10.10.2014 Views

Agricultural Roads in Bhutan AU

Agricultural Roads in Bhutan AU

Agricultural Roads in Bhutan AU

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Agricultural</strong> <strong>Roads</strong> <strong>in</strong> <strong>Bhutan</strong><br />

Ugyen Chewang<br />

• national plann<strong>in</strong>g and programm<strong>in</strong>g for Farm <strong>Roads</strong> development;<br />

• ensur<strong>in</strong>g that all cooperat<strong>in</strong>g agencies fulfill their implementation roles <strong>in</strong> accordance<br />

with the Guidel<strong>in</strong>es;<br />

• work<strong>in</strong>g closely with the M<strong>in</strong>istry of Works and Human Settlement <strong>in</strong> plann<strong>in</strong>g the<br />

road network of the country;<br />

• proper coord<strong>in</strong>ation to ensure optimum utilization of limited resources;<br />

• seek<strong>in</strong>g adequate resources to support the selected roads;<br />

• sign<strong>in</strong>g a Memorandum of Understand<strong>in</strong>g (MoU) with the Dzongkhags.<br />

The Eng<strong>in</strong>eer<strong>in</strong>g Division (ED) of the Department of Agriculture will:<br />

• lead the technical plann<strong>in</strong>g of farm roads development;<br />

• screen out road proposals received from Dzongkhags us<strong>in</strong>g the selection criteria;<br />

• co-ord<strong>in</strong>ate with Forestry Development Corporation Limited (FDCL) to plan road<br />

construction <strong>in</strong> areas that fall with<strong>in</strong> their Forestry Management Units;<br />

• support Dzongkhags <strong>in</strong> selection, survey, design and construction plann<strong>in</strong>g and<br />

provide timely technical back-stopp<strong>in</strong>g;<br />

• along with other relevant agencies carry out monitor<strong>in</strong>g and evaluation of the<br />

programme;<br />

• where feasible, provide construction mach<strong>in</strong>ery on hire from its centralized pool.<br />

(Although the contractors are expected to arrange their own mach<strong>in</strong>ery, the M<strong>in</strong>istry<br />

will ma<strong>in</strong>ta<strong>in</strong> its mach<strong>in</strong>ery base to ensure that construction mach<strong>in</strong>ery are available<br />

at all times to avoid delays.)<br />

The Dzongkhag is responsible for:<br />

• putt<strong>in</strong>g up proposals submitted by GYTs to the DYT. The DYT shall screen and<br />

prioritize the Dzongkhag’s programme;<br />

• the day-to-day implementation of the programme;<br />

• obta<strong>in</strong><strong>in</strong>g all necessary clearance certificates and complete other pre-construction<br />

requirements like survey, design, and estimat<strong>in</strong>g;<br />

• contract<strong>in</strong>g out the road construction follow<strong>in</strong>g standard procedures;<br />

• manag<strong>in</strong>g and supervis<strong>in</strong>g the construction <strong>in</strong> conformity with exist<strong>in</strong>g Guidel<strong>in</strong>es to<br />

ensure adequate quality standards and timely completion;<br />

• send<strong>in</strong>g regular progress reports to enable the ED to monitor progress;<br />

• sign<strong>in</strong>g a MoU with the beneficiaries upon completion of construction.<br />

The beneficiaries will:<br />

• submit their proposal to GYT. The GYT shall assess the need and <strong>in</strong>corporate <strong>in</strong> their<br />

plans;<br />

• assist the Dzongkhag <strong>in</strong> the detail <strong>in</strong>vestigations lead<strong>in</strong>g to f<strong>in</strong>al selection;<br />

• appo<strong>in</strong>t representative(s) who along with the Dzongkhag eng<strong>in</strong>eers will be<br />

responsible for supervision and quality control dur<strong>in</strong>g construction;<br />

• sign a MoU with the Dzongkhag to form an association/cooperative for operation and<br />

ma<strong>in</strong>tenance of the road.<br />

7 Site selection process<br />

As outl<strong>in</strong>ed <strong>in</strong> the ‘Guidel<strong>in</strong>es for Farm Road Development’, the farmers shall put a request<br />

to GYT and discuss the genu<strong>in</strong>e need for such a proposal. If the GYT resolves that the need<br />

was genu<strong>in</strong>e then the GYT Chairman shall certify the parameters, except the viability<br />

analysis and eng<strong>in</strong>eer<strong>in</strong>g parameters, and submit the same to Dzongkhag. The RNR Sector<br />

Heads and Dzongkhag eng<strong>in</strong>eers shall visit the proposed sites and reconfirm the submission<br />

by GYT, and accord<strong>in</strong>gly submit to the DYT session. If the DYT resolution is to go ahead as<br />

requested, a central team from MoA shall visit the site and verify if the parameters are met.<br />

PIARC – RGC, Siem Reap, November 2005 Paper 9 Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!