THE NEW UPPER DUBLIN HIGH SCHOOL<br />
PHASE TWO OPENED JANUARY 3, 2011<br />
<strong>Phase</strong> <strong>Two</strong>—<strong>Academic</strong> <strong>Wing</strong><br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
87 Classrooms w/ Interactive Whiteboards<br />
Media Center/Library<br />
Expanded Science Lab Facilities<br />
Technology Forum Room for Large Group<br />
Instruction & Video Conferencing<br />
Administrative Offices/Guidance Suite<br />
Cafeteria w/ Kitchen & Serving Areas<br />
Full Wireless Access<br />
Leadership in Energy & Environmental Design<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Natural Daylight in all Educational Spaces<br />
Enhanced Indoor Air Quality<br />
Ducted HVAC System/Humidity Control<br />
Recycled Materials Used<br />
Enhanced Acoustic Wall Performance<br />
Water Conservation Design<br />
75% of Waste Diverted from Landfills<br />
Sustainable Materials Used<br />
<strong>Phase</strong> One—Athletic Complex<br />
(Completed on December 9, 2009)<br />
Main Gymnasium with Seating for 1,500 Spectators<br />
Natatorium with a 10 Lane, 35 Meter Swimming Pool &<br />
Expanded Balcony Seating<br />
Auxiliary Gymnasium<br />
Weight Training/Fitness Room<br />
Trainer/Team Rooms in Locker Room<br />
<strong>Phase</strong> Three—Auditorium & Visual/Performing Arts Center<br />
(Completion expected in August, 2012)<br />
Auditorium<br />
Black Box <strong>The</strong>atre<br />
Instructional Areas for Band, Chorus, & Orchestra<br />
Performing Art Classrooms<br />
Photography Lab<br />
Digital Media Lab
Architect<br />
Gilbert Architects Inc.<br />
Construction Manager<br />
D’Huy Engineering, Inc.<br />
Mechanical & Electrical Consulting Engineer<br />
Snyder Hoffman Associates<br />
Civil Engineer & Landscape Architect<br />
Renew Design Group<br />
Structural Engineer<br />
Baker Ingram & Associates<br />
Natatorium Consultant<br />
Wallover Architects, Inc.<br />
Traffic Consultant<br />
McMahon and Associates, Inc.<br />
Asbestos Abatement<br />
Sargent Contracting, Inc.<br />
Environmental Consultant<br />
1 Source Safety and Health, Inc.<br />
General Contractor<br />
Skepton Construction, Inc.<br />
Plumbing and HVAC Contractor<br />
Worth and Company, Inc.<br />
Electrical Contractor<br />
Boro Construction, Inc.<br />
LEED Consultants/Certification<br />
7 Group/Aramark<br />
Location<br />
<strong>Upper</strong> <strong>Dublin</strong> High <strong>School</strong><br />
800 Loch Alsh Avenue<br />
Fort Washington, PA 19034<br />
(215) 643-8900<br />
Total Cost<br />
$119,242,976<br />
(includes new Bus Garage)<br />
Debt Act Referendum Approved<br />
March 20, 2007<br />
Township Population<br />
Approximately 26,000<br />
High <strong>School</strong> Student Population<br />
Approximately 1,465<br />
Board of <strong>School</strong> Directors<br />
Michael Paston, President<br />
Joseph Chmielewski, Vice President<br />
David Robinson, Treasurer<br />
Debbie Mendelson, Secretary<br />
Bert Saddler, Asst. Secretary<br />
Margaret Barrett, Member<br />
Vanessa Good, Member<br />
Art Levinowitz, Member<br />
Michael Resnick, Member<br />
Albert Feather, Former Board Member<br />
Administration<br />
Michael Pladus, Superintendent of <strong>School</strong>s<br />
Brenda Jones Bray, Business Administrator<br />
Charles Rittenhouse, High <strong>School</strong> Principal<br />
Susan Lohoefer, Facility/Community Affairs Manager<br />
Designed by:<br />
Katie Braun, Executive Assistant to the Superintendent<br />
<strong>The</strong> construction of the new <strong>Upper</strong> <strong>Dublin</strong> High <strong>School</strong> marks the only new school construction approved by<br />
voters through referendum in the Commonwealth of Pennsylvania since the inception of Act 1 of 2006.