram was limited in scope. In 20<strong>08</strong>/09<br />

financial year, we will be undertaking a programme of realigning our organogram with<br />

operations and ensuring that we improve operational efficiency through systems,<br />

processes, partnerships, priority projects, job profiles, and teams among other measures.<br />

In particular, we would like to build strong capability<br />

104


4 UTILISATION OF DONOR FUNDS<br />

No donor funding was received.<br />

5 TRADING ENTITIES AND PUBLIC ENTITIES<br />

The following is a brief summary of functions of Public Entities under our control:<br />

NAME OF PUBLIC ENTITY<br />

Eastern Cape Development<br />

Corporation (ECDC)<br />

Eastern Cape Tourism Board (ECTB)<br />

The Eastern Cape Gambling and<br />

Betting Board (ECGBB)<br />

LEGISLATION UNDER WHICH<br />

ESTABLISHED<br />

National Small Business Act of 1995.<br />

Businesses Act 71 of 1991.<br />

Eastern Cape Development Corporation<br />

Act 2 of 1997 (EC).<br />

Policy documents from the DTI.<br />

Eastern Cape Tourism Board Act No 8 of<br />

2003 (EC).<br />

Gambling and Betting Act 5 of 1997 (EC).<br />

MAIN PURPOSE OF THE PUBLIC ENTITY/REASONS<br />

FOR TRANSFERS<br />

To facilitate economic development in the<br />

Province by promoting investment, small<br />

business development and innovative<br />

development financing.<br />

To promote and facilitate tourism and tourism<br />

development in the Province, including<br />

sustainable investment and job creation.<br />

To regulate and manage the gambling and<br />

betting industry in the Province.<br />

The Eastern Cape Liquor Board The Liquor Act No 10 of 2003. To regulate and manage the retail sale of liquor in<br />

the Province.<br />

The Coega Development<br />

Corporation<br />

(ECDC subsidiary)<br />

The East London Development<br />

Zone Corporation<br />

(ECDC subsidiary)<br />

The Industrial Development Zone<br />

Programme of the DTI.<br />

The Industrial Development Zone<br />

Programme of the DTI.<br />

To promote and facilitate the establishment of<br />

the Coega IDZ and the new deepwater Coega Port<br />

as a focus for private sector investment.<br />

To promote and facilitate the establishment of<br />

the East London IDZ and the further development<br />

of the Port of East London as a focus for private<br />

sector investment.<br />

Eastern Cape Consumer Tribunal Consumer Affairs Act No 5 of 1998. To adjudicate disputes arising from unfair<br />

business practices in the Province.<br />

6 ORGANISATIONS TO WHOM TRANSFER PAYMENTS WERE MADE<br />

The Department supports 5 public entities and 2 subsidiaries. In <strong>2007</strong>/<strong>08</strong> financial year,<br />

the following was allocated to our public entities:<br />

AGENCY/ACCOUNT<br />

TRANSFER ALLOCATION (R’000)<br />

Eastern Cape Tourism Board 22,500<br />

Eastern Cape Gambling and Betting Board 20,233<br />

Coega Development Co-operation 25,200<br />

East London Industrial Development Zone 192,000<br />

Eastern Cape Parks Board 99,407<br />

105


AGENCY/ACCOUNT<br />

TRANSFER ALLOCATION (R’000)<br />

Eastern Cape Development Corporation 180,210<br />

Eastern Cape Liquor Board 22,305<br />

Universities 1,000<br />

Private Enterprises 4,000<br />

Local Economic Development 30,000<br />

Non Profit Institution 4,000<br />

TOTAL 600,855<br />

With regard to reasons for transfers, see 4.1.5 above.<br />

7 CORPORATE GOVERNANCE ARRANGEMENTS<br />

Internal Audit<br />

The Department made use of shared internal audit services which was located in<br />

Provincial Treasury, in terms of section 38 (1) (a) (ii) of the PFMA, under the direction of<br />

the Audit Committee. This assisted the Department in accomplishing its objectives by<br />

bringing a systematic disciplined approached to the evaluation and improvement of the<br />

effectiveness of risk management, internal control and governance processes.<br />

Audit Committee<br />

The department has a functioning Audit Committee which has been established in terms<br />

of Section 77 of the PFMA. The Committee meets to evaluate the effectiveness of the<br />

corporate governing structures and offer guidance for compliance purposes.<br />

The committee has held its four (4) statutory meetings during the 2207/20<strong>08</strong> financial year. It has<br />

reviewed and agreed the SIAS operational plan for the department and compliance issues.<br />

Internal Control<br />

The Department established an internal control unit within the Department through<br />

financial management information system interface. The turnaround time for payment of<br />

creditors was within the prescribed time frames in terms of the applicable legislation.<br />

Supply Chain Management<br />

The Department implemented an electronic procurement system ensuring compliance<br />

with the PFMA and Supply Chain Management Framework to:<br />

• Establish an electronic supplier data base<br />

• Ensure rotation of suppliers<br />

• Establish an electronic audit trail<br />

106


• To ensure effective and efficient record management of SCM documentation<br />

• Ensure reduction in turnaround time<br />

• Produce an electronic asset management system<br />

Risk Management<br />

The Department, through the engagement of the service provider developed a risk<br />

strategy framework and departmental risk register. Subsequent to which a departmental<br />

risk committee was established.<br />

Fraud Management<br />

A Fraud Prevention Plan was developed and approved.<br />

Committees<br />

The Department established various committees; these include the various Bidding<br />

Committees and the Monitoring & Evaluation Committee. Furthermore monthly top<br />

management forum meetings were held to discuss strategic issues.<br />

Financial Management<br />

The department drew up an intervention plan to address all the weaknesses that were<br />

raised by the Auditor-General in the previous year. Provincial Treasury seconded a CFO<br />

Support to the department to assist it in the implementation of the plans.<br />

Policies<br />

The following under listed Departmental policies are in place:<br />

• Resettlement Policy<br />

• Special Leave Policy<br />

• Induction Policy<br />

• Supply Chain Management Framework<br />

• Revenue Strategy<br />

• Political Office Bearers Vehicle Policy<br />

• Asset Management Policy<br />

• Financial Rules<br />

• Debts Write-off Policy<br />

8 DISCONTINUED ACTIVITIES/ACTIVITIES TO BE DISCONTINUED<br />

No activities were discontinued or will be discontinued.<br />

107


9 NEW/PROPOSED ACTIVITIES<br />

The Department aims to develop strong monitoring and evaluation capacity, and<br />

strengthening of regional offices as well as planning economic development and<br />

environmental management for the whole Province. We also propose to implement the<br />

industrial development action plans by employing sector specialists and other focal skills<br />

to implement our mandate.<br />

Communities and citizens of the Province are an important player in our operations.<br />

The Department, working together with other government departments, will prepare<br />

and mobilize these groups in order for them to benefit from public entity programmes.<br />

Additionally a more focused approach towards provision of local government support<br />

will be pursued. The departmental outreach programme, which was initiated in <strong>2007</strong>/<strong>08</strong>,<br />

will be deepened in 20<strong>08</strong>/09. Priority focal projects through the HIPPs and 24 priority<br />

projects will be implemented in 20<strong>08</strong>/09. These include:<br />

• Business process outsourcing (BPO) projects<br />

• Supplier development support measures<br />

• Skills development and market access<br />

• Incubator projects for priority sectors (9 sectors selected for the Province)<br />

• Investment promotion and facilitation strategy<br />

• Payment call centre and integrated call centre for the province<br />

• Creation of register of investors for the province<br />

• Conduct trade analysis for the province<br />

• BEE entry into the manufacturing sector<br />

• Local procurement strategy<br />

• Completion of tourism development strategy and plan<br />

• Mentorship of tourism operators<br />

• Fast tracking of EIA processes<br />

• Integration and support of regional tourism authorities<br />

• Craft development programme<br />

• Training of tourism ambassadors<br />

The Department continues to play a critical role in developing the eastern part of the<br />

Province. The Provincial ASGISA Programme for Umzimvubu will be implemented.<br />

The Department is participating in the preparation of the 2010 soccer showpiece. Our<br />

efforts are related to economic and tourism opportunities. Our priority is to develop<br />

projects linked to community participation and involvement through the Provincial<br />

2010 tourism readiness plan. Already the department has engaged the services of a 2010<br />

1<strong>08</strong>


tourism manager to focus on departmental 2010 projects with a total value of R100<br />

million in 20<strong>08</strong>/09 financial year<br />

10 ASSET MANAGEMENT<br />

The Department engaged the services of a service provider to ensure the roll out of<br />

an electronic procurement system to comply with the PFMA and the Supply Chain<br />

Management Framework to produce an electronic asset management system. The Asset<br />

Management Policy of the Department has been approved. The Department is in the<br />

process of identifying items to be disposed off.<br />

11 EVENTS AFTER THE REPORTING DATE<br />

There was a provincial dispute with the Department of Roads and Transport with regards<br />

to services rendered by Fleet Africa which resulted to a legal decision whereby the<br />

department was ordered to pay an amount of R 1 023 878.67 due to outstanding payments<br />

including interest accrued for R 402 669.99. The amount was subsequently paid by the<br />

department in 20<strong>08</strong>/09 financial year. The amount was disclosed as an accrual in the<br />

disclosure notes to the annual financial statements for the year ended 31 March 20<strong>08</strong>.<br />

12 PERFORMANCE INFORMATION<br />

During the <strong>2007</strong>/<strong>08</strong> financial year, the Strategic Planning Unit endeavoured to establish<br />

formal processes which will deliver performance information. Due to capacity constraints<br />

the anticipated processes was not realized as planned. The Unit however planned all<br />

processes against the background of the Framework for Programme Performance<br />

Information of National Treasury and the Government-Wide Monitoring & Evaluation<br />

System of The Presidency. The main process for delivering performance information<br />

was through the coordination of quarterly performance reports of all programmes and<br />

sub-programmes of the Department. Towards the end of the <strong>2007</strong>/<strong>08</strong> financial year the<br />

Strategic Planning Unit together with the newly established Monitoring & Evaluation<br />

Unit embarked on a robust strategy for initiating formal processes for monitoring<br />

performance information of the Department.<br />

The urgency for this development was underscored by the Provincial Monitoring<br />

& Evaluation Framework of the Office of the Premier and the Policy Framework for<br />

109


Government-Wide Monitoring & Evaluation issued by the Presidency in November <strong>2007</strong>.<br />

The aforementioned strategies are captured in the Department <strong>Annual</strong> Performance Plan<br />

of 20<strong>08</strong>/09. As part of the envisaged Departmental monitoring-system for the 20<strong>08</strong>/09<br />

financial year, the Monitoring & Evaluation Unit initiated a Monthly Performance<br />

<strong>Report</strong>ing-system for all Programmes of the Department in order to build-up a database<br />

of information which will enable analysis and evaluation. The Monitoring & Evaluation<br />

Unit plans to expand its capacity during the 20<strong>08</strong>/09 financial year in order to fully<br />

adhere to the requirements from The Presidency and National Treasury. The Monitoring &<br />

Evaluation Unit realizes the urgency to monitor its Public Entities much more effectively<br />

and is consciously working towards achieving that state of affairs.<br />

13 SCOPA RESOLUTIONS<br />

Include a table in the management report on the SCOPA resolutions. The table should<br />

conform to the following format:<br />

REFERENCE TO PREVIOUS<br />

AUDIT REPORT AND SCOPA<br />

RESOLUTIONS<br />

SUBJECT<br />

FINDINGS ON PROGRESS<br />

Unauthorised Expenditure for<br />

2003/04 & 2005/06<br />

Compensation of Employees<br />

Goods and Services<br />

Local and Foreign Assistance<br />

Unauthorised expenditure amounting to<br />

R3,827 million<br />

Transfer of employees to the Eastern Cape<br />

Parks Board<br />

Non-submission of documentation<br />

requested<br />

Incorrect disclosure of the revenue and<br />

expenditure<br />

An unauthorised expenditure amounting to<br />

R382, 000 for 2003/04 was approved by SCOPA.<br />

However, R772, 000 for 2003/04 & 2005/06 was<br />

not considered as an unauthorised expenditure<br />

and R 2,673 million for 2005/06 was not approved.<br />

The findings for the 2005/06 & 2006/07 financial<br />

years have as yet not been tabled<br />

See above<br />

See above<br />

Housing Guarantees Incorrect disclosure of Contingent Liability See above<br />

Commitments Incorrect commitments listed. See above<br />

Lease Commitments Incorrect Lease Commitments exposure See above<br />

Capital Assets No proper Fixed Assets Register See above<br />

Leave Entitlement Incorrect calculation of leave entitlements See above<br />

Journals Inadequate narrations to Journals See above<br />

110


14 PRIOR MODIFICATIONS TO AUDIT REPORTS<br />

• Actual Verification System (AVS) has been implemented as a mechanism to address the<br />

audit findings by the Auditor General.<br />

• Proqure & Proquote System was utilised to generate the commitment register<br />

• Appointment and absorption of internship programme and unemployed graduates<br />

15 OTHER<br />

A new Head of Department was appointed in November <strong>2007</strong> and a new Chief Director<br />

for Economic Development was appointed in February 20<strong>08</strong>.<br />

16 APPROVAL<br />

The <strong>Annual</strong> Financial Statements set out on pages 20 to 72 have been approved by the<br />

Accounting Officer.<br />

Dr E Nkem-Abonta<br />

Head of Department<br />

31 May 20<strong>08</strong><br />

111


3.2 <strong>Report</strong> of the Auditor General<br />

REPORT OF THE AUDITOR-GENERAL TO THE EASTERN CAPE PROVINCIAL LEGISLATURE<br />

ON THE FINANCIAL STATEMENTS AND PERFORMANCE INFORMATION OF VOTE NO. 9:<br />

DEPARTMENT OF ECONOMIC DEVELOPMENT AND ENVIRONMENTAL AFFAIRS FOR THE<br />

YEAR ENDED 31 MARCH 20<strong>08</strong><br />

REPORT ON THE FINANCIAL STATEMENTS<br />

1.<br />

Introduction<br />

I have audited the accompanying financial statements of the Department of Economic<br />

Development and Environmental Affairs which comprise the appropriation statement,<br />

statement of financial position as at 31 March 20<strong>08</strong>, statement of financial performance,<br />

statement of changes in net assets and cash flow statement for the year then ended, and<br />

a summary of significant accounting policies and other explanatory notes, as set out on<br />

pages 102 to 169.<br />

Responsibility of the accounting officer for the financial statements<br />

2. The accounting officer is responsible for the preparation and fair presentation of<br />

these financial statements in accordance with the modified cash basis of accounting<br />

determined by the National Treasury, as set out in accounting policy note 1 and in the<br />

manner required by the Public Finance Management Act, 1999 (Act No. 1 of 1999) (PFMA).<br />

This responsibility includes:<br />

• designing, implementing and maintaining internal control relevant to the preparation<br />

and fair presentation of financial statements that are free from material misstatement,<br />

whether due to fraud or error<br />

• selecting and applying appropriate accounting policies<br />

• making accounting estimates that are reasonable in the circumstances.<br />

3.<br />

Responsibility of the Auditor-General<br />

As required by section 188 of the Constitution of the Republic of South Africa, 1996 read<br />

with section 4 of the Public Audit Act, 2004 (Act No. 25 of 2004) (PAA), my responsibility is<br />

to express an opinion on these financial statements based on my audit.<br />

4.<br />

I conducted my audit in accordance with the International Standards on Auditing and<br />

General Notice 616 of 20<strong>08</strong>, issued in Government Gazette No. 31057 of 15 May20<strong>08</strong>.<br />

Those standards require that I comply with ethical requirements and plan and perform<br />

the audit to obtain reasonable assurance on whether the financial statements are free<br />

from material misstatement.<br />

112


5.<br />

An audit involves performing procedures to obtain audit evidence about the amounts<br />

and disclosures in the financial statements. The procedures selected depend on the<br />

auditor’s judgement, including the assessment of the risks of material misstatement of<br />

the financial statements, whether due to fraud or error. In making those risk assessments,<br />

the auditor considers internal control relevant to the entity’s preparation and fair<br />

presentation of the financial statements in order to design audit procedures that are<br />

appropriate in the circumstances, but not for the purpose of expressing an opinion on<br />

the effectiveness of the entity’s internal control.<br />

6. An audit also includes evaluating the:<br />

• appropriateness of accounting policies used<br />

• reasonableness of accounting estimates made by management<br />

• overall presentation of the financial statements.<br />

7.<br />

I believe that the audit evidence I have obtained is sufficient and appropriate to provide<br />

a basis for my audit opinion.<br />

Basis of accounting<br />

The department’s policy is to prepare financial statements on the modified cash basis of<br />

accounting determined by the National Treasury, as set out in accounting policy note 1.<br />

Basis for qualified opinion<br />

8.<br />

Capital assets<br />

The department did not exercise sufficient controls over the maintenance of the fixed<br />

asset register. As a result, the fixed asset register submitted for audit purposes totaled<br />

R7,8 million whereas the closing balance disclosed in disclosure note 28 totals R24,6<br />

million resulting in a misstatement of R16,8 million for which the department are unable<br />

to provide an adequate explanation. Furthermore, additions to tangible assets disclosed<br />

in disclosure note 28.1 to the annual financial statements have been understated by<br />

an amount of R1,5 million included in accruals, in respect of machinery and equipment<br />

purchased and received prior to year end but not paid for. In addition, the fixed asset<br />

register did not contain adequate information to enable me to confirm the existence of<br />

assets contained therein.<br />

9.<br />

Consequently, I was unable to verify the accuracy, existence, completeness and valuation<br />

of assets included in the tangible assets closing balance of R24,6 million as disclosed in<br />

disclosure note 28 to the financial statements.<br />

113


10.<br />

Accruals<br />

I was unable to obtain sufficient appropriate audit evidence for accruals to the value<br />

of R445 678. In addition, accruals has been overstated by an amount of R1,04 million<br />

representing expenditure paid for during the year and invoices for which goods and<br />

services had not yet been received at year end and understated by an amount of R452 952<br />

representing goods and services received during the year but were not paid for at year<br />

end. Consequently, I was not able to verify the existence, completeness and accuracy of<br />

accruals disclosed in disclosure note 21 to the financial statements in the amount of<br />

R4,38 million.<br />

11.<br />

Commitments<br />

I was unable to obtain sufficient appropriate audit evidence for commitments to the<br />

value of R417 290. In addition, amounts totaling R558 050 are included in accruals and<br />

should have been disclosed as commitments. It was thus not possible to confirm the<br />

existence, completeness and accuracy of the commitments disclosed in disclosure note<br />

20 to the financial statements in the amount of R1,4 million.<br />

12.<br />

Departmental revenue to be surrendered to the revenue fund<br />

I was unable to obtain sufficient appropriate audit evidence for departmental revenue<br />

to be surrendered to the revenue fund as disclosed at R5,4 million in the statement of<br />

financial position and note 15 to the financial statements. Alternative audit procedures<br />

that were performed and according to a confirmation received from the provincial<br />

revenue fund resulted in the conclusion that this amount is understated by R5.5 million.<br />

The department was not able to provide an adequate explanation for the difference.<br />

13.<br />

Contingent liabilities<br />

I was unable to obtain sufficient appropriate audit evidence related to the housing loan<br />

guarantees to the value of R553 870.Alternative procedures were performed but were not<br />

successful to enable me to confirm the accuracy, validity and classification of the amount<br />

of R1.2 million disclosed in disclosure note 19 to the financial statements.<br />

Qualified opinion<br />

14. In my opinion, except for the effects of the matters described in the Basis for qualified<br />

opinion paragraphs, the financial statements present fairly, in all material respects, the<br />

financial position of the Department of Economic Development and Environmental<br />

Affairs as at 31 March 20<strong>08</strong> and its financial performance and cash flows for the year<br />

then ended, in accordance with the modified cash basis of accounting and in the manner<br />

required by the PFMA.<br />

114


Emphasis of matters<br />

I draw attention to the following matters:<br />

Highlighting critically important matters presented or disclosed in the financial<br />

statements<br />

15.<br />

Irregular expenditure<br />

As disclosed in note 25 to the financial statements, irregular expenditure amounting<br />

to R6,5 million was incurred by the department during the year ended 31 March 20<strong>08</strong>.<br />

This expenditure relates to departmental funds committed without the approval of the<br />

provincial legislature, as required by Treasury Regulation 21.1.1.<br />

Fruitless and wasteful expenditure<br />

16. As disclosed in note 10 to the financial statements, fruitless and wasteful<br />

expenditure amounting to R149 000 was incurred by the department for the year<br />

ended 31 March 20<strong>08</strong>.<br />

17.<br />

Material under spending of the budget<br />

As disclosed in the appropriation statement, the department has materially under spent<br />

its budget to the amount of R21,4 million for the financial year under review.<br />

18.<br />

Restatement of corresponding figures<br />

Disclosure note 10 and annexure 3A to the annual financial statements indicates that the<br />

previously issued financial statements were restated due to the department attempts to<br />

rectify the disclosure of housing guarantees.<br />

OTHER MATTERS<br />

I draw attention to the following matters that relate to my responsibilities in the audit<br />

of the financial statements:<br />

115


19.<br />

Internal controls<br />

Section 38(1)(a)(i) of the PFMA states that the accounting officer must ensure that the<br />

department has and maintains effective, efficient and transparent systems of financial<br />

and risk management and internal control. The table below depicts the root causes that<br />

gave rise to the inefficiencies in the system of internal control, which led to the qualified<br />

opinion. The root causes are categorised according to the five components of an effective<br />

system of internal control. In some instances deficiencies exist in more than one internal<br />

control component.<br />

REPORTING ITEM<br />

CONTROL<br />

ENVIRONMENT<br />

RISK<br />

ASSESSMENT<br />

CONTROL<br />

ACTIVITIES<br />

INFORMATION<br />

AND COMMUNI-<br />

CATION<br />

MONITORING<br />

Capital assets<br />

<br />

Accruals<br />

<br />

Commitments<br />

<br />

Departmental revenue to be<br />

surrendered to the revenue fund<br />

<br />

Contingent liabilities <br />

• Control environment: establishes the foundation for the internal control system by providing fundamental discipline and<br />

structure for financial reporting.<br />

• Risk assessment: involves the identification and analysis by management of relevant financial reporting risks to achieve<br />

predetermined financial reporting objectives.<br />

• Control activities: policies, procedures and practices that ensure that management’s financial reporting objectives are achieved<br />

and financial reporting risk mitigation strategies are carried out.<br />

• Information and communication: supports all other control components by communicating control responsibilities for financial<br />

reporting to employees and by providing financial reporting information in a form and time frame that allows people to carry<br />

out their financial reporting duties.<br />

• Monitoring: covers external oversight of internal controls over financial reporting by management or other parties outside the<br />

process; or the application of independent methodologies, like customised procedures or standard checklists, by employees<br />

within a process.<br />

Matters of governance<br />

20. The PFMA tasks the accounting officer with a number of responsibilities concerning<br />

financial and risk management and internal control. Fundamental to achieving this is the<br />

implementation of certain key governance responsibilities, which I have assessed as follows:<br />

MATTER OF GOVERNANCE YES NO<br />

Audit committee<br />

The department had an audit committee in operation throughout the financial year.<br />

The audit committee operates in accordance with approved, written terms of reference.<br />

<br />

<br />

The audit committee substantially fulfilled its responsibilities for the year, as set out in section 77 of the PFMA<br />

and Treasury Regulations 3.1.10.<br />

<br />

Internal audit<br />

The department had an internal audit function in operation throughout the financial year.<br />

<br />

116


MATTER OF GOVERNANCE YES NO<br />

The internal audit function operates in terms of an approved internal audit plan.<br />

The internal audit function substantially fulfilled its responsibilities for the year, as set out in Treasury<br />

Regulations 3.2.<br />

Other matters of governance<br />

The annual financial statements were submitted for audit as per the legislated deadlines (section 40 of the<br />

PFMA).<br />

The financial statements submitted for audit were not subject to any material amendments resulting from the<br />

audit.<br />

No significant difficulties were experienced during the audit concerning delays or the unavailability of<br />

expected information and/or the unavailability of senior management.<br />

The prior year's external audit recommendations have been substantially implemented.<br />

SCOPA resolutions have been substantially implemented.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

OTHER REPORTING RESPONSIBILITIES<br />

<strong>Report</strong> on Performance Information<br />

21.<br />

I have reviewed the performance information as set out on pages 32 to 99.<br />

Responsibility of the accounting officer for the performance information<br />

22. The accounting officer has additional responsibilities as required by section 40(3)(a)<br />

of the PFMA to ensure that the annual report and audited financial statements fairly<br />

present the performance against predetermined objectives of the department.<br />

Responsibility of the Auditor-General<br />

23. I conducted my engagement in accordance with section 13 of the PAA read with General<br />

Notice 616 of 20<strong>08</strong>, issued in Government Gazette No. 31057 of 15 May 20<strong>08</strong>.<br />

24. In terms of the foregoing my engagement included performing procedures of an audit<br />

nature to obtain sufficient appropriate evidence about the performance information<br />

and related systems, processes and procedures. The procedures selected depend on the<br />

auditor’s judgement.<br />

25. I believe that the evidence I have obtained is sufficient and appropriate to provide a basis<br />

for the audit findings reported below.<br />

117


Audit findings (performance information)<br />

Non-compliance with regulatory requirements<br />

26. Supporting evidence that performance reports for each quarter were compiled and<br />

submitted to the executive authority, as required by Treasury Regulation 5.3.1, could not be<br />

produced for audit purposes. Consequently, it was not possible to ascertain whether effective<br />

performance monitoring, evaluation and corrective action had been implemented.<br />

27.<br />

Measurable objectives not consistent<br />

The strategic plan of the department did not in all respects include measurable objectives<br />

and expected outcomes, as required by Treasury Regulation 5.2.2(d).<br />

Lack of sufficient appropriate audit evidence<br />

28. Sufficient appropriate audit evidence could not be obtained in relation to performance<br />

information in respect of programmes 3 and 9 to substantiate the actual performance as<br />

reported in the annual report of the department.<br />

OTHER REPORTS<br />

Investigations<br />

29. An independent investigation is being conducted to probe the potential deviations from<br />

normal payment procedures and processes. The investigation was still ongoing at the<br />

reporting date.<br />

APPRECIATION<br />

30. The assistance rendered by the staff of the Department of Economic Development and<br />

Environmental Affairs during the audit is sincerely appreciated.<br />

East London<br />

31 July 20<strong>08</strong><br />

118


4.3 <strong>Report</strong> of the Audit Committee<br />

1 OVERVIEW<br />

We are pleased to present our report for the financial year ended 31 March 20<strong>08</strong>.<br />

2 AUDIT COMMITTEE MEMBERS AND ATTENDANCE<br />

The Audit Committee consists of the members listed hereunder and meets as often as it<br />

deems necessary as per the approved terms of reference.<br />

During the period under review, there were six meetings held.<br />

NAME OF MEMBER POSITION DATE APPOINTED # OF MEETINGS<br />

HELD<br />

Mr. V.G. Magan Chairperson December 2005 6 6<br />

Ms. L. Steele Member December 2005 6 6<br />

Ms. H.N. Jaxa Member December 2005 6 6<br />

Mr. M du Toit Member November 2006 6 6<br />

# OF MEETINGS<br />

ATTENDED<br />

3 AUDIT COMMITTEE RESPONSIBILITY<br />

The Audit Committee reports that it has complied with its responsibilities arising from<br />

Section 38(1) (a) of the Public Finance Management Act and Treasury Regulations<br />

The Audit Committee also reports that it has adopted appropriate formal terms<br />

of reference as its audit committee charter, has regulated its affairs in compliance<br />

with its charter and has discharged its responsibilities as contained therein.<br />

4 THE EFFECTIVENESS OF INTERNAL CONTROL<br />

During the year under review internal audit performed certain assignments. <strong>Report</strong>s<br />

presented to management highlighted certain internal control weaknesses where<br />

management had failed to comply with certain prescripts and/or legislation.<br />

Management acknowledged the findings and recommendations of internal audit.<br />

However, difficulties are often experienced by the department in terms of implementing<br />

these recommendations.<br />

119


Internal Audit<br />

The province has a shared internal audit services (SIAS) and audit committee function in<br />

respect of 8 departments which is administered by the Provincial Treasury Department.<br />

As required by the Institute of Internal Auditors, an external quality assurance review<br />

commenced in March 20<strong>08</strong>.<br />

SIAS continues to experience an inherent challenge of high staff turnover and is in the<br />

process of identifying means of attending to this matter.<br />

Notwithstanding these constraints, the audit committee is satisfied that the internal<br />

audit function operated effectively and efficiently during the year under review.<br />

5 GOVERNANCE<br />

Risk Management<br />

A service provider was engaged to develop a risk strategy and a departmental risk register.<br />

These documents are still in draft stage and will be further refined and adopted in the<br />

forthcoming financial year.<br />

6 EVALUATION OF FINANCIAL STATEMENTS<br />

The Audit Committee concurs and accepts the Auditor Generals’ conclusions on the annual<br />

financial statements and is of the opinion that the audited annual financial statements<br />

be accepted and read together with the report of the Auditor General with the exception<br />

of items under matters of governance relating to the Audit Committee and the Internal<br />

Audit function, in that, in our opinion, substantial compliance has been achieved.<br />

7 APPRECIATION<br />

The committee expresses its sincere appreciation to the Honorable MEC, Accounting<br />

Officer, Senior Management team, Shared Internal Audit Services and the Auditor General.<br />

Chairperson of the Audit Committee<br />

Date: 30 July 20<strong>08</strong><br />

120


3.4. APPROPRIATION STATEMENT<br />

for the year ended 31 March 20<strong>08</strong><br />

APPROPRIATION PER PROGRAMME<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Variance<br />

Actual<br />

Expenditure<br />

Expenditure<br />

as %<br />

of final<br />

Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

1.Administration<br />

Current payment 75,100 75,100 69,344 5,756 92.3 65,824 53,450<br />

Transfers and subsidies 4,000 4,000 4,000 – 100 25 26<br />

Payment for capital assets 5,614 5,614 4,773 841 85.0 5,111 3,262<br />

2. Integrated Economic Development Services<br />

Current payment 21,056 21,056 13,177 7,879 62.6 18,854 15,654<br />

Transfers and subsidies 1<strong>08</strong>,031 1<strong>08</strong>,031 113,500 (5,469) 105.1 85,007 85,0<strong>08</strong><br />

Payment for capital assets 600 600 460 140 76.7 1,159 270<br />

3. Trade & Industry Development<br />

Current payment 3,389 3,389 3,212 177 94.8 – –<br />

Transfers and subsidies 340,410 340,410 340,410 – 100.0 360,331 360,331<br />

Payment for capital assets 200 200 48 152 24.0 – –<br />

4. Business Regulations & Governance<br />

Current payment 3,939 3,939 3,614 325 91.7 3,268 2,097<br />

Transfers and subsidies 42,538 42,538 42,538 – 100.0 33,637 33,637<br />

Payment for capital assets – – 2 (2) 0.0 – –<br />

5. Economic Planning<br />

Current payment 1,000 1,000 373 627 37.3 – –<br />

Transfers and subsidies – – – – – – –<br />

Payment for capital assets – – – – – – –<br />

6. Environmental Management SDP L & CO & MO<br />

Current payment 40,280 40,280 31,022 9,258 77.0 41,856 14,227<br />

Transfers and subsidies – – 1,000 (1,000) 0 43 –<br />

Payment for capital assets 2,449 2,449 1,624 825 66.3 1,000 405<br />

7. Planning, Impact Pol & Waste<br />

Current payment 4,522 4,522 3,425 1,097 75.7 2,056 846<br />

Transfers and subsidies – – – – – – –<br />

Payment for capital assets – – – – – – –<br />

8. Ecosystems Bio & Nat Her Ma<br />

Current payment 3,341 3,341 2,965 376 88.7 3,315 27,236<br />

Transfers and subsidies 99,407 99,407 99,407 – 100.0 79,700 79,739<br />

Payment for capital assets – – – – – – –<br />

121


Adjusted<br />

Appropriation<br />

Shifting<br />

of Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Variance<br />

Actual<br />

Expenditure<br />

Expenditure<br />

as %<br />

of final<br />

Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

9. Marine & Coastal Management<br />

Current payment 1,187 1,187 726 461 61.2 1,226 422<br />

Transfers and subsidies – – – – 0.0 – –<br />

Payment for capital assets – – – – 0.0 – –<br />

Subtotal 757,063 757,063 735,620 21,443 97.2 702,412 676,610<br />

Statutory Appropriation<br />

Current payment 910 910 697 213 76.6 810 480<br />

Transfers and subsidies<br />

Payment for capital assets<br />

TOTAL 757,973 757,973 736,317 21,656 97.1 703,222 677,090<br />

Reconciliation with Statement of Financial Performance<br />

Add:<br />

Prior year unauthorised expenditure approved with funding 382<br />

Departmental receipts 8,048 635<br />

Local and foreign aid assistance received –<br />

Actual amounts per Statements of<br />

Financial Performance (Total revenue) 766,403 703,857<br />

Add:<br />

Local and foreign aid assistance<br />

Prior year unauthorised expenditure approved 3,055<br />

Prior year fruitless and wasteful expenditure authorised<br />

Actual amounts per Statements of Financial Performance<br />

(Total expenditure) 739,372 677,090<br />

122


APPROPRIATION PER ECONOMIC CLASSIFICATION<br />

Current payments<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Compensation of employees 94,434 94,434 78,762 15,672 83.4 86,758 73,614<br />

Goods and services 59,380 59,380 49,096 10,284 82,7 49,641 40,318<br />

Interest and rent on land<br />

Financial transactions in<br />

assets and liabilities<br />

Transfers and subsidies<br />

Provinces and municipalities<br />

Departmental agencies<br />

and accounts<br />

560,386 560,386 561,855 (1,469) 100.3 538,668 538,668<br />

Universities and technikons 1,000 (1,000) 0<br />

Foreign governments and<br />

international organisations<br />

Public corporations and private<br />

enterprises<br />

4,000 (4,000) 0<br />

Non-profit institutions 34,000 34,000 34,000 - 100.0 20,000 20,000<br />

Households 75 73<br />

Payments for capital assets<br />

Buildings and other fixed structures<br />

Machinery and equipment 8,863 8,863 6,907 1,956 77.9 7,270 3,937<br />

Biological or cultivated assets<br />

Software and other intangible assets<br />

Land and subsoil assets<br />

Total 757,063 757,063 735,620 21,443 97.2 702,412 676,610<br />

123


STATUTORY APPROPRIATION<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

List all direct charges against the<br />

National/Provincial Revenue Fund<br />

President and Deputy President<br />

salaries<br />

Member of executive committee/ 910 910 697 213 76.6 810 480<br />

parliamentary officers/legislature<br />

Judges and magistrates salaries<br />

Sector education and training<br />

authorities (SETA)<br />

National Skills Fund<br />

TOTAL 910 910 697 213 76.6 810 480<br />

124


DETAILS PER PROGRAMME FOR THE YEAR ENDED 31 MARCH 20<strong>08</strong><br />

Programme 1 – Administration<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

1.1 Office of the MEC<br />

Current Payment 5,538 5,538 5,322 216 96.1 5,411 4,788<br />

Transfers and Subsidies 2 1<br />

Payment for Capital Assets 200 200 123 77 61.5 106<br />

1.2 Office of the HOD<br />

Current Payment 27,115 27,115 22,173 4,942 81.8 22,201 12,934<br />

Transfers and Subsidies 4,000 4,000 4,000 0 100.0 12 4<br />

Payment for Capital Assets 4,002 4,002 3,267 735 81.6 3,805 2,735<br />

1.3 Financial Management<br />

Current Payment 21,698 21,698 22,117 (419) 101.9 21,685 23,503<br />

Transfers and Subsidies 7 17<br />

Payment for Capital Assets 700 700 719 (19) 102.7 800 293<br />

1.4 Corporate Services<br />

Current Payment 20,749 20,749 19,732 1,017 95.1 16,527 12,225<br />

Transfers and Subsidies 4 4<br />

Payment for Capital Assets 712 712 664 48 93.3 400 234<br />

TOTAL 84,714 84,714 78,117 6,597 92.2 70,960 56,738<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 42,890 42,890 38,632 4,258 90.1 39,170 28,746<br />

Goods and services 32,210 32,210 30,712 1,498 95.3 26,654 24,704<br />

Transfers and subsidies to:<br />

Non-profit institutions 4,000 4,000 4,000 0 100.0<br />

Households 25 26<br />

Payments for capital assets:<br />

Machinery and equipment 5,614 5,614 4,773 841 85.0 5,111 3,262<br />

TOTAL 84,714 84,714 78,117 6,597 92.2 70,960 56,738<br />

125


Programme 2 – Integrated Economic Development Services<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

2.1 Enterprise Development<br />

Current Payment 18,070 18,070 11,467 6,603 63.5 2,800 2,319<br />

Transfers and Subsidies 11,031 11,031 15,500 (4,469) 140.5<br />

Payment for Capital Assets 600 600 460 140 76.7<br />

2.2 Local Economic Development<br />

Current Payment 2,986 2,986 1,710 1,276 57.3 1,119 626<br />

Transfers and Subsidies 30,000 30,000 31,000 (1,000) 103.3 20,000 20,000<br />

Payment for Capital Assets 93<br />

2.3 Economic Development<br />

Current Payment 14,935 12,709<br />

Transfers and Subsidies 67,000 67,000 67,000 0 100.0 65,007 65,0<strong>08</strong><br />

Payment for Capital Assets 1,159 177<br />

TOTAL 129,687 129,687 127,137 2,550 98.0 105,020 100,932<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 14,059 14,059 12,021 2,038 85.5 13,263 10,262<br />

Goods & Services 6,997 6,997 1,156 5,841 16.5 5,591 5,392<br />

Transfers and subsidies to:<br />

Departmental agencies and<br />

78,031 78,031 79,500 (1,469) 101.9 65,000 65,000<br />

accounts<br />

Public corporations and private<br />

4,000 (4,000)<br />

enterprises<br />

Non-profit institutions 30,000 30,000 30,000 0 100.0 20,000 20,000<br />

Households 7 8<br />

Payments for capital assets:<br />

Machinery and equipment 600 600 460 140 76.7 1,159 270<br />

TOTAL 129,687 129,687 127,137 2,550 98.0 105,020 100,932<br />

126


Programme 3 – Trade and Industry Development<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

3.1 Trade & Investment Development<br />

Transfers and Subsidies 20,410 20,410 20,410 0 100.0 14,200 14,200<br />

3.2 Sector Development<br />

Current Payment 3,389 3,389 3,212 177 94.8<br />

Transfers and Subsidies 102,800 102,800 102,800 0 100.0 121,931 121,931<br />

Payment for Capital Assets 200 200 48 152 24.0<br />

3.3 Industry Development<br />

Transfers and Subsidies 217,200 217,200 217,200 100.0 224,200 224,200<br />

TOTAL 343,999 343,999 343,670 329 99.9 360,331 360,331<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 902 902 502 400 55.7<br />

Goods & Services 2,487 2,487 2,710 (223) 109.0<br />

Transfers and subsidies to:<br />

Departmental agencies and<br />

accounts<br />

340,410 340,410 340,410 0 100.0 360,331 360,331<br />

Payments for capital assets:<br />

Macinery and equipment 200 200 48 152 24.0<br />

TOTAL 343,999 343,999 343,670 329 99.9 360,331 360,331<br />

Programme 4 – Business Regulations and Governance<br />

Actual<br />

Expenditure<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

4.1 Corporate Governance<br />

Current Payment 2,363 2,363 2,179 184 92.2 2,268 1,615<br />

4.2 Consumer Protection<br />

Current Payment 1,576 1,576 1,435 141 91.1 1,000 482<br />

Payment for Capital Assets 0 0 2 (2) 0.0<br />

4.3 Liquor Regulation<br />

Transfers and Subsidies 22,305 22,305 22,305 0 100.0 14,391 14,391<br />

4.4 Gambling & Betting<br />

Transfers and Subsidies 20,233 20,233 20,233 0 100.0 19,246 19,246<br />

TOTAL 46,477 46,477 46,154 323 99.3 36,905 35,734<br />

127


Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees (1) 1<br />

Goods & Services 3,939 3,939 3,615 324 91.8 3,268 2,097<br />

Transfers and subsidies to:<br />

Departmental agencies and<br />

accounts<br />

42,538 42,538 42,538 0 100.0 33,637 33,637<br />

Payments for capital assets:<br />

Macinery and equipment 2 (2)<br />

TOTAL 46,477 46,477 46,154 323 99.3 36,905 35,734<br />

Programme 5 – Economic Planning<br />

Actual<br />

Expenditure<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

5.1 Policy & Planning<br />

Current Payment 150 150 0 150 0.0<br />

5.2 Research & Development<br />

Current Payment 400 400 0 400 0.0<br />

5.3 Knowledge Management<br />

Current Payment 150 150 0 150 0.0<br />

5.4 Monitoring & Evaluation<br />

Current Payment 300 300 373 (73) 124.3<br />

TOTAL 1,000 1,000 373 627 37.3<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Goods & Services 1,000 1,000 373 627 37.3<br />

TOTAL 1,000 1,000 373 627 37.3<br />

128


Programme 6 – Environmental Management and Sustainable Development<br />

Policy, Legislation Coordination & monitoring<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

6.1 Corporate Governance<br />

Current Payment 836 836 1,432 (596) 171.3<br />

Payment for Capital Assets 9 (9)<br />

6.2 Inst. & Leg. Development<br />

Current Payment 35,983 35,983 27,249 8,734 75.7 41,856 14,227<br />

Transfers and Subsidies 1,000 (1,000) 43<br />

Payment for Capital Assets 1,000 405<br />

6.3 Sus. Dev. & Sus Mon & <strong>Report</strong>ing<br />

Current Payment 3,461 3,461 2,341 1,120 67.6<br />

Payment for Capital Assets 2,449 2,449 1,615 834 65.9<br />

TOTAL 42,729 42,729 33,646 9,<strong>08</strong>3 78.7 42,899 14,632<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 35,983 35,983 27,126 8,857 75.4 34,325 9,663<br />

Goods and services 4,297 4,297 3,896 401 90.7 7,531 4,564<br />

Transfers and subsidies to:<br />

Universities and Technikons 1,000 (1,000)<br />

Households 43<br />

Payments for capital assets:<br />

Machinery and equipment 2,449 2,449 1,624 825 66.3 1,000 405<br />

TOTAL 42,729 42,729 33,646 9,<strong>08</strong>3 78.7 42,899 14,632<br />

Programme 7 – Planning, Impact, Pollution and Waste Management,<br />

Actual<br />

Expenditure<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

7.1 Compl., Enforcement & Rehab.<br />

Current Payment 1,393 1,393 829 564 59.5 1,200 627<br />

7.2 Air Quality Management<br />

Current Payment 966 966 775 191 80.2 856 219<br />

7.3 Waste Management<br />

Current Payment 2,163 2,163 1,821 342 84.2<br />

TOTAL 4,522 4,522 3,425 1,097 75.7 2,056 846<br />

129


Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Goods & Services 4,522 4,522 3,425 1,097 75.7 2,056 846<br />

TOTAL 4,522 4,522 3,425 1,097 75.7 2,056 846<br />

Programme 8 – Ecosystems, Biodiversity and National Heritage Planning<br />

Actual<br />

Expenditure<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

8.1 Eco Bio Nat Her PMR<br />

Current Payment 2,402 2,402 1,581 821 65.8 3,315 27,236<br />

Payment for Capital Assets 39<br />

8.2 Protected Area Establishment<br />

Current Payment 99,407 99,407 99,407 0 100.0 79,700 79,700<br />

8.3 Eco Bio Nat Her Rus Invest<br />

Current Payment 939 939 1,384 (445) 147.4<br />

TOTAL 102,748 102,748 102,372 376 99.6 83,015 106,975<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 24,943<br />

Goods & Services 3,341 3,341 2,965 376 88.7 3,315 2,293<br />

Transfers and subsidies to:<br />

Departmental agencies and<br />

accounts<br />

99,407 99,407 99,407 0 100.0 79,700 79,700<br />

Payments for capital assets:<br />

Macinery and equipment 39<br />

TOTAL 102,748 102,748 102,372 376 99.6 83,015 106,975<br />

130


Programme 9 – Marine and Coastal Management,<br />

Environmental Management and Sustainable Development<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Adjusted<br />

Appropriation<br />

Shifting<br />

of<br />

Funds<br />

Virement<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance<br />

Expenditure<br />

as % of<br />

final Appropriation.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

DETAILS/SUB-PROGRAMME R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

9.1 Marine & Coastal Res<br />

Current Payment 387 387 163 224 42.1 1,226 422<br />

9.2 Marine & Coast Rusia<br />

Current Payment 600 600 482 118 80.3<br />

9.3 Marine Pol. Man & Reg.<br />

Current Payment 200 200 81 119 40.5<br />

TOTAL 1,187 1,187 726 461 61.2 1,226 422<br />

DETAILS/ECON. CLASSIFICATION R’000 R’000 R’000 R’000 R’000 R’000 % R’000 R’000<br />

Current payments:<br />

Compensation of employees 600 600 482 118 80.3<br />

Goods & Services 587 587 244 343 41.6 1,226 422<br />

TOTAL 1,187 1,187 726 461 61.2 1,226 422<br />

131


3.5 Notes to the Appropriation Statement<br />

1.<br />

Detail of transfers and subsidies as per Appropriation Act (after Virement):<br />

Detail of these transactions can be viewed in note 9 (Transfers and subsidies) and<br />

Annexure1(A-K) to the <strong>Annual</strong> Financial Statements.<br />

2.<br />

Detail of specifically and exclusively appropriated amounts voted (after Virement):<br />

Detail of these transactions can be viewed in note 1 (<strong>Annual</strong> Appropriation) to the <strong>Annual</strong><br />

Financial Statements.<br />

3.<br />

Detail on financial transactions in assets and liabilities<br />

Detail of these transactions per programme can be viewed in note 8 (Financial transactions<br />

in assets and liabilities) to the <strong>Annual</strong> Financial Statements.<br />

4.<br />

Explanations of material variances from Amounts Voted (after Virement):<br />

The variance are recorded as material when they exceed 5% of the voted amount of a programme.<br />

Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance Variance as a %<br />

of Final<br />

Appropriation<br />

4.1 PER PROGRAMME R’000 R’000 R’000 R’000<br />

1 Administration 85,624 78,814 6,810 7.9<br />

2. Integrated Economic Development Services 129,687 127,137 2,550 2.0<br />

3. Trade & industry Development 343,999 343,670 329 0.1<br />

4 Business Regulations & Governance 46,477 46,154 323 0.7<br />

5 Economic Planning 1,000 373 627 62.7<br />

6 Environmental Management 42,729 33,646 9,<strong>08</strong>3 21.3<br />

7 Planning, Impact Pol & Waste 4,522 3,425 1,097 24.3<br />

8 Ecosystems Bio & Nat Her Ma 102,748 102,372 376 0.4<br />

9 Marine & Coastal Management 1,187 726 461 38.8<br />

Total 757,973 736,317 21,656<br />

132


Final<br />

Appropriation<br />

Actual<br />

Expenditure<br />

Variance Variance as a %<br />

of Final<br />

Appropriation<br />

4.2 PER ECONOMIC CLASSIFICATION R’000 R’000 R’000 R’000<br />

Economic Classification<br />

Current payment: 154,724 128,555 26,169 12.7<br />

Compensation of employees 95,344 79,459 15,885 16.7<br />

Goods and services 59,380 49,096 10,284 17.3<br />

Transfers and subsidies: 594,386 600,855 (6,469) -1.1<br />

Departmental agencies and accounts 560,386 561,855 (1,469) -0.9<br />

Public corporations and private enterprises 4,000 (4,000) -1.0<br />

Universities - 1,000 (1,000) 0.0<br />

Non-profit institutions 34,000 34,000 - 0.0<br />

Payments for capital assets: 8,863 6,907 1,956 22.1<br />

Machinery and equipment 8,863 6,907 1,956 22.1<br />

Totals 757,973 736,317 21, 656<br />

Explanations of material variances from Amounts Voted (after Virement):<br />

The variance are recorded as material when they exceed 5% of the voted amount of a programme<br />

a.<br />

Programme 1: Administration<br />

Compensation of employees<br />

The Programme planned to recruit more senior managers in the Strategic Planning,<br />

Compliance & Risk Management and the Supply Chain Management Units and the<br />

operational staff. For the new posts, the recruitment could only begin when the jobs had<br />

been fully evaluated as required by the Public Service Regulations. Unfortunately the<br />

job evaluation could not be completed during the year under review and therefore, the<br />

budget for Compensation of Employees could not be spent.<br />

b.<br />

Payment for capital assets<br />

Recruitment of new staff normally results in new equipment, especially computers and<br />

office furniture, being bought. The under-spending is partly attributable to the inability<br />

of the department to complete the job evaluation and subsequent recruitment of the<br />

senior management staff for which new equipment would have been purchased.<br />

The department however placed orders for capital assets but they could not be delivered<br />

by the suppliers before the year ended and therefore payment could not be made. The<br />

amount involved is included in the List of Commitments at the end of the year.<br />

133


a.<br />

Programme 5: Economic Planning<br />

Goods and services<br />

The Programme planned to commission consultants to undertake research in various<br />

areas in economic development and also to develop knowledge database that will assist<br />

the department in meeting its obligation. Since this was a new programme in line with<br />

the gazetted budget programme structure, the staffing was done late in the financial<br />

year and therefore the budget for goods and services could not all be spent.<br />

a.<br />

Programme 6: Environmental Management & Sustainable<br />

Development Policy,Legislation, Co-ordination & Monitoring<br />

Compensation of employees<br />

The recruitment process of some key staff in the Environmental Affairs - Chief Directorate<br />

- got off late and therefore the budget for compensation of employees could not be spent.<br />

The advert for the additional key staff has been placed in the newspapers in April 20<strong>08</strong>.<br />

b.<br />

Payment for capital assets<br />

As a result of the inability of the department to recruit the additional technical staff in<br />

the Environmental Affairs Chief Directorate, the planned purchase of office furniture and<br />

computers for the envisaged new staff could not take place.<br />

a.<br />

Programme 7: Planning, Impact, Pollution & Waste Management<br />

Goods and Services<br />

This programme was also a new programme in terms of the gazetted budget programme<br />

structure and in the first place, there were difficulties in the recruitment process to get<br />

the right technical staff and secondly the planning processes began only when the staff<br />

had been appointed. There was thus under-expenditure of the budget for goods and<br />

services.<br />

a.<br />

Programme 9: Marine And Coastal Management<br />

Compensation of employees<br />

The budget for Compensation of Employees for the Environmental Affairs Programme was<br />

allocated under Programme 6 – Environmental Management. This means there should<br />

not have been a budget allocation for Compensation of Employees for this programme<br />

– Marine and Coastal Management. Hence the under-spending of Compensation of<br />

Employees budget.<br />

b.<br />

Goods and services<br />

As a result of the inability of the department to recruit staff to this programme, the<br />

department could not spend some of the budget for goods and services.<br />

134


3.6 STATEMENT OF FINANCIAL PERFORMANCE<br />

for the year ended 31 March 20<strong>08</strong><br />

REVENUE<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

<strong>Annual</strong> appropriation 1 757,063 702,412<br />

Statutory appropriation 2 910 810<br />

Appropriation for unauthorised expenditure approved 9 382 -<br />

Departmental revenue 3 8,048 635<br />

TOTAL REVENUE 766,403 703,857<br />

EXPENDITURE<br />

Current expenditure<br />

Compensation of employees 5 79,459 74,094<br />

Goods and services 6 49,096 40,318<br />

Unauthorised expenditure approved 9 3,055 -<br />

Total current expenditure 131,610 114,412<br />

Transfers and subsidies 7 600,855 558,741<br />

Expenditure for capital assets<br />

Machinery and equipment 8 6,907 3,937<br />

Total expenditure for capital assets 6,907 3,937<br />

TOTAL EXPENDITURE 739,372 677,090<br />

SURPLUS 27,031 26,767<br />

Add back unauthorised expenditure 9 - 2,673<br />

Add back fruitless and wasteful expenditure 10 149 -<br />

SURPLUS FOR THE YEAR 27,180 29,440<br />

Reconciliation of Surplus for the year<br />

Voted Funds 14 19,132 28,805<br />

Departmental Revenue 15 8,048<br />

SURPLUS FOR THE YEAR 27,180 29,440<br />

135


3.7 STATEMENT OF FINANCIAL POSITION<br />

as at 31 March 20<strong>08</strong><br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

ASSETS<br />

Current assets 4,560 10,647<br />

Unauthorised expenditure 9 - 3,827<br />

Fruitless and wasteful expenditure 10 306 157<br />

Cash and cash equivalents 11 2,738 6,242<br />

Receivables 12 1,516 421<br />

Non-current assets 270,870 239,373<br />

Investments 13 270,870 239,373<br />

TOTAL ASSETS 275,430 250,020<br />

LIABILITIES<br />

Current liabilities 4,560 10,647<br />

Voted funds to be surrendered to the Revenue Fund 14 (962) 3,426<br />

Departmental revenue to be surrendered to the Revenue Fund 15 5,486 7,119<br />

Payables 16 36 102<br />

TOTAL LIABILITIES 4,560 10,647<br />

NET ASSETS 270,870 239,373<br />

Represented by:<br />

Capitalisation reserve 270,870 239,373<br />

TOTAL 275,430 250,020<br />

3.8 STATEMENT OF CHANGES IN NET ASSETS<br />

for the year ended 31 March 20<strong>08</strong><br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

CAPITALISATION RESERVES<br />

Opening balance 239,373 172,755<br />

Transfers: 31,497 66,618<br />

Movement in Equity<br />

Movement in Operational Funds<br />

Other movements (Non-cash movement from ECDC) 31,497 66,618<br />

Closing balance 270,870 239,373<br />

TOTAL 270,870 239,373<br />

136


3.9 CASH FLOW STATEMENT<br />

for the year ended 31 March 20<strong>08</strong><br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

CASH FLOWS FROM OPERATING ACTIVITIES<br />

Receipts 838,570 768,468<br />

<strong>Annual</strong> appropriated funds received 1.1 737,722 677,033<br />

Statutory appropriated funds received 910 810<br />

Appropriation for unauthorised expenditure received 9 382 -<br />

Departmental revenue received 3 99,556 90,625<br />

Net (increase)/decrease in working capital 2,517 (4,971)<br />

Surrendered to Revenue Fund (105,368) (111,825)<br />

Current payments (131,461) (114,412)<br />

Unauthorised expenditure – current payment 9 - 2,673<br />

Transfers and subsidies paid (600,855) (558,741)<br />

Net cash flow available from operating activities 17 3,403 (18,8<strong>08</strong>)<br />

CASH FLOWS FROM INVESTING ACTIVITIES<br />

Payments for capital assets (6,907) (3,937)<br />

(Increase) in investments (31,497) (66,618)<br />

Net cash flows from investing activities (38,404) (70,555)<br />

CASH FLOWS FROM FINANCING ACTIVITIES<br />

Increase in net assets 31,497 66,618<br />

Net cash flows from financing activities 31,497 66,618<br />

Net increase/(decrease) in cash and cash equivalents (3,504) (22,745)<br />

Cash and cash equivalents at the beginning of the period 6,242 28,987<br />

Cash and cash equivalents at end of period 18 2,738 6,242<br />

137


3.10 ACCOUNTING POLICIES<br />

for the year ended 31 March 20<strong>08</strong><br />

The Financial Statements have been prepared in accordance with the following policies,<br />

which have been applied consistently in all material aspects, unless otherwise indicated.<br />

However, where appropriate and meaningful, additional information has been disclosed<br />

to enhance the usefulness of the Financial Statements and to comply with the statutory<br />

requirements of the Public Finance Management Act, Act 1 of 1999 (as amended by Act<br />

29 of 1999), and the Treasury Regulations issued in terms of the Act and the Division of<br />

Revenue Act, Act 2 of 2006.<br />

1 PRESENTATION OF THE FINANCIAL STATEMENTS<br />

1.1.1 Basis of preparation<br />

The Financial Statements have been prepared on a modified cash basis of accounting,<br />

except where stated otherwise. The modified cash basis constitutes the cash basis of<br />

accounting supplemented with additional disclosure items. Under the cash basis of<br />

accounting transactions and other events are recognised when cash is received or paid.<br />

1.2 Presentation currency<br />

All amounts have been presented in the currency of the South African Rand (R) which is<br />

also the functional currency of the department.<br />

1.3 Rounding<br />

Unless otherwise stated all financial figures have been rounded to the nearest one<br />

thousand Rand (R’000).<br />

1.4 Comparative figures<br />

Prior period comparative information has been presented in the current year’s financial<br />

statements. Where necessary figures included in the prior period financial statements<br />

have been reclassified to ensure that the format in which the information is presented is<br />

consistent with the format of the current year’s financial statements.<br />

1.5 Comparative figures - Appropriation Statement<br />

A comparison between actual amounts and final appropriation per major classification<br />

of expenditure is included in the appropriation statement.<br />

138


2 REVENUE<br />

2.1 Appropriated funds<br />

Appropriated funds are recognised in the financial records on the date the appropriation<br />

becomes effective. Adjustments to the appropriated funds made in terms of the<br />

adjustments budget process are recognised in the financial records on the date the<br />

adjustments become effective.<br />

Total appropriated funds are presented in the statement of financial performance.<br />

Unexpended appropriated funds are surrendered to the National/Provincial Revenue<br />

Fund. Amounts owing to the National/Provincial Revenue Fund at the end of the financial<br />

year are recognised in the statement of financial position.<br />

2.2 Statutory Appropriation<br />

Statutory appropriations are recognised in the financial records on the date the<br />

appropriation becomes effective. Adjustments to the statutory appropriations made in<br />

terms of the adjustments budget process are recognised in the financial records on the<br />

date the adjustments become effective.<br />

Total statutory appropriations are presented in the statement of financial performance.<br />

Unexpended statutory appropriations are surrendered to the National/Provincial<br />

Revenue Fund. Amounts owing to the National/Provincial Revenue Fund at the end of<br />

the financial year are recognised in the statement of financial position.<br />

2.3 Departmental Revenue<br />

All departmental revenue is paid into the National/Provincial Revenue Fund when received,<br />

unless otherwise stated. Amounts owing to the National/Provincial Revenue Fund at the<br />

end of the financial year are recognised in the statement of financial position.<br />

Amounts receivable at the reporting date are disclosed in the disclosure notes to the<br />

annual financial statements.<br />

2.3.1 Tax revenue<br />

Tax revenue consists of all compulsory unrequited amounts collected by the department<br />

in accordance with laws and or regulations (excluding fines, penalties & forfeits).<br />

Tax receipts are recognised in the statement of financial performance when received.<br />

139


2.3.2 Sales of goods and services other than capital assets<br />

The proceeds received from the sale of goods and/or the provision of services is recognised<br />

in the Statement of Financial Performance when the cash is received.<br />

2.3.3 Fines, penalties & forfeits<br />

Fines, penalties & forfeits are compulsory unrequited amounts which were imposed by a<br />

court or quasi-judicial body and collected by the department. Revenue arising from fines,<br />

penalties and forfeits is recognised in the Statement of Financial Performance when the<br />

cash is received.<br />

2.3.4 Interest, dividends and rent on land<br />

Interest, dividends and rent on land is recognised in the statement of financial<br />

performance when the cash is received.<br />

2.3.5 Sale of capital assets<br />

The proceeds received on sale of capital assets are recognised in the Statement of<br />

Financial Performance when the cash is received.<br />

2.3.6 Financial transactions in assets and liabilities<br />

Repayments of loans and advances previously extended to employees and public<br />

corporations for policy purposes are recognised as revenue in the Statement of Financial<br />

Performance on receipt of the funds.<br />

Cheques issued in previous accounting periods that expire before being banked are<br />

recognised as revenue in the Statement of Financial Performance when the cheque<br />

becomes stale. When the cheque is reissued the payment is made from Revenue.<br />

Forex gains are recognised on payment of funds.<br />

2.4 Local and Foreign Aid Assistance<br />

Local and foreign aid assistance is recognised as revenue when notification of the<br />

assistance is received from the National Treasury or when the department directly<br />

receives the cash from the donor(s).<br />

All in-kind local and foreign aid assistance are disclosed at fair value in the annexures to<br />

the annual financial statements<br />

The cash payments made during the year relating to local and foreign aid assistance<br />

projects are recognised as expenditure in the Statement of Financial Performance. The<br />

140


value of the assistance expensed prior to the receipt of the funds is recognized as a<br />

receivable in the statement of financial position<br />

Inappropriately expensed amounts using local and foreign aid assistance and any<br />

unutilised amounts are recognised as payables in the statement of financial position.<br />

3 EXPENDITURE<br />

3.1 Compensation of employees<br />

3.1.1 Short-term employee benefits<br />

Salaries and wages comprise payments to employees (including leave entitlements,<br />

thirteenth cheques and performance bonuses). Salaries and wages are recognised as<br />

an expense in the Statement of Financial Performance when final authorisation for<br />

payment is effected on the system (by no later than 31 March of each year). Capitalised<br />

compensation forms part of the expenditure for capital assets in the Statement of<br />

Financial Performance.<br />

All other payments are classified as current expense.<br />

Short-term employee benefits that give rise to a present legal or constructive obligation<br />

are disclosed in the disclosure notes to the financial statements. These amounts are not<br />

recognised in the Statement of Financial Performance or Position.<br />

3.1.2 Post retirement benefits<br />

The department provides retirement benefits (pension benefits) for certain of its<br />

employees through a defined benefit plan for government employees. These benefits are<br />

funded by both employer and employee contributions.<br />

Employer contributions (i.e. social contributions) to the fund are expensed when the final<br />

authorisation for payment to the fund is effected on the system (by no later than 31 March<br />

of each year). No provision is made for retirement benefits in the financial statements of the<br />

department. Any potential liabilities are disclosed in the financial statements of the National/<br />

Provincial Revenue Fund and not in the financial statements of the employer department.<br />

The department provides medical benefits for certain of its employees. Employer<br />

contributions to the medical funds are expensed when final authorisation for payment<br />

to the fund is effected on the system (by no later than 31 March of each year).<br />

141


3.1.3 Termination benefits<br />

Termination benefits such as severance packages are recognised as an expense in the<br />

Statement of Financial Performance as a transfer (to households) when the final authorisation<br />

for payment is effected on the system (by no later than 31 March of each year).<br />

3.1.4 Other long-term employee benefits<br />

Other long-term employee benefits (such as capped leave) are recognised as an expense<br />

in the Statement of Financial Performance as a transfer (to households) when the final<br />

authorisation for payment is effected on the system (by no later than 31 March of each year).<br />

Long-term employee benefits that give rise to a present legal or constructive obligation<br />

are disclosed in the disclosure notes to the financial statements. These amounts are not<br />

recognised in the Statement of Financial Performance or Position.<br />

3.2 Goods and Services<br />

Payments made for goods and/or services are recognised as an expense in the Statement of<br />

Financial Performance when the final authorisation for payment is effected on the system<br />

(by no later than 31 March of each year). The expense is classified as capital if the goods<br />

and services were used for a capital project or an asset of R5000 or more is purchased. All<br />

assets costing less than R5000 will also be reflected under goods and services.<br />

3.3 Interest and Rent on Land<br />

Interest and rental payments are recognised as an expense in the Statement of Financial<br />

Performance when the final authorisation for payment is effected on the system (by no<br />

later than 31 March of each year). This item excludes rental for the use of buildings or<br />

other fixed structures. If it is not possible to distinguish between payment for the use of<br />

land and the fixed structures on it, the whole amount should be recorded under goods<br />

and services.<br />

3.4 Financial Transactions in Assets and Liabilities<br />

Debts are written off when identified as irrecoverable. Debts written-off are limited to<br />

the amount of savings and/or underspending of appropriated funds. The write off occurs<br />

at year-end or when funds are available. No provision is made for irrecoverable amounts<br />

but amounts are disclosed as a disclosure note.<br />

All other losses are recognised when authorisation has been granted for the recognition<br />

thereof.<br />

142


3.5 Unauthorised Expenditure<br />

When discovered unauthorised expenditure is recognised as an asset in the statement<br />

of financial position until such time as the expenditure is either approved by the relevant<br />

authority, recovered from the responsible person or written off as irrecoverable in the<br />

Statement of Financial Performance.<br />

Unauthorised expenditure approved with funding is recognised in the Statement of<br />

Financial Performance when the unauthorised expenditure is approved and the related<br />

funds are received. Where the amount is approved without funding it is recognised as<br />

expenditure, subject to availability of savings, in the Statement of Financial Performance<br />

on the date of approval..<br />

3.6 Fruitless and wasteful expenditure<br />

Fruitless and wasteful expenditure is recognised as an asset in the statement of financial<br />

position until such time as the expenditure is recovered from the responsible person or<br />

written off as irrecoverable in the Statement of Financial Performance.<br />

3.7 Irregular Expenditure<br />

Irregular expenditure is recognised as expenditure in the Statement of Financial<br />

Performance. If the expenditure is not condoned by the relevant authority it is treated as<br />

an asset until it is recovered or written off as irrecoverable.<br />

3.8 Transfers and Subsidies<br />

Transfers and subsidies are recognised as an expense when the final authorisation for<br />

payment is effected on the system (by no later than 31 March of each year).<br />

3.9 Expenditure for Capital Assets<br />

Payments made for capital assets are recognised as an expense in the Statement of<br />

Financial Performance when the final authorisation for payment is effected on the<br />

system (by no later than 31 March of each year).<br />

4 ASSETS<br />

4.1 Cash and Cash Equivalents<br />

Cash and cash equivalents are carried in the statement of financial position at cost.<br />

For the purposes of the cash flow statement, cash and cash equivalents comprise cash on<br />

hand, deposits held, other short-term highly liquid investments and bank overdrafts.<br />

143


4.2 Other Financial Assets<br />

Other financial assets are carried in the Statement of Financial Position at cost.<br />

4.3 Receivables<br />

Receivables included in the statement of financial position arise from cash payments<br />

made that are recoverable from another party.<br />

Receivables outstanding at year-end are carried in the statement of financial position<br />

at cost.<br />

4.4 Investments<br />

Capitalised investments are shown at cost in the statement of financial position. Any<br />

cash flows such as dividends received or proceeds from the sale of the investment are<br />

recognised in the statement of financial performance when the cash is received.<br />

Investments are tested for an impairment loss whenever events or changes in<br />

circumstances indicate that the investment may be impaired. Any loss is included in the<br />

disclosure notes.<br />

4.5 Inventory<br />

Inventories purchased during the financial year are disclosed at cost in the notes.<br />

4.6 Capital assets<br />

A capital asset is recorded on receipt of the item at cost. Cost of an asset is defined as<br />

the total cost of acquisition. Where the cost cannot be determined accurately, the capital<br />

asset should be stated at fair value. Where fair value cannot be determined, the capital<br />

asset is included in the asset register at R1.<br />

Projects (of construction/development) running over more than one financial year<br />

relating to assets, are only capitalised as assets on completion of the project and at the<br />

total cost incurred over the duration of the project.<br />

Disclosure Notes 37 and 38 reflect the total movement in the asset register for the current<br />

financial year.<br />

144


5 LIABILITIES<br />

5.1 Voted Funds to be surrendered to the Revenue Fund<br />

Unexpended appropriated funds are surrendered to the Provincial Revenue Fund. Amounts<br />

owing to the Provincial Revenue Fund at the end of the financial year are recognised in<br />

the Statement of Financial Position<br />

5.2 Departmental Revenue to be surrendered to the Revenue Fund<br />

Amounts owing to the Provincial Revenue Fund at the end of the financial year are<br />

recognised in the statement of financial position at cost.<br />

5.3 Payables<br />

Recognised payables mainly comprise of amounts owing to other governmental entities.<br />

These payables are recognised at historical cost in the statement of financial position.<br />

5.4 Contingent liabilities<br />

Contingent liabilities are included in the disclosure notes.<br />

5.5 Commitments<br />

Commitments are not recognised in the statement of financial position as a liability<br />

or as expenditure in the statement of financial performance but are included in the<br />

disclosure notes.<br />

5.6 Accruals<br />

Accruals are not recognised in the statement of financial position as a liability or<br />

as expenditure in the statement of financial performance but are included in the<br />

disclosure notes.<br />

5.7 Employee Benefits<br />

Short-term employee benefits that give rise to a present legal or constructive<br />

obligation are disclosed in the disclosure notes to the financial statements. These<br />

amounts are not recognised in the statement of financial performance or the<br />

statement of financial position.<br />

145


5.8 Lease Commitments<br />

Lease commitments are not recognised in the statement of financial position as a<br />

liability or as expenditure in the statement of financial performance but are included in<br />

the disclosure notes.<br />

Operating and finance lease commitments are expensed when the payments are made.<br />

Assets acquired in terms of finance lease agreements are disclosed in the annexures and<br />

disclosure notes to the financial statements.<br />

6 RECEIVABLES FOR DEPARTMENTAL REVENUE<br />

Receivables for departmental revenue are disclosed in the disclosure notes to the annual<br />

financial statements.<br />

7 NET ASSETS<br />

7.1 Capitalisation Reserve<br />

The capitalisation reserve comprises of financial assets and/or liabilities originating in a<br />

prior reporting period but which are recognised in the statement of financial position for<br />

the first time in the current reporting period. Amounts are transferred to the National/<br />

Provincial Revenue Fund on disposal, repayment or recovery of such amounts.<br />

7.2 Recoverable Revenue<br />

Amounts are recognised as recoverable revenue when a payment made in a previous<br />

financial year becomes recoverable from a debtor in the current financial year.<br />

8 KEY MANAGEMENT PERSONNEL<br />

Compensation paid to key management personnel including their family members<br />

where relevant, is included in the disclosure notes.<br />

146


3.11 NOTES TO THE ANNUAL FINANCIAL STATEMENTS<br />

for the year ended 31 March 20<strong>08</strong><br />

1 <strong>Annual</strong> Appropriation<br />

1.1 <strong>Annual</strong> Appropriation<br />

Included are funds appropriated in terms of the Appropriation Act for National<br />

Departments (Voted funds) and Provincial Departments :**<br />

Final<br />

Appropriation<br />

Actual Funds<br />

Received<br />

Funds not<br />

requested/<br />

not received<br />

Appropriation<br />

received<br />

2006/07<br />

R’000 R’000 R’000 R’000<br />

1. Administration 84,714 80,219 4,495 56,4<strong>08</strong><br />

2. Integrated Economic Development Services 129,687 127,137 2,550 476,750<br />

3. Trade & Industry Development 343,999 343,670 329<br />

4. Business Regulations & Governance 46,477 46,154 323<br />

5. Economic Planning 1,000 373 627<br />

6. Environmental Management SDP L & CO & MO 42,729 33,646 9,<strong>08</strong>3 143,875<br />

7. Planning, Impact Pol & Waste 4,522 3,425 1,097<br />

8. Ecosystems Bio & Nat Her Ma 102,748 102,372 376<br />

9. Marine & Coastal Management 1,187 726 461<br />

Total 757,063 737,722 19,341 677,033<br />

2 Statutory Appropriation<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Member of executive committee/parliamentary officers 910 810<br />

Actual Statutory Appropriation received 910 810<br />

3 Departmental Revenue<br />

Description (Specify material amounts separately)<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Tax revenue 92,554 81,447<br />

Sales of goods and services other than capital assets 3.1 463 437<br />

Interest, dividends and rent on land 3.2 388 152<br />

Financial transactions in assets and liabilities 3.3 6,151 8,589<br />

Total revenue collected 99,556 90,625<br />

Less: Departmental Revenue Budgeted 15 91,5<strong>08</strong> 89,990<br />

Departmental revenue collected 8,048 635<br />

147


3.1 Sales of goods and services other than capital assets<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Sales of goods and services produced by the department 463 437<br />

Sales by market establishment<br />

Administrative fees – 437<br />

Other sales 463 –<br />

Sales of scrap, waste and other used current goods<br />

Total 463 437<br />

3.2 Interest, dividends and rent on land<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Interest 388 152<br />

Dividends<br />

Rent on land<br />

Total 388 152<br />

3.3 Financial transactions in assets and liabilities<br />

Nature of recovery<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Other Receipts including Recoverable Revenue 6,151 8,589<br />

Total 6,151 8,589<br />

4 Local and Foreign Aid Assistance<br />

Assistance received in cash: Other<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Local<br />

Opening Balance – 350<br />

Revenue<br />

Expenditure – 350<br />

Current 350<br />

Capital<br />

Closing Balance – –<br />

Total assistance<br />

Opening Balance – 350<br />

Revenue<br />

Expenditure – 350<br />

Current 350<br />

Capital<br />

Closing Balance – –<br />

148


5 Compensation of Employees<br />

5.1 Salaries and Wages<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Basic salary 51,028 51,430<br />

Performance award 220 116<br />

Service Based 5,121 3,030<br />

Compensative/circumstantial 2,362 461<br />

Periodic payments 21 -<br />

Other non-pensionable allowances 10,771 9,058<br />

Total 69,523 64,095<br />

5.2 Social contributions<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Employer contributions<br />

Pension 6,427 6,565<br />

Medical 3,497 3,496<br />

Bargaining council 12 (62)<br />

Total 9,936 9,999<br />

Total compensation of employees 79,459 74,094<br />

Average number of employees 488 471<br />

6 Goods and Services<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Advertising 2,416 812<br />

Attendance fees (including registration fees) 414 442<br />

Bank charges and card fees 15 13<br />

Catering 1,323 1,060<br />

Communication 4,765 3,899<br />

Computer services 3,776 3,842<br />

Consultants, contractors and special services 6,804 8,991<br />

Courier and delivery services 1 -<br />

Entertainment 2 3<br />

External audit fees 6.1 2,493 2,055<br />

Equipment less than R5000 645 435<br />

Inventory 6.2 4,681 2,147<br />

Legal fees 872 774<br />

Maintenance, repairs and running costs 105 46<br />

Medical Services 25 32<br />

Operating leases 1,882 1,549<br />

Resettlement costs 884 328<br />

Owned and leasehold property expenditure 186 139<br />

Travel and subsistence 6.3 12,874 10,501<br />

149


Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Venues and facilities 1,697 661<br />

Protective, special clothing & uniforms 3 138<br />

Training & staff development 3,233 2,451<br />

Total 49,096 40,318<br />

*Note: Catering and Entertainment for 2006/07 has been re-classified<br />

6.1 External audit fees<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Regulatory Audits 2,493 2,055<br />

Total 2,493 2,055<br />

6.2 Inventory<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Domestic consumables 539 168<br />

Food and food supplies 373 93<br />

Fuel, oil and gas 12 4<br />

Other consumables 1,709 418<br />

Parts and other maintenance material 7 11<br />

Stationery and printing 2,041 1,452<br />

Medical supplies - 1<br />

Total 4,681 2,147<br />

6.3 Travel and Subsistence<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Local 12,516 10,097<br />

Foreign 358 404<br />

Total 12,874 10,501<br />

7 Transfers and Subsidies<br />

R’000 R’000<br />

Departmental agencies and accounts Annex 1G 561,855 538,668<br />

Universities and technikons Annex 1H 1,000 -<br />

Public corporations and private enterprises Annex 1I 4,000 -<br />

Non-profit institutions Annex 1K 34,000 20,000<br />

Households Annex 1L 73<br />

Total 600,855 558,741<br />

150


8 Expenditure for Capital Assets<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Machinery and equipment 28 6,907 3,937<br />

Total 6,907 3,937<br />

9 Unauthorised Expenditure<br />

Reconciliation of unauthorised expenditure<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Opening balance 3,827 1,154<br />

Unauthorised expenditure – current year 2,673<br />

Amounts approved by Parliament/Legislature (with funding) (382) –<br />

Current expenditure (382)<br />

Transfers and subsidies<br />

Expenditure for capital assets<br />

Amounts approved by Parliament/Legislature (without funding) (2,673)<br />

Current expenditure (2,673)<br />

Transfers and subsidies<br />

Expenditure for capital assets<br />

Transfer to receivables for recovery (not approved) (772)<br />

Unauthorised expenditure awaiting authorisation – 3,827<br />

10 Fruitless and Wasteful Expenditure<br />

Reconciliation of fruitless and wasteful expenditure<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Opening balance 157 157<br />

Fruitless and wasteful expenditure – current year 149<br />

Current 149<br />

Fruitless and wasteful expenditure awaiting condonement 306 157<br />

Analysis of Current Year Fruitless and wasteful expenditure<br />

2006/07<br />

R’000<br />

Incident<br />

Disciplinary steps taken/criminal<br />

proceedings<br />

Double printing of <strong>Annual</strong> <strong>Report</strong>s for 2006/07 financial year <strong>Report</strong>ed to the Head of Department 149<br />

Total 149<br />

151


11 Cash and Cash Equivalents<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Consolidated Paymaster General Account 3,107 8,351<br />

Cash receipts (5) (8)<br />

Disbursements (364) (2,101)<br />

Total 2,738 6,242<br />

12 Receivables<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Less than one<br />

year<br />

One to three<br />

years<br />

Older than three<br />

years<br />

Staff debtors 12.1 301 141 256 698 396<br />

Other debtors 12.2 818 818 25<br />

Total 301 959 256 1,516 421<br />

12.1 Staff Debtors<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

(Group major categories, but list material items) R’000 R’000<br />

Debt Account, Debt Receivable Income, Debt Receivable<br />

Interest 698 396<br />

Total 698 396<br />

Total<br />

Total<br />

12.2 Other debtors<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

(Group major categories, but list material items) R’000 R’000<br />

Sal: Medical 11 25<br />

Sal: Income Tax 19 –<br />

Sal: Pension Fund 16 –<br />

Claims Recoverable (Provincial Treasury) 772 –<br />

Total 818 25<br />

152


13 Investments<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Securities other than shares<br />

Annex 2A<br />

(List investments at cost)<br />

Eastern Cape Development Corporation – Share Capital 270,870 239,373<br />

Total 270,870 239,373<br />

Total non-current 270,870 239,373<br />

Analysis of non current investments<br />

Opening balance 239,373 172,755<br />

Non-cash movements 31,497 66,618<br />

Closing balance 270,870 239,373<br />

14 Voted Funds to be surrendered to the Revenue Fund<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Opening balance 3,426 607<br />

Transfer from Statement of Financial Performance 19,132 28,805<br />

Voted funds not requested/not received 14.1 (19,341) (25,379)<br />

Paid during the year (4,179) (607)<br />

Closing balance (962) 3,426<br />

14.1 Voted funds not requested/not received<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Funds not to be requested (19,341) –<br />

(19,341) –<br />

15 Departmental Revenue to be surrendered to the Revenue Fund<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Opening balance 7,119 27,712<br />

Transfer from Statement of Financial Performance 8,048 635<br />

Departmental revenue budgeted 3 91,5<strong>08</strong> 89,990<br />

Transfer from local and foreign aid assistance<br />

Paid during the year (101,189) (111,218)<br />

Closing balance 5,486 7,119<br />

153


16 Payables – Current<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

30 Days 30+ Days Total Total<br />

Clearing accounts 16.1 36 36 102<br />

Total 36 36 102<br />

16.1 Clearing accounts<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

(Identify major categories, but list material amounts) R’000 R’000<br />

Sal: ACB Recalls: and Sal: Deduction Disallowance 36 102<br />

Total 36 102<br />

17 Net Cash Flow Available from Operating Activities<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Net surplus as per Statement of Financial Performance 27,180 29,440<br />

Add back non cash/cash movements not deemed operating activities (23,777) (48,248)<br />

(Increase) in receivables – current (1,095) (43)<br />

(Increase)/decrease in other current assets 3,678 (2,673)<br />

Increase/(decrease) in payables – current (661) (2,255)<br />

Expenditure on capital assets 6,907 3,937<br />

Surrenders to Revenue Fund (105,368) (111,825)<br />

Voted funds not requested/not received (19,341) (25,379)<br />

Other non-cash items 91,5<strong>08</strong> 89,990<br />

Net cash flow generated by operating activities 3,403 (18,8<strong>08</strong>)<br />

18 Reconciliation of Cash and Cash Equivalents for Cash Flow Purposes<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Consolidated Paymaster General account 3,107 8,351<br />

Cash receipts (5) (8)<br />

Disbursements (364) (2,101)<br />

Total 2,738 6,242<br />

154


3.12 DISCLOSURE NOTES TO<br />

THE ANNUAL FINANCIAL STATEMENTS<br />

for the year ended 31 March 20<strong>08</strong><br />

19 Contingent Liabilities<br />

Note <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Liable to<br />

Nature<br />

Housing loan guarantees Employees Annex 3A 1,291 563<br />

Claims against the department Annex 3B 7.206 2,533<br />

Other departments (interdepartmental unconfirmed balances) Annex 5 - 429<br />

Total 8,497 3,525<br />

*Opening balances of the housing guarantees have been re-classified<br />

20 Commitments<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Current expenditure<br />

Approved and contracted 235 3,101<br />

Approved but not yet contracted<br />

Capital expenditure<br />

Approved and contracted 1,178 1,288<br />

Approved but not yet contracted<br />

1,413 4,389<br />

Total Commitments 1,413 4,389<br />

21 Accruals<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Listed by economic classification 30 Days 30+ Days Total Total<br />

Goods and services 2,918 2,918 357<br />

Machinery and equipment 1,466 1,466<br />

Total 4,384 4,384 357<br />

Listed by programme level 119<br />

Administration 3,040 67<br />

Integrated Economic Development Services 549<br />

Trade & Industry Development 120<br />

Business Regulations & Governance 237<br />

Environ Management & Sus Dev Pol, Leg, Co & Mo 149 171<br />

Planning, Impact, Pollution & Waste Management 209<br />

Ecosystems, Biodiversity & Nat Heritage Management 22<br />

Marine & Coastal Management 58<br />

4,384 357<br />

Confirmed balances with other departments Annex 5 5<br />

Confirmed balances with other government entities Annex 5<br />

5<br />

155


22 Employee benefits<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Leave entitlement 3,745 1,951<br />

Thirteenth cheque 2,306 2,048<br />

Performance awards 944 876<br />

Capped leave commitments 14,475 14,069<br />

Total 21,470 18,944<br />

23 Lease Commitments<br />

Operating leases<br />

<strong>2007</strong>/20<strong>08</strong> Land Buildings &<br />

Fixed Structures<br />

Machinery &<br />

Equipment<br />

R’000 R’000 R’000 R’000<br />

No later than 1 year 194 3,719 3,913<br />

Later than 1 year & no later than 5 years 5,942 5,942<br />

Later than 5 years<br />

Total present value of lease liabilities 194 9,661 9,855<br />

Total<br />

2006/<strong>2007</strong> Land Buildings &<br />

Fixed Structures<br />

Machinery &<br />

Equipment<br />

R’000 R’000 R’000 R’000<br />

No later than 1 year 879 879<br />

Later than 1 year & no later than 5 years 4,381 4,381<br />

Later than 5 years<br />

Total present value of lease liabilities 5,260 5,260<br />

Total<br />

Finance leases**<br />

<strong>2007</strong>/20<strong>08</strong> Land Buildings &<br />

Fixed Structures<br />

Machinery &<br />

Equipment<br />

R’000 R’000 R’000 R’000<br />

No later than 1 year 333 333<br />

Later than 1 year & no later than 5 years 985 985<br />

Later than 5 years<br />

Total present value of lease liabilities 1,318 1,318<br />

Total<br />

2006/<strong>2007</strong> Land Buildings &<br />

Fixed Structures<br />

Machinery &<br />

Equipment<br />

R’000 R’000 R’000 R’000<br />

No later than 1 year 134 134<br />

Later than 1 year & no later than 5 years 1,649 1,649<br />

Later than 5 years<br />

Total present value of lease liabilities 1,783 1,783<br />

Total<br />

156


24 Receivables for Departmental Revenue<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Tax Revenue 7,764 7,438<br />

Total 7,764 7,438<br />

25 Irregular Expenditure<br />

Reconciliation of irregular expenditure<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Opening balance 229,549 189,092<br />

Add: Irregular expenditure – current year 6,500 40,457<br />

Less: Amounts condoned<br />

Current expenditure<br />

Transfers and subsidies<br />

Expenditure for capital assets<br />

Less: Not condoned<br />

Current expenditure<br />

Transfers and subsidies<br />

Expenditure for capital assets<br />

Irregular expenditure awaiting condonement 236,049 229,549<br />

Analysis of awaiting condonement per classification<br />

Current expenditure 40,457 40,457<br />

Transfers and subsidies 195,592 189,092<br />

Expenditure for capital assets<br />

236,049 229,549<br />

Analysis of awaiting condonement per age classification<br />

Current year 6,500<br />

Prior years 229,549 229,549<br />

Total 236,049 229,549<br />

26 Key Management Personnel<br />

No. of<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

Individuals<br />

R’000 R’000<br />

Political office bearers (provide detail below) 1 699 685<br />

Officials<br />

Level 15 to 16 3 771 727<br />

Level 14 (incl CFO if at a lower level) 4 1,838 1,670<br />

Family members of key management personnel<br />

Total 3,3<strong>08</strong> 3,<strong>08</strong>2<br />

157


27 Provisions<br />

<strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Potential irrecoverable Debts<br />

Staff debtors 698<br />

Total 698<br />

28 Tangible Capital Assets<br />

Movement in tangible capital assets per asset register for the year ended 31 March 20<strong>08</strong><br />

Opening<br />

Balance<br />

Current<br />

year Adj. to<br />

prior year<br />

Balances<br />

Additions Disposals Closing<br />

Balance<br />

R’000 R’000 R’000 R’000 R’000<br />

Machinery and Equipment 13,303 6,907 20,210<br />

Transport assets 22 – 22<br />

Specialised military assets – – –<br />

Computer equipment 3,345 5,570 8,915<br />

Furniture and office equipment 587 1,337 1,924<br />

Other machinery and equipment 9,349 – 9,349<br />

Land and Subsoil Assets 4,350 – 4,350<br />

Land 4,350 – 4,350<br />

Mineral and similar non-regenerative<br />

resources<br />

Total Tangible Assets 17,653 6,907 24,560<br />

28.1 Additions to tangible capital assets per asset register for the year ended 31 March 20<strong>08</strong><br />

Cash Non-Cash (Capital<br />

work in<br />

prog. current<br />

costs)<br />

Received<br />

current, not<br />

paid /(Paid<br />

current year,<br />

received<br />

prior year)<br />

R’000 R’000 R’000 R’000 R’000<br />

Machinery and Equipment 6,907 6,907<br />

Transport assets<br />

Specialised military assets<br />

Computer equipment 5,570 5,570<br />

Furniture and office equipment 1,337 1,337<br />

Other machinery and equipment<br />

Total 6,907 6,907<br />

Total<br />

158


28.2 Movement in tangible capital assets per asset register for the year ended 31 March <strong>2007</strong><br />

Opening<br />

Balance<br />

Additions Disposals Closing<br />

Balance<br />

R’000 R’000 R’000 R’000<br />

Machinery and Equipment 9,366 3,937 13,303<br />

Transport assets 22 – 22<br />

Specialised military assets – – –<br />

Computer equipment – 3,345 3,345<br />

Furniture and office equipment 587 587<br />

Other machinery and equipment 9,344 5 9,349<br />

Land and Subsoil Assets 4,350 4,350<br />

Land 4,350 4,350<br />

Mineral and similar non-regenerative resources<br />

Total Tangible Assets 13,716 3,937 17,653<br />

29 Intangible Capital Assets<br />

Movement in intangible capital assets per asset register for the year ended 31 March 20<strong>08</strong><br />

Opening<br />

Balance<br />

Current<br />

year Adj. to<br />

prior year<br />

Balances<br />

Additions Disposals Closing<br />

Balance<br />

R’000 R’000 R’000 R’000 R’000<br />

Computer Software 1,144 1,144<br />

Total Intangible Assets 1,144 – – – 1,144<br />

Movement in intangible capital assets per asset register for the year ended 31 March <strong>2007</strong><br />

Opening<br />

Balance<br />

Additions Disposals Closing<br />

Balance<br />

R’000 R’000 R’000 R’000<br />

Computer Software 1,144 1,144<br />

Total – 1,144 – 1,144<br />

159


4.13 ANNEXURES TO THE<br />

ANNUAL FINANCIAL STATEMENTS<br />

for the year ended 31 March 20<strong>08</strong><br />

ANNEXURE 1G<br />

Statement of Transfers to Departmental Agencies and Accounts<br />

Department/Agency/Account<br />

Adjusted<br />

Appr.Act<br />

Transfer Allocation Transfer 2006/07<br />

Roll Overs<br />

Total<br />

Available<br />

Actual<br />

Transfer<br />

% of<br />

Avail. funds<br />

Transf.<br />

Final<br />

Appr. Act<br />

R’000 R’000 R’000 R’000 R’000 % R’000<br />

EC Tourism Board 22,000 22,000 22,500 102.3 21,000<br />

EC Gambling & Betting 20,233 20,233 20,233 100.0 19,246<br />

Coega Development<br />

25,200 25,200 25,200 100.0 -<br />

Corporation<br />

East London Industrial<br />

192,000 192,000 192,000 100.0 224,200<br />

Development Zone<br />

EC Parks Board 99,407 99,407 99,407 100.0 79,700<br />

EC Development Corporation 179,210 179,210 180,210 100.6 180,131<br />

EC Liquor Board 22,305 22,305 22,305 100.0 14,391<br />

560,355 560,355 561,855 538,668<br />

University/<br />

Technikon<br />

ANNEXURE 1H<br />

Statement of Transfers to Universities and Technikons<br />

Nelson Mandela<br />

University<br />

Adjusted<br />

Appr.Act<br />

Transfer Allocation Transfer 2006/07<br />

Roll Overs<br />

Total<br />

Available<br />

Actual<br />

Transfer<br />

Amount not<br />

Transf.<br />

% of<br />

Avail. funds<br />

Transf.<br />

Final<br />

Appr. Act<br />

R’000 R’000 R’000 R’000 R’000 R’000 % R’000<br />

1,000 (1,000) 0.00<br />

1,000 (1,000)<br />

Corporation/<br />

Pvt Enterprise<br />

Inkanyezi Event<br />

Organisers<br />

ANNEXURE 1I<br />

Statement of Transfers/Subsidies to Public Corporations and Private Enterprises<br />

Adjusted<br />

Appr.Act<br />

Transfer Allocation Transfer 2006/07<br />

Roll Overs<br />

Adjustments<br />

Adjustments<br />

Adjustments<br />

Total<br />

Available<br />

Actual<br />

Transfer<br />

% of<br />

Avail.<br />

funds<br />

Transf.<br />

Capital Current Final<br />

Appr. Act<br />

R’000 R’000 R’000 R’000 R’000 % R’000 R’000 R’000<br />

4,000<br />

4,000<br />

160


ANNEXURE 1K<br />

Statement of Transfers to Non-Profit Institutions<br />

Non-Profit Institution<br />

Adjusted<br />

Appr.Act<br />

Transfer Allocation Transfer 2006/07<br />

Roll Overs<br />

Total<br />

Available<br />

Actual<br />

Transfer<br />

% of<br />

Avail. funds<br />

Transf.<br />

Final<br />

Appr. Act<br />

R’000 R’000 R’000 R’000 R’000 % R’000<br />

Transfers<br />

Amathole 3,000 3,000 3,000 100 2,000<br />

Cacadu 3,000 3,000 3,000 100 2,000<br />

Alfred Nzo 5,250 5,250 5,250 100 3,500<br />

Ukhahlamba 5,250 5,250 5,250 100 3,500<br />

Chris Hani 5,250 5,250 5,250 100 3,500<br />

OR Thambo 5,250 5,250 5,250 100 3,500<br />

Nelson Mandela 3,000 3,000 3,000 100 2,000<br />

National Business Initiative 4,000 4,000 4,000 100 –<br />

34,000 34,000 34,000 20,000<br />

Subsidies<br />

Total 34,000 34,000 34,000 100 20,000<br />

Household<br />

ANNEXURE 1L<br />

Statement of Transfers/Subsidies to Households<br />

Adjusted<br />

Appr.Act<br />

Transfer Allocation Transfer 2006/07<br />

Roll Overs<br />

Adjustments<br />

Adjustments<br />

Total<br />

Available<br />

Actual<br />

Transfer<br />

% of<br />

Avail. funds<br />

Transf.<br />

Final<br />

Appr. Act<br />

R’000 R’000 R’000 R’000 R’000 % R’000<br />

RSCL 73<br />

73<br />

ANNEXURE 1M<br />

Statement of Gifts, Donations and Sponsorships Received<br />

Name of Organisation Nature of Gift, Donation or Sponsorship <strong>2007</strong>/<strong>08</strong> 2006/07<br />

R’000 R’000<br />

Received in Cash<br />

Intengu Communications Provincial Growth and Development summit – 757<br />

Subtotal – 757<br />

Total – 757<br />

161


ANNEXURE 1O<br />

Statement of Gifts, Donations and Sponsorships made and Remmissions, Refunds<br />

and Payments made as an act of Grace for the year ended 31 March 20<strong>08</strong><br />

Nature of Gift, Donation or Sponsorship <strong>2007</strong>/<strong>08</strong> 2006/07<br />

(Group major categories but list material items including name of organisation) R’000 R’000<br />

Paid in cash<br />

Society for conservation 1,000 –<br />

South African Automotive Week 4,000 –<br />

South African Rugby Institute/Alicedale Rugby Academy 1,000 –<br />

Eastern Cape Tourism Board – Madiba Action 500<br />

Subtotal 6,500 –<br />

Total 6,500 –<br />

ANNEXURE 2A<br />

Statement of investments in and amounts owing by/to<br />

national/provincial public entities as at 31 March 20<strong>08</strong><br />

Name<br />

of Public<br />

Entity<br />

State Entity’s<br />

PFMA<br />

Schedule<br />

type (state<br />

year end<br />

if not 31<br />

March)<br />

%<br />

Held<br />

07/<strong>08</strong><br />

%<br />

Held<br />

06/07<br />

Number of shares<br />

held<br />

Cost of investment<br />

Net Asset value<br />

of investment<br />

Profit/(Loss) for<br />

the year<br />

Losses<br />

guaranteed<br />

R’000 R’000 R’000<br />

‘07/<strong>08</strong> ‘06/07 ‘07/<strong>08</strong> ‘06/07 ‘07/<strong>08</strong> ‘06/07 ‘07/<strong>08</strong> ‘06/07 Y/N<br />

Nat./Prov.<br />

Publ. Entity<br />

ECDC Schedule 3D 100 100 270,870 239,373 270,870 239,373<br />

Subtotal 270,870 239,373 270,870 239,373<br />

Other<br />

Total 270,870 239,373 270,870 239,373 - - - -<br />

162


ANNEXURE 3A<br />

Statement of Financial Guarantees Issued as at 31 March 20<strong>08</strong> – Local<br />

Guarantor<br />

institution/Guarantee in<br />

respect of<br />

Orig.<br />

guaran.<br />

capital<br />

amount<br />

Opening<br />

balance<br />

1 April<br />

<strong>2007</strong><br />

Guaran.<br />

draw<br />

downs<br />

during<br />

the<br />

year<br />

Guaran.<br />

repayments/<br />

cancelled/<br />

reduced/<br />

released<br />

during<br />

the year<br />

Revaluations<br />

Closing<br />

balance<br />

31 March<br />

20<strong>08</strong><br />

Guaran.<br />

interest<br />

for year<br />

ended 31<br />

March<br />

20<strong>08</strong><br />

Realised<br />

losses not<br />

recoverable<br />

i.e.<br />

claims<br />

paid out<br />

R’000 R’000 R’000 R’000 R’000 R’000 R’000 R’000<br />

Motor vehicles<br />

Housing<br />

Standard Bank 103 95 11 187<br />

Ned Bank Ltd - 120 - 120<br />

FirstRand Bank 16 218 - 234<br />

Ned Bank(INC B ) 13 - - 13<br />

ABSA 153 317 20 450<br />

Unique Finance 6 - - 6<br />

Peoples Bank 114 15 45 84<br />

FNB – Former SA 35 7 - 42<br />

Old Mutual(NedB/P) 123 32 - 155<br />

Total 563 804 76 1,291<br />

*Note: Opening balances of the Housing Guarantees have been re-classified<br />

ANNEXURE 3B<br />

Statement of contingent liabilities as at 31 March 20<strong>08</strong><br />

Nature of Liability<br />

Opening Liabilities incurred Liabilities paid/ Liabilities recoverable<br />

Closing<br />

(Provide<br />

Balance<br />

during the year cancelled/reduced<br />

Balance<br />

during the year details hereunder)<br />

01/04/<strong>2007</strong><br />

31/03/20<strong>08</strong><br />

R’000 R’000 R’000 R’000 R’000<br />

Claims against the department<br />

Pending court cases 2,533 4,476 7,000<br />

Department of Justice 50 50<br />

Department of Health 11 11<br />

Department of Foreign Affairs 44 44<br />

South African Police Services 2 2<br />

Department of Provincial Treasury 99 99<br />

Total 2,533 4,673 - - 7,206<br />

163


ANNEXURE 4<br />

Inter-Government Receivables<br />

Government Entity<br />

Confirmed balance outstanding<br />

Unconfirmed balance<br />

outstanding<br />

31/03/20<strong>08</strong> 31/03/<strong>2007</strong> 31/03/20<strong>08</strong> 31/03/<strong>2007</strong> 31/03/20<strong>08</strong> 31/03/<strong>2007</strong><br />

R’000 R’000 R’000 R’000 R’000 R’000<br />

Department<br />

Provincial Legislature 7 – 7<br />

TOTAL<br />

– – – 7 – 7<br />

Other Government Entities<br />

Eastern Cape Parks Board 6,740 – 6,740<br />

– – – 6,740 – 6,740<br />

TOTAL – – – 6,747 – 6,747<br />

ANNEXURE 5<br />

Inter-Government Payables<br />

Government Entity<br />

Confirmed balance outstanding<br />

Unconfirmed balance<br />

outstanding<br />

31/03/20<strong>08</strong> 31/03/<strong>2007</strong> 31/03/20<strong>08</strong> 31/03/<strong>2007</strong> 31/03/20<strong>08</strong> 31/03/<strong>2007</strong><br />

R’000 R’000 R’000 R’000 R’000 R’000<br />

Departments<br />

Current<br />

Provincial Treasury 31 – 31<br />

Dept of Environmental Affairs, Nat. 5 – 5<br />

Dept of Social Department 357 – 357<br />

Dept of Justice 41 – 41<br />

Subtotal 5 – 429 – 434<br />

Total 5 – 429 – 434<br />

TOTAL<br />

164


Part 4<br />

Human Resource Management<br />

165


4.1 AIM<br />

To render Human Resources Administration, Human Resources Development<br />

Organisational Development and Labour Relations Services to the Department.<br />

4.2 SERVICE DELIVERY<br />

4.2.1 MAIN SERVICES PROVIDED AND STANDARDS<br />

MAIN SERVICES ACTUAL CUSTOMERS POTENTIAL CUSTOMERS STANDARD<br />

OF SERVICE<br />

Provision of efficient<br />

HRM services in the<br />

department<br />

Implement sound<br />

labour relations<br />

between management<br />

and employees<br />

Implement wellness<br />

programmes(EAP,HIV/<br />

AIDS,SHE) by providing<br />

care and support for<br />

affected and infected<br />

employees<br />

Ensure effective<br />

organizational<br />

development and<br />

efficiency services<br />

Improve performance<br />

of all staff in line<br />

with organisational<br />

objectives<br />

Line functionaries Job applicants Providing the right<br />

skilled employees at the<br />

right time<br />

Management and all<br />

employees<br />

All employees of the<br />

department<br />

Management and<br />

employees of the<br />

department<br />

All employees of the<br />

department<br />

Organised labour and<br />

sector councils<br />

Immediate family<br />

members and medical<br />

practitioners<br />

Organised labour<br />

None<br />

Effective and efficient<br />

management of<br />

discipline maintained<br />

Confidentiality and<br />

professionalismreferrals<br />

dealt with on<br />

time<br />

A functional<br />

organisational structure<br />

maintained<br />

Signed and validated<br />

performance<br />

plans,reviews and<br />

assessments conducted<br />

ACTUAL ACHIEVEMENT<br />

AGAINST STANDARDS<br />

Competent employees<br />

appointed<br />

Facilitation and advice<br />

provided<br />

All referrals attended to<br />

timeously<br />

Facilitated needs<br />

analysis and interviews<br />

from all programmes<br />

and staff<br />

100% signed<br />

performance plans,<br />

reviews done.<br />

4.2.2 CONSULTATION ARRANGEMENTS WITH CUSTOMERS<br />

TYPE OF ARRANGEMENT ACTUAL CUSTOMERS POTENTIAL CUSTOMERS ACTUAL ACHIEVEMENTS<br />

Meetings: information sharing<br />

sessions , reports<br />

Management and employees OTP,DPSA, PSC, PSCBC <strong>Report</strong>s submitted on time<br />

4.2.3 SERVICE DELIVERY ACCESS STRATEGY<br />

ACCESS STRATEGY<br />

Staff meetings and workshops on HR issues<br />

ACTUAL ACHIEVEMENTS<br />

Workshops and HR Sessions held<br />

166


4.2.4 SERVICE INFORMATION TOOL<br />

TYPES OF INFORMATION TOOL<br />

Employee files<br />

Persal System<br />

Vulindlela<br />

Intranet, e-mail and departmental website<br />

ACTUAL ACHIEVEMENTS<br />

100% compliant<br />

100% information updated<br />

Quarterly updates<br />

High rate of utilisation for Departmental information<br />

4.2.5 COMPLAINTS MECHANISM<br />

COMPLAINTS MECHANISM<br />

Designated employees<br />

Negotiating Team<br />

Appeals Authority<br />

Local Employment Equity Consultative Forum<br />

ACTUAL ACHIEVEMENTS<br />

Designated employees appointed in writting<br />

Labour-Management Forum established and functional<br />

Appeals authority appointed and functional<br />

Employment Equity Forum established and functional<br />

4.3 EXPENDITURE<br />

4.3.1 PERSONNEL COSTS BY PROGRAMME, <strong>2007</strong>/<strong>08</strong><br />

Programme<br />

Total Expenditure<br />

Personnel<br />

Expenditure<br />

Training Expenditure<br />

Professional<br />

and Special<br />

Services<br />

Personnel cost<br />

as % of total<br />

expenditure<br />

Average personnel<br />

cost per<br />

employee<br />

R’000 R’000 R’000 R’000 % R’000<br />

Programme 1 78,814 39,328 3,233 5,075 49.7<br />

Programme 2 127,137 12,021 410 9.5<br />

Programme 3 343,670 502 1,629 .1<br />

Programme 4 46,154 -1<br />

Programme 5 373 73<br />

Programme 6 33,646 27,126 210 80.6<br />

Programme 7 3,425 398<br />

Programme 8 102,372 1,000<br />

Programme 9 726 482 9 66.4<br />

Total 736,317 79,459 3,233 8,804<br />

*Note All training expenditure has been managed through programme 1: Administration,<br />

sub-programme Corporate Services<br />

167


4.3.2 PERSONNEL COSTS BY SALARY BANDS, <strong>2007</strong>/<strong>08</strong><br />

Salary bands<br />

Personnel<br />

Expenditure<br />

(R’000)<br />

% of total personnel<br />

cost<br />

Average personnel<br />

cost per<br />

employee<br />

R’000 % R’000<br />

Lower skilled (Levels 1-2) 7,133 9.3 70,624<br />

Skilled (Levels 3-5) 7,689 10 72,538<br />

Highly skilled production (Levels 6-8) 27,398 35.7 138,374<br />

Highly skilled supervision (Levels 9-12) 17,389 22.7 252,014<br />

Senior management (Levels 13-16) 10,248 13.4 445,565<br />

Contract (Levels 3-5) 10 0<br />

Contract (Levels 6-8) 262 0.3 262,000<br />

Contract (Levels 9-12) 1,043 1.4 347,667<br />

Contract (Levels 13-16) 930 1.2 310,000<br />

Abnormal Appointment 1,587 2.1 18,241<br />

TOTAL 73,689 96 124,685<br />

4.3.3 SALARIES, OVERTIME, HOME OWNERS ALLOWANCE<br />

AND MEDICAL ASSISTANCE BY PROGRAMME, <strong>2007</strong>/<strong>08</strong><br />

Programme Salaries Overtime Home Owners Allowance Medical Assistance<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

R’000 % R’000 % R’000 % R’000 %<br />

Programme 1 26,072 66.3 5 .01 1,334 3.4 1,891 4.8<br />

Programme 2 8,526 70.9 315 2.6 446 3.7<br />

Programme 3 345 68.7 43 8.6 5 1<br />

Programme 4 -1 100<br />

Programme 5<br />

Programme 6 15,633 57.6 540 2 1,155 4.3<br />

Programme 7<br />

Programme 8<br />

Programme 9 482 100<br />

Total 51,028 64.2 5 2,231 2.8 3,497 4.4<br />

168


4.3.4 SALARIES, OVERTIME, HOME OWNERS ALLOWANCE<br />

AND MEDICAL ASSISTANCE BY SALARY BANDS, <strong>2007</strong>/<strong>08</strong><br />

Salary Bands Salaries Overtime Home Owners<br />

Allowance<br />

Medical Assistance<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

Amount<br />

(R’000)<br />

% of<br />

personnel<br />

cost<br />

R’000 % R’000 % R’000 % R’000 %<br />

Lower skilled (Levels 1-2) 5,<strong>08</strong>1 69.3 374 5.1 562 7.7<br />

Skilled (Levels 3-5) 5,397 69.6 456 5.9 632 8.1<br />

Highly skilled Prod. (Levels 6-8) 2,0281 71.5 794 2.8 1,435 5.1<br />

Highly skilled Supervision<br />

(Levels 9-12)<br />

Senior management<br />

(Levels 13-16)<br />

12,332 66.9 243 1.3 556 3<br />

6,050 55.1 313 2.8 252 2.3<br />

Contract (Levels 3-5) 7 70<br />

Contract (Levels 6-8) 169 64.5<br />

Contract (Levels 9-12) 662 60.7 47 4.3<br />

Contract (Levels 13-16) 557 59<br />

Abnormal Appointment 10 0.6<br />

TOTAL 50,546 65.9 2,227 2.9 3,437 4.5<br />

4.4.1 EMPLOYMENT AND VACANCIES BY PROGRAMME, 31 March 20<strong>08</strong><br />

PROGRAMME NO. OF POSTS NO. OF POSTS<br />

FILLED<br />

VACANCY RATE<br />

%<br />

NO. OF POSTS<br />

FILLED ADD. TO<br />

ESTAB.<br />

Pr1:administration, Permanent 305 217 28.9 43<br />

Pr2:policy plan res&infosys, Permanent 22 16 27.3<br />

Pr3:economic affairs, Permanent 84 56 33.3 1<br />

Pr4:environmental affairs, Permanent 778 195 74.9 1<br />

TOTAL 847 568 59.3 45<br />

169


4.4 EMPLOYMENT AND VACANCIES<br />

4.4.2 EMPLOYMENT AND VACANCIES BY SALARY BANDS, 31 March 20<strong>08</strong><br />

SALARY BAND NO. OF POSTS NO. OF POSTS<br />

FILLED<br />

VACANCY RATE<br />

%<br />

NO. OF POSTS<br />

FILLED ADD. TO<br />

ESTAB.<br />

Lower skilled (Levels 1-2), Permanent 39 30 23.07 41<br />

Skilled (Levels 3-5), Permanent 155 150 3.22<br />

Highly skilled production (Levels 6-8), Permanent 450 245 45.55<br />

Highly skilled supervision (Levels 9-12), Permanent 163 121 25.30 1<br />

Senior management (Levels 13-16), Permanent 33 22 33.33<br />

Contract (Levels 6-8), Permanent 6 3<br />

Contract (Levels 9-12), Permanent<br />

Contract (Levels 13-16), Permanent 1<br />

TOTAL 847 568 59.3 45<br />

4.4.3 EMPLOYMENT AND VACANCIES<br />

BY CRITICAL OCCUPATION, 31 March 20<strong>08</strong><br />

CRITICAL OCCUPATIONS NO. OF POSTS NO. OF POSTS<br />

FILLED<br />

VACANCY RATE<br />

%<br />

Administrative related 46 35 23.9<br />

NO. OF POSTS<br />

FILLED ADD. TO<br />

ESTAB.<br />

Agricul animal oceanogr. forestry & other scien 7 3 57.1<br />

Agriculture related 16 9 43.8<br />

Biochem. pharmacol. zoology & life scie.techni 128 21 83.6 10<br />

Bus and heavy vehicle drivers 1 1<br />

Cleaners in offices workshops hospitals etc. 116 19 83.6<br />

Client inform clerks(switchb recept inform clerks) 3 3<br />

Conservation labourers 133 53 60.2<br />

Farm hands and labourers 217 27 87.6 1<br />

Farming forestry advisors and farm managers 16 7 56.3<br />

Finance and economics related 11 8 27.3<br />

Financial and related professionals 12 11 8.3<br />

Financial clerks and credit controllers 32 20 37.5<br />

Food services aids and waiters 3 2 33.3<br />

Human resources & organisat developm & relate prof 15 7 53.3<br />

Human resources clerks 23 17 26.1<br />

Human resources related 2 2<br />

Identification experts 3 2 33.3<br />

170


CRITICAL OCCUPATIONS NO. OF POSTS NO. OF POSTS<br />

FILLED<br />

Language practitioners interpreters & other commun 1 1<br />

VACANCY RATE<br />

%<br />

NO. OF POSTS<br />

FILLED ADD. TO<br />

ESTAB.<br />

Library mail and related clerks 5 3 40<br />

Life sciences related 1 1<br />

Light vehicle drivers 2 2<br />

Logistical support personnel 2 2<br />

Material-recording and transport clerks 1 100<br />

Messengers porters and deliverers 1 1<br />

Motor vehicle drivers 1 1<br />

Nature conservation and oceanographical rel.techni 135 59 56.3<br />

Other administrat & related clerks and organisers 72 41 43.1 1<br />

Other administrative policy and related officers 29 21 27.6<br />

Other occupations 1 1<br />

Regulatory inspectors 10 5 50<br />

Secretaries & other keyboard operating clerks 85 57 32.9 1<br />

Security guards 18 15 16.7<br />

Security officers 4 3 25<br />

Senior managers 28 18 35.7 1<br />

Trade/industry advisers & other related profession 9 6 33.3<br />

TOTAL 847 568 59.3 41<br />

171


4.5 JOB EVALUATION<br />

4.5.1 JOB EVALUATION, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Salary band<br />

No. of<br />

posts<br />

No. of Jobs<br />

Evaluated<br />

% of posts<br />

evaluated by<br />

salary bands<br />

Posts Upgraded<br />

Posts downgraded<br />

NO.<br />

% POSTS<br />

EVAL.<br />

NO..<br />

% POSTS<br />

EVAL.<br />

Lower skilled (Levels 1-2) 39<br />

Skilled (Levels 3-5) 155<br />

Highly skilled production (Levels 6-8) 450 24 5.3 24 100<br />

Highly skilled supervision (Levels 9-12) 162 68 41.9<br />

Senior Management Service Band A 33 16 48<br />

Senior Management Service Band B 6 6 100<br />

Senior Management Service Band C 1 1 100<br />

Senior Management Service Band D<br />

Total 846 115 13.5 24 100<br />

4.5.2 PROFILE OF EMPLOYEES WHOSE SALARY POSITIONS WERE<br />

UPGRADED DUE TO THEIR POSTS BEING UPGRADED, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

BENEFICIARIES AFRICAN ASIAN COLOURED WHITE TOTAL<br />

Female 4 1 5<br />

Male 7 7<br />

Total 11 1 12<br />

Employees with a disability<br />

4.5.3 EMPLOYEES WHOSE SALARY LEVEL EXCEED GRADE<br />

DETERMINED BY JOB EVALUATION, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong> (in terms of PSR 1.V.C.3)<br />

OCCUPATION<br />

Total Number of Employees whose salaries exceeded the<br />

level determined by job evaluation in 2003/04<br />

Percentage of total employment<br />

NO. OF<br />

EMPLOYEES<br />

JOB EVAL. LEVEL REMUN. LEVEL REASON FOR<br />

DEV.<br />

N/A<br />

172


4.5.4 PROFILE OF EMPLOYEES WHOSE SALARY LEVEL EXCEEDED GRADE<br />

DETERMINED BY JOB EVALUATION, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong> (in terms of PSR 1.V.C.3)<br />

BENEFICIARIES AFRICAN ASIAN COLOURED WHITE TOTAL<br />

Female<br />

Male<br />

Total<br />

4.5.5 EMPLOYEES WITH DISABILITIES<br />

Total Number of Employees whose salaries exceeded the grades determined by job evaluation in 2003/ 04<br />

nil<br />

4.6 EMPLOYMENT CHANGES<br />

4.6.1 ANNUAL TURNOVER RATES BY SALARY BAND<br />

for the period 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Salary Band<br />

No. of employees<br />

per band as<br />

on 1 April 2004<br />

Appoint. and<br />

transfers into<br />

the Dept.<br />

Terminations<br />

and transfers<br />

out of the Dept.<br />

NO. NO. NO.<br />

Turnover rate<br />

Lower skilled (Levels 1-2), Permanent 102 252 65.6<br />

Skilled (Levels 3-5), Permanent 104 140 61.4<br />

Highly skilled production (Levels 6-8), Permanent 195 28 15.1<br />

Highly skilled supervision (Levels 9-12), Permanent 71 3 5.2<br />

Senior Management Service Band A, Permanent 18 2 15.4<br />

Senior Management Service Band B, Permanent 03 1 50<br />

Senior Management Service Band C, Permanent 1 0 0<br />

Other, Permanent 0 0 0<br />

Contract (Levels 6-8), Permanent 0 1 50<br />

Contract (Levels 9-12), Permanent 0 2 100<br />

Contract (Band B), Permanent 0 1 100<br />

Contract (Band C), Permanent 1 0 0<br />

Total 568 59.3 41<br />

173


4.6.2 ANNUAL TURNOVER RATES BY CRITICAL OCCUPATION<br />

for the period 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupation<br />

No. of employees<br />

per band as<br />

on 1 April 2004<br />

Appoint. and<br />

transfers into<br />

the Dept.<br />

Terminations<br />

and transfers<br />

out of the Dept.<br />

Turnover rate<br />

NO. NO. NO.<br />

Administrative related 35 1 4 11.4<br />

Agricul animal oceanography forestry & other scien 12 4 33.3<br />

Agriculture related 4 3 0<br />

Building and other property caretakers 18 12 66.7<br />

Bus and heavy vehicle drivers 1<br />

Client inform clerks(switchb recept inform clerks) 7<br />

Conservation labourers 237 169 71.3<br />

Farm hands and labourers 212 166 78.3<br />

Farming forestry advisors and farm managers 2 3<br />

Finance and economics related 9 2 2 22.2<br />

Financial and related professionals 9<br />

Financial clerks and credit controllers 19 2 10.5<br />

Food services aids and waiters 1<br />

Human resources & organisat developm & relate prof 6 3 2 33.3<br />

Human resources clerks 16 9<br />

Human resources related 2 1<br />

Language practitioners interpreters & other commun 1<br />

Library mail and related clerks 6<br />

Light vehicle drivers 3<br />

Logistical support personnel 2<br />

Material-recording and transport clerks 6 1 16.7<br />

Nature conservation and oceanographical rel.techni 61 13 17 27.9<br />

Other administrat & related clerks and organisers 46 4 12 26.1<br />

Other administrative policy and related officers 30 2 2 6.7<br />

Other occupations 64 1 19 29.7<br />

Rank: Unknown 1<br />

Regulatory inspectors 6 1 16.7<br />

Safety health and quality inspectors 1<br />

Secretaries & other keyboard operating clerks 37 18 12 32.4<br />

Security guards 7 0 1 14.3<br />

Senior managers 12 3 2 16.7<br />

Trade/industry advisers & other related profession 2<br />

Water plant and related operators 3 2 66.7<br />

TOTAL 847 568 59.3 41<br />

174


4.6.3 REASONS WHY STAFF ARE LEAVING THE DEPARTMENT<br />

TERMINATION TYPE NUMBER % OF TOTAL<br />

Death 3<br />

Resignation 14<br />

Expiry of contract -<br />

Dismissal – operational changes -<br />

Dismissal – misconduct 5<br />

Dismissal – inefficiency -<br />

Discharged due to ill-health -<br />

Retirement 2<br />

Transfers to other Public Service Departments 21<br />

Total 45<br />

Total number of employees who left as a % of the total employment<br />

Termination Type<br />

4.6.4 PROMOTIONS BY CRITICAL OCCUPATION<br />

Occupation<br />

Employees<br />

as at 1 April<br />

<strong>2007</strong><br />

Promot. to<br />

another<br />

salary level<br />

Salary level<br />

promot.<br />

as a % of<br />

employees..<br />

Progressions<br />

to another<br />

notch within<br />

a salary level<br />

Notch<br />

progressions<br />

as a % of<br />

employees<br />

NO. NO. % NO. %<br />

Administrative related 35 2 5.7 7 20<br />

Agricul animal oceanography forestry & other scien 12 3 25<br />

Agriculture related 4 3 75 0<br />

Building and other property caretakers 18<br />

Bus and heavy vehicle drivers 1<br />

Client inform clerks(switchb recept inform clerks) 7 5 71.4<br />

Conservation labourers 237 13 5.5<br />

Farm hands and labourers 212 20 9.4<br />

Farming forestry advisors and farm managers 2<br />

Finance and economics related 9 1 11.1 3 33.3<br />

Financial and related professionals 9 1 11.1<br />

Financial clerks and credit controllers 19 3 15.8 7 36.8<br />

Food services aids and waiters 1 1 100<br />

Human resources & organisat developm & relate prof 6 1 16.7 1 16.7<br />

Human resources clerks 16 2 12.5 7 43.8<br />

Human resources related 2 1 50 1 50<br />

175


Occupation<br />

Employees<br />

as at 1 April<br />

<strong>2007</strong><br />

Promot. to<br />

another<br />

salary level<br />

Salary level<br />

promot.<br />

as a % of<br />

employees..<br />

Progressions<br />

to another<br />

notch within<br />

a salary level<br />

Notch<br />

progressions<br />

as a % of<br />

employees<br />

NO. NO. % NO. %<br />

Language practitioners interpreters & other commun 1<br />

Library mail and related clerks 6 1 16.7 3 50<br />

Light vehicle drivers 3 1 33.3<br />

Logistical support personnel 2 1 50<br />

Material-recording and transport clerks 6 1 16.7 2 33.3<br />

Nature conservation and oceanographical rel.techni 61 1 1.6 13 21.3<br />

Other administrat & related clerks and organisers 46 14 30.4<br />

Other administrative policy and related officers 30 5 16.7<br />

Other occupations 64 2 3.1 15 23.4<br />

Rank: Unknown 1<br />

Regulatory inspectors 6 2 33.3<br />

Safety health and quality inspectors 1 0 0<br />

Secretaries & other keyboard operating clerks 37 12 32.4 7 18.9<br />

Security guards 7 5 71.4<br />

Senior managers 12 1 8.3<br />

Trade/industry advisers & other related profession 2<br />

Water plant and related operators 3 1 33.3<br />

TOTAL 847 568 59.3 41 847<br />

4.6.5 PROMOTIONS BY SALARY BAND<br />

Occupation<br />

Employees<br />

as at 1 April<br />

<strong>2007</strong><br />

Promot. to<br />

another salary<br />

level<br />

Salary level<br />

promot. as a<br />

% of employees<br />

Progres. to another<br />

notch in<br />

a salary level<br />

Notch<br />

progressions<br />

as a % of<br />

employees<br />

NO. NO. % NO. %<br />

Lower skilled (Levels 1-2), Permanent 384 38 9.9<br />

Skilled (Levels 3-5), Permanent 228 11 4.8 37 16.2<br />

Highly skilled production (Levels 6-8), Permanent 185 9 4.9 51 27.6<br />

Highly skilled supervision (Levels 9-12), Permanent 58 6 10.3 11 19<br />

Senior management (Levels 13-16), Permanent 16 4 25<br />

Other, Permanent 1<br />

Contract (Levels 6-8), Permanent 2<br />

Contract (Levels 9-12), Permanent 2 2 100<br />

Contract (Levels 13-16), Permanent 2 0 0 0 0<br />

TOTAL 847 568 59.3 41<br />

176


4.7 EMPLOYMENT EQUITY<br />

4.7.1 TOTAL NUMBER OF EMPLOYEES<br />

(including employees with disabilities) in each of the following occupational categories as on 31 March 20<strong>08</strong><br />

Occupational categories (SASCO) Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Legislators, senior officials<br />

and managers<br />

9 9 1 8 8<br />

Professionals 82 1 83 14 78 1 1 80<br />

Clerks 42 42 89 3 92<br />

Service and sales workers 6 6 3 3<br />

Plant and machine operators and<br />

assemblers<br />

5 5<br />

Elementary occupations 73 73 5 60 3 63<br />

Other 2 2 3 3<br />

TOTAL 219 1 220 20 241 7 1 249<br />

4.7.2 TOTAL NUMBER OF EMPLOYEES<br />

(including employees with disabilities) in each of the following occupational bands as on 31 March 20<strong>08</strong><br />

Occupational Bands Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Top Management 1 1<br />

Senior Management 9 9 3 10 10<br />

Professionally qualified and<br />

experienced specialists and midmanagement<br />

Skilled technical and academically<br />

qualified workers, junior<br />

management, supervisors, foremen<br />

Semi-skilled and discretionary<br />

decision making<br />

Unskilled and defined decision<br />

making<br />

33 1 34 7 23 1 24<br />

78 78 9 94 4 0 98<br />

33 33 68 3 0 71<br />

63 63 42 0 42<br />

Contract (Senior Management) 1 1 1 1 0 1<br />

Contract (Professionally qualified) 1 1 2 0 2<br />

Contract (Skilled technical) 1 0 1<br />

TOTAL 219 1 220 20 241 7 1 249<br />

177


4.7.3 RECRUITMENT FOR THE PERIOD 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupational Bands Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Top Management 1 1<br />

Senior Management 2 2 5 9<br />

Professionally qualified and<br />

experienced specialists and midmanagement<br />

Skilled technical and academically<br />

qualified workers, junior<br />

management, supervisors, foreman<br />

and superintendents<br />

Semi-skilled and discretionary<br />

decision making<br />

4 1 1 4 1 11<br />

15 5 25 6 51<br />

44 1 49 1 95<br />

Contract (Top Management)<br />

Contract (Professional) 1 3 4<br />

Total 67 1 9 86 8 171<br />

Employees with disabilities<br />

4.7.4 PROMOTIONS FOR THE PERIOD 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupational Bands Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Top Management 1 1<br />

Senior Management 2 2 5 1 9<br />

Professionally qualified and<br />

experienced specialists and<br />

midmanagement<br />

Skilled technical and academically<br />

qualified workers, junior<br />

management, supervisors, foreman<br />

and superintendents<br />

Semiskilled and discretionary<br />

decision making<br />

Unskilled and defined decision<br />

making<br />

4 1 1 2 8<br />

40<br />

15 2 13 30<br />

22 1 19 42<br />

Contract (Professional) 1 1<br />

Total 56 3 1 7 52 2 1 6 128<br />

178


4.7.5 TERMINATIONS FOR THE PERIOD 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupational Bands Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Top Management 1 1 2<br />

Senior Management 1 1 2<br />

Professionally qualified and<br />

experienced specialists and midmanagement<br />

Skilled technical and academically<br />

qualified workers, junior<br />

management, supervisors, foreman<br />

and superintendents<br />

Semi-skilled and discretionary<br />

decision making<br />

Unskilled and defined decision<br />

making<br />

8 5 3 16 34<br />

1 1 2<br />

5 1 6 12<br />

Contract (Professional)<br />

Total 15 7 3 26 52<br />

4.7.6 DISCIPLINARY ACTION FOR THE PERIOD 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Disciplinary action<br />

Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Final written warning and<br />

counselling<br />

x<br />

One month suspension without pay<br />

and final written warning<br />

x<br />

Dismissal<br />

x<br />

Dismissal<br />

Dismissal<br />

Dismissal<br />

x<br />

x<br />

x<br />

One month suspension without pay<br />

x<br />

Final written and leave without pay<br />

x<br />

179


4.7.7 SKILLS DEVELOPMENT FOR THE PERIOD 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupational Categories Male Female Total<br />

AFRICAN COLOURED INDIAN WHITE AFRICAN COLOURED INDIAN WHITE<br />

Legislators, senior officials and<br />

managers<br />

23 1 7 47 2 80<br />

Professionals 20 1 6 16 6 51<br />

Technicians and associate<br />

professionals<br />

Clerks 37 82 3 6 128<br />

Service and sales workers<br />

Skilled agriculture and fishery<br />

workers<br />

Craft and related trades workers<br />

Plant and machine operators and<br />

assemblers<br />

Elementary occupations 22 15 37<br />

Total 102 2 13 160 3 14 296<br />

Employees with disabilities 1 1<br />

4.8 PERFORMANCE REWARDS<br />

4.8.1 PERFORMANCE REWARDS BY RACE, GENDER, AND DISABILITY,<br />

1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Beneficiary Profile<br />

Cost<br />

NO. BENEF.<br />

TOTAL NO.OF<br />

EMPLOYEES<br />

% OF TOTAL<br />

WITHIN GROUP<br />

COST (R’000)<br />

AVERAGE COST<br />

PER EMPLOYEE<br />

African, Female 20 219 9.1 56 2,822<br />

African, Male 11 214 5.1 42 3,776<br />

Asian, Female 2<br />

Coloured, Female 1 8 12.5 3 3,309<br />

Coloured, Male 2<br />

White, Female 16<br />

White, Male 23<br />

TOTAL 32 484 6.6 101 9,907<br />

180


4.8.2 PERFORMANCE REWARDS BY SALARY BANDS FOR PERSONNEL<br />

BELOW SENIOR MANAGEMENT SERVICE, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Salary Bands Beneficiary Profile Cost<br />

NO. BENEF. TOTAL NO.OF<br />

EMPLOYEES<br />

% OF TOTAL<br />

WITHIN GROUP<br />

COST<br />

(R’000)<br />

AVERAGE COST<br />

PER EMPLOYEE<br />

Lower skilled (Levels 1-2) 10 128 7.8 20 2,000<br />

Skilled (Levels 3-5) 10 102 9.8 26 2,600<br />

Highly skilled production (Levels 6-8) 10 176 5.7 41 4,100<br />

Highly skilled supervision (Levels 9-12) 2 58 3.4 14 7,000<br />

Contract (Levels 6-8) 2<br />

Contract (Levels 9-12) 3<br />

TOTAL 32 469 6.8 101 15,700<br />

4.8.3 PERFORMANCE REWARDS BY CRITICAL OCCUPATIONS,<br />

1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Critial Occupation Beneficiary Profile Cost<br />

NO. BENEF.<br />

TOTAL NO.OF<br />

EMPLOYEES<br />

% OF TOTAL<br />

WITHIN GROUP<br />

COST<br />

(R’000)<br />

AVERAGE COST<br />

PER EMPLOYEE<br />

TOTAL<br />

4.8.4 PERFORMANCE RELATED REWARDS (CASH BONUS),<br />

BY SALARY BAND, FOR SENIOR MANAGEMENT SERVICE<br />

Salary Bands Beneficiary Profile Cost<br />

NO. BENEF.<br />

TOTAL NO.OF<br />

EMPLOYEES<br />

% OF TOTAL<br />

WITHIN GROUP<br />

COST<br />

(R’000)<br />

AVERAGE COST<br />

PER EMPLOYEE<br />

TOTAL COST AS<br />

% OF PERSON.<br />

EXPEND.<br />

Band A 19<br />

Band B 5<br />

Band C 1<br />

TOTAL 25<br />

181


4.9 FOREIGN WORKERS<br />

4.9.1 FOREIGN WORKERS BY SALARY BAND, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Salary Band 1 April <strong>2007</strong> 31 March 20<strong>08</strong> Change<br />

NO. % OF TOTAL NO. % OF TOTAL NO. % CHANGE<br />

Lower skilled (Levels 1-2) – – – – – –<br />

Skilled (Levels 3-5) – – – – – –<br />

Highly skilled production (Levels 6-8) – – – – – –<br />

Highly skilled supervision (Levels 9-12) – – – – – –<br />

Senior management (Levels 13-16) – – – – – –<br />

Total – – – – – –<br />

4.9.2 FOREIGN WORKER BY MAJOR OCCUPATION, 1 April <strong>2007</strong> to 31 March<br />

Major Occupation 1 April <strong>2007</strong> 31 March 20<strong>08</strong> Change<br />

NO. % OF TOTAL NO. % OF TOTAL NO. % CHANGE<br />

Total – – – – – –<br />

4.10 LEAVE UTILISATION FOR THE PERIOD<br />

1 JANUARY <strong>2007</strong> TO 31 DECEMBER <strong>2007</strong><br />

4.10.1 SICK LEAVE, 1 JANUARY <strong>2007</strong> TO 31 DECEMBER <strong>2007</strong><br />

SALARY BAND<br />

TOTAL<br />

DAYS<br />

% DAYS WITH<br />

MEDIC. CERT.<br />

NO. OF<br />

EMPLOYEES<br />

USING SICK<br />

LEAVE<br />

% OF TOTAL<br />

EMPL. USING<br />

SICK LEAVE<br />

AVE. DAYS PER<br />

EMPLOYEE<br />

ESTIMATED COST<br />

(R’000)<br />

Lower skilled (Levels 1-2) 164 85.4 36 19.9 5 29<br />

Skilled (Levels 3-5) 192 79.7 48 26.5 4 39<br />

Highly skilled production<br />

(Levels 6-8)<br />

Highly skilled supervision<br />

(Levels9-12)<br />

Senior management<br />

(Levels 13-16)<br />

273 82.8 70 38.7 4 123<br />

94 86.2 24 13.3 4 80<br />

6 50 2 1.1 3 13<br />

3 100 1 0.6 3 6<br />

Total 732 82.8 181 100 4 290<br />

182


4.10.2 DISABILITY LEAVE (temporary and permanent), 1 January <strong>2007</strong> to 31 December <strong>2007</strong><br />

SALARY BAND<br />

TOTAL<br />

DAYS<br />

% DAYS WITH<br />

MEDIC. CERT.<br />

NO. OF<br />

EMPLOYEES<br />

USING SICK<br />

LEAVE<br />

% OF TOTAL<br />

EMPL. USING<br />

SICK LEAVE<br />

AVE. DAYS PER<br />

EMPLOYEE<br />

ESTIMATED COST<br />

(R’000)<br />

Lower skilled (Levels 1-2) 3 – – – – –<br />

Skilled (Levels 3-5) 5 – – – – –<br />

Highly skilled production<br />

(Levels 6-8)<br />

Highly skilled supervision<br />

(Levels 9-12)<br />

Senior management<br />

(Levels 13-16)<br />

9 – – – – –<br />

3 – – – – –<br />

- – – – – –<br />

Total 20 – – – – –<br />

4.10.3 ANNUAL LEAVE, 1 January <strong>2007</strong> to 31 December <strong>2007</strong><br />

SALARY BANDS TOTAL DAYS TAKEN AVE.PER EMPLOYEE<br />

Lower skilled (Levels 1-2) 610 9<br />

Skilled Levels 3-5) 736 9<br />

Highly skilled production (Levels 6-8) 1436.16 8<br />

Highly skilled supervision(Levels 9-12) 525 8<br />

Senior management (Levels 13-16) 81 5<br />

Total 3388.16 8<br />

4.10.4 CAPPED LEAVE, 1 January <strong>2007</strong> to 31 December <strong>2007</strong><br />

SALARY BANDS<br />

TOTAL DAYS OF CAPPED<br />

LEAVE TAKEN<br />

AVE. NO. OF DAYS TAKEN<br />

PER EMPLOYEE<br />

AVE. CAPPED LEAVE PER EM-<br />

PLOYEE AS AT 31.12.<strong>2007</strong><br />

Lower skilled (Levels 1-2) 322 10 87<br />

Skilled Levels 3-5) 122 8 121<br />

Highly skilled production (Levels 6-8) 252 9 107<br />

Highly skilled supervision(Levels 9-12) 43 8 105<br />

Senior management (Levels 13-16)<br />

Total 739 9 103<br />

183


4.10.5 LEAVE PAYOUTS for the period 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

The following table summarises payments made to employees as a result of leave that<br />

was not taken.<br />

REASON<br />

TOTAL AMOUNT<br />

(R’000)<br />

NO. OF EMPLOYEES AVE. PAYMENT PER<br />

EMPLOYEE<br />

Leave payout for <strong>2007</strong>/<strong>08</strong> due to non-utilisation of leave<br />

for the previous cycle<br />

Capped leave payouts on termination of service for<br />

<strong>2007</strong>/<strong>08</strong><br />

739 9 103<br />

Current leave payout on termination of service for <strong>2007</strong>/<strong>08</strong><br />

Total 739 9 103<br />

4.11 HIV AND AIDS & HEALTH PROMOTION PROGRAMMES<br />

4.11.1 STEPS TAKEN TO REDUCE THE RISK OF OCCUPATIONAL EXPOSURE<br />

UNITS/CATEGORIES OF EMPLOYEES IDENTIFIED TO BE AT HIGH RISK OF CONTRACTING HIV &<br />

RELATED DISEASES (IF ANY)<br />

KEY STEPS TAKEN TO REDUCE THE<br />

RISK<br />

4.11.2 DETAILS OF HEALTH PROMOTION AND<br />

HIV & AIDS PROGRAMMES (tick the applicable boxes and provide the required information)<br />

QUESTION Y N DETAILS, IF YES<br />

1. Has the department designated a member of the SMS to implement the<br />

provisions contained in Part VI E of Chapter 1 of the Public Service Regulations,<br />

2001? If so, provide her/his name and position.<br />

2. Does the department have a dedicated unit or has it designated specific staff<br />

members to promote the health and well being of your employees? If so, indicate<br />

the number of employees who are involved in this task and the annual budget<br />

that is available for this purpose.<br />

3. Has the department introduced an Employee Assistance or Health Promotion<br />

Programme for your employees? If so, indicate the key elements/services of this<br />

Programme.<br />

4. Has the department established (a) committee(s) as contemplated in Part VI<br />

E.5 (e) of Chapter 1 of the Public Service Regulations, 2001? If so, please provide<br />

the names of the members of the committee and the stakeholder(s) that they<br />

represent.<br />

5. Has the department reviewed its employment policies and practices to ensure<br />

that these do not unfairly discriminate against employees on the basis of their<br />

HIV status? If so, list the employment policies/practices so reviewed.<br />

X<br />

X<br />

X<br />

X<br />

x<br />

Senior Manager : HRM<br />

Mrs N.Qamata<br />

The programme is driven from<br />

Head Office where three personnel<br />

is employed full-time. In the<br />

regions the fuction is an add on to<br />

the HR Practitioners<br />

EAP,HIV/AIDS, SAFETY AND HEALTH<br />

ENVIRONMENT (SHE)<br />

Partly. Committees are a loose<br />

structure which consists of EW role<br />

players that were elected and no<br />

formal structure<br />

Recruitment Poilcy<br />

184


QUESTION Y N DETAILS, IF YES<br />

6. Has the department introduced measures to protect HIV-positive employees<br />

or those perceived to be HIV-positive from discrimination? If so, list the key<br />

elements of these measures.<br />

7. Does the department encourage its employees to undergo Voluntary Counselling<br />

and Testing? If so, list the results that you have you achieved.<br />

8. Has the department developed measures/indicators to monitor & evaluate the<br />

impact of its health promotion programme? If so, list these measures/indicators.<br />

x<br />

x<br />

We have not systematically<br />

captured and kept statistics after<br />

tests<br />

No impact assessment is in place<br />

4.12 LABOUR RELATIONS<br />

The following collective agreements were entered into with trade unions within the department.<br />

4.12.1 COLLECTIVE AGREEMENTS, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

SUBJECT MATTER<br />

DATE<br />

N/A –<br />

If there were no agreements, then use the following table:<br />

Total collective agreements<br />

None<br />

The following table summarises the outcome of disciplinary hearings conducted within<br />

the department for the year under review.<br />

4.12.5 MISCONDUCT AND DISCIPLINARY HEARINGS FINALISED<br />

OUTCOMES OF DISCIPLINARY HEARINGS NO. % OF TOTAL<br />

Correctional counselling 1 8<br />

Verbal warning<br />

Written warning<br />

Final written warning 4 31<br />

Suspended without pay 2 12<br />

Fine<br />

Demotion<br />

Dismissal 4 31<br />

Not guilty 2 15<br />

Case withdrawn 0 0<br />

Total 13 100<br />

185


If there were no disciplinary hearings, then use the following table:<br />

Disciplinary hearings – <strong>2007</strong>/<strong>08</strong><br />

None<br />

4.12.3 TYPES OF MISCONDUCT<br />

ADDRESSED AT DISCIPLINARY HEARINGS<br />

TYPE OF MISCONDUCT NO. % OF TOTAL<br />

Drunk on duty<br />

Damage to government vehicles<br />

Unacceptable conduct 8 73<br />

Misappropriation of funds<br />

Theft of state property<br />

Misuse of government vehicle 2 18<br />

Unauthorised use of government vehicle<br />

Fraud<br />

Misuse of state petrol<br />

Misuse of state telephone<br />

Unauthorised keeping of personal firearm in the state premises<br />

Unauthorised purchase/requisition of stock<br />

Fighting at work 1 9<br />

Sexual harrassment<br />

Total 11 100<br />

4.12.4 GRIEVANCES LODGED for the period 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

NO.<br />

% OF TOTAL<br />

Number of grievances resolved 13 76.5<br />

Number of grievances not resolved 4 23.5<br />

Total number of grievances lodged 17 100.0<br />

4.12.5 DISPUTES LODGED WITH COUNCILS for the period 1 April 2004 to 31 March 2005<br />

NO.<br />

% OF TOTAL<br />

Number of disputes upheld 1 12.5<br />

Number of disputes dismissed 7 87.5<br />

Total number of disputes lodged 8 100.0<br />

186


4.12.6 STRIKE ACTIONS for the period 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Total number of person working days lost –<br />

Total cost (R’000) of working days lost –<br />

Amount (R’000) recovered as a result of no work no pay –<br />

4.12.7 Precautionary suspensions for the period 1 April 2004 to 31 March 2005<br />

Number of people suspended 3<br />

Number of people whose suspension exceeded 30 days<br />

Average number of days suspended 30<br />

Cost (R’000) of suspensions<br />

4.13 SKILLS DEVELOPMENT<br />

4.13.1 TRAINING NEEDS IDENTIFIED 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

Occupational Categories Gender No. of<br />

empl. as at<br />

1.04.<strong>2007</strong><br />

Training needs identified at start of reporting period<br />

LEARNER-<br />

SHIPS<br />

SKILLS PROGR. & OTHER<br />

SHORT COURSES<br />

OTHER FORMS<br />

OF TRAINING<br />

Legislators, senior officials & managers Female 38 38<br />

Male 39 39<br />

Professionals Female 42 42<br />

Male 40 40<br />

TOTAL<br />

Technicians and associate professionals<br />

Female<br />

Male<br />

Clerks Female 45 45<br />

Male 81 81<br />

Service and sales workers<br />

Female<br />

Male<br />

Skilled agriculture and fishery workers<br />

Female<br />

Male<br />

Craft and related trades workers<br />

Female<br />

Male<br />

187


Occupational Categories Gender No. of<br />

empl. as at<br />

1.04.<strong>2007</strong><br />

Training needs identified at start of reporting period<br />

LEARNER-<br />

SHIPS<br />

SKILLS PROGR. & OTHER<br />

SHORT COURSES<br />

OTHER FORMS<br />

OF TRAINING<br />

TOTAL<br />

Plant, machine operators & assemblers<br />

Female<br />

Male<br />

Elementary occupations Female 24 24<br />

Male 25 25<br />

Sub Total Female 149 149<br />

Male 185 185<br />

Total 334 334<br />

4.13.2 TRAINING PROVIDED 1 APRIL 2004 TO 31 MARCH 2005<br />

Occupational Categories Gender No. of<br />

empl. as at<br />

1.04.<strong>2007</strong><br />

Training needs identified at start of reporting period<br />

Legislators, senior officials and<br />

managers<br />

LEARNER-<br />

SHIPS<br />

SKILLS PROGR. & OTHER<br />

SHORT COURSES<br />

OTHER FORMS<br />

OF TRAINING<br />

Female 17 17<br />

Male 25 25<br />

TOTAL<br />

Professionals Female 26 26<br />

Male 21 21<br />

Technicians and associate professionals<br />

Female<br />

Male<br />

Clerks Female 139 139<br />

Male 75 75<br />

Service and sales workers<br />

Female<br />

Male<br />

Skilled agriculture and fishery workers<br />

Female<br />

Male<br />

Craft and related trades workers<br />

Female<br />

Male<br />

Plant, machine operators & assemblers<br />

Female<br />

Male<br />

Elementary occupations Female 25 25<br />

Male 29 29<br />

Sub Total Female 207 207<br />

Male 150 150<br />

Total 357 357<br />

188


4.14 INJURY ON DUTY<br />

4.14.1 INJURY ON DUTY, 1 April <strong>2007</strong> to 31 March 20<strong>08</strong><br />

NATURE OF INJURY ON DUTY NO. % OF TOTAL<br />

Required basic medical attention only – –<br />

Temporary Total Disablement – –<br />

Permanent Disablement – –<br />

Fatal – –<br />

Total – –<br />

4.15 UTILISATION OF CONSULTANTS<br />

4.15.1 REPORT ON CONSULTANT<br />

APPOINTMENTS USING APPROPRIATED FUNDS<br />

PROJECT TITLE<br />

TOTAL NUMBER OF CONSULTANTS<br />

THAT WORKED ON THE PROJECT<br />

DURATION:<br />

CONTRACT VALUE IN<br />

WORK DAYS<br />

RAND<br />

– –<br />

– –<br />

TOTAL NUMBER OF<br />

PROJECTS<br />

TOTAL INDIVIDUAL CONSULTANTS<br />

TOTAL DURATION: TOTAL CONTRACT<br />

WORK DAYS<br />

VALUE IN RAND<br />

– –<br />

– –<br />

4.15.2 ANALYSIS OF CONSULTANT APPOINTMENTS<br />

using appropriated funds, in terms of Historically Disadvantaged Individuals (HDIs)<br />

PROJECT TITLE<br />

PERCENTAGE OWNERSHIP BY<br />

HDI GROUPS<br />

PERCENTAGE MANAGEMENT<br />

BY HDI GROUPS<br />

NUMBER OF CONSULTANTS FROM HDI<br />

GROUPS THAT WORK ON THE PROJECT<br />

–<br />

–<br />

189


4.15.3 REPORT ON CONSULTANT<br />

APPOINTMENTS USING DONOR FUNDS<br />

PROJECT TITLE<br />

TOTAL NUMBER OF CONSULTANTS<br />

THAT WORKED ON THE PROJECT<br />

DURATION:<br />

CONTRACT VALUE IN<br />

WORK DAYS<br />

RAND<br />

– –<br />

– –<br />

TOTAL NUMBER OF<br />

PROJECTS<br />

TOTAL INDIVIDUAL CONSULTANTS<br />

TOTAL DURATION: TOTAL CONTRACT<br />

WORK DAYS<br />

VALUE IN RAND<br />

– –<br />

– –<br />

4.15.4 ANALYSIS OF CONSULTANT APPOINTMENTS<br />

using Donor funds, in terms of Historically Disadvantaged Individuals (HDIs)<br />

PROJECT TITLE<br />

PERCENTAGE OWNERSHIP BY<br />

HDI GROUPS<br />

PERCENTAGE MANAGEMENT<br />

BY HDI GROUPS<br />

NUMBER OF CONSULTANTS FROM HDI<br />

GROUPS THAT WORK ON THE PROJECT<br />

–<br />

–<br />

190


Acronyms<br />

AFS <strong>Annual</strong> Financial Statements ECTB Eastern Cape Tourism Board<br />

AIDC Automotive Industry Development Centre EDMS Electronic Document Management System<br />

APP <strong>Annual</strong> Performance Plan EG & I CLUSTER Economic Growth & Infrastrucutre Cluster<br />

AQA Air Quality Act EL East London<br />

AQM Air Quality Management EMI Environmental Management Inspectors<br />

AQMA Air Quality Management Act EU-LED European Union - Local Economic<br />

Development<br />

ASGI-SA<br />

Accelerated Shared Growth Initiative of<br />

South Africa<br />

GDS<br />

Growth & Development Summit<br />

BAS Basic Accounting System GEF Global Environmental Facility<br />

BBBEE Broad Based Black Economic Empowerment GIS Geographic Information System<br />

BPO Business Process Outsourcing GRAP Genereally Accepted Accounting Practice<br />

BRAG Business Regulation & Governance HIPPs High Impact Priority Projects<br />

CDC Coega Development Corporation HOD Head Of Department<br />

CDM Chris Hani District Municipality HRD Human Resource Development<br />

CFO Chief Financial Officer IDP Integrated Development Plan<br />

CITES<br />

Convention on International Trade &<br />

Endangered Species of Wild Flora & Fauna<br />

IDZ<br />

Industrial Development Zone<br />

CSIR Council of Scientific & Industrial Research IEM Integrated Environmental Management<br />

CZM Coastal Zone Management IGR Inter Governmental Relations<br />

DEAT Department of Economic Affairs & Tourism IT Information Technology<br />

DEDEA<br />

DGITO<br />

DLGTA<br />

DPLG<br />

Department of Economic Development &<br />

Environmental Affairs<br />

Departmental Government Information<br />

Officer<br />

Department of Local Government<br />

&Traditional Affairs<br />

Department of Provincial & Local<br />

Government<br />

IWMP<br />

IYM<br />

KPIs<br />

KZN<br />

Integrated Waste Management Plan<br />

In-Year Monitoring<br />

Key Performance Indicators<br />

Kwa-Zulu Natal<br />

DPW Department of Public Works M&E Monitoring & Evaluation<br />

DTI Department of Trade & Industry MEC Member of the Executive Council<br />

DWAF Department of Water Affairs & Forestry MINMEC Minister & Member of Executive Council<br />

EC Eastern Cape MINTEC Ministerial Inter-Provincial Technical<br />

Committee<br />

ECA Environmental Conservation Act MOU Memorandum Of Understanding<br />

ECDC Eastern Cape Development Corporation MS EA Microsoft Enterprise Agreement<br />

ECGBB Eastern Cape Gambling & Betting Board MSP Master Systems Plan<br />

ECL ACT Eastern Cape Liquor Act MSP Municipal Support Programme<br />

ECLB Eastern Cape Liquor Board MTREF Medium Term Revenue & Expenditure<br />

Framework<br />

ECPB Eastern Cape Parks Board NCA National Credit Act<br />

ECSECC<br />

Eastern Cape Socio Economic Consultative<br />

Council<br />

NCR<br />

National Credit Regulator<br />

191


NEAS<br />

National Environmental Authorization<br />

System<br />

SANBI<br />

South African National Biodiversity Institute<br />

NEMA National Environmental Management Act SAPS South Arican Police Service<br />

NMBMM<br />

Nelson Mandela Bay Metropolitan<br />

Municipality<br />

SCM<br />

Supply Chain Management<br />

NPA National Prosecuting Authority SCOA Standard Chart of Accounts<br />

NSDP National Spatial Development Plan SCOPA Standing Committee on Public Accounts<br />

OP Operational Plan SEA Strategic Environmental Assessment<br />

OTP Office of the Premier SEDA Small Eneterprise Development Agency<br />

PCC Provincial Co-ordinating Committee SIAS Shared Internal Audit Services<br />

PEDF Provincial Economic Development Forum SITA State Information Technology Agency<br />

PFMA Public Finance Management Act SLA Service Level Agreement<br />

PGDP Provincial Growth & Development Plan SMME Small, Medium & Macro Enterprises<br />

PGITOC<br />

Provincial Government Information<br />

Technology Council<br />

PIDS Provincial Industrial Development Strategy SP Strategic Plan<br />

PMDS<br />

Performance Management Development<br />

Systems<br />

SMS<br />

SPU<br />

Senior Management System<br />

Special Programme Unit<br />

PMS Performance Management Systems STATS – SA Statistics South Africa<br />

PPP Public Private Partnerships TID Trade & Indusrty Development<br />

PSR Public Service Regulation TIP Trade & Investment Promotion<br />

R&D Research & Development UFH University of Fort Hare<br />

RoD<br />

Record of Decision<br />

Notes<br />

192


Department of Economic Development and Environmental Affairs<br />

Province of the Eastern Cape, South Africa<br />

www.deaet.ecprov.gov.za<br />

<br />

<br />

2boyz[J6926

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!