Research Partnership to Secure Energy for America<br />

7. SUBCONTRACTOR will prepare/present at least one technical article for SPE or similar peerreviewed<br />

journal. This article or presentation should be accepted by the review organization by<br />

the end <strong>of</strong> the project.<br />

8. SUBCONTRACTOR will provide a technical report detailing the experimental parameters and<br />

results <strong>of</strong> the experiments undertaken in Task 4.<br />

9. SUBCONTRACTOR will provide a technical report describing the results <strong>of</strong> the simulations<br />

performed in Task 5.<br />

10. A Final Report on the results <strong>of</strong> the Defined Effort. Template will be provided by RPSEA and<br />

available on RPSEA web.<br />

Deliverables Summary<br />

Notwithstanding the above descriptions <strong>of</strong> deliverables, the table below summarizes the<br />

project deliverables and due dates that are required for submittal throughout the project.<br />

These deliverables shall be submitted by their respective due dates.<br />

Deliverable<br />

Due Date<br />

Project Management Plan<br />

1 month after the Project<br />

Kick<strong>of</strong>f date<br />

Technology Status Assessment<br />

1 month after the Project<br />

Report<br />

Kick<strong>of</strong>f date<br />

Technology Transfer Plan<br />

1 month after the Project<br />

Kick<strong>of</strong>f date<br />

Website Construction<br />

To be maintained for<br />

duration <strong>of</strong> 36 month<br />

Project<br />

Annual Report #1 Interim report for Task 4<br />

- 12 months after<br />

Subcontract Award<br />

Annual Report #2<br />

Interim report for Tasks<br />

3, 4, &5 - 24 months after<br />

Subcontract Award<br />

Draft Final Report<br />

2 Months prior to Project<br />

completion date.date<br />

Presentations #1 & 2<br />

Due on completion <strong>of</strong><br />

Task 4 - 32 months after<br />

Subcontract Award<br />

Article publication #1<br />

Article acceptance by<br />

RPSEA – Prior to 36<br />

Month Project<br />

<strong><strong>09</strong>123</strong>-<strong>09</strong> - <strong>University</strong> <strong>of</strong> <strong>North</strong> <strong>Dakota</strong> (WANG)<br />

Appendix 1 32