THE NEW UPPER DUBLIN HIGH SCHOOL<br />

PHASE TWO OPENED JANUARY 3, 2011<br />

<strong>Phase</strong> <strong>Two</strong>—<strong>Academic</strong> <strong>Wing</strong><br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

87 Classrooms w/ Interactive Whiteboards<br />

Media Center/Library<br />

Expanded Science Lab Facilities<br />

Technology Forum Room for Large Group<br />

Instruction & Video Conferencing<br />

Administrative Offices/Guidance Suite<br />

Cafeteria w/ Kitchen & Serving Areas<br />

Full Wireless Access<br />

Leadership in Energy & Environmental Design<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Natural Daylight in all Educational Spaces<br />

Enhanced Indoor Air Quality<br />

Ducted HVAC System/Humidity Control<br />

Recycled Materials Used<br />

Enhanced Acoustic Wall Performance<br />

Water Conservation Design<br />

75% of Waste Diverted from Landfills<br />

Sustainable Materials Used<br />

<strong>Phase</strong> One—Athletic Complex<br />

(Completed on December 9, 2009)<br />

Main Gymnasium with Seating for 1,500 Spectators<br />

Natatorium with a 10 Lane, 35 Meter Swimming Pool &<br />

Expanded Balcony Seating<br />

Auxiliary Gymnasium<br />

Weight Training/Fitness Room<br />

Trainer/Team Rooms in Locker Room<br />

<strong>Phase</strong> Three—Auditorium & Visual/Performing Arts Center<br />

(Completion expected in August, 2012)<br />

Auditorium<br />

Black Box <strong>The</strong>atre<br />

Instructional Areas for Band, Chorus, & Orchestra<br />

Performing Art Classrooms<br />

Photography Lab<br />

Digital Media Lab


Architect<br />

Gilbert Architects Inc.<br />

Construction Manager<br />

D’Huy Engineering, Inc.<br />

Mechanical & Electrical Consulting Engineer<br />

Snyder Hoffman Associates<br />

Civil Engineer & Landscape Architect<br />

Renew Design Group<br />

Structural Engineer<br />

Baker Ingram & Associates<br />

Natatorium Consultant<br />

Wallover Architects, Inc.<br />

Traffic Consultant<br />

McMahon and Associates, Inc.<br />

Asbestos Abatement<br />

Sargent Contracting, Inc.<br />

Environmental Consultant<br />

1 Source Safety and Health, Inc.<br />

General Contractor<br />

Skepton Construction, Inc.<br />

Plumbing and HVAC Contractor<br />

Worth and Company, Inc.<br />

Electrical Contractor<br />

Boro Construction, Inc.<br />

LEED Consultants/Certification<br />

7 Group/Aramark<br />

Location<br />

<strong>Upper</strong> <strong>Dublin</strong> High <strong>School</strong><br />

800 Loch Alsh Avenue<br />

Fort Washington, PA 19034<br />

(215) 643-8900<br />

Total Cost<br />

$119,242,976<br />

(includes new Bus Garage)<br />

Debt Act Referendum Approved<br />

March 20, 2007<br />

Township Population<br />

Approximately 26,000<br />

High <strong>School</strong> Student Population<br />

Approximately 1,465<br />

Board of <strong>School</strong> Directors<br />

Michael Paston, President<br />

Joseph Chmielewski, Vice President<br />

David Robinson, Treasurer<br />

Debbie Mendelson, Secretary<br />

Bert Saddler, Asst. Secretary<br />

Margaret Barrett, Member<br />

Vanessa Good, Member<br />

Art Levinowitz, Member<br />

Michael Resnick, Member<br />

Albert Feather, Former Board Member<br />

Administration<br />

Michael Pladus, Superintendent of <strong>School</strong>s<br />

Brenda Jones Bray, Business Administrator<br />

Charles Rittenhouse, High <strong>School</strong> Principal<br />

Susan Lohoefer, Facility/Community Affairs Manager<br />

Designed by:<br />

Katie Braun, Executive Assistant to the Superintendent<br />

<strong>The</strong> construction of the new <strong>Upper</strong> <strong>Dublin</strong> High <strong>School</strong> marks the only new school construction approved by<br />

voters through referendum in the Commonwealth of Pennsylvania since the inception of Act 1 of 2006.