16.10.2014 Views

Capacity development on CDM PoA

Capacity development on CDM PoA

Capacity development on CDM PoA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> <str<strong>on</strong>g>development</str<strong>on</strong>g> <strong>on</strong> <strong>CDM</strong> <strong>PoA</strong>:<br />

The Priority Sectors and Areas<br />

Venue:<br />

Author:<br />

UNFCCC<br />

Workshop <strong>on</strong> Programme of Activities under the <strong>CDM</strong>:<br />

Challenges and the Road Ahead<br />

7-8 May 2011, B<strong>on</strong>n<br />

Perspectives GmbH, Hamburg<br />

Marc André Marr<br />

Alberto Galante<br />

www.perspectives.cc · marr@perspectives.cc<br />

© 2011 Perspectives GmbH


Agenda<br />

• Requirements for <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

• The Priority Sectors and Areas within the <strong>PoA</strong> cycle<br />

• Exemplary <strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development needs<br />

- For <strong>on</strong>e specific <strong>PoA</strong><br />

www.perspectives.cc · marr@perspectives.cc 2


Requirements for <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

www.perspectives.cc · marr@perspectives.cc 3


The Power of Simplicity<br />

www.perspectives.cc · marr@perspectives.cc 4


What is required for providing<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development?<br />

www.perspectives.cc · marr@perspectives.cc 5


What is required for providing<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development?<br />

Overall Strategy<br />

Why?<br />

www.perspectives.cc · marr@perspectives.cc 6


What is required for providing<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development?<br />

Overall Strategy<br />

Why?<br />

Clear Targets/Objectives<br />

Regulatory framework<br />

www.perspectives.cc · marr@perspectives.cc 7


What is required for providing<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development?<br />

Overall Strategy<br />

Why?<br />

Clear Targets/Objectives<br />

Regulatory framework<br />

Specific Measures<br />

What?<br />

www.perspectives.cc · marr@perspectives.cc 8


Priority Sectors and Areas within the <strong>PoA</strong> cycle<br />

www.perspectives.cc · marr@perspectives.cc 9


<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

„Pave the way“<br />

and<br />

Bound to real case /specific <strong>PoA</strong><br />

„Walk the way“<br />

www.perspectives.cc · marr@perspectives.cc 10


The “simplified” interacti<strong>on</strong>s within a <strong>PoA</strong><br />

Project developer/<br />

Technology provider/ Investors<br />

UNFCCC<br />

DOE<br />

<strong>PoA</strong> Coordinating Entity<br />

DNA<br />

<strong>PoA</strong>-DD<br />

Generic CPA-DD<br />

Service provider<br />

Local instituti<strong>on</strong>s<br />

CPA 1 CPA 2 CPA 3 CPA X<br />

www.perspectives.cc · marr@perspectives.cc 11


The “simplified” interacti<strong>on</strong>s within a <strong>PoA</strong><br />

Project developer/<br />

Technology provider/ Investors<br />

UNFCCC<br />

DOE<br />

<strong>PoA</strong> Coordinating Entity<br />

DNA<br />

<strong>PoA</strong>-DD<br />

Generic CPA-DD<br />

CPA 1 CPA 2 CPA 3 CPA X<br />

Service provider<br />

Local instituti<strong>on</strong>s<br />

CPA developers<br />

www.perspectives.cc · marr@perspectives.cc 12


<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Pave the way“<br />

During <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Walk the way“<br />

www.perspectives.cc · marr@perspectives.cc 13


Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Pave the way“<br />

1) UNFCCC/EB/DNA/DOE<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Simplify/Streamline<br />

<strong>PoA</strong> Rules & Procedures<br />

During <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Walk the way“<br />

www.perspectives.cc · marr@perspectives.cc 14


Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Pave the way“<br />

1) UNFCCC/EB/DNA/DOE<br />

2) Project developer/<br />

Technology provider/<br />

Investors<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Simplify/Streamline<br />

<strong>PoA</strong> Rules & Procedures<br />

<strong>CDM</strong> + <strong>PoA</strong>s as <strong>on</strong>e opti<strong>on</strong><br />

Pros & C<strong>on</strong>s of <strong>PoA</strong>s<br />

During <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Walk the way“<br />

www.perspectives.cc · marr@perspectives.cc 15


Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Pave the way“<br />

1) UNFCCC/EB/DNA/DOE<br />

2) Project developer/<br />

Technology provider/<br />

Investors<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Simplify/Streamline<br />

<strong>PoA</strong> Rules & Procedures<br />

<strong>CDM</strong> + <strong>PoA</strong>s as <strong>on</strong>e opti<strong>on</strong><br />

Pros & C<strong>on</strong>s of <strong>PoA</strong>s<br />

3) Coordinating Entities Identificati<strong>on</strong> and Assessment<br />

During <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Walk the way“<br />

www.perspectives.cc · marr@perspectives.cc 16


Prior to <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Pave the way“<br />

1) UNFCCC/EB/DNA/DOE<br />

2) Project developer/<br />

Technology provider/<br />

Investors<br />

<str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development for <strong>PoA</strong>s<br />

Priority Sectors and Areas<br />

Simplify/Streamline<br />

<strong>PoA</strong> Rules & Procedures<br />

<strong>CDM</strong> + <strong>PoA</strong>s as <strong>on</strong>e opti<strong>on</strong><br />

Pros & C<strong>on</strong>s of <strong>PoA</strong>s<br />

3) Coordinating Entities Identificati<strong>on</strong> and Assessment<br />

During <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g> - „Walk the way“<br />

4) Coordinating Entity &<br />

involved stakeholders<br />

<strong>PoA</strong> specific <str<strong>on</strong>g>Capacity</str<strong>on</strong>g><br />

Development<br />

www.perspectives.cc · marr@perspectives.cc 17


Exemplary <strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development needs<br />

www.perspectives.cc · marr@perspectives.cc 18


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

www.perspectives.cc · marr@perspectives.cc 19


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

www.perspectives.cc · marr@perspectives.cc 20


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

www.perspectives.cc · marr@perspectives.cc 21


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

www.perspectives.cc · marr@perspectives.cc 22


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

4. C<strong>on</strong>tractual Arrangements, legal structure<br />

www.perspectives.cc · marr@perspectives.cc 23


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

4. C<strong>on</strong>tractual Arrangements, legal structure<br />

5. Interacti<strong>on</strong> with stakeholders – Service providers, banks, etc.<br />

www.perspectives.cc · marr@perspectives.cc 24


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

4. C<strong>on</strong>tractual Arrangements, legal structure<br />

5. Interacti<strong>on</strong> with stakeholders – Service providers, banks, etc.<br />

6. Matching Theory and Practice<br />

www.perspectives.cc · marr@perspectives.cc 25


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

4. C<strong>on</strong>tractual Arrangements, legal structure<br />

5. Interacti<strong>on</strong> with stakeholders – Service providers, banks, etc.<br />

6. Matching Theory and Practice<br />

• Implementati<strong>on</strong> of <strong>PoA</strong>, Inclusi<strong>on</strong> process, M<strong>on</strong>itoring<br />

www.perspectives.cc · marr@perspectives.cc 26


<strong>PoA</strong> <str<strong>on</strong>g>Capacity</str<strong>on</strong>g> Development<br />

During a specific <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

1. CME Assessment – Capacities, Strengths/Weaknesses<br />

2. <strong>PoA</strong> Design & Business Model - Objectives, <strong>CDM</strong> Implicati<strong>on</strong>s<br />

3. Tasks and Resp<strong>on</strong>sibilities for CME<br />

4. C<strong>on</strong>tractual Arrangements, legal structure<br />

5. Interacti<strong>on</strong> with stakeholders – Service providers, banks, etc.<br />

6. Matching Theory and Practice<br />

• Implementati<strong>on</strong> of <strong>PoA</strong>, Inclusi<strong>on</strong> process, M<strong>on</strong>itoring<br />

Backstopping throughout the <strong>PoA</strong> <str<strong>on</strong>g>development</str<strong>on</strong>g><br />

www.perspectives.cc · marr@perspectives.cc 27


Finally - Adjust to local c<strong>on</strong>diti<strong>on</strong>s<br />

www.perspectives.cc · marr@perspectives.cc 28


Finally - Adjust to local c<strong>on</strong>diti<strong>on</strong>s<br />

www.perspectives.cc · marr@perspectives.cc 29


Thank you!<br />

Perspectives GmbH<br />

Alberto Galante<br />

<strong>CDM</strong>/JI C<strong>on</strong>sultant<br />

galante@perspectives.cc<br />

www.perspectives.cc · marr@perspectives.cc 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!