MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

‘B-2’ TENDER FORM<br />

NAME OF WORK :- :-M&R TO N.R.BUILDING & WATER SUPPLY SCHEME<br />

@ NASHIK INDUSTRIAL AREA… HOUSEKEEPING OF<br />

UDYOG BHAVAN BUILDING, CSC BUILDING, OLD<br />

FLATTED FACTORY BUILDING AND STAFF COLONY<br />

@ SATPUR.<br />

ESTIMATED COST :- Rs. 9,37,685.0<br />

TECH. SANCTION :- Tech Sanction Vide EE (N) Register Item<br />

No (03) of July-2012 amount to<br />

Rs. 984600.00 Lakh (N) .<br />

COMPUTER CODE :- Nil.<br />

AGREEMENT NO :- B-2/___________of’ 2012-2013<br />

DOWNLOADED BY :-<br />

SUPERINTENDING ENGINEER(II),MIDC,PUNE-19<br />

EXECUTIVE ENGINEER,MIDC,NASHIK DIVISION NASHIK<br />

Contractor<br />

- 1 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Name of work:<br />

M&R TO N.R.BUILDING & WATER SUPPLY SCHEME @ NASHIK<br />

INDUSTRIAL AREA… HOUSEKEEPING OF UDYOG BHAVAN<br />

BUILDING, CSC BUILDING, OLD FLATTED FACTORY BUILDING<br />

AND STAFF COLONY @ SATPUR.<br />

Sr. No. Description Page Nos.<br />

From<br />

1. Important Note 3 -<br />

2. Disclaimer 4 -<br />

3. Tender Notice 5 6<br />

4. Detailed Tender Notice No.28 (3)of 2012-13 7 8<br />

5. Direction to the <strong>tender</strong>er for filling <strong>tender</strong> 9 11<br />

6. Agreement 12 15<br />

7. Scope of Work. 16 19<br />

8. Works Contract Act Under <strong>Maharashtra</strong> Value 20 -<br />

Added Tax Act,2002<br />

9. Terms and Conditions for the Reimbursement of 21 -<br />

Taxes / Duties.<br />

10. Registration Under Contract Labour (Regulation 22 -<br />

&Abolition) Act-1972<br />

11. CLAUSE FOR RECOVERY OF LABOUR CESS 23 -<br />

12. Insurance of Contract Work 24 -<br />

13. General Specifications and Additional Contract 25 26<br />

Conditions<br />

14. General Terms and Conditions 27 30<br />

15. Undertaking in Format From Contractor. 31 -<br />

16. B-2 Tender Form 32 47<br />

17. Schedule ‘A’ 48 49<br />

18. Schedule ‘B’ 50 51<br />

19. Itemwise Specification 52 54<br />

20. Special Contract Conditions 55 56<br />

To<br />

Contractor<br />

- 2 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Important Note:<br />

All the contractors are requested to read each & every paper included in this<br />

<strong>tender</strong> and point out the discrepancy/ difficulty, if any to the notice of competent<br />

authority before quoting and submitting the <strong>tender</strong> offer. If nothing is brought to<br />

the notice by them, it will be presumed that the contractors have understood the<br />

<strong>tender</strong> conditions and stipulations thoroughly and no complaint of any kind from<br />

contractor will be entertained later on by M.I.D.C. The reply to the<br />

discrepancy/difficulty if any should be taken in writing from the Executive<br />

Engineer, All intending <strong>tender</strong>er are requested to down load the complete <strong>tender</strong><br />

<strong>form</strong>, from M.I.D.C.’s website “www.midcindia.org” at his cost and submit the<br />

same without any changes /deletion /addition.<br />

Contractor<br />

- 3 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Disclaimer<br />

The in<strong>form</strong>ation contained in this Tender Document or subsequently provided to Bidder(s) or<br />

Tenderer(s) whether verbally or in documentary <strong>form</strong> by or on behalf of <strong>Maharashtra</strong> <strong>Industrial</strong><br />

<strong>Development</strong> <strong>Corporation</strong> (hereinafter “the <strong>Corporation</strong>”) or by any of their employees or advisors,<br />

shall be subject to the terms and conditions set out in this Tender Document and all other terms and<br />

conditions subject to which such in<strong>form</strong>ation is provided.<br />

This Tender Document is not an agreement and is not an offer or invitation by the <strong>Corporation</strong> to any<br />

parties other than the Tenderer(s) who are qualified to submit the Tenders. This Tender Document<br />

does not purport to contain all the in<strong>form</strong>ation each Bidder may require. This Tender Document may<br />

not be appropriate for all persons, and it is not possible for the <strong>Corporation</strong>, their employees or<br />

advisors to consider the investment objectives, financial situation and particular needs of each Bidder<br />

who reads or uses this Tender Document. Each Bidder should conduct its own investigations and<br />

analysis and should check the accuracy, reliability and completeness of the in<strong>form</strong>ation in this Tender<br />

Document and where necessary obtain independent advice from appropriate sources. The <strong>Corporation</strong>,<br />

their employees and advisors make no representation or warranty and shall incur no liability under any<br />

law, statute, rules or regulations as to the accuracy, reliability or completeness of the Tender<br />

Document. The <strong>Corporation</strong> may in their absolute discretion, but without being under any obligation to<br />

do so, update, amend or supplement the in<strong>form</strong>ation in this Tender Document.<br />

Contractor<br />

- 4 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

y Submitte×−Ö×¾Ö¤üÖ ÃÖã“Ö−ÖÖ ÛÎú´ÖÖÓÛú ú28(2) ÃÖ−Ö 2012-2013.<br />

"ÃÖÖŸÖ¯Öæ¸ü †ÖîªÖê×ÝÖÛú õÖê¡Ö... †×®Ö¾ÖÖÃÖß ‡´ÖÖ¸üŸÖàÛú¸üŸÖÖ ŸÖÃÖê“Ö ¯ÖÖÞÖß ¯Öã¸ü¾ÖšüÖ µÖÖê•Ö®ÖêÛú׸üŸÖÖ ¤êüÜÖ³ÖÖ»Ö ¾Ö ¤ãü¹ýßÖß<br />

ÃÖÖŸÖ¯Öæ¸ü µÖê£Öᯙ ˆªÖêÝÖ ³Ö¾Ö®Ö ‡´ÖÖ¸üŸÖ, ÃÖÖ´ÖÖ‡ÔÛú ÃÖã×¾Ö¬ÖÖ Ûëú¦ü, •Öã®Öß ±ú»Öòêü›ü ‡´ÖÖ¸üŸÖ, Ûú´ÖÔ“ÖÖ¸üß ¾ÖÃÖÖÆüŸÖ µÖê£Öß»Ö<br />

‡´ÖÖ¸üŸÖà“Öê ¤îü®ÖÓפü®Ö þ֓”ûŸÖÖ ¾Ö ÃÖ±úÖ‡Ô“Öê (ÆüÖ‰úÃÖ×ÛúدÖÝÖ) ÛúÖ´Ö Ûú¸üÞÖê". †Ó¤üÖ×•ÖŸÖ ÜÖ“ÖÔ ¹ý. 9,37,685.00<br />

ÆüüµÖÖ ÛúÖ´ÖÖÛú¸üߟÖÖ ²Öß-2 ±úÖò´ÖÔ´Ö¬µÖê ´ÖÖêÆüÖê¸ü²ÖÓ¤ü ×−Ö×¾Ö¤üÖ ´ÖÖÝÖ×¾ÖÞµÖÖŸÖ µÖêŸÖ †ÖÆêü. ÃÖ¤ü¸ü ÛúÖ´ÖÖ“Öß ÛúÖê¸üß ×−Ö×¾Ö¤üÖ<br />

´ÖÆüÖ´ÖÓ›üôûÖ“µÖÖ ÃÖÓÛêúŸÖãÖôûÖ¾Ö¸ü (www.midcindia.org) פü®ÖÖÓÛú 09.08.2012 ŸÖê 23.08.2012<br />

µÖÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ˆ¯Ö»Ö²¬Ö ÆüÖêŸÖß»Ö. ÃÖÓ²ÖÓ¬ÖßŸÖ ‡“”æûÛú šêüÛêú¤üÖ¸üÖÓ®ÖÖ ×¾Ö−ÖÓŸÖß Ûú¸üÞµÖÖŸÖ µÖêŸÖê Ûúß, ÃÖ¤ü¸ü ÛúÖ´ÖÖ“Öß<br />

ÛúÖê¸üß ×−Ö×¾Ö¤üÖ ´Ö.†Öî.×¾Ö.´ÖÆüÖ´ÖÓ›üôûÖ“µÖÖ ÃÖÓÛêúŸÖãÖôûÖ¾Ö¹ý®Ö ¯ÖÏÖ¯ŸÖ Ûú¸üÖ¾µÖÖŸÖ.<br />

----------------------------------×−Ö×¾Ö¤Ö µÖê£Öê ÃÖÓ¯ÖŸÖê ------------------------------------------<br />

Contractor<br />

- 5 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

TENDER NOTICE NO. 28(3 ) OF 2012-2013<br />

Sealed <strong>tender</strong>s are invited for the following works with estimated cost indicated against the work.<br />

Sr.<br />

No<br />

Name of Work Cost Availability of <strong>tender</strong>s on<br />

web<br />

From To<br />

1 2 3 4 5<br />

1 M&R TO N.R.BUILDING & WATER<br />

SUPPLY SCHEME @ NASHIK INDUSTRIAL<br />

AREA… HOUSEKEEPING OF UDYOG<br />

BHAVAN BUILDING, CSC BUILDING, OLD<br />

Rs.9,37,685.00 09.08.2012 23.08.2012<br />

FLATTED FACTORY BUILDING AND<br />

STAFF COLONY @ SATPUR.<br />

The blank <strong>tender</strong> <strong>form</strong>s for the above work is available on website www.midcindia.org .<br />

---------------- - - - - - - - - - - - - - - - - - - - - - - - NOTICE END - -- - ------------------------------- - - - - - - - - - - - - - - - - - -<br />

No/EE/TC/NSK/IFMS/ 4135 /0f 2012.<br />

Office of the Executive Engineer,<br />

M.I.D.C., Nashik Division,<br />

“Udyog Bhavan” 2 nd floor,<br />

Satpur, Nashik- 422 007.<br />

Date:- 09 / 08 / 2012.<br />

1. Copy submitted to the Chief Engineer, MIDC, Mumbai / Chief Engineer, MIDC, Pune /<br />

Additional Chief Engineer Nagpur for favour of in<strong>form</strong>ation please.<br />

2. Copy submitted to the Chief Accounts Officer, MIDC, Mumbai for favour of perusal and<br />

in<strong>form</strong>ation please.<br />

3. Copy submitted to the Superintending Engineer, MIDC, Pune- Circle No. 1, 2/E&M/<br />

Aurangabad / Mumbai / Nagpur/ Amrawati / Panvel / Dombivali, for favour of in<strong>form</strong>ation<br />

please.<br />

4. Copy f.w.cs to the Jt. Chief Accounts Officer, MIDC, Pune for in<strong>form</strong>ation.<br />

5. Copy f.w.cs to all Executive Engineers, in MIDC for in<strong>form</strong>ation with a request to publish the<br />

<strong>tender</strong> notice on their office notice board for wide publicity.<br />

6. Copy to all Deputy Engineers in MIDC, for in<strong>form</strong>ation.<br />

7. Copy to Notice Board @ Nashik Dn. Office, MIDC, Nashik.<br />

8. Copy to TB/TC, MIDC Nashik for in<strong>form</strong>ation.<br />

9. Copy to<br />

M/s./ Shri.<br />

_______________________<br />

_______________________<br />

Contractor<br />

- 6 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

DETAILED TENDER NOTICE NO." 28(3) " FOR 2012 – 2013.<br />

Sealed <strong>tender</strong>s on Item rate basis are invited by the undersigned from the Contractors registered<br />

with PWD Government of <strong>Maharashtra</strong>, CPWD, MES, MJP and Railways etc. in appropriate class<br />

having sufficient experience in similar nature of work.<br />

1. Name of Work : -M&R TO N.R.BUILDING & WATER SUPPLY<br />

SCHEME @ NASHIK INDUSTRIAL AREA…<br />

HOUSEKEEPING OF UDYOG BHAVAN BUILDING,<br />

CSC BUILDING, OLD FLATTED FACTORY<br />

BUILDING AND STAFF COLONY @ SATPUR.<br />

2. Class of Registration. : Registered contractors in appropriate class with<br />

MES/CPWD/PWD Railway & MJP<br />

3. Estimated Cost : Rs. 9,37,685.0<br />

4. Type of Agreement : “B-2”<br />

5. Earnest Money Deposit : Rs. 9400.00<br />

6 Security Deposit<br />

: 1) Rs. 28200.00<br />

Initial 3% of estimated cost or <strong>tender</strong>ed cost<br />

whichever is higher (in the <strong>form</strong> of Demand Draft on<br />

any Nationalized bank or Schedule Bank)<br />

: 2) Rs. 46900.00<br />

Through R.A. Bill- 5% estimated cost or <strong>tender</strong>ed cost<br />

which is higher<br />

7 Time limit : Twelve Calendar Months (including monsoon.)<br />

8 Compensation for delay in : Rs. 200.00 per day.<br />

completion.<br />

9 Cost of blank <strong>tender</strong> <strong>form</strong> : Rs. 1000.00 (by DD)<br />

(Non-refundable)<br />

10 Date of issue of blank <strong>tender</strong> : From 09.08.2012 to 23.08.2012<br />

<strong>form</strong> on MIDC’s website: Available on MIDC’s web site<br />

www.midcindia.org<br />

11 Last date for receipt of queries<br />

of Contractor in respect of the<br />

: 14.08.2012<br />

Contractor<br />

- 7 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

<strong>tender</strong>.<br />

12 Date of reply to the queries will<br />

be exhibited on website.<br />

: 17.08.2012<br />

13 Date of submission of <strong>tender</strong> in the<br />

office of The Chief Engineer (PZ),<br />

MIDC,Pune, OR The Superintending<br />

Engineer(II), MIDC, Chinchwad,<br />

Pune-19 OR Executive Engineer,<br />

MIDC, Dn. Nashik 07 either by RPAD<br />

or Reputed Courier Service only<br />

: 27.08.2012 upto 13.30 hrs.<br />

14 Date of opening of <strong>tender</strong> in the : 30.08.2012 at 11.30 hrs. (If possible)<br />

office of The Executive @ Executive Engineer, MIDC Nashik Dn.Satpur<br />

Engineer, MIDC, Nashik Nashik-07.<br />

Division Nashik.<br />

15 Validity of offer : 180 days.<br />

(from the date of submission <strong>tender</strong>)<br />

The blank <strong>tender</strong> <strong>form</strong> can be obtained for above work is available on the MIDC web site<br />

www.midcindia.org.<br />

Important:- The Earnest Money Deposit shall be paid by Demand Draft drawn in favour of the<br />

Executive Engineer, M.I.D.C. Nashik Division, Nashik on any Nationalised / Schedule Bank<br />

payable at Nashik Or certified copy of Earnest Money Exemption Certificate issued by M.I.D.C<br />

Right to reject any or all <strong>tender</strong>s without assigning any reasons there of is reserved with the competent<br />

authority of the <strong>Corporation</strong>. It is not obligatory, on the part of MIDC to accept the lowest <strong>tender</strong> and<br />

MIDC’s decision in this matter shall be final.<br />

Sd/-<br />

Executive Engineer,<br />

MIDC Nashik Dn.<br />

Contractor<br />

- 8 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

DIRECTION TO THE TENDERER FOR FILLING TENDER<br />

1. The <strong>tender</strong>ed will duly seal, sign & complete the <strong>tender</strong> <strong>form</strong>.<br />

2. Every page of the <strong>tender</strong> and contract documents including specifications, every<br />

correction, deletion or addition and every slip pasted etc. will be signed by the<br />

<strong>tender</strong>ed.<br />

3. The <strong>tender</strong>ed should quote the item rate in words and figures.<br />

4. The rates shall be quoted including all taxes, duties, octroi and transportation.<br />

5. Where the item rates in words differ from the one in figures the lowest of the two will be taken<br />

as corrected.<br />

6. The <strong>tender</strong>er (bidder) should carefully note the unit of each item. No change in this unit is to<br />

be made. In case of any doubt, the intending <strong>tender</strong>ed should refer the matter to the<br />

Executive Engineer, and get necessary clarification in writing. Details of work of a similar<br />

nature carried out during last (Three) years and currently being carried out.<br />

7. The names and address of reference who would be prepared to give an opinion as to the quality<br />

of work.<br />

8. Each <strong>tender</strong> proposed should be signed by the bidder giving the name and a exact address of<br />

the firm to whom the contract is to be issued.<br />

9. The bids can only be submitted in the name of the bidder in whose name the bid documents<br />

were issued by MIDC. The <strong>tender</strong>, shall be valid for acceptance for a minimum period of 180<br />

days from the date of opening of <strong>tender</strong>. If any bidder desires to offer a longer validity period,<br />

if should specifically be mentioned in the <strong>tender</strong>.<br />

10. Each <strong>tender</strong> shall be complete and free from alteration or ambiguity.<br />

11. The contractor should submit the <strong>tender</strong> in two envelopes.<br />

Following documents be enclosed to the <strong>tender</strong> as Envelope No.1 & 2.<br />

1 st Envelope :-<br />

1) Earnest money , cost of blank <strong>tender</strong> <strong>form</strong>s in the <strong>form</strong> of demand draft / pay order only.<br />

2) A True copy of current certificate of registration as approved Contractor in the appropriate class.<br />

3) Copy of registration under work contract Act under Value Added Tax Act 2002 with current<br />

clearance certificate.<br />

4) Certified copy of PAN card.<br />

5) C.P.F. Registration Certificate<br />

6) Service Tax registration Certificate<br />

7) E.S.I.C. registration Certificate.<br />

Contractor<br />

- 9 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

8) Exemption certificate for payment of Earnest Money deposit. (If contractor holds) issued by<br />

MIDC only. If Demand draft for Earnest money & cost of blank <strong>tender</strong> <strong>form</strong> is not enclosed by<br />

the contractor in the 1 st envelope, the II nd envelope shall not be opened<br />

9) Contractor shall have similar type of work experience costing not less than 4.5 Lakh of<br />

single work.<br />

10) Reply of queries raised by Contractor duly signed.<br />

All the above documents shall be attested by gazeted officer or special executive Magistrate only.<br />

After opening envelop No.1, item No.1 to 10 as above will be seen & checked chronologically & if<br />

they are found in order then only sealed envelope No.2 will be opened & rates will be read out.<br />

2 nd Envelope :<br />

Tender shall be with clear offer without any condition. Any conditional offer would be<br />

rejected out right. Contractor should submit the sealed <strong>tender</strong> by Registered Post or Reputed Courier<br />

Services Only. Tender submitted by hand delivery shall not be accepted.<br />

The envelope No.2 will be opened only if the contents of envelope No.1 are found to be correct.<br />

1) Initial Security Deposit: -<br />

i) The contractor is required to pay 8% security deposit of <strong>tender</strong>ed cost or estimated cost<br />

which ever is more if his offer is accepted and he is called for execution of agreement as<br />

explained below.<br />

ii) 3% initial security deposit shall be paid at the time of execution of agreement in the<br />

<strong>form</strong> of D.D.<br />

The Balance 5 % security deposit shall be recovered through running account bill only.<br />

3 % Initial S.D. shall be released along with payment of final bill & remaining balance 5 % S.D. to be<br />

recovered through R.A.bill in cash shall be released after N.O.C. from concerned Dy.Engineer.<br />

Additional Security Deposit:- If the Contractor quotes his offer more than 15% below, he will have to pay 1% security<br />

deposit extra for every extra 2% below. Subject to a maximum of 6%.<br />

Contractor<br />

- 10 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

e.g. If the Contractor quotes 20% below then he will have to pay<br />

20-15 = 5 = 2.50% Additional Security Deposit.<br />

2 2<br />

If the Contractor quotes 30% below then he will have to pay<br />

30-15 = 15 = 7.50% limited to 6% Additional Security Deposit.<br />

2 2<br />

50% of Additional Security Deposit and initial S.D.3% will be released alongwith the<br />

payment of final bill & and remaining 50% will be released alongwith remaining 5%<br />

Security Deposit after defect liability period is over.<br />

2) Stamp Duty :-<br />

The contractor, whose offer is proposed for acceptance and called for execution of<br />

agreement shall have to pay the stamp duty as communicated by Stamp Duty Office. All<br />

necessary help shall be extended to the contractor for procuring the adhesive stamps from<br />

Stamp Duty Office.<br />

If the demand draft accepted from the Contractor against Initial Security Deposit, the Contractor shall have to submit Non<br />

judicial stamp as applicable by the Bombay Stamp Act 1958 from time to time.<br />

However it has come to the notice that the Stamp Duty charges are required to tbe calculated as per Article 63 of the<br />

Schedule 1 of the Bombay Stamp Act 1958. The Provisions of Article 63 are as below:-<br />

Works Contract, that is to say a contract for works and<br />

labour or services involving transfer or property in goods<br />

(whether as goods or in some other <strong>form</strong>) in its execution<br />

and includes a sub-Contract.<br />

a) Where the amount or value set forth in such contract does<br />

not exceed rupees ten lakh<br />

One Hundred.<br />

b) Where it exceeds rupees ten lakh One Hundred rupees plus one hundred rupees for every<br />

Rs.1,00,000/- or part thereof above rupees ten lakh, subject<br />

to the maximum of Rs.5,00,000/-<br />

The Contractor whose offer will be accepted will called for execution of the agreement and shall only be liable to pay the<br />

stamp duty applicable thereon.<br />

iii) The acceptance of Bank Guarantee shall be at the discretion of competent<br />

authority. The mention of payment of initial security in the <strong>form</strong> of Bank Guarantee<br />

at the time of submission of offer will not be treated as a condition.<br />

i) If the demand draft or Cash accepted from the Contractor against Initial Security Deposit, the<br />

Contractor shall have to submit Non judicial stamp worth 3 % of Initial Security Deposit or as<br />

applicable by the Bombay Stamp Act 1958 from time to time.<br />

ii) The Contractor is bound to pay stamp duty as per procedure of the concerned Department or as<br />

applicable by the Bombay Stamp Act 1958 from time to time..<br />

Contractor<br />

- 11 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

AGREEMENT<br />

This Agreement is made and entered into at __________.<br />

on this _____________________________________.<br />

Between<br />

Executive Engineer, MIDC,_________ Division _________. on behalf of <strong>Maharashtra</strong> <strong>Industrial</strong><br />

<strong>Development</strong> <strong>Corporation</strong>, having its Head Office at Udyog Sarathi, Marol <strong>Industrial</strong> estate, Andheri,<br />

Mumbai 400 093 (hereinafter referred to as the ‘<strong>Corporation</strong>’) of the ONE PART.<br />

AND<br />

__________________________________________________________________________________<br />

_______________ (Contractor) the PARTY OF THE SECOND PART.<br />

WHERE AS the <strong>Corporation</strong> has established Nashik Division, Sub Divisional offices and full<br />

fledged Engineering & maintenance Department at Mumbai alongwith other Supporting Department.<br />

AND WHEREAS for -M&R TO N.R.BUILDING & WATER SUPPLY SCHEME @ NASHIK<br />

INDUSTRIAL AREA… HOUSEKEEPING OF UDYOG BHAVAN BUILDING, CSC BUILDING, OLD<br />

FLATTED FACTORY BUILDING AND STAFF COLONY @ SATPUR.<br />

, the corporation has agreed to award this work to the Party of second part.<br />

AND WHEREAS _________________________________________<br />

____________________________________________________ (Contractor)<br />

Party of the Second part has offered to -M&R TO N.R.BUILDING & WATER SUPPLY SCHEME @ NASHIK<br />

INDUSTRIAL AREA… HOUSEKEEPING OF UDYOG BHAVAN BUILDING, CSC BUILDING, OLD<br />

FLATTED FACTORY BUILDING AND STAFF COLONY @ SATPUR.<br />

for Satpur Sub Divisions under Division Nashik Office on contract basis on the terms and conditions<br />

set forth here in below.<br />

AND WHEREAS the <strong>Corporation</strong> has agreed for the same;<br />

AND WHEREAS both the parties desire to reduce the terms and conditions into writing;<br />

Contractor<br />

- 12 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

NOW THEREFORE THIS AGREEMENT WITNESSTH AS FOLLOWS:<br />

1. The contractor shall be responsible for the corporate and personnel taxes, & service tax<br />

levied by the Government of India and State Government for the work done under this<br />

contract, if any.<br />

2. The offer shall include service tax while making payments of R.A. bills, the service tax @<br />

12.36% shall be deducted & on production of valid documents of payment of service tax<br />

to Government, the necessary payment towards service tax shall be released.<br />

3. That personnel shall be deployed by the Contractor on the job of the <strong>Corporation</strong>, subject to<br />

fulfillment of the standard of Physical Fitness & minimum qualification as specified in<br />

specification.<br />

4. That no employee of the Contractor shall be at the place of his work except during his duty<br />

hours.<br />

5. That the Contractor shall be responsible for the security and safety of the installations<br />

including and other moveable and immovable properties of the <strong>Corporation</strong> and shall<br />

ensure that strict vigil is maintained by the personnel so as not to cause loss or damage to<br />

the <strong>Corporation</strong>, whatsoever.<br />

6. That the personnel engaged/employed by the Contractor in relation to this contract shall be<br />

under direct control of the Contractor and there shall not exist any employer-employee<br />

relationship between the <strong>Corporation</strong> and the Contractor his personnel in any way.<br />

7. On satisfactory fulfillment of the Contract, the <strong>Corporation</strong> shall pay to the Contractor,<br />

charges at the rates agreed for job/month.That the Contractor shall be responsible for the<br />

payment of salary/wages and other remuneration or allowances if any, to the personnel so<br />

employed by them and the corporation shall not be responsible for any such<br />

payment/liability. Moreover, the services of such personnel shall be governed by the<br />

service conditions extended to them by the Contractor, in accordance with the statutory<br />

provisions applicable to them, if any.<br />

8. The Contractor shall maintain muster roll of his personnel and other statutory records and<br />

make payment and submit authentic proof of such disbursement to the corporation in<br />

respect of payment to his personnel in accordance with the statutory provisions applicable if<br />

any.<br />

9. The <strong>Corporation</strong> will not be responsible to make any payment in respect of the personnel<br />

of the Contractor under any statutory obligation and/or any statutes such as Contract Labour<br />

(Regulation and Abolition) Act, 1970, Employee’s Provident Fund Act, 1952, Workmen’s<br />

Compensation Act, 1923, Payment of Gratuity Act, 1972 or any other statutes in force<br />

and/or which will be in force, or any other act as applicable. It will be sole responsible of<br />

the the Contractor to make the payments as applicable.<br />

Contractor<br />

- 13 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

10. The Contractor should make if applicable regular contribution of personnel’s provident<br />

fund and ESIC of the concerned Personnel and give regular receipts to them and submit a<br />

consolidated report of the above said transactions to this office.<br />

11. The Contractor should submit if applicable the proof of the previous contributions of<br />

employee’s provident fund and ESIC within a period of three months from the date of given<br />

work order to the Contractor.<br />

12. The Contractor shall undertake to comply with all other statutory provisions/obligations in<br />

respect of the personnel engaged by them for the said contract work.<br />

13. The Contractor shall be responsible for any loss or damage caused to the <strong>Corporation</strong><br />

properties on account of any act of commission or commission on the part of its personnel<br />

and Supervisors / representatives and the same will be made good from the payment<br />

payable to the Contractor to the extent of the loss or damages so caused.<br />

14. In case the contractor fails to comply with any of his obligations in the contract and/or in<br />

respect of any amount due from the contractor to MIDC, the security deposit shall be<br />

forfeited/adjusted towards such amount due <strong>form</strong> the contractor. The decision of MIDC<br />

will be final in this regard.<br />

15. The Contractor shall be fully responsible against all claims, costs, charges arising out of personal injury or<br />

death to the employees. No accident risk of contractor’s employee will be covered by MIDC. It is the entire<br />

responsibility of the contractor to bring the labour force covered under the Employee State Insurance Scheme.<br />

MIDC shall not be liable to pay any compensation.<br />

16. This agreement shall remain in force initially for a period of 12 months from date of work<br />

order _________to____________ and/or it will automatically come to an end on the expiry<br />

of the above contractual period however the said contract is liable to be terminated by<br />

giving 1 Month Notice by either party.<br />

17. The <strong>Corporation</strong> reserves its right to deduct an amount @ billing amount of the wages<br />

payable to the party of the second part as security deposit and towards the effective<br />

per<strong>form</strong>ance of the said Agreement and the same will be returned after the expiry of the<br />

agreement.<br />

18. During the contract period, if any employee of Contractor is injured in any mishap, the<br />

Contractor shall be responsible for taking necessary action directly without involving<br />

MIDC in this behalf.<br />

19. The Contractor shall also directly deal with any complaints or disputes or notices given by<br />

any Govt. Organizations without involving MIDC.<br />

20. The following contents in the <strong>tender</strong> document shall also be deemed to <strong>form</strong> an integral part<br />

& partial of this contract.<br />

i) Schedule ‘B’<br />

ii) Special Contract Condition .<br />

Contractor<br />

- 14 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

iii) General Terms & Condition<br />

iv) Scope of Work<br />

Nothing contained in this agreement shall be construed to give any<br />

right to any of the personnel of the contractor to claim any benefits from the <strong>Corporation</strong> and that the<br />

said personnel shall have nothing to do with the affairs of the <strong>Corporation</strong> or any other work of the<br />

<strong>Corporation</strong>.<br />

IN WITNESS WHEREOF THE PARTIES HAVE SET THEIR HANDS ON THIS<br />

AGREEMENT ______________________________________.<br />

Executive Engineer,<br />

Contractor MIDC.Nashik Division ,<br />

Satpur Nashik-7<br />

Sign in presence of<br />

Sign in presence of<br />

1)________________<br />

1)______________<br />

2)________________<br />

2)______________<br />

Contractor<br />

- 15 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

SCOPE OF WORK<br />

Name Of Work :- -M&R TO N.R.BUILDING & WATER SUPPLY SCHEME @ NASHIK INDUSTRIAL<br />

AREA… HOUSEKEEPING OF UDYOG BHAVAN BUILDING, CSC BUILDING, OLD FLATTED<br />

FACTORY BUILDING AND STAFF COLONY @ SATPUR.<br />

<br />

Detailed Scope of Work is as follows.<br />

(A) 1) Tenderer shall have to execute an agreement in the prescribed <strong>form</strong> to MIDC.<br />

2)Udyog Bhavan Building @ Satpur:- Udyog Bhavan building is having total six floors<br />

including ground floor. On ground floor there are total 14 shops. On first floor total six offices are<br />

there and all are occupied. On second floor, MIDC Division and R.O. office are functioning. On third<br />

, fourth floor & fifth floor 4 offices on each floor along with two terraces are situated . On fifth floor,<br />

all 4 offices are vacant. On ground floor one common Gents toilet and other Ladies toilet is there. In<br />

M.I.D.C. offices on second floor total 6 toilets are there. Two lift ducts are there in the building.<br />

Entire daily cleaning of all toilets as above and total corridors, common passages, stairs, lift ducts,<br />

building premises alongwith continuous mopping, cleaning toilets by using phenoil, acid, naphthaleine<br />

balls & odonil in W.C.Toilet blocks etc. including all material, labour, is included in the scope of<br />

work. All vacant offices, galas, terraces of the building are to be kept clean by sweeping, washing if<br />

required doors, windows, glass, walls, ceilings shall also be kept clean every time. Premises of the<br />

building are to be swept daily. Grass, bushes if any are also to be removed in the entire premises of<br />

Udyog Bhavan building.<br />

Division office and R.O. office in the Udyog Bhavan building situated on second floor are to be daily<br />

swept early in the morning along with mopping, cleaning of furniture’s, doors, windows, glasses, etc.<br />

All the toilets in both the offices are to be cleaned with phenoil, acid daily. Naphthalene balls & odonil<br />

in W.C.Toilet blocks are to be provided as per requirement.<br />

Entire drainage system of the building is to be cleaned and choke-ups if any observed in drainage<br />

system are to be cleared by the contractor at his cost only. Periodic cleaning of septic tank through<br />

NMC services shall be arranged by the contractor . Necessary NMC charges will be paid by MIDC.<br />

Easy disposal of storm water from the premises is also to be looked after by the contractor.<br />

Maintenance of lawn and shrubbery bed with watering in Udyog Bhavan premises for 12 month also<br />

included in the work.<br />

(3) CSC building @ Satpur :- CSC building @ Satpur is situated on Trimbak road in the side of<br />

State Bank of India. In this building on ground floor one common Ladies & Gents toilet is there. On<br />

first floor five suits & one dining hall of M.I.D.C. guest house is there. there are total six toilets in this<br />

guest house.<br />

Contractor<br />

- 16 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Daily Cleaning of all these toilets as above along with maintenance of drainage system for the entire<br />

building including removal of choke-ups if any, at the cost of contractor with all materials & labours<br />

is included in the scope of work.<br />

4 ) Old Flatted factory building @ Satpur :- It is situated on plot No. 44/15 on street No. 13 in<br />

Satpur Indl. Area. There are two common toilets in this building. Daily cleaning of these toilets,<br />

maintenance of drainage system for the entire building including removal of choke-ups if any, etc.<br />

including all materials & labour is included in the scope of work.<br />

5) Staff Colony @ Satpur :- It is situated along Trimbak road infront of Satpur Bus Stand. There<br />

are Six bunglows, one three storied, six two storied and two single storied building in this colony. One<br />

community hall is also there is the colony. Daily cleaning of common passages, stairs, internal roads,<br />

courtyards of bungalows, community hall with toilet in it is included in the scope of work. Removal of<br />

choke-ups in the drainage system, maintenance of drainage system, periodic cleaning of septic tank,<br />

easy disposal of storm water is also included in the scope of work.<br />

All the materials, labour, tools and plants required for above work is to be provided by the contractor<br />

at his own cost.<br />

NOTE:- If the Housekeeping of any building / structure mentioned in the <strong>tender</strong> is deleted<br />

payment of the housekeeping work will not be made. No extra claims for the amount<br />

or quantity are entertained.<br />

A) Scope of Contract:<br />

1. Award of contract against the <strong>tender</strong> shall not entitle the contractor the exclusive right to carry<br />

out MIDC’s job covered under this contract.<br />

2 MIDC also reserves the right to get the services from outside or execute departmentally at its<br />

discretion the unexpected job of the contractor at the cost and risk of the contractor.<br />

3 MIDC reserves the right to award the contract simultaneously to more than one contractor and<br />

also to award only a part of this contract against this <strong>tender</strong> at its discretion.<br />

4 The contract is liable to be terminated in case it is observed that the persons provided under the<br />

contract are not of required qualification or contractor is not fulfilling the terms & conditions of<br />

the contract. In such cases MIDC reserves the right to forfeit the earnest money<br />

deposit/security deposit etc.<br />

Contractor<br />

- 17 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

C) Qualification & Experience:<br />

1. The identity cards will be issued by contractor to his employee and same shall have to be kept with<br />

them. All employee/worker shall wear uni<strong>form</strong> approved by Engineer-In-charge.<br />

2. Persons employed by the contractor, shall have to be capable for reading & understanding &<br />

practicing safety/accident/caution signboards.<br />

3. The requirement of qualification, age and experience may be relayed at discretion of MIDC.<br />

4. The contractor should produce proof of age, qualifications and experience of his personnel to<br />

MIDC. No delay on this account will be acceptable.<br />

5. The contractor would be responsible for providing character and antecedent certificate from the<br />

police authorities in respect of selected candidates prior to there posting on MIDC jobs.<br />

6. The contractor shall discontinue its personnel if such personnel shown no alertness while on duty.<br />

In such cases, the contractor shall have to provide a replacement immediately.<br />

D) Working Day & Hour :<br />

1. The service of the personnel for carrying out the job work would be required on seven days a<br />

week depending on the working hours fixed by MIDC from time to time.<br />

2. The contractor shall provide adequate and timely substitute, in case of any absenteeism.<br />

E) Execution of Work<br />

1. The contractor shall execute the work with professional competence and in efficient workmen like<br />

manner.<br />

2. In<strong>form</strong>ation Confidential: All in<strong>form</strong>ation obtained by the contractor in the conduct of<br />

operation here under shall be confidential and shall not be divulged by the contractor or its employees<br />

to any person, firm or company other than the <strong>Corporation</strong>s designated representatives. The contractor<br />

should mention the number of personnel per each shift available at the site. The contractor shall at all<br />

times, permit the corporation and its authorized employees and representatives to inspect all works<br />

per<strong>form</strong>ed and to witness and check all measurements and test made in connection with the said work.<br />

3. Variation in Job Requirements: The contractor shall arrange manpower for the job requirement,<br />

which will vary from time to time depending on the <strong>Corporation</strong>’s requirements.<br />

F) Obligations<br />

1. For carrying out the work, the contractor shall :<br />

a) Arrange at his own cost to and fro transportation of all his own men and material to the<br />

working spot. Due to disruption of public transport, if the contract personnel are not relieved in time,<br />

Contractor<br />

- 18 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

the corporation will not be held responsible and the contract personnel will have to continue on duty<br />

till a reliever reaches the site.<br />

b) Make his own arrangement, at his own cost, for providing residential accommodation,<br />

traveling, meals, tea etc. to the staff engaged by him.<br />

2. It is further agreed by the contractor that :-<br />

a) His personnel shall observe security and safety rules of the corporation while at site.<br />

3. It is further agreed by the contractor that :-<br />

a) The contractor and the corporation shall maintain strict discipline and maintain good order<br />

among their respective employees and shall abide by and con<strong>form</strong> to all rules and regulations<br />

promulgated by the corporation. Should the corporation feel that the conduct of any of the contractors<br />

personnel is against corporation’s interest, the corporation shall notify the contractors in writing the<br />

reasons for requesting removal of such contractor’s personnel. The contractor shall remove and<br />

replace such employees at contractor’s expense within 24 hours from the time of the notice by the<br />

corporation in this regard. The corporation’s decision on the per<strong>form</strong>ance or behavior of an individual<br />

shall be final and shall be binding on the contractor.<br />

b) In the event of the corporation finds that the workmen/personnel deployed by the contractor are<br />

not of the required caliber or otherwise not satisfactory, owing to any reason of which the corporation<br />

shall be sole judge. The corporation will be entitled to reject such jobs, cancel the contract at the risk<br />

and cost of the contractor reserving always to itself the right to forfeit the security deposit furnished by<br />

the contractor for the fulfillment of the contract. If the services rendered by the contractor are found<br />

unsatisfactory, the corporation reserves the right to terminate the contract without notice and in such<br />

case the security deposit will be forfeited.<br />

c) The contractors personnel are liable for physical check up by competent authority as decided by<br />

the corporation from time to time.<br />

d) The contractors shall provide documentary evidence in respect of qualifications, age, and<br />

experience of the personnel he indents to post at the corporation against this contract. The corporation<br />

reserves the right to accept/reject any person being sent for the corporation’s approval.<br />

Contractor<br />

- 19 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

SPECIAL INSTRUCTIONS TO THE TENDERER<br />

“ Works Contract Act under <strong>Maharashtra</strong> value Added Tax Act. 2002”<br />

1) The <strong>tender</strong>ed rates shall be inclusive of all taxes, rates & cesses & shall also be<br />

inclusive of the tax leviable in respect of works contract under the provision of <strong>Maharashtra</strong><br />

value Added Tax Act. 2002.<br />

2) The contractors who submit the <strong>tender</strong>s should necessarily be a Registered Dealer<br />

under the of <strong>Maharashtra</strong> Value Added Tax Act 2002.<br />

3) The contractor shall submit the Registration Certificate as a registered dealer under<br />

the of <strong>Maharashtra</strong> value Added Tax Act, 2002. at the time of submission of <strong>tender</strong>s or at the time of<br />

issuing the work order.<br />

4) MIDC will deduct this tax at source at 2% (for registered dealer) & 4% (in any other<br />

case) of the value of work done as per section 31 of <strong>Maharashtra</strong> value Added Tax Act. 2002. &<br />

Notification No. VAT-1505/CR-123/ Taxation -1 Dt. 1/ 4 / 2005 . TDS Certificate to this effect will be<br />

issued by MIDC.<br />

Contractor<br />

- 20 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

TERMS AND CONDITIONS FOR THE REIMBURSEMENT OF TAXES/DUTIES.<br />

“Clause:- While submitting the <strong>tender</strong>, the contractor shall consider prevailing taxes and duties on the<br />

date of submission. In case there is statutory increase in the taxes / duties, the Contractor shall submit<br />

documentary evidence for the payment of the same. On verification of the documents, the<br />

reimbursement will be made if there is increase. In case there is reduction in the statutory taxes, duties,<br />

deduction will be effected. It may also be noted that this clause is not applicable if there is increase in<br />

the Octroi during execution of the work.”<br />

Contractor<br />

- 21 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

REGISTRATION UNDER CONTRACT LABOUR( Regulation & Abolition ) ACT -1970<br />

After submitting the <strong>tender</strong>, and if the work is awarded to the contractor, the <strong>tender</strong>er should<br />

produce the certified copy of registration in prescribed <strong>form</strong> issued by Labour Commissioner<br />

under Contract Labour (Regulation & Abolition) Act-1970, as an employer, as such as they are<br />

directly employing the workers for execution of the contract works awarded to him by<br />

M.I.D.C., and comply with the provisions of the Act. After acceptance of the <strong>tender</strong> by<br />

M.I.D.C., the contractor has to give intimation about the work order and get this particular<br />

work registered within a period of 15 days from the date of issue of work order, from<br />

Labour Commissioner under Contract Labour (Regulation & Abolition) Act-1970.<br />

Contractor<br />

- 22 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

CLAUSE FOR RECOVERY OF LABOUR CESS<br />

The Govt. of <strong>Maharashtra</strong> vide its decision dated 17/06/2010 has decided to recover labour cess on all<br />

the Construction works undertaken by Govt. Public Sector Undertaking and Municipal <strong>Corporation</strong>.<br />

Municipal Councils, Gram Panchayat etc. the Contractors are therefore requested to note that labour<br />

cess at 1% of the cost of Construction (excluding land cost) arrived at after deducting amount of<br />

Compensation if any paid to the workers or their relatives under workers compensation Act 1923 will<br />

have to be paid by them.<br />

The contractor shall initially pay 75% amount of the labour cess worked out on the basis of estimated<br />

cost or <strong>tender</strong>ed cost which ever is higher to the MIDC at the time of execution of agreement. Only<br />

after payment of the cess, work order shall be issued to the contractor.<br />

a) The actual cost of the work shall be assessed / arrived after one year from the date of work<br />

order or at time of pre final bill and the labour cess shall be worked out on the basis of actual<br />

cost of the work executed by the contractor. The balance amount of cess shall be recovered<br />

from pre-final / final bill.<br />

b) The final bill shall be paid to the Contractor after the recovery of balance amount of labour cess<br />

for the said work.<br />

Contractor<br />

- 23 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

INSURANCE OF CONTRACT WORK<br />

Contractor shall take out necessary Insurance Policy / Policies so as to provide adequate insurance<br />

cover for execution of the awarded contract work for total contract value and complete contract period<br />

from the "Directorate of Insurance, <strong>Maharashtra</strong> State, Mumbai" Only. Its postal address for<br />

correspondence is "264 MHADA, First Floor, Opp. Kalanagar, Bandra (East), Mumbai-400051."<br />

(Telephone Nos. 26590690/26590746 and Fax No. 26438461). Similarly, all workmen appointed to<br />

complete the contract work are required to be insured under workmen's compensation Insurance<br />

policy. Insurance Policy / Policies taken out from any other company will not be accepted.<br />

If any contractor have effected insurance with any Insurance Company, the same will not be accepted<br />

and the amount of premium calculated by the Directorate of Insurance will be recovered directly from<br />

the amount payable to the Contractor for the executed contract work.<br />

Contractor<br />

- 24 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

GENERAL SPECIFICATION AND ADDL. CONTRACT CONDITION<br />

1. The contractor shall provide adequate experienced persons / services as specified category at<br />

different location for the works of maintenance in the direction of engineer in charge .<br />

2. Orders issued by department from time to time shall be binding on the contractor.<br />

3. It will be the contractors responsibility to investigate specifications thoroughly so as to arrive at<br />

the rates quoted in the <strong>tender</strong>.<br />

4. It shall be the responsibility of the contractor to see that the services are made available<br />

immediately in case of requirement. If such services are not made available within given time<br />

the work shall be got executed by the department at the risk and cost of the agency.<br />

5. If the labourer does not attend the work the deduction shall be as per prevailing labour<br />

rates or as per the circular of MIDC.<br />

6. MATERIALS: -<br />

6.1 MIDC shall supply the materials, if and when required. The material so supplied shall be used<br />

for work in question only. The contractor shall maintain regular account of the receipts, the use of such<br />

materials to the satisfaction of the Engineer-in-charge and submit monthly statement there of. He shall<br />

keep the account of such materials in suitable books, which would be available for inspection to the<br />

Engineer-in-charge, whenever demanded. The contractor will be responsible for proper handling and<br />

safe custody of all materials delivered to him by the department.<br />

6.2 He shall make proper and economic use of all materials supplied by the department whether<br />

free of cost or on payment for utilization in the execution of the contract.<br />

6.3 All the surplus materials from those supplied by the Department to the contractor free of charge<br />

will be returned to the Department and delivered at places as directed and if any shortages are noticed<br />

in the materials or found in damaged or unserviceable condition, the cost there of as fixed by the<br />

Deputy Engineer will be recovered from the Contractor. All the surplus materials from those supplied<br />

by Department on payment shall neither be disposed off nor removed by the contractor without<br />

obtaining written permission of the Department to that effect as the Department shall have the option<br />

to take over such surplus materials at the issue rates.<br />

Contractor<br />

- 25 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

6.4 The contractor shall give at the time of taking delivery, receipts for all materials, pipes and<br />

specials etc. issued to him when those are issued free of cost to safe guard specially against wrong<br />

debit being raised by the contractor.<br />

7. WORKS: -<br />

7.1 The contractor shall not claim for compensation on account of reasonable variation in the depth<br />

of foundation or trenches.<br />

8. GENERAL: -<br />

8.1. The contractor shall make his own arrangement for water supply to the laborers for drinking<br />

purpose.<br />

Contractor<br />

- 26 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

GENERAL TERMS AND CONDITIONS<br />

1. Security Deposit<br />

The corporation shall be entitled to withhold the cash, security deposit, if any furnished as the case<br />

may be and also have a lien over the same, pending finalization or adjudication of any claim. In the<br />

event of security deposit being insufficient to cover the claimed amount or amounts or if so security<br />

has been taken from the contractor, the corporation shall be entitled to withhold and have a lien to the<br />

extent of sum or sums found payable to the contractor under the same contract or any other contract<br />

with the corporation or Government or any person contracting through the corporation pending<br />

finalization or adjudication of any such claim..<br />

It is agreed under the contract that the sum/sums of money so withheld or retained under the lien<br />

referred to above by the corporation will be withheld or retained as such by the corporation till the<br />

claim arising out of or under the contract is determined by the competent court and that the contractor<br />

will have no claim for interest or damages, whatsoever, on any account in respect of such withholding<br />

or retention under the lien referred to duly notified as such to the contractor, for the purpose of this<br />

clause. Where the contractor is a partnership firm, the <strong>Corporation</strong> will withhold and also have lien in<br />

respect of such claims in whole or in parts from any sum found payable to any partners/limited<br />

company, as the case may be whether in his individual capacity or otherwise. The corporation is not<br />

liable to pay any interest on the amounts so withheld.<br />

Lien in respect of claims in other contracts :<br />

Any sum of money due and payable to the contractor (including the security deposit returnable to him<br />

under the contract may be withheld or retained by way of lien by the corporation or Government<br />

against any claim of the corporation or Government with such other person or persons. It is agreed<br />

under the contract that the sum of money so withheld or retained under this clause will be duly notified<br />

to the contractor.<br />

2. Alternations to be Authorised :<br />

No alterations in or additions to or omission or abandonment of or variation in the contract of any part<br />

of the contract shall be deemed authorized except under instructions from the Addl. Chief Engineer of<br />

the corporation. Otherwise the contractor shall be liable for any consequences that may arise.<br />

Contractor<br />

- 27 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


3. Jurisdictions :<br />

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

All question, disputes and differences arising under, out of or in connection with the contract, shall be<br />

subject to the exclusive jurisdiction of the court within local, limits of courts of Nashik.<br />

4. Subletting and Assignments :<br />

The contractor shall comply with all statues/laws or the local authorities state and Central Govts. and<br />

shall indemnify the corporation from any default on their part.<br />

The whole of the work included in the contract shall be executed by the contractor and the contractor<br />

shall not directly or indirectly transfer, assign or underlet the contract of any part, share or interest<br />

there in nor shall taken a new partner without the written consent of the Executive Engineer, MIDC<br />

Nashik Dn. and no subletting shall relieve the contractor from the full and entire responsibilities<br />

obligations under the contract or from active superintendence of the work during the progress.<br />

No. variation i.e. addition or substitution shall vitiate the contract. The contractor shall be responsible<br />

for all injury to persons, animal or things and for all damages to the structural and or decorative part of<br />

property, which may arise from the operations and on neglect or fault of himself or of any<br />

sub/contractors employee, whether such injury or damage raised from carelessness. Theft, accident<br />

and other cause whatever in any way connected with the carrying out this contract.<br />

The corporation shall be at liberty and is hereby empowered to deduct from the security deposit the<br />

amount of any damages, compensation costs charges and expenses arising or occurring from or in<br />

respect of any claim or damage from any sum or sums due or any become due to the contractor.<br />

The contractor shall observe all the safety and security rules and regulations of the<br />

<strong>Maharashtra</strong>/Central Govt. which at present in force and which may come into force during the<br />

tendency of the contract any violation of any rule and regulation will lead to termination of the<br />

contract.<br />

The contractor shall execute this work in such a way as not be interfere with functioning of the office<br />

and also without any disturbance or damage into the structures and installations etc. within the campus.<br />

No property of the corporation shall be tempered with. In case of default, the damages as assessed by<br />

the authorized offer of the corporation, whose assessment shall be final and binding on the contractor,<br />

shall be payable by the contractor, who will have to pay the amount of damages within 7 days failing<br />

Contractor<br />

- 28 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

which the contract will be terminated and the damages shall be recovered from the running bill to the<br />

contractor are liable to be forfeited.<br />

Payment of corporate tax, personal tax provident fund of employees etc. of any Government or other<br />

bodies should be borne by the contractor.<br />

5. Failure & Termination :<br />

The corporation will be entitled to reject the work executed, cancel the contract and procure the<br />

services from other contractors/partners at the risk and cost of the contractor reserving always to itself<br />

the right to forfeit the security deposit furnished by the contractor for the due fulfillment of the<br />

contract.<br />

Breach of the conditions laid down by the <strong>Corporation</strong> shall entail termination of contract, the<br />

remainder of the work of the contractor will be got done through another agency/agencies at the risk<br />

and cost of the contractor and all amounts which may be due to the contractor are liable to be forfeited.<br />

Since the job completed under this contract will be logged and measured on daily basis the contractor<br />

is liable to forfeit the entire charges for the job completed in the full day in case it is found that the<br />

proportion of the job completed on that day is in complete due to shortage or incompetence of man<br />

power associated with job.<br />

In case the contractor fails to per<strong>form</strong> the contract work in any day. He shall not be paid for the work<br />

not per<strong>form</strong>ed for that day besides the contractor shall be liable to pay damages to the corporation on<br />

prorate basis.<br />

If the contractor fails to per<strong>form</strong> the duties as per the scope of work given to the satisfaction of the<br />

corporation, the corporation without prejudice to any other right or remedy available to it, may in<br />

addition recover damage for breach of the contract.<br />

If the corporation finds that the job executed is not of the requisite quality or according to specification<br />

or otherwise not satisfactory due to any reason (on which the decision of the corporation shall be final<br />

and binding on the contractor).<br />

The corporation shall be entitled to recover damages on account of procuring services from elsewhere<br />

or getting the remaining work executed departmentally after servicing notice on the contractor, such<br />

work shall be procured from outside or executed departmentally at the sole risk, and cost of the<br />

Contractor<br />

- 29 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

contractor for completing the work, which may be lift unexecuted by the contractor after canceling the<br />

contract for a portion thereof in respect of the unexpected work.<br />

6. Indemnity<br />

The contractor shall indemnify corporation and hold it harmless in respect of any and all cost, expenses<br />

arising from any such injury or damage to persons or property as aforesaid and also in respect of any<br />

claim or proceedings at law and also in respect of any award of compensation or damage arising there<br />

from.<br />

The contractor shall indemnify the corporation against all claims which may be made against the<br />

corporation by any member of the public or other third party in respect of any thing which may arise in<br />

respect of the work or in consequence thereof and caused by the negligence of the contractor or his<br />

representative employees.<br />

7. Force Majeure:<br />

In the event of either party being rendered unable due to force majeure to per<strong>form</strong> any obligation<br />

required to be per<strong>form</strong>ed by them under the contract, the relative obligation of the party affected by<br />

such force majeure shall upon notification to the other party be suspended for the period of delay<br />

which is directly caused by such force majeure event. The term “Force Majeure” means any delay or<br />

default caused by the conditions beyond the control of the parties including, but not limited to acts of<br />

God, Government, restrictions, wars, insurrections and/or any other cause beyond the reasonable<br />

control of the parties. Upon the occurrence of such event the party alleging the it has been rendered<br />

unable as aforesaid thereby, shall notify the other party (the <strong>Corporation</strong>) in writing within 18 hours of<br />

the alleged beginning and ending of such an event thereof giving full particulars & satisfactorily<br />

evidence in support of the claim. Time for per<strong>form</strong>ance of the relative obligations rendered suspended<br />

by the force majored and shall then be extended by the period of delay, which is directly caused by the<br />

majeure event. If deliveries of bought out items and/or works to be executed by the contractor remain<br />

suspended due to force majeure condition lasting for more than two months the corporation shall have<br />

option of terminating the contract in whole or part thereof, at corporation’s discretion.<br />

Contractor<br />

- 30 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

UNDERTAKING IN FORMAT FROM CONTRACTOR<br />

CLAUSE FOR M.I.D.C.’s EX-EMPLOYEE<br />

I/We hereby declare that the <strong>form</strong>ation of our company, either by way of partnership or consultant, no<br />

M.I.D.C.’s Ex-Employee has been on the enrollment of the company.<br />

It is further to certify that the Ex-Employee of the MIDC, who has joined the company, has completed<br />

02 years from his date of resignation from M.I.D.C. or from the date of retirement from M.I.D.C.,<br />

Date :- Signature of Contractor.<br />

Place :-<br />

NOTE:- Contractor should furnish the above in<strong>form</strong>ation separately<br />

in envelope No.1<br />

Contractor<br />

- 31 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

G. R., P. W. D., Nos. 88/36, dated P.W.D.286 e.<br />

20-3-40, 10-6-40, 1-7-40, 6-5-41,<br />

5-10-42. 12-11-42, and 5-7-44 &<br />

G.R.,P.W.D.No.ELW1056-Sdated<br />

26-1-57 and G.M.,P.W.D., No. ELW<br />

1056/165950 dated 4-1-58.]<br />

P.W.Department.<br />

FORM ‘B-2’<br />

CIRCLE.<br />

DIVIISION<br />

Item Rate Tender and Contract for Works<br />

General Rules and Directions for the Guidance of Contractors<br />

1. All work proposed to be executed by contract shall be notified in a <strong>form</strong> of invitation to<br />

<strong>tender</strong> posted on a board hung up in the office of the Executive Engineer and signed by the<br />

Executive Engineer. This <strong>form</strong> will state the work to be carried out, as well as the date for<br />

submitting and opening <strong>tender</strong>s and the time allowed for carrying out the work; also the<br />

amount of earnest money to be deposited with the <strong>tender</strong>, and the amount of the security<br />

deposit to be deposited by the successful <strong>tender</strong>er and the percentage, if any, to be<br />

deducted from bills. It will also state whether a refund of quarry fees, royalties, octroi dues<br />

and ground rents will be granted. Copies of the specifications, designs and drawings and<br />

estimated rates, scheduled rates and any other documents required in connection with the<br />

work which will be signed by the Executive Engineer for the purpose of identification shall<br />

also be open for inspection by contractors at the office of the Executive Engineer during<br />

office hours. Where the works are proposed to be executed according to the specifications<br />

recommended by a contractor and approved by a competent authority on behalf of the<br />

Government of <strong>Maharashtra</strong> such specification which designs and drawings shall <strong>form</strong> part<br />

of. the accepted <strong>tender</strong>.<br />

2. In the event of the <strong>tender</strong> being submitted by a firm, it must be signed by each partner<br />

thereof, and in the event of the absence of any partner, it shall be signed on his behalf by a<br />

person holding a power-of-autorney authorising him to do so.<br />

3. Receipts for payments made on account of any work, executed by a firm, should also<br />

be signed by all the partners, except where the contractors are described in their <strong>tender</strong> as<br />

a firm, in which case the receipts shall be signed in the name of the firm by one of the<br />

partners, or by some other person having authority to give effectual receipts for the firm.<br />

4. Any person who submits a <strong>tender</strong> shall fill up the usual printed <strong>form</strong> including the<br />

column total according to estimated quantities, stating at what rate he is willing to undertake<br />

each item of the work. Tenders which propose any alteration in the work specified in the said<br />

<strong>form</strong> of invitation to <strong>tender</strong>, or in the time allowed for carrying out the work, or which contain<br />

any other conditions of any sort, will be liable to rejection. No single <strong>tender</strong> shall include<br />

more<br />

than one work, but contractors who wish to <strong>tender</strong> for two or more works shall submit a<br />

-separate <strong>tender</strong> for each. Tender shall have the name and the number of the work to which<br />

they refer written outside the envelope.<br />

5. The Executive Engineer or his duly authorized Assistant will open <strong>tender</strong>s in the<br />

presence of any intending contractors who may be present at the time, and will enter the<br />

amounts of the several <strong>tender</strong>s in a comparative statement in a suitable <strong>form</strong>. In the event<br />

of a <strong>tender</strong> being accepted, the contractor shall thereupon, for the purpose of identification,<br />

sign copies of the specifications and other documents mentioned in Rule 1. In event of a<br />

<strong>tender</strong> being rejected, the Divisional Officer shall authorize the Officer concerned to refund<br />

the amount of the earnest money deposited to the contractor making the <strong>tender</strong>, on his<br />

giving<br />

a receipt for the return of the money.<br />

6. The Officer competent to dispose of the <strong>tender</strong> shall have the right of rejecting all or<br />

any of the <strong>tender</strong>s.<br />

7. No receipt for any payment alleged to have been made by a contractor in regard to<br />

any matter relating to this <strong>tender</strong> or the contract shall be valid and binding on M.I.D.C.it<br />

unless<br />

Contractor<br />

- 32 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

(a) If several subworks<br />

are included they<br />

should be detailed in a<br />

separate list.<br />

(c) The amount of<br />

earnest money to be<br />

deposited shall be in<br />

accordance with the<br />

provisions of<br />

paragraphs 202 and<br />

203 of the Public<br />

Works Department<br />

Manual.<br />

(d) This deposit shall<br />

be in accordance with<br />

paragraphs 203<br />

and 209 of the Public<br />

Works Department<br />

Manual.<br />

(e) This percentage<br />

where no security<br />

deposit is taken, will<br />

vary from 5 per cent to<br />

10 percent according<br />

to the requirements of<br />

the case. Where<br />

security deposit is<br />

taken, see note to<br />

Clause 1 of conditions<br />

of contract.<br />

(f) Give schedule were<br />

necessary showing<br />

dates by which the<br />

various items are to be<br />

completed<br />

Amount to be<br />

specified in words and<br />

figures.<br />

** Strike out (a) if is no<br />

cash security deposit<br />

is to be taken<br />

Signature of contractor<br />

before submission of<br />

<strong>tender</strong>.<br />

+ Signature of witness<br />

contractor's signature'<br />

Signature of the Officer<br />

by whom accepted.<br />

Tender for the supply of Materials<br />

I/We hereby <strong>tender</strong> for the execution for the Governor of <strong>Maharashtra</strong><br />

(hereinbefore and hereinafter referred to as "M.I.D.C.") of the work<br />

specified in the underwritten memorandum within the time specified in such<br />

memorandum at the <strong>tender</strong>ed rates specified in Schedule B (memorandum<br />

showing items of work to be carried out) and in accordance in all respects<br />

with the specifications, design: drawings, and instructions in writing<br />

referred to in Rule 1 hereof and in clause 13 of the annexed conditions of<br />

contract and agree that when materials for the work are provided by<br />

M.I.D.C. to such materials and the rates to be paid for them shall be as<br />

provided in Schedule A hereto.<br />

MEMORANDUM<br />

a) General description:- M&R TO N.R.BUILDING & WATER<br />

SUPPLY SCHEME @ NASHIK INDUSTRIAL AREA…<br />

HOUSEKEEPING OF UDYOG BHAVAN BUILDING, CSC<br />

BUILDING, OLD FLATTED FACTORY BUILDING AND STAFF<br />

COLONY @ SATPUR.<br />

(b) Estimated cost Rs. 9,37,685.00<br />

(c) Earnest Money Rs. 9,400.00<br />

(d) Security deposit<br />

(i) Cash (not less than the amount of earnest money. (3%) Rs 28,200.00<br />

(ii) To be deducted from current bill (5%) Rs. 46900.0<br />

Total Rs. 75100.00<br />

(e) Percentage, if any, to be deducted from bills so as to make up the total<br />

amount required as security deposit by the time half the work, as measured<br />

by the cost, is done Eight per cent.<br />

(f) Time allowed for the work from the date of written order to commerce<br />

Twelve Months including Monsoon.<br />

Should this <strong>tender</strong> be accepted, I/we hereby agree to abide by and fulfil all<br />

the terms and the provisions of conditions of contract annexed hereto, so<br />

far as applicable, and in default thereof, to forfeit and pay to the MIDC the<br />

sum of money mentioned in the said conditions.<br />

Receipt No. dated from the Government<br />

Treasury<br />

or Sub Treasury at in respect of sum Rs. *<br />

is<br />

herewith forwarded representing the earnest money (** (a) the full value of<br />

which is to be absolutely forfeited to MIDC should I/we. not deposit the full<br />

amount of security deposit specified in the above memorandum in<br />

accordance with clause 1 (A) of the said conditions, otherwise the said<br />

sum of Rs.<br />

shall be refunded.]<br />

Contractor<br />

Address<br />

Dated the day of 2012.<br />

(Witness)+<br />

(Address)<br />

(Occupation)<br />

The above <strong>tender</strong> is hereby accepted by me on behalf of the Mah. Ind.<br />

Dev. Corp.<br />

for Rs. (Rs. )<br />

Contractor<br />

- 33 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Dated the day of 2012.<br />

it is signed by the Executive Engineer.<br />

8. The memorandum of work to be <strong>tender</strong>ed for and the schedule of materials to be<br />

supplied by the Public Works Department and their rates shall be filled in and<br />

completed by the office of the Executive Engineer before the <strong>tender</strong> <strong>form</strong> is issued. If a<br />

<strong>form</strong> issued to an intending <strong>tender</strong>er has not been so filled in and completed, he shall<br />

request the said office to have this done before he completes and delivers his <strong>tender</strong>.<br />

9. All work shall be measured net by standard measure and according to the rules and<br />

custom of the Mah. Ind. Dev. Corp. ent without reference to any local custom.<br />

10. Under no circumstances shall any contractor be entitled to claim enhanced rates<br />

for any items in this contract.<br />

11. Every contractor shall, unless exempted in writing by the Superintending Engineer<br />

concerned, produce along with his <strong>tender</strong>, a solvency certificate from the Collector of<br />

the District within which he resides, or a banker's certificate, of his financial stability. If<br />

he fail to produce such a certificate his <strong>tender</strong> will not be considered.<br />

12. All corrections and additions or pasted slips should be intialied.<br />

13. The measurements of work will be taken according to the usual method in use in<br />

the M.I.D.C. and no proposals to adopt alternative methods will be accepted. The<br />

Executive Engineer's decision as to what is "the usual method in use in the MIDC will be final."<br />

Conditions of Contract.<br />

Clause 1 -The person/persons whose <strong>tender</strong> may be accepted (hereinafter called the<br />

contractor, which expression shall unless exclused by or repuganant to the context<br />

increase his heirs, excutors, administrator, and assigns.) shall (A) within 10 days<br />

(which may be extended by the Superintending Engineer concerned upto 15 days if the<br />

Superintending Engineer thinks fit to so) if the receipt by him of the notification of the<br />

acceptance of his <strong>tender</strong> deposit with the Executive Engineer in cash or Govt.<br />

securities endorsed to the Executive Engineer (if deposited for more than 12 months)<br />

of sum sufficient which will made up the full security deposit specified in the <strong>tender</strong> or<br />

(B) (Permit Government at the time of making any payment to him for work done under<br />

the contract to deduct such as well amount to percent of all money so payable such<br />

deductions to be held by MI DC by way of security deposits) Provided always that in<br />

the event of the contractor deposit in a lump sum by way of security deposit as<br />

contemplated at (A) above, then and in such case, if the sum so deposited shall not<br />

amount to 4 percent of the total estimated cost of the work, if shall be lawful for MIDC,<br />

at the time of making any payment to the contractor for work done under the contract to<br />

make up the full amount of percent by deducting a sufficient sum from every such<br />

payment as last aforesaid until the full amount of the security deposit is made up. All<br />

compensation or other sums of money payable by the contractor to MIDC under the<br />

terms of his contract may be deducted from or paid by ths sale of sufficient part of his<br />

security deposit or from the interest become due by MIDC to the contractor under any<br />

other contract or transaction if any nature on any account what soever and in the event<br />

of security deposit being reduced by reason of any such deduction or sale as<br />

aforesaid, the contractor shall, within ten days there after, make good in cash or<br />

Government securities endorsed as aforesaid any sum or sums which may have been<br />

deducted from or raised by sale of his security deposit any part there for. The security<br />

deposit referred to, when paid in cash may, at the cost of the deposit or, be converted<br />

into interest bearing securities provided that the depositor has expressly desired this in writting.<br />

If the amount of the security deposit to be paid in a lump sum within the period<br />

specified at (A) above is not paid, the <strong>tender</strong>/contract already accepted shall be<br />

considered as cancelled and legal step taken against the contractor for recovery of the<br />

amounts. The amount of the security deposit lodged by a contractor shall be refunded<br />

along with the payment of the final bill if the date upto which the contractor has agreed<br />

to maintain the work in good order is over. If such date is not over, only 90% amount of<br />

security deposit shall be refunded along with payment of the final bill. The amount of<br />

security deposit retained by the MIDC shall be released after expiry of period upto which<br />

the contractor has agreed to maintain the work in good order is over. In the event of the<br />

contractor failing or neglecting to complete rectification work within the period upto<br />

which the contractor has agreed to maintain the work in good order, the subjects to<br />

provision of clauses 16 and 19 here of the amount of security deposit retained by MIDC<br />

shall be adjusted toward the excess cost incurred by the department on rectification work.<br />

Security<br />

Deposit<br />

Contractor<br />

- 34 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Compensation<br />

for delay<br />

Rs.500/-<br />

per day<br />

Clause 2 The time allowed for carrying out the work as entered in the <strong>tender</strong> shall be strictly<br />

observed by the contractor and shall be reckoned from the date on which the order to<br />

commence work is given to the contractor. The work shall throughout the stipulated period of<br />

the contract be proceeded with, with all due diligence (time being deemed to be of the essence<br />

of the contract on the part of the contractor) and the contractor shall pay as compensation an<br />

amount equal to one per cent, or such smaller amount as the Superintending Engineer (whose<br />

decision in writing shall be final) may decide of the amount of the estimate; cost of the whole<br />

work as shown by the <strong>tender</strong> for every day that the work remains uncommenced, or unfinished,<br />

after the proper dates. And further to ensure good progress during the execution of the work,<br />

the contractor shall be bound, in all cases in which the time allowed for any work exceeds one<br />

month to complete.<br />

Action when<br />

whole of<br />

security<br />

deposit is<br />

forfieted.<br />

* Note. The quantity of work to be done within a particular time to be specified above<br />

shall be fixed by the Officer competent to accept the contracts after taking into<br />

considerationthe circumstances of each case and inserted in the blank space kept for the<br />

purpose. and abide by the programme of detailed progress laid down by the Executive<br />

Engineer. The following properties will usually be found suitable :<br />

In 1/4 1/2 3/4 of the time.<br />

Reasonable progress of earth work 1/6 1/2 3/4 of the total value of the<br />

work to be done.<br />

do. do. of masonry work 1/10 4/10 8/10 do. do.<br />

In the event of the contractor failing to comply with these conditions he shall be liable to pay as<br />

compensation an amount equal to one per cent or such smaller amounts as the<br />

Superintending Engineer (whose decision in writting shall be final) may decide of the said<br />

estimated cost of the whole work for every day that the due quantity of work remains<br />

incomplete : Provided always that the total amount of compensation to be paid under the<br />

provisions of this clause shall not exceed 10 per cent of the estimated cost of the work as<br />

shown in the <strong>tender</strong>.<br />

Clause 3. In any case in which under any clause or clauses of this contract the contractor shall<br />

have rendered himself liable to pay compensation amounting to the whole of his security<br />

deposit (whether paid in one sum or deducted by installments) or in the case of abandonment<br />

of the work owing to serious illness or death of the contractor or any other cause, the Executive<br />

Engineer on behalf of the M.I.D.C. shall have power to adopt any of the following courses as he<br />

may deem best suited to the interest of M.I.D.C.<br />

(a) To rescind the contract (of which recission notice in writing to the contractor under the hand<br />

of the Executive Engineer shall be conclusive evidence), and in that case the security deposit<br />

of the contractor shall stand forfeited and be absolutely at the disposal of M.I.D.C.<br />

(b) To employ labour paid by the M.I.D.C. and to supply materials to carry out the work, or any<br />

part of the works, debiting the contractor with the cost of the labour and the price of the<br />

materials (as to the correctness of which cost and price the certificate of the Executive<br />

Engineer shall be final and conclusive against the contractor) and crediting him with the value<br />

of the work done, in alt aspects in the same manner and at the same rates as if it had been<br />

carried out by the contractor under the terms of his contractor; and in. that case the certificate<br />

of the executive Engineer as to the value of the work done shall be final and conclusive against<br />

the contractor.<br />

(c) To order that the work of the contractor be measured up and to take such part thereof, as<br />

shall be unexecuted out of his hands, and to give it to another contractor to complete, in which<br />

case any expenses which may be incurred in excess of the sum which would have been paid to<br />

the original contractor, if the whole work had been executed by him (as to the amount of which<br />

excess expenses the certificate in writing of the Executive Engineer shall be final and<br />

conclusive) shall be borne and paid by the original contractor or otherwise or and shall be<br />

deducted from any money due to him by Govt. under the contract from his security deposit or<br />

the proceeds of sale thereof, a sufficient part thereof.<br />

In the event of any of the above courses, being adopted by the Executive Engineer the<br />

contractor shall have no claim to compensation for any loss sustained by him by reason of his<br />

having purchased, or procured any material, or entered into any engagements, or made any<br />

advances on account of or with a view to the execution of the work or the per<strong>form</strong>ance of the<br />

contract. And in case the contract shall be rescinded under the provision aforesaid the<br />

Contractor<br />

- 35 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

contractor shall not be entitled to recover or be paid any sum for any work thereto for<br />

actuallyper<strong>form</strong>ed by him under this contract unless and untill the Executive Engineer shall<br />

have certified in writing the per<strong>form</strong>ance of such work and the amount payable to him in<br />

respect thereof, and he shall only be entitled to be paid the amount so certified.<br />

Clause 4.- If the progress of any particular portion of the work is unsatisfactory the Executive<br />

Engineer shall notwithstanding that the general progress of the work is satisfactory in<br />

accordance with clause 2, be entitiled to take action under clause 3 (b) after giving the<br />

contractor 10 days' notice in writing and the contractor will have no claim for compensation, for<br />

any loss sustained by him owing to such action.<br />

Clause 5. - In any case in which any of the powers conferred upon the Executive Engineer by<br />

clauses 3 and 4 hereof shall have become exercisable and the same shall not have been<br />

exercised the non-exercise thereof shall not constitute a waiver of any of the conditions hereof<br />

and such powers shall notwithstanding be exercisable in any future case of default by the<br />

contractor for which by any clause or clauses hereof he is declared liable to pay compensation<br />

amounting to the whole of his security deposit and the liability of the contractor for past and<br />

future compensation shall remain unaffected. In the event of the Executive Engineer taking<br />

action under sub-clause (a) or (c) of clause 3. he may if he so desires take possession of all or<br />

any tools, plant, materials and stores, in or upon the works or the site thereof or belonging to<br />

the contractor, or procured by him and intended to be used for the execution of the work or any<br />

part, thereof, paying or allowing for the same in account at the contract rates, or in the case of<br />

contract rates not being applicable, at current market rates, to be certified by the Executive<br />

Engineer whose certificate thereof shall be final. In the alternative the Executive Engineer may,<br />

by notice in writing to the contractor or his clerk of the works, foreman or other authorized<br />

agent require him to remove such tools, plant, materials or stores from the premises within a<br />

time to be specified in such notice; and in the event of the contractor failing to comply with an<br />

such requisition, the Executive Engineer may remove them at the contractor's expenses or sell<br />

them by auction or private sale at the risk and account of the contractor in all respects, and the<br />

certificate of the Executive Engineer as to the expenses of any such removal, and the amount<br />

of the proceeds and expense of any such sale shall be final and conclusive against the<br />

contractor.<br />

Clause 6. If the contractor shall desire an extension of the time for completion of the work on<br />

the ground of his having been unavoidably hindered in its execution on any other ground, he<br />

shall apply in writting to the Executive Engineer before the expiation of the period stipulated in<br />

the <strong>tender</strong> or before the expiration of 30 days from the date to which he was hindered as<br />

aforesaid or on which the cause for asking for extension occured whichever is earlier is and the<br />

Executive Engineer may if in his opinion here are reasonable grounds for granting an<br />

extension, grant such extension as he thinks necessary or proper. The decision of the<br />

Executive Engineer in this matter shall be final.<br />

Clause 7. On completion of the work the contractor shall be furnished with a certificate by the<br />

Executive Engineer (hereinafter called the Engineer-in-charge) of such completion but no such<br />

certificate shall be given nor shall the work be considered to be complete until the contractor<br />

shall have removed from the premises on which the work shall have been executed all<br />

scaffolding, surplus materials and rubbish, and shall have cleaned off the dirt from all<br />

woodwork, doors, windows, walls, floor or other parts of any building in or upon which the work<br />

has been executed, or of which he may have possession for the purpose of executing the<br />

work, or of which he may have had possession for the purpose of executing the work, nor until<br />

the 'works shall have been measured by the Engineer-in-charge or where the measurements<br />

have been taken by his subordinates until they have received the approval of the Engineerincharge,<br />

the said measurements being binding and conclusive against the contractor. If the<br />

'contractor shall fail to comply with the requirements of this clause as to the removal of<br />

scaffolding surplus materials and rubbish and cleaning off dirt on or before the date fixed for<br />

the completion of the work the Engineer-in-charge may at the expenses of the contractor,<br />

remove such scaffolding surplus materials and rubbish and dispose of the same as he thinks<br />

fit and clean off such dirt as aforesaid; and the contractor shall forthwith pay the amount of all<br />

expenses so incurred, but shall have no claim in respect of any such scaffolding or surplus<br />

materials as aforesaid except for any sum actually realized by the scale thereof.<br />

Clause 8. No payment shall be made for any work, estimated to cost less than rupees one<br />

thousand, till after the whole of the said work shall have been completed and a certificate of<br />

completion given. But in the case of works estimated to cost more than rupees one thousand,<br />

the contractor shall, on submitting a monthly bill therefor, be entitled to receive payment<br />

proportionate to the part of the work then approved and passed by the Engineer-<br />

Action when the<br />

progress of any<br />

particular portion<br />

of the work is<br />

unsatisfactory.<br />

Contractor<br />

remains liable to<br />

pay compensation<br />

if action not taken<br />

under clause 3<br />

Power to take<br />

possession of or<br />

require removal of<br />

or sell contractor's<br />

plant<br />

Extension of time<br />

Final Certificate<br />

Payments on<br />

intermediate<br />

certificate<br />

to be regarded as<br />

advances.<br />

Contractor<br />

- 36 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Payment at<br />

reduced rates<br />

on account of'<br />

items of work<br />

not accepted<br />

as completed<br />

to be at the<br />

discretion of<br />

the Engineer-in<br />

charge<br />

Bills to be<br />

submitted<br />

monthly.<br />

Bills to be<br />

submitted<br />

monthly<br />

Stores supplied<br />

by Government<br />

Works to be<br />

executed<br />

in accordance<br />

with<br />

specifications,<br />

drawings,<br />

orders etc.<br />

in-charge, whose certificate of such approval and passing of the sum so payable shall be final<br />

and conclusive against the contractor. All such intermediate payments shall be regarded as<br />

payments by way of advance against the final payments only and not as payments for work<br />

actually done and completed, and shall not preclude the Engineer-in-charge from requiring bad,<br />

unsound, imperfect or unskillful work to be removed and taken away and reconstructed, or reerected,<br />

nor shall any such payment be considered as an admission of the due per<strong>form</strong>ance of<br />

the contract or any part thereof in any respect or the accruing of any claim nor shall it conclude,<br />

determine affect in any way the powers of the Engineer-in-charge as to the final settlement and<br />

adjustment of the accounts or otherwise, or in any other way vary or affect the contract. The final<br />

bill shall be submitted by the contractor within one month of the date fixed for the completion of<br />

the work, otherwise the Engineer-in-charge's certificate of the measurement and of the total<br />

amount payable for the work shall be final and binding on all parties.<br />

Clause 9. - The rates for several items of works estimated to cost more than Rs. 1,000r agreed to<br />

within, shall be valid only when the items concerned is accepted as having been completed fully<br />

in accordance with the sanctioned specifications. In cases where the items of work are not<br />

accepted as so completed the Engineer-in-charge may make payment on account of such items<br />

at such reduced rate as he may consider reasonable in the preparation of final or on account bills.<br />

Clause 10. - A bill be submitted by the contractor each month on or before the date fixed by the<br />

Engineer-in-charge for all work executed in the previous month, and the Engineer-incharge shall<br />

take or cause to be taken the requisite measurement for the purpose of having the same verified,<br />

and the claim, so far as it is admissible, shall be adjusted, if possible, within ten days from the<br />

presentation of the bill. If the contractor does not submit the bill within the time fixed as aforesaid,<br />

the Engineer-in-charge may depute a subordinate to measure up the said work in the presence of<br />

the contractor or his duly authorized agent whose counter signature to the measurement list shall<br />

be sufficient warrant and the Engineer-in-charge may prepare a bill from such list which shall be<br />

binding on the contractor in all respects.<br />

Clause 11. - The contractor shall submit all bills on the printed <strong>form</strong>s to be had on application at<br />

the office of the Engineer-in-charge. The charges to be made in the bills shall always be entered<br />

at the rates specified in the <strong>tender</strong> or in the case of any extra work ordered in pursuance of these<br />

conditions, and not mentioned or provided for in the <strong>tender</strong>, at the rates hereinafter provided for<br />

such work.<br />

Clause 12.If the specification or estimate of the work provides for the use of any special<br />

description of materials to be supplied from the M.I.D.C. store or if it is required that the contractor<br />

shall use certain stores to be provided by the Engineer-in-charge (such material and stores, and<br />

the prices to be charged therefor as hereinafter mentioned being so far as practicable for the<br />

convenience of the contractor but not so as in any way to control the meaning or effect of this<br />

contract specified in the schedule or memorandum here to annexed) the contractor shall be<br />

supplied with such materials and stores as may be required from time to time to be used by him<br />

for purposes of the contract only, and the value of the full quantity of materials and stores so<br />

supplied shall be set off or deducted from any sums then due, or thereafter to become due to the<br />

contractor under the contract, or otherwise, or from the security deposit, or the proceeds of sale<br />

thereof; if the deposit is held in Government securities, the same or a sufficient portion thereof<br />

shall in that case be sold for the purpose. All materials supplied to the contractor shall remain the<br />

absolute property of M.I.D.C. at, and shall on no account be removed from the site of the work,<br />

and shall at all times be open to inspection by the Engineer-in-charge. Any such materials unused<br />

and in perfectly good condition at the time of completion or determination of the contract shall be<br />

returned to the Public Works Department store, if the Engineer-in-charge so requires by a notice<br />

in writting given under his hand; but the contractor shall not be entitled to return any such material<br />

except with such consent and shall have no claim for compensation on account of any such<br />

material supplied to him as aforesaid but remaining unused by him or for any wastage in or<br />

damage thereto.<br />

Clause 13. The contractor shall execute the whole and every part of the work in the most<br />

substantial and work manlike manne, and both as regards materials and in every other aspect in<br />

strict accordance with the specifications. The contractor shall also con<strong>form</strong> exactly fully and<br />

faithfully to the designs, drawings, and instructions in writing relating to the work signed by the<br />

Engineer-in-charge and lodged in his office and to which the contractor shall be entitled to have<br />

access for the purpose of inspection at such office, or on the site of the work during office hours,<br />

and the contractor shall, if he so requires, be entitled at his own<br />

Contractor<br />

- 37 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

expense to make or cause to be made copies of the specifications, and of all such designs,<br />

drawings, as instructions and aforesaid.<br />

Clause 14. - The Engineer-in-charge shall have power to make any alterations in, or<br />

additions to, the original specifications, drawings, designs, and instructions, that may appear<br />

to him to be necessary or advisable during the process of the work, and the contractor shall<br />

be bound to carry out the work in accordance with any instructions in this connections which<br />

may be given to him in witting signed by the Engineer-in-charge and such alteration shall not<br />

invalidate the contract; and any additional work which the contractor may be directed to do in<br />

the manner above specified as part of the work shall be carried out by the contractor on the<br />

same conditions in all respects on which he agreed to do the main work, and at the same<br />

rates as are specified in the <strong>tender</strong> for the main work. And if the additional and altered work<br />

includes any class of work for which no rate is specified in this contract, then such class of<br />

work shall be carried out at the rates entered in the Schedule of Rates of the Division or at<br />

the rates mutually agreed upon between the Engineer-in-charge and the contractor,<br />

whichever are lower. If the additional or altered work, for which no rate is entered in the<br />

Schedule of Rates of the Division, is ordered to be carried out before-the rates are agreed<br />

upon then the contractor .shall, within seven days of the date of receipt by him of the order<br />

to carry out the work, in<strong>form</strong> the Engineer-in-charge of the rates of which it is his intention to<br />

charge for such class of work, and if the engineer-in-charge does not agree to this rate he<br />

shall by notice in writing be at liberty to cancel his order to carry out such class of work, and<br />

arrange to carry it out in such a manner as he may consider advisable, provided always that<br />

if the contractor shall commence work or incur any expenditure in regard thereto before the<br />

rates shall have been determined as lastly hereinbefore mentioned, then in such case he<br />

shall only be entitled to be paid in respect of the work carried out or expenditure incurred by<br />

him prior to the date of<br />

the determination of the rate as aforesaid according to such rate or as shall be fixed by the<br />

Engineer-in-charge. In the event of a dispute, the decision of the Superintending Engineer of<br />

the Circle will be final. Where, however, the work is to be executed according to the designs,<br />

drawing and specifications recommended by the contractor and accepted by the competent<br />

authority the alterations above referred to shall be within the scope of such design, drawings<br />

and specifications appended to the <strong>tender</strong>. The time limit for the completion of the work shall<br />

be extended in the proportion that the increase in its cost occasioned by alteration or<br />

additions bear to the cost of the original contract work, and the certificate of the Engineer-incharge<br />

as to such proportion shall be conclusive.<br />

Clause 15. - If at any time after the execution of the contract the Engineer shall for any<br />

reason whatsoever (other than default on the part of the contractor for which the<br />

Government is entitled to rescind the contract) desire that the whole or any part of the work<br />

specified in the <strong>tender</strong> should be suspended for any period or that the whole or part of the<br />

work should not be carried out at all shall give to the contractor a notice writing of such<br />

desire and upon the receipt of which notice the contractor shall for with suspend or stop the<br />

work wholly or in part as required after having due regard of the appropriate stage at which<br />

the work should be stopped or suspended so as not no cause any damage or injury to the<br />

work already done or endanger the safet there of provided that the decision of the engineer<br />

as to the stage at which the work or any part of it could be or could have been safely<br />

stopped or suspended shall be final and conclusive against the contractor. The contractor<br />

shall have no claim to any payment of compensation whatsoever by reason of or in<br />

persuance of any notice aforesaid on account of any suspension stoppage or curtailment<br />

except to the extent specified hereinafter.<br />

2. Where the total suspension of work ordered as aforesaid continued for a contineous<br />

period exceeding 90 days the contractor shall be at liberty to withdrew from the contractural<br />

obligations under the contract so far as it pertains to the unexecuted part of the work by<br />

giving<br />

a 10 days prior notice in writing to the Engineer within 30 days of the expiry of the said<br />

period<br />

of 90 day of such intention and required the Engineer to record the final such notice the<br />

contractor shall be deemed to pay the final bill. Upon giving such notice the contractor shall<br />

be deemed to have been discharged from his obligation to complete the remaining<br />

unexecuted work under this contract. On receipt of such notice, the Engineer shall proceed<br />

to complete<br />

the measurement and make such payment as may be finally due to the contractor within a<br />

period of 90 days from the receipt of such notice in respect of the work already done by the<br />

contractor. Such payment shall not in any manner prejudice the right of the contractor to any<br />

further compensation under the remaining provisions of this clause.<br />

3. Where the Engineer required the contractor to suspend the work for a period in<br />

excess of 30 days at any time of 60 (Sixty) days in the aggregate, the contractor shall be<br />

Alterations in<br />

specifications and<br />

designs not to<br />

indicate contracts.<br />

Rates for works<br />

not entered in<br />

estimate or<br />

schedule of rates<br />

of the district.<br />

Extensions of time<br />

in consequence of<br />

additions or<br />

alterations<br />

Contractor<br />

- 38 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

No claim to<br />

compensation<br />

on<br />

account of loss<br />

due to dulay in<br />

supply of<br />

materials by<br />

Government<br />

Time limit for<br />

unforeseen<br />

claims.<br />

Action and<br />

compensation<br />

payable in case<br />

of bad work.<br />

entitled to apply to the Engineer within 30 days of the resumption of work after such<br />

suspension<br />

for payment of the compensation the extent of porcuniayyloss suffered by him in respect of<br />

working machinery rendered idle on the site or on account of this having had to pay the salary<br />

or wages of labour engaged by him during the said period of suspension provided to any claim<br />

in respect of any such working machinery salary or wages for the first 30 days whether<br />

consecutive or in the aggregate of such suspension or in unsatisfactory work or any other<br />

default on his oart. the conslusive against the contractor.<br />

4. In the event of ........<br />

i) Any total stoppage of work on notice from the Engineer under sub-clause (1) in that behalf:<br />

ii) Withdrawal by the contractor from the contractual obligations to complete the remaining<br />

unexecuted work under sub clause (2) on account of continued suspension of work for a<br />

period exceeding 90 days.<br />

iii) Curtailment in the quantity of items originally <strong>tender</strong>ed on account of any alteration,<br />

omission or substitutions in the specifications, drawings designs as or instructions under<br />

clause 14.<br />

5. Where such curtailment exceeds 25% in quantity and the value of the quantity curtailed<br />

beyond 25% at the rates for the item specified in the <strong>tender</strong> is more than Rs. 5,000.00. It shall<br />

be open to the contractor, within 90 days from the service of (i) the notice of stoppage of work<br />

or (ii) other notice of with drawal from the contractual obligations under the contract on<br />

account of the continued suspension of work of (iii) notice under clause 14(i) resulting in such<br />

curtailment to produce to the Engineer satisfactory evidence of that he had purchased or<br />

agreed to purchase material for use in the contracted work before receipt by him of the notice<br />

or stoppage suspension or curtailment and required the Government to take over on payment<br />

such material at the rates determined by the Engineer. The Government shall therefore take<br />

over the excess of the requirements of the unexecuted works as specified in the accepted<br />

<strong>tender</strong> at and are of quality and specifications approved by the Engineer. That any work this<br />

will be the same percentage as that in the <strong>tender</strong> at (e).<br />

Clause 15-A. - The contractor shall not be entitled to claim any compensation from<br />

Government for the loss suffered by him on account of delay by M. I. D. C. in the supply of<br />

materials entered in Schedule A where such delay is caused by –<br />

(i) Difficulties relating to the supply of railway waggons.<br />

(ii) Force majeure.<br />

(iii) Act of God.<br />

(iv) Act of enemies of the State or any other reasonable cause beyond the control of<br />

Government.<br />

In the case of such delay in the supply of materials Government shall grant such extension of<br />

time for the completion of the works as shall appear to Executive Engineer to be reasonable in<br />

accordance with the circumstances of the case. The decision of the Executive Engineer as to<br />

be extension of the time shall be accepted as final by the contractor.<br />

Clause 16. - Under no circumstances whatever shall the contractor be entitled to any<br />

compensation from Government on any account unless the contractor shall have submitted a<br />

claim in writing to the Engineer-in-charge within one month of the cause of such claim<br />

occurring.<br />

Clause 17. - If any time before the security deposit or any part therefore is refunded to the<br />

contractor it shall appear to the Engineer-in-charge or his subordinate in charge of the work<br />

executed with unsound, imperfect or unskillful workmanship with materials of inferior quality,<br />

or that any materials or article provided by him for the execution of the work unsound or of a<br />

quality inferior to that contracted for, are otherwise not in accordance with the contract, it shall<br />

be lawful for the Engineer-in-charge to intimate this fact in writting to the contractor and then<br />

not withstanding the fact that the work, materials or articles complained of may have been in<br />

advertantly passed, certified and paid for, the contractor shall be bound forthwith to rectify or<br />

remove and reconstruct the work so specified in whole or in part, as the case may required or<br />

if so required, shall remove the material or article so specified and provided other proper and<br />

suitable materials or articles at his own charge and in the event of his failing to do so within a<br />

period to be specified by the Engineer-in-charge in the written intimation aforesaid the<br />

contractor shall be liable to pay compensation at the rate of one percent on the estimate for<br />

every day not exceeding 10 days, during which the failure so continues and in the case of any<br />

such failure the Engineer-in-charg may rectify or remove and re-execute the work or remove<br />

and replace the materials or articles complained of as the case may be at the risk and<br />

expense in all respects of the contractor. Should the Engineer-in-charge consider<br />

Contractor<br />

- 39 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

that any interior work of materials as described above may be accepted or made use it shall be<br />

within his discretion to accept the same at such reduced rates as he may fix therefore.<br />

Clause 17-A - *The contractor shall maintain and keep in proper condition and repair at his<br />

cost the surface of the road for years from the date from which the final finishing coat is laid to<br />

the satisfaction of the Executive Engineer. The decision of the Executive Engineer as to the<br />

necessity of the repairs to the surface of the road shall be final and binding on the contractor. If<br />

the contractor fails to maintain and keep in proper condition and repair the surface of the road<br />

during the stipulated period of years. the Executive Engineer shall be entitled to carry out the<br />

necessary repairs departmentally at the cost of the contractor. The decision of the Executive<br />

Engineer as to the amount of expenses incurred in carrying out the repairs shall be final and<br />

binding on the contractor. The Executive Engineer shall be entitled to appropriate the whole or<br />

any part of the amount of the security deposit toward the expenses, if any, incurred by him in<br />

repairing the surface.<br />

Clause 18A. - All works under or in course of execution or executed in pursuance of the<br />

contract shall at all times be open to inspection and supervision of the Engineer-in-charge and<br />

his subordinates, and the contractor shall at all times during the usual working hours, and at all<br />

other times at which reasonable notice of the intention of the Engineer-in-charge or his<br />

subordinates to visit the work shall have been given to the contractor, either himself be present<br />

to receive orders and instructions, or have a responsible agent duly authorised in writing<br />

present for that purpose. Orders given to the contractor's duly authorised agent shall be<br />

considered to have the same force and effect as if they had been given to the contractor<br />

himself.<br />

Clause 19. - The contractor shall give not less five days' notice in writing to the Engineerincharge<br />

or his subordinate in charge of the work before covering up or otherwise placing<br />

beyond the reach of measurement any work in order that the same may be measured, and<br />

correct dimension thereof taken before the same is so covered up or placed beyond the reach<br />

of measurement, and shall not cover up or place beyond the reach of measurement any work<br />

without the consent in writing of the Engineer-in-charge or his subordinate in charge of the<br />

work: and if any work shall be covered up or placed beyond the reach of measurement without<br />

such notice having been given or consent obtained, the same shall be uncovered at the<br />

contractor's expense, and in default thereof no payment or allowance shall be made for such<br />

work or for the materials with which the same was executed.<br />

Clause 20. - If during the period of - months from the date of completion as certified by the<br />

Engineer-in-charg persuant to clause-7 of the contract of - months after commissioning the<br />

work, whichever is earlier in the opinion of the Executive engineer, the said work is defective in<br />

receipt of notice in that behalf from the Executive Engineer, duly commence execution and<br />

completely carry out at his cost in every respect all the work that may be necessary for<br />

specifying and setting right the defect specified therein including dismantling and<br />

reconstruction of unsafe portions strictly in accordance with and in the manner prescribed<br />

under the supervision of the Executive Engineer. In the event of the contractor failing or<br />

neglecting to commence execution of the said rectification work within the period prescribed<br />

therefore, in the said notice and/or to complete the same as aforesaid as required by the said<br />

notice, the Executive Engineer get the same executed and carried out departmentally or by<br />

:any other agency at this risk on account and at the cost of the contractor. The contractor shall<br />

'forthwith on demand pay to the MIDC the amount of such costs, charges and expenses<br />

sustained or incurred by MIDC of which the certificate of the Executive Engineer shall be final<br />

'and binding on the contractor, such costs, charges, expenses shall be deemed to be arrears<br />

of land revenue and in the event of the contractor failing or neglecting to pay the same on<br />

demand as aforesaid without prejudice to any other rights and remedies of the MIDC, the same<br />

may be recovered from the contractor as arrears of land revenue. The MIDC shall also entitled<br />

to deduct the same from any amount which may then be payable or which may thereafter<br />

become payable by the MIDC to the contractor either in respect of the said work or any other<br />

work whatsoever or from the amount of security deposit retained by MIDC.<br />

Clause 21. - The contractor shall supply at his own cost all materials (except such special<br />

.materials, if any, as may be supplied from the M. 1. D. C. in accordance with the contract,<br />

plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding, and any temporary<br />

works which may be required for the proper execution of the work, in the original, altered or<br />

substituted <strong>form</strong>, and whether included in the specification, or other documents <strong>form</strong>ing part<br />

* This will apply to a contract where the works are to be executed by the contractor according<br />

to the specifications recommended by him.<br />

Works to be open<br />

to inspection<br />

Contractor or<br />

responsible agent<br />

to be present.<br />

Notice to be given<br />

before work is<br />

covered up.<br />

Contractor liable<br />

for damage done,<br />

and for<br />

imperfections for<br />

three months after<br />

certificate.<br />

Contractor to<br />

supply plant,<br />

ladders,<br />

scaffoldings etc.<br />

Contractor<br />

- 40 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

And is liable<br />

for damages<br />

arising from<br />

nonprovision<br />

of<br />

lights<br />

fencing etc.<br />

of the contract or referred to in these conditions or not and which may be necessary for the purpose<br />

satisfying or complying with the requirements of the Engineer-in-charge as to any matter on which<br />

under these conditions he is entitled to be satisfied, or which he is entitled to require together with<br />

carriage there for, to and from the work. The contractor shall also supply without charge the requisite<br />

number of persons with the means and materials necessary for the purpose of setting out works,<br />

and counting, weighing and assisting in the measurement or examination at any time and from time<br />

to time of the work or materials. Failing this the same may be provided by the Engineer-in-charge at<br />

the expenses of the contractor and expenses may be deducted from any money due to the<br />

contractor under the contract or from his security deposit or the proceeds of the sale thereof, or of a<br />

sufficient portion thereof. The contractor shall provide all necessary fencing and lights required to<br />

protect the public from accident, and shall also be bound to bear the expenses of defense of every<br />

suit. action or other legal proceedings, at law, that may be brought by any person for injury sustained<br />

owing to neglect of the above precautions, and to pay any damage and costs which may be awarded<br />

in any such suit, action or proceeding to any such person, or which may with the consent of the<br />

contractor be paid in compromising any claim by any such person.<br />

Clause 21 A. - The contractor shall provide suitable scaffolds and working plat<strong>form</strong>s, gangways and<br />

stairways, and shall comply with the following regulations in connection therewith :-<br />

(a) Suitable scaffolds shall be provided for workmen for all work that cannot be safely done from a<br />

ladder or by other means.<br />

(b) A scafold shall not be constructed, taken down, or substantially altered, except<br />

(i) under the supervision of a competent and responsible person; and<br />

(ii) as far as possible by competent workers possessing adequate experience in this<br />

kind of work.<br />

(c) All scaffolds and appliances connected therewith and all ladders shall<br />

(i) be of sound materials;<br />

(ii) be of adequate strength having regards to the loads and stains to which they will<br />

be subjected; and<br />

(iii) be maintained in proper condition.<br />

(d) Scaffolds shall be so constructed that no part thereof can be deplaced in consequence<br />

of normal use.<br />

(e) Scafolds shall be overloaded and so far a practicable the load shall be evenly<br />

distributed.<br />

(f) Before installing lifting gear on scaffolds special precautions shall be taken to ensure<br />

the strength and stability of the scaffolds.<br />

(g) Scaffolds shall be periodically inspected by a competent person.<br />

(h) Before allowing a scaffold to be used by his workmen the contractor shall, whether the scaffold<br />

has been erected by his workmen or not, take steps to ensure that it complies fully with the<br />

regulations herein specified.<br />

(i) working plat<strong>form</strong>s, gangways & stairways shall be so constructed that no part<br />

thereof can sag unduly or unequally.<br />

(ii) be so constructed and maintained, having regard to the prevailing conditions as<br />

to reduce as far as practicable risks of persons tripping or slipping; and<br />

(iii) be kept free from any unnecessary obstructions<br />

(j) In the case of working plat<strong>form</strong>s, gangways, working places and stairways at a height<br />

exceeding.............................................. (To be specified)<br />

(i) every working plat<strong>form</strong> and every gangway shall be, closely boarded unless other<br />

adequate measures are taken to ensure safety;<br />

(ii) every working plat<strong>form</strong> and gangway shall have adequate width; and<br />

(iii) every working plat<strong>form</strong>, gangway, working place and stairway shall be suitably fenced.<br />

(k) Every opening in the floor of a building or in a working plat<strong>form</strong> shall, except for the time and to<br />

the extent required to allow the access of persons or the transport or shifting or material, be<br />

provided with suitable means to prevent the fall of persons or materials.<br />

(l) When persons are employed on a roof where there is a danger of falling from a height<br />

exceeding................................. suitable precautions shall be taken to prevent<br />

(To be prescribed) the fall of persons or material.<br />

(m)Suitable precautions shall be taken to prevent persons being struck by articles which<br />

might fall from scaffolds or other working places.<br />

Contractor<br />

- 41 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

(n) Safe means of access shall be provided to all working plat<strong>form</strong>s and other working places.<br />

Clause 21 B. - The contractor shall comply with the following regulations as regards the Hoisting<br />

Appliances to be used by him :-<br />

(a)Hoisting machines and tackle, including there attachments, anchorages and supports shall :-<br />

(i) be of good mechanical construction, sound material and adequate strength and<br />

free from patent defect and<br />

(ii) be kept in good repair and in good working order.<br />

(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable<br />

quality and adequate strength and free from patent defect.<br />

(c) Hoisting machines and tackle shall be examined and adequately tested after erection on the site<br />

and<br />

before use and be re-examined in position at intervals to be prescribed by the Government.<br />

(d) Every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering<br />

materials or as a means, of suspension shall be periodically examined.<br />

(e) Every crane driver or hoisting appliances operator shall be properly qualified. No person<br />

who is below the age of years shall be in control of any hoisting machine, including any<br />

scaffold which, or give signals to the operator.<br />

(f) In the case of every hoisting machine and of every chain, ring, hook, shackle, swivel<br />

and puly block used in hoisting or lowering or as a means of suspension the safe working<br />

load shall be ascertained by adequate means.<br />

(h) Every hoisting machine and all gear referred to in the proceeding regulation shall be<br />

plainly marked with the safe working load.<br />

(i) In case of the hoisting machine having a variable safe working load each safe working<br />

load and the conditions under which it is applicable shall be clearly indicated.<br />

(j) No part of any hoisting machine or of any gear referred to in regulation 7 above shall<br />

be loaded beyond the safe working load except for the purpose of testing.<br />

(k) Motors, gearing, transmissions, electric wiring and other dangerous parts of hoisting<br />

appliance hall be provided with efficient safeguards.<br />

(l) Hoisting appliances shall be provided with such means as will reduce to a minimum<br />

the risk of the accidental descent of the load.<br />

(m) Adequate precautions shall be taken to reduce to a minimum the risk of any part of a<br />

suspended load becoming accidentally displaced.<br />

Clause 22. - The contractor shall not set fire to any standing jungle, trees, brushwood or grass without<br />

a written permit from the Executive Engineer. When such permit is given, and also in all cases when<br />

destroying cut or dug up trees, brushwood, grass, etc., by fire, the contractor shall take necessary<br />

measures to prevent such fire spreading to or otherwise damaging surrounding property. The<br />

contractor shall make his own arrangements for drinking water for the labour employed by him.<br />

Clause 23-Compensation for all damage done intentionally or unintentionally by contractor's laborers<br />

whether in or beyond the limits of Government property including any damage caused by the<br />

spreading of fire mentioned in clause 22 shall be estimated by the Engineer-in-charge or such other<br />

officer as he may appoint and estimates of the Engineer-in- charge subject to the decision of<br />

Superintending Engineer on appeal shall be final and the contractor shall be bound to pay the amount<br />

of assessed compensation on demand failing which the same will be recovered from the contractor as<br />

damages in the manner prescribed in clause 1 or deducted by the Engineer-in-charge from any sums<br />

that may be due to or become due from Government to the contractor under this contract or<br />

otherwise. The contractor shall bear the expenses of defending any action or other legal proceedings<br />

that may be brought by any person for injury sustained by him owing to neglect of precautions to<br />

prevent the spread of fire and he also pay any damage and cost that may be awarded by the court in<br />

consequence.<br />

Clause 24. - The employment of female laborers on works in the neighborhood of soldiers' barracks<br />

should be avoided as far as possible.<br />

Clause 25. - No work shall be done on a Sunday without the sanction in writing of the Engineer-incharge.<br />

Clause 26. - The contract shall not be assigned or sublet without the written approval of the Engineerin-charge.<br />

And if the contractor shall assign or sublet his contract, or attempt so to do, or become<br />

insolvent or commence an proceedings to be adjudicated an insolvent<br />

Measure for<br />

prevention<br />

of fire<br />

Liability of<br />

contractors<br />

for any damage<br />

done<br />

in or outside<br />

work area<br />

Employment of<br />

female labour.<br />

Work on<br />

Sundays<br />

Work not to be<br />

sublet<br />

Contractor<br />

- 42 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Contract may be<br />

rescinded and<br />

security deposit<br />

forfeited for<br />

subletting is without<br />

approval or for<br />

bribing a public office<br />

or if contractor<br />

becomes insolvent<br />

Sum payable by way<br />

of compensation to<br />

be considered as<br />

reasonable<br />

compensation<br />

without reference to<br />

actual toss<br />

Changes in the<br />

constitution of firm to<br />

be notified.<br />

Works to be under<br />

direction of<br />

superintending<br />

Engineer<br />

Decision of<br />

superintending<br />

Engineer<br />

to be final.<br />

Stores of European<br />

or American<br />

manufacture<br />

to be obtained from<br />

Government.<br />

Lump sums in<br />

estimates<br />

Action where no<br />

specification.<br />

Definition of work.<br />

or make any composition with his creditors, or attempt so to do, the Engineer-in-charge may by<br />

notice in writing rescind the contract. Also if any bribe, gratuity, gift loan, perquisite, reward or<br />

advantage, pecuniary or otherwise, shall either directly or indirectly be given, promised or<br />

offered by the contractor, or any of his servants or agents or any public officer or person in the<br />

employ of M.I.D.C. to in any way relating to his office or employment, or if any such office or<br />

person shall become in anyway directly or indirectly interested in the contract, the Engineer-incharge<br />

may by notice in writing rescind the contract. In the event of a contract being rescinded,<br />

the security deposit of the contractor shall thereupon stand forfeited and be absolutely at the<br />

disposal of Government, and the same consequences shall ensue as if the contract had been<br />

rescinded under clause 3 hereof and in addition the contractor shall no be entitled to recover or<br />

be paid for any work theretofore actually per<strong>form</strong>ed under the contract.<br />

Clause 27. - All sums payable by a contractor by way of compensation under any of these<br />

conditions shall be considered as a reasonable compensation to be applied to the use of<br />

Government without reference to the actual loss or damage sustained, and whether an)<br />

damage has or not been sustained.<br />

Clause 28. - In the case of a <strong>tender</strong> by partners any change in the constitution of a firm shall<br />

be forthwith notified by the contractor to the Engineer-in-charge for his in<strong>form</strong>ation.<br />

Clause 29. - All works to be executed under the contract shall be executed under the<br />

direction and subject to the approval in all respects of the Superintending Engineer of the<br />

Circle for the time being who shall be entitled to direct at what point or points and in what<br />

manner they are to be commenced, and from time to time carried on.<br />

Clause 30. - Except where otherwise specified in the contract and subject to the powers<br />

delegated to him by M.I.D.C. under the Code rules then in force, the decision of the<br />

Superintending Engineer of the Circle for the time being shall be final, conclusive, and binding<br />

on all parties to the contract upon all questions relating to the meaning of the specifications,<br />

designs, drawings, and instructions hereinbefore mentioned and as to the quality of<br />

workmanship or material used on the work, or as to any other question, claim, right, matter, or<br />

thing whatsoever, in anyway arising out of, relating to the contract, designs, drawings,<br />

specifications, estimates, instructions, orders, or these conditions, or otherwise concerning the<br />

works, or the execution or failure to execute the same. whether arising, during the progress of<br />

the work, or after the completion or abandonment thereof.<br />

Clause 31. - The contractor shall obtain from the M.I.D.C. stores and articles of European<br />

or American manufactures which may be required for the work or an part of the work or in<br />

making up any articles required, there for or in connection therewith unless he has obtained<br />

permission in writting from the Engineer-in-charge to obtain such stores and articles elsewhere.<br />

The values of such stores and articles as may be supplied to the contractor by the Engineer-incharge<br />

will be debited to the contractor in his account at the rates shown in the schedule in<br />

Form A attached to the contract, and if they are not entered in the said schedule they shall be<br />

debited to him at cost price which for the purpose of this contract shall include the cost of<br />

carriage and all other expenses whatsoever, which may have to be incurred in obtaining<br />

delivery of the same as the stores aforesaid.<br />

Clause 32. - When the estimate on which a <strong>tender</strong> is made includes lump sums in respect<br />

of parts of the works, the contractor shall be entitled to payment in respect of the items of work<br />

involved or the part of the work in question at the same rates as are payable under this<br />

contract for such items, or if the part of the work in question is not in the opinion of the<br />

Engineer-in-charge capable of measurement, the Engineer-in-charge may at his discretion pay<br />

the lump sum amount entered in the estimate and the certificate in writing of the Engineer-incharge<br />

shall be final and conclusive against the contractor with regard to any sum or sums<br />

payable to him under the provisions of this clause. *<br />

Clause 33. - In the case of any class of work for which there is no such specification as<br />

is mentioned in Rule I such work shall be carried out in accordance with the Divisional<br />

specifications and in the event of there being no Divisional specification there in such case<br />

the work shall be carried out in all respects in accordance with the instructions and<br />

requirements of the Engineer-in-charge.<br />

Clause 34. - The expression "works" or "work" where used in these conditions shall unless<br />

there be something in the subject or context repugnant to such construction be construed to<br />

mean the work or the works contracted to be executed under or in virtue of the contract,<br />

whether temporary or permanent and whether original, altered, substituted or additional.<br />

Contractor<br />

- 43 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Clause 35. - All quarry fees, royalties, octroi dues and ground rent for stracking material, if<br />

any, should be paid by the contractor, who will however, be entitled to a refund of such of<br />

the charges as are permissible under the rule on obtaining a certificate from the Engineer-inchage<br />

that the materials were required for use on M.I.D.C. work.<br />

Clause 36. - The contractor shall be responsible for and shall pay any compensation to his<br />

workmen payable under the Workmen's Compensation Act, 1923 (VIII of 1923), (hereinafter<br />

called the said Act) for injuries caused to the workmen. If such compensation is paid by<br />

Government as principal under sub-section (1) of section 12 of the said Action behalf of the<br />

contractor it shall be recoverable by Government from the contractor under sub-section (2)of<br />

the said section. Such compensation shall be recovered in the manner laid down in Clause<br />

1 above.<br />

Clause 36 A. - The contractor shall be responsible for and shall pay the expenses of<br />

providing medical aid to any workman who may suffer a bodily injury as a result of an<br />

accident. If such expenses are incurred by MIDC the same shall be recoverable from the<br />

contractor forthwith and be deducted without prejudice to any other remedy of Govt. from<br />

any amount due or that may become due to the contractor.<br />

* Clause 36 B -The contractor shall provide all necessary safety equipment and first aid<br />

apparatus available for the use of the persons employed on the site, shall maintain the<br />

same condition suitable for immediate use at any time and shall comply with the following<br />

regulations in connection therewith :<br />

(a) The worker shall be required to use the equipment so provided by the contractor and<br />

the contractor shall take adequate steps to ensure proper use of the equipment by<br />

those concerned.<br />

(b) When work is carried on in proximity to any place where there is no risk of drowning,<br />

alt necessary equipment shall be provided and kept ready for use and all necessary<br />

steps shall be taken for the prompt rescue of any person in danger.<br />

(c) Adequate provision shall be made for prompt first-aid treatment of all injuries likely to<br />

be sustained during the course of the work.<br />

Clause 37. - 1. Quantities to respect of the several items shown in the <strong>tender</strong> are<br />

approximated and no revision in the <strong>tender</strong>ed rate shall be permitted in respect of any of the<br />

items so long as subject to special provision contained in the specifications prescribing<br />

differences percentage of permissible variation. The quantity of the items does not exceed<br />

the <strong>tender</strong> quantity by more than 25% and so long as the value of the excess Quantity<br />

beyond this limit at the rate of the item specified in the <strong>tender</strong> is not more than Rs. 5000.00.<br />

2. The contractor shall if ordered in writing by the Engineer so to do carry out any quantities<br />

in excess of the limit mentioned above in this clause, on the same conditions as and in<br />

accordance with the specifications in the <strong>tender</strong> and at the rate derived from the rates<br />

entered in the current schedule of rates and in absence of such rates at the rates prevailing<br />

in the market, which may be increased or decreased as this case may be by the percentage<br />

which the total <strong>tender</strong>ed amount bears to the estimated cost of the total work as put to<br />

<strong>tender</strong>.<br />

3. Claims arising out of reduction in the <strong>tender</strong>ed quantity of any item beyond 25% will be<br />

governed by the provision of clause 15 only when the amount of such reduction beyond 25%<br />

at the rate of the item specified in the <strong>tender</strong> is more than Rs. 5000.00 In view of the<br />

rationalisation of the revision of clause-37 of B-2 it is necessary to prescribed the manner in<br />

which the claims arising out of reduction in the <strong>tender</strong>ed quantity of any item under 15 of the<br />

<strong>tender</strong> <strong>form</strong> should be dealt with.<br />

* Clause 38. - The contractor shall employ any famine, convict or other labour of a particular<br />

kind or class if ordered in writing to do so by the Engineer-in-charge.<br />

Clause 39. - No compensation shall be allowed for any delay caused in the starting of the<br />

work on account of any acquisition of land and in the case of clearance works, for any delay<br />

in according sanction to estimates.<br />

Clause 40. - No compensation shall be allowed for any delay in execution of the work on<br />

account of water standing in borrow pits or compartment. The rates are inclusive for hard or<br />

cracked soil, excavation in mud, sub-soil water or water standing in borrow pits and no claim<br />

for an extra rate shall be entertained, unless otherwise expressly specified.<br />

Clause 41. - The contractor shall not enter upon or commence any portion of work except<br />

with the written authority and instructions of the Engineer-in-charge or of his subordinate incharge<br />

of the work. Failing such authority the contractor shall have no claim to ask for<br />

measurements of or payment for work.<br />

Clause 42. - (i) No contractor shall employ any person who is under the age of 12 years.<br />

(ii) No contractor shall employ donkeys or other animals with breeching of string or thin<br />

Refund of quarry<br />

fees,<br />

and royalties.<br />

Compensation under<br />

Workmen's<br />

Compensation Act.<br />

Claim for quantities<br />

of work entered in<br />

the <strong>tender</strong> or<br />

estimate.<br />

Employment of<br />

famine or other<br />

labour.<br />

Claim for<br />

compensation for<br />

delay<br />

in starting the work.<br />

Claim for compensation<br />

for delay in the<br />

execution<br />

of work. Entering upon<br />

or commencing an<br />

portion of work.<br />

Minimum age of person<br />

employed, the<br />

employed,<br />

the employment of<br />

donkeys and/or other<br />

animals, and the<br />

payment<br />

of fair wages.<br />

Contractor<br />

- 44 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Method of<br />

payment<br />

Acceptanc<br />

e of<br />

condition<br />

compulsor<br />

y before<br />

<strong>tender</strong>ing<br />

of work.<br />

Employment<br />

of<br />

scarcity<br />

Labour.<br />

rope. The breeching must be at least three inches wide and should be of tape (Nawar).<br />

(iii) No animal suffering from sores, lameness or emaciation or which is immature shall<br />

be employed on the work.<br />

(iv) The Engineer-in-charge or his Agent is authorised to remove from the work any person or animal<br />

found working which does not satisfy these conditions and no responsibility shall be accepted by M.I.D.C.<br />

for any delayed caused in the completion of the work by such removal.<br />

(v) The contractor shall pay fair and reasonable wages to the workmen employed by him in the contract<br />

undertaken by him. In the event of any dispute arising between the contractor and his workmen on<br />

grounds that the wages paid are not fair and reasonable the dispute shall be referred without delay to the<br />

Executive Engineer, who shall decide the same. The Decision of the Executive Engineer shall be<br />

conclusive and binding on the contractor, but such decision shall not in any way affect the condition in the<br />

contract regarding the payment to be made by M.I.D.C. at the sanctioned <strong>tender</strong> rates. '<br />

(vi) The contractor shall provide drinking water facilities to the workers. Similar amenities shall be<br />

provided to the workers engaged on large work in urban areas.<br />

Clause 43. - Payment to contractor shall be made by cheques drawn on any treasury within the Division<br />

convenient to them, provided the amount exceeds Rs. 10. Amounts not exceeding Rs. 10 will be paid in<br />

cash.<br />

Clause 44. - Any contractor who does not accept these conditions shall not be allowed to <strong>tender</strong> for work.<br />

Clause 45. - If M.I.D.C. declares a state of scarcity or famine to exist in any village situated within 10<br />

miles of the work. the piece worker / contractor shall employ upon such parts of the work, as are suitable<br />

for unskilled labour, any person certified to him by the Executive Engineer or by any person to whom the<br />

Executive Engineer may have delegated this duty in writing, to be in need, of relief and shall be bound to<br />

pay to such persons wages not below minium which M.I.D.C. may have fixed in this behalf. Any dispute<br />

which may arise in connection with implementation of this clause shall be decided by the Executive<br />

Engineer whose decision shall be final and binding on the piece worker / contractor.<br />

Clause 46. - The price quoted by the contractor shall not in any case exceed the control<br />

price if any fixed by Government or reasonable price which it is permissible for him to charge a private<br />

purchase for the same class and description of goods under the provisions of Hoarding or Profiteering<br />

Prevention Ordinance 1948 as amended from time to time. If the price quoted exceeds the controlling<br />

price or the price permissible under Hoarding and Profiteering Prevention Ordinance the contractor will<br />

specifically mention this fact in his <strong>tender</strong> along with the reasons for quoting such higher price. The<br />

purchaser at his discretion will in such case exercise the right of revising the price at any stage so as to<br />

confirm with the controlled price on the permissible under the Hoarding and Profiteering Prevention<br />

Ordinance. This discretion will be exercise without prejudice to any other action that may be taken against<br />

the contractor.<br />

Clause 47. - The rates to be quoted by the contractor must be inclusive of sales tax No.extra payment on<br />

this account will be made to the contractor.<br />

Clause 48. - The contractor should as far as possible obtain his requirement of labour skilled and<br />

unskilled from the nearest Employment Exchange.<br />

Clause 49. - The provision regarding contractor's labours in the contract labour (Regulation and abolition)<br />

Act, 1970 with the <strong>Maharashtra</strong> contract labour (Regulation and Addition) Rules-1971 shall be binding on<br />

the contractors. If the provision in the said act contradicts with any of the provision regarding contractor<br />

labour in any of the clause in this <strong>tender</strong>, the provision in the contract labour (Regulation and Abolition)<br />

Act 1970 with the <strong>Maharashtra</strong> Labour (Regulation and Abolition) Rules, 1971 shall prevail.<br />

Clause 50. - The Contractor shall comply with the provisions of the apprentices Act- 1961 and the rule<br />

and the orders issued the <strong>tender</strong> there under from time to time. If he/the~ fail/fails to do so the failure will<br />

be breach of the contract and the superintending Engineer may in the discretion, cancel the contract, the<br />

contractor Shall be liable to appropriate action by him/them of the provision of the act.<br />

Clause 51 Supply of material etc. by the contractors: The contractor are to provide every article with the<br />

exception noted in schedule 'A' attached which may be necessary and requisite for the due and proper<br />

execution of the several work included in contractor according to the indent and measuring or the drawing<br />

and specifications taken together which are to be signed by Executive Engineer, MIDC. (hereinafter called<br />

the Executive Engineer) and by the contractor whether the same may or may not have been particularly<br />

described in the specifications or whom on the drawing provided however that the same are reasonable<br />

and<br />

Contractor<br />

- 45 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

obviously to be in<strong>form</strong>ed there from. In case of any discrepancy between the drawing and the<br />

specification the Executive Engineer shall decide which of the two is to be followed.<br />

Clause 52. - The contractor shall set out the whole of the work as per approved<br />

drawings and details supplied to him and during the progress of the work shall set right as ordered by the<br />

Executive Engineer or his agent any error, which may be found therein and shall provide all necessary<br />

labour plant, labours and material for the purpose. The contractor shall also provide plants, labours and<br />

materials (with the exceptions noted in schedule attached) which may be necessary and requisite for the<br />

works. The materials and workmanship, are to the best of their respective jobs. The contractors shall<br />

have to work in all respects clean and perfect at the completion there off.<br />

Clause 53. - Drawing and specifications : At least six copies of the drawing and specifications submitted<br />

by the contractor and approved signed by the superintending Engineer shall be furnished by the<br />

contractor to the MIDC and copies there of shall be kept on site. Contractor agent who is to be constantly<br />

kept at site by the contractor and to whom the instructions can be given by the Executive Engineer. MIDC<br />

under schedule A of the contract will supply plain M.S. round and/or tor steel depending upon the<br />

availability. As such design based on exclusive use of steel shall not be accepted.<br />

Clause 54. - (Control over works) The Executive Engineer or his duly authorised representative have at<br />

all times access to the works which are to be entirely under his control. He may require the contractor to<br />

dismiss person in the contractor's employment on the work if such person in his opinion is incompetent or<br />

misconducts himself and the contract or shall forthwith comply with every such requirements.<br />

Clause 55. - Materials left at site : All works and materials brought and left upon the site of the work<br />

either by the contractor or the orders for the purpose of <strong>form</strong>ing part of the work are to be considered to<br />

the property of the MIDC and the same shall not be removed or carried away by the contractors or any<br />

other person without the consent in writing of the Executive Engineer but the MI DC shall not in any way<br />

be answerable for any loss or damage which may happen to in respect of any such work or materials on<br />

account of the same being lost or stolen or injured by weather or otherwise.<br />

Clause 56. - Removal and substitution of materials : The Executive Engineer shall have full power for<br />

removal from the premises of the materials which in his opinion are not in accordance with the<br />

specifications and incase of default the Executive Engineer shall be at liberty to employ other persons to<br />

remove the same without being answerable or accountable for any loss or damage that may be caused<br />

to such materials. The Executive Engineer shall also have full power to acquire other proper materials to<br />

be substituted and in case of default the Executive fc*ngineer may cause the same to be supplied and all<br />

cost which he incurred in such removal and substitution shall be borned by the contractor.<br />

Clause 57. - Action in case of improper materials and workmanship: If in the opinion of the Executive<br />

Engineer any work or any part thereof is executed with improper material of defective workmanship, the<br />

contractor shall when required by the Executive Engineer forthwith re-execute the same and substitute<br />

proper materials and workmanship & in case of default by the contractor in so doing within a week from<br />

the dates of the requisition the Executive Engineer shall have full power to employ other persons to reexecute<br />

the work & cost there of shall be borne by contractor.<br />

Clause 58. - Action and compensation payable in case of bad work : If at any time before security deposit<br />

is refunded to the contractor, it shall appear to the Engineer-in-charge or his subordinate in charge of the<br />

work, that any work has been executed with unsound imperfect or unskilled full workmanship for with<br />

material of inferior quality of that any materials or articles provided by him for the execution of the work<br />

unsound, or of a quality inferior to that contract it shall be lawful for the Engineer-in-charge to intimate this<br />

fact in writing to the contractor and than not withstanding the fact that the work material or articles<br />

complained or may have been in advertantly passed, certified and paid for. The contractor shall be bound<br />

to forthwith rectify or remove or reconstruct the work so specified in whole or in part, as the case may<br />

require or if so required, shall remove the materials & articles so specified and provide other proper and<br />

suitable materials at his own charge and cost. In the event of this failing to do so within a period to be<br />

specified by the Engineer-in-charge in written intimation aforesaid the contractor shall be liable to pay<br />

compensation at the rate of 1% on the amount of estimate for every day not exceeding 10 days, during<br />

which the failure so continuous and in that event of any such failures as aforesaid the Engineer-in-charge<br />

may rectify or remove and re-execute the work or remove and replace the materials or articles complained or as the case may<br />

be at the risk & expenses in all respect of the contractor. The Engineer-in-<br />

Contractor<br />

- 46 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

charge consider that any such inferior work or materials as described above will not be<br />

accepted and will be straight way rejected.<br />

Clause 59.- Per<strong>form</strong>ance & guarantee of work of plant completed by the contractor:<br />

The contractor shall make good and repair defects in materials and workmanship &<br />

per<strong>form</strong>ance, etc. revealed in the finished work or the plant completed by him for a<br />

period of 24 months from the date of which final completion certificate is issued by<br />

Engineer-in-charge. The decision of the Engineer-in-charge as to the necessity of<br />

repairs shall be binding on the contractor. If the contractor fails to maintain and keep<br />

in proper condition. The work completed by him or if the-plant erected by him<br />

stipulated period of maintenance or per<strong>form</strong>ance, the Engineer-in-charge shall be<br />

entitled to carry out the necessary repair departmental or enough other agency at the<br />

cost of contractor. The decision of the Engineer-in-charge as to the amount of the<br />

expenses incurred in carrying out the repairs shall be final and binding on the<br />

contractor. The Engineer-in-charge shall be entitled to forfeit the whole or any part of<br />

the security deposit the amount stated elsewhere in these documents for this purpose<br />

towards„ expenses incurred by him in repairing the work completed by the contractor.<br />

Clause 60. - Responsibility of contractor for damage or fire etc. : From the<br />

commencement of the work to the completion of the same work shall be under the<br />

contractor's charge. The contractor shall be held responsible for any damage done to<br />

the same by fire or any other cause and they shall be liable to make good all such<br />

damage and to carry out any repairs which may be rendered necessary to the same<br />

be fire or other causes and they are to hold the MIDC harmless from any claim for<br />

injuries to persons for structural damage, damage to property happening from any<br />

neglect or default for want of proper care or misconduct on the part of the contractor or<br />

any one of their employee during the execution of the work.<br />

Clause 61. - Execution of works included in the contract : The Executive Engineer<br />

shall have full power to send workman on the premises to execute fitting and other<br />

works not included in the contract and for which the contractors shall offer ever<br />

responsible facility during ordinary working hours provided that such operation shall be<br />

carried on in such a manner as not to impede the progress of the work included in the<br />

contract. The contractors shall however be responsible for any damage which may<br />

happen to or be occasioned in the execution of any such fittings or other works.<br />

Contractor<br />

- 47 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

SCHEDULE 'A'<br />

Name of Work :-M&R TO N.R.BUILDING & WATER SUPPLY SCHEME @ NASHIK INDUSTRIAL<br />

AREA… HOUSEKEEPING OF UDYOG BHAVAN BUILDING, CSC BUILDING, OLD FLATTED<br />

FACTORY BUILDING AND STAFF COLONY @ SATPUR.<br />

Scheduled showing (approximately) the material to be issued to the Contractor for works to<br />

be executed on this contract, and the rate at which they are to be charged.<br />

Serial<br />

No.<br />

Particulars Quantity Rates at which<br />

the materials will<br />

be charged to the<br />

contractor with<br />

unit<br />

Place of<br />

delivery<br />

1 2 3 4 5<br />

---------------------------------------- N I L -------------------------<br />

Contractor<br />

- 48 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Terms and Conditions for Issue of materials under schedule 'A' are as under :<br />

(1) Material required in excess of the quantity may or may not be supplied by the Department. If not supplied, the<br />

contractor should make his own arrangements to provide the same, for which no extra claim will be entertained.<br />

(2) All materials remaining unused after the completion of the works should be returned to the Department at the<br />

Department stores. For the material remaining unused and not returned, recovery will be effected at twice the issue<br />

rate of material or the prevailing market rate at the time of completion of work, whichever is higher.<br />

(3) Considerable delay is likely to occur in getting the materials required to be conveyed by Rail, whether such<br />

material is to be supplied by the <strong>Corporation</strong> or by the contractor himself. The contractor therefore should submit<br />

indent for his requirement sufficiently in advance to allow for the period usually taken tor supply of such material. No<br />

responsibility can be accepted for such delays in regard to supply of these materials. Every assistance will however<br />

be given to obtain the supplies as quickly as possible. ~<br />

(4) The contractor should check the material before they are issued to him. Any complaint<br />

after the material is once accepted by him will not be entertained.<br />

(5) The contractor should be make his own arrangements for storing the materials issuer to him, by constructing a<br />

Pucca shed which should be leak proof and should protect against moist climates.<br />

(6) All other materials not included in the above schedule will have to be procured by the<br />

contractors from the open market at their own cost.<br />

(7) The contractor shall maintain a regular account of consumption of the material issued to him by the Department,<br />

either at cost or free of cost, and shall be produced when asked for.<br />

(8) all conveyance charges including loading and unloading operations for bringing the materials issued from the<br />

place of delivery to the site of work should be borne by the contractor.<br />

(9) Weight of M.S. Rounds that will be issued under schedule 'A' will be computed on the basis of following table:-<br />

Dia of Bar<br />

Weight in Kg / RM length of bar<br />

6 mm .... .... .... .... .... .... 0.22<br />

8 mm .... .... .... .... .... .... 0.39<br />

10 mm .... .... .... .... .... .... 0.62<br />

12 mm .... .... .... .... .... .... 0.89<br />

16 mm .... .... .... .... .... .... 1.58<br />

18 mm .... .... .... .... .... .... 2.00<br />

20 mm .... .... .... .... .... .... 2.46<br />

22 mm .... .... .... .... .... .... 2.92<br />

25 mm .... .... .... .... .... .... 3.85<br />

28 mm .... .... .... .... .... .... 4.83<br />

32 mm .... .... .... .... .... .... 6.31<br />

36 mm .... .... .... .... .... .... 7.99<br />

40 mm .... .... .... .... .... .... 9.87<br />

In case of dispute or delegation in diameters computation of weight shall be made at a rate of 0.785 kg.<br />

per square centimeter of cross sectional area.<br />

The issue of steel from the stores stipulated in schedule A shall be on the basis of length~ of M.S.<br />

rounds measured in Metric System to the nearest 10 mm length. The surplus steel after completion of<br />

work shall also be taken back and measured on the same basis. The M.S.rounds returned to<br />

departmental store shall be in the <strong>form</strong> of cut pieces or whole length remaining unutilised and will be<br />

accepted as such. Pieces of length one meter and above shall be accepted. The percentage waste in<br />

the <strong>form</strong> of pieces of length below one meter shall not be more than 1 per cent of the tonnage actually<br />

used in work. Any additional loss beyond one percent stipulated above shall be treated as used in any<br />

unauthorised and wasteful manner and recovery at double the issue rate or market rate, whichever is<br />

more, shall be effected for such wasteful use of steel.<br />

Contractor<br />

- 49 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

SCHEDULE “B”<br />

Name of work:- M&R to N.R. building & Water Supply Scheme @ Nashik <strong>Industrial</strong><br />

Area……...Housekeeping of Udyog Bhavan building,CSC building,<br />

Old Flatted Factory building and Staff Colony @ Satpur.<br />

Qty. Description of Item. Unit Rate (Rs.) Amount.<br />

In<br />

Figures<br />

In<br />

Words<br />

M&R to Non Residential Building<br />

365.00 Item No-1Housekeeping i.e. daily<br />

sweeping, cleaning washing, mopping of<br />

corridors, stairs, all vacant gallas /offices<br />

in Udyog Bhavan, MIDC office in Udyog<br />

Bhavan on second floor, all common<br />

toilets in Udyog Bhavan, MIDC offices in<br />

Udyog Bhavan, all doors, windows, roofs,<br />

walls, ceiling, terrace & entire premises<br />

drainage system, septic tank, rain water<br />

disposal and maintenance of lawn,<br />

shrubbery with necessary watering,<br />

prumming, trimming etc. including all<br />

labours, material etc. complete.….Job<br />

Work.<br />

365.00 Item No. 2 :- Daily cleaning of all toilets (<br />

Common at ground floor & all toilets in guest<br />

house) in CSC building @ Satpur, toilets in<br />

old flatted factory building @ Satpur<br />

including maintaining drainage system,<br />

removing choke-ups including all labour,<br />

material etc. complete - Job work<br />

M&R to Water Supply Scheme.<br />

365.00 Item No.1:- Daily cleaning of the<br />

premises of staff colony @ Satpur,<br />

common passages, stairs, terraces of all<br />

building courtyards of all bungalows,<br />

housekeeping of community hall,<br />

removing choke-ups in drainage system<br />

including all materials, labour etc.<br />

complete-…Job work.<br />

Job<br />

per<br />

day<br />

Job<br />

per<br />

day<br />

Job<br />

per<br />

day<br />

Total Rs. (A)<br />

Total Rs. (B)<br />

Total (A + B)<br />

Rs.<br />

Contractor<br />

- 50 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

(In words Rs.______________________________________________________________________)<br />

I/ We agree to carry out the above work at the rates mentioned above.<br />

NOTE:-The rates shall be quoted inclusive of all taxes, duties, octroi, VAT/Sale Tax<br />

Excises Duty .etc. complete.<br />

Contractor<br />

- 51 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

DETAILED ITEM WISE SPECIFICATON<br />

Name of work:- M&R to N.R. building & Water Supply Scheme @ Nashik <strong>Industrial</strong><br />

Area……...Housekeeping of Udyog Bhavan building,CSC building,<br />

Old Flatted Factory building and Staff Colony @ Satpur.<br />

M&R to Non Residential Building<br />

Item No-1:- 1Housekeeping i.e. daily sweeping, cleaning washing, mopping of corridors, stairs, all<br />

vacant gallas /offices in Udyog Bhavan, MIDC office in Udyog Bhavan on second floor, all common<br />

toilets in Udyog Bhavan, MIDC offices in Udyog Bhavan, all doors, windows, roofs, walls, ceiling,<br />

terrace & entire premises drainage system, septic tank, rain water disposal and maintenance of lawn,<br />

shrubbery with necessary watering, prumming, trimming etc. including all labours, material etc.<br />

complete.…..Job Work.<br />

The item includes following jobs.<br />

1) Daily sweeping of all common corridors, stairs, vacant gallas / offices in Udyog Bhavan, &<br />

cleaning internal roads alongwith total premises of Udyog Bhavan building.<br />

2) Constant mopping by using phenoil of all common places on all floors, central lobby, main<br />

entrance, other entrances etc. is required to be carried out.<br />

3) Daily cleaning of all common toilets in MIDC offices, II nd floor of Udyog Bahavn (i.e.<br />

Dn.Office & R.O.Office) are required to be done by using phenoil, acid and naphthalene ball.<br />

4) The job includes cleaning of all wall, ceilings, terraces, doors, windows, rolling shutters and all<br />

glazier work of both the bldg. such as to appear clean and sparkling all the time. All vacant<br />

offices gals are cleaned twice in a week & terraces once in a month or as per requirement<br />

as directed by Engineer-in-charge.<br />

5) The job includes cleaning, clearing and removing choke-ups if any for drainage system, rain<br />

water disposal system alongwith drainage chambers and septic tank for the building.<br />

6) The job includes time-to-time removal of grass, shrubs, bushes, debris if any in the total<br />

premises of building.<br />

7) If any damage to the property of MIDC is observed during housekeeping contractor has to<br />

repair it at his own cost only.<br />

8) Total material and labour required. is to be provided by the contractor only.<br />

9) The whole work shall be carried out as per the directions of Engineer-in-charge & it is binding<br />

on the contractor to obey the instructions issued by MIDC officials at time-to-time.<br />

10) The contractor has to produce certificate from responsible person / security person at the end of<br />

every month regarding satisfactory work, without which payment will not be proposed.<br />

11) The contractor is bound to do any additional work than above as instructed by Engineer-incharge<br />

time-to-time for which no any extra payment will be made.<br />

Contractor<br />

- 52 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

12 ) Maintenance of Shrub Item includes providing labour, tools and equipment etc. for<br />

maintaining the Shrub Bed.<br />

If it is observed that the growth of the plant is not satisfactory or the plant is dead or any other<br />

damage to the plant, the contractor will have to replace all such plants with new one of equal age<br />

for which again new maintenance period will be counted and shall be payable proportionately. If<br />

such plants are not replaced, the recovery at the rate 100 Rs/m2 will be made.<br />

Watering the Plants : The water shall be made available free of cost by MIDC at suitable<br />

locations. watering should be done carefully and plants shall never be allowed to wilt/die without<br />

water. Spray pots/drums shall be used to water small plants. The garden pipes if possible also may<br />

be used.<br />

13 ) Maintenance of Lawn The item includes to maintenance of lawn , including making<br />

arrangement of water supply. The cutting of lawn with lawn mover shall be done during the<br />

maintenance of the lawn for the period of 12 months.<br />

Maintenance : The maintenance of Lawn shall be done under the guidance of the horticulturist<br />

and Engineer-in-charge. The water supply arrangement shall be made by the contractor, including<br />

watering equipment such as rubber hose, pipes spray pots etc. and sufficient watering at least twice<br />

in a day shall be done by the contractor . Sludge/manure shall be mixed with the soil and spread to<br />

the Lawn area. The sludge/manure shall be made available by the contractor at his own cost.<br />

If it is observed that the growth of the Lawn is not satisfactory or the Lawn is dead or any other<br />

damage to the Lawn, the contractor will have to replace all such Lawn with new one of equal age<br />

for which again new maintenance period will be counted and shall be payable proportionately. If<br />

such Lawn is not replaced, the recovery at the rate 150 Rs/m2.<br />

Mode of measurement:- The contract rate shall be per day basis.<br />

Item No.2:- Daily cleaning of all toilets (common at ground floor & all toilets in guest house) in CSC<br />

bldg. @ Satpur, toilets in old flatted factory bldg @ Satpur including maintaining drainage system,<br />

removing choke-ups including all labour, material etc. complete--- Job Work.<br />

The item includes following Jobs.---<br />

1. Daily cleaning of common toilet on ground floor and all toilets in guest house at first floor in<br />

CSC building @ Satpur by using phenoil, acid and naphthalene balls.<br />

2. Daily cleaning of common toilets in old flatted factory building @ Satpur by using phenoil,<br />

acid, and providing odonils packets and naphthalene balls in W.C. Toilet blocks.<br />

3. The job includes cleaning, clearing and removing choke-ups if any for drainage system, rain<br />

water disposal system alongwith drainage chambers and periodic cleaning of septic tank for<br />

both the buildings.<br />

4. Total material and labour required is to be provided by the contractor at his cost only.<br />

Contractor<br />

- 53 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

5. If any damage to the property of MIDC is observed during housekeeping. contractor has to<br />

repair it at his own cost only.<br />

6. The whole work shall be carried out as per the directions of Engineer-in-charge & it is binding<br />

on the contractor to obey the instructions issued by MIDC officials time-to-time.<br />

7. The contractor has to produce certificate from responsible person using the every building at<br />

the end of every month regarding satisfactory work without which payment will not be<br />

proposed.<br />

8. The contractor is bound to do any additional work than above as instructed by Engineer-incharge<br />

time-to-time for which no any extra payment will be made.<br />

Mode of Measurement:- The contract rate shall be per day basis.<br />

M&R to Water Supply Scheme.<br />

Item No.1:- Daily cleaning of the premises of staff colony @ Satpur, common passages, stairs,<br />

terraces of all building courtyards of all bungalows, housekeeping of community hall, removing<br />

choke-ups in drainage system including all materials, labour etc. complete-…Job work.The item<br />

includes following jobs.<br />

1. Daily cleaning of common passages, stairs, courtyards of all banglows, buildings, internal roads<br />

in staff colony @ Satpur.<br />

2. Daily cleaning, washing, mopping of community hall in the colony including cleaning of toilets in<br />

it, doors, windows, etc.<br />

3. Cleaning of terraces shall be done once in a month alongwith rain water down take pipes or as per<br />

requirement as directed by Engineer-In-Charge. C.D.works for internal roads are also cleaned as<br />

pre direction Engineer-In-charge to facilitate easy disposal of rain water from colony premises.<br />

4. Cleaning. clearing and removing choke-ups if any for drainage system alongwith drainage<br />

chambers and periodic cleaning of septic tank for staff colony.<br />

5. Total material, labour, tools & plants is to be provided by the contractor at his cost only.<br />

6. If any damage to the property of MIDC is observed during housekeeping, contractor has to repair<br />

it at his own cost only.<br />

7. The whole work shall be carried out as per the directions of Engineer-in-charge & it is binding on<br />

the contractor to obey the instructions issued by MIDC officials time-to-time.<br />

8. The contractor has to produce certificate from responsible person/ security personnel at the end of<br />

every month regarding satisfactory work execution, without which payment will not be made.<br />

9. The contractor is bound to do any additional work than above as instructed by Engineer-in-charge<br />

time-to-time for which no any extra payment will be made.<br />

Mode of Measurement;- The contract rate shall be per day basis.<br />

Contractor<br />

- 54 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

Special Contract Conditions<br />

1. Location: -The services are to be provided at Sub Division under at Satpur, Nashik<br />

Division.<br />

2. Authorized Representative: - The Contractor shall depute authorized representative to<br />

monitor the man powers, at least once in a day, to take the instructions, from engineer incharge.<br />

3. Disputes if any :- If any disputes are found with man power, those will be in<strong>form</strong>ed to<br />

authorized representative. He shall co-ordinate the issues with Staff and shall see that the<br />

man power is working properly.<br />

4. Right to discontinue service :- The Executive Engineer has right to remove or reduce any<br />

man power by giving 7 days notice in writing in case ofi)<br />

The man power provided is in efficient, not able to understand the work,<br />

creating any nuisance, has committed any misconduct, misbehavior, finds any<br />

reasonable cause, discontinuation, irregular in duties etc.<br />

5. Quantum of Services :–<br />

i) The quantum of Services mentioned is indicative and may either increase or<br />

decrease. The Contractor shall have no claim for additional rate for increase or<br />

decreased requirement of Services.<br />

ii) Considering the work load, additional man power may found necessary, in such<br />

case, the additional man power shall be provided after, issuing the letter from<br />

the Executive Engineer. Within 15 days.<br />

6. Leave period for man power:-<br />

i) If any manpower is taking leave more than a day, the same shall be in<strong>form</strong>ed<br />

through authorized representative. In such case, the Contractor shall arrange for<br />

the substitute of equal qualification.<br />

7. Taxes, duties, Insurance to be paid by Contractor: - All the taxes duties, insurance,<br />

transport expenses etc. towards supply of manpower shall be paid by the Contractor. MIDC<br />

shall not take any responsibility and / or any liability on any account and in any way.<br />

Contractor<br />

- 55 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

(A Government of <strong>Maharashtra</strong> Undertaking)<br />

8. Confidentiality :-<br />

The Contractor, his authorized representative, and the manpower provided should not<br />

disclose any proprietary, confidential in<strong>form</strong>ation relating to the project, Services, Office<br />

work and Operations to any other outsider. It found so the same will be viewed serious,<br />

and will be liable for discontinuation.<br />

9. The personnel appointed by Contractor shall make proper & careful use of supplied<br />

Material etc.<br />

10. It shall be the responsibility of the Contractor to pay the monthly salary to the personnel on<br />

or before 5 th day of Every month, irrespectively of Payment from MIDC.<br />

11. MIDC will not take any responsibility & liability of any personnel on any account.<br />

12. NO Escalation is payable.<br />

Contractor<br />

- 56 -<br />

Executive Engineer,<br />

M.I.D.C., Nashik.


Filename:<br />

NEW DTP <strong>form</strong>at<br />

Directory:<br />

D:\My Documents<br />

Template:<br />

C:\Documents and Settings\Administrator\Application<br />

Data\Microsoft\Templates\Normal.dotm<br />

Title:<br />

TENDER NOTICE NO<br />

Subject:<br />

Author:<br />

Rohidas<br />

Keywords:<br />

Comments:<br />

Creation Date: 5/21/2011 12:13:00 PM<br />

Change Number: 47<br />

Last Saved On: 8/10/2012 6:29:00 PM<br />

Last Saved By: intel<br />

Total Editing Time: 156 Minutes<br />

Last Printed On: 8/10/2012 6:37:00 PM<br />

As of Last Complete Printing<br />

Number of Pages: 56<br />

Number of Words: 22,402 (approx.)<br />

Number of Characters: 127,692 (approx.)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!