Research Partnership to Secure Energy for America<br />
7. SUBCONTRACTOR will prepare/present at least one technical article for SPE or similar peerreviewed<br />
journal. This article or presentation should be accepted by the review organization by<br />
the end <strong>of</strong> the project.<br />
8. SUBCONTRACTOR will provide a technical report detailing the experimental parameters and<br />
results <strong>of</strong> the experiments undertaken in Task 4.<br />
9. SUBCONTRACTOR will provide a technical report describing the results <strong>of</strong> the simulations<br />
performed in Task 5.<br />
10. A Final Report on the results <strong>of</strong> the Defined Effort. Template will be provided by RPSEA and<br />
available on RPSEA web.<br />
Deliverables Summary<br />
Notwithstanding the above descriptions <strong>of</strong> deliverables, the table below summarizes the<br />
project deliverables and due dates that are required for submittal throughout the project.<br />
These deliverables shall be submitted by their respective due dates.<br />
Deliverable<br />
Due Date<br />
Project Management Plan<br />
1 month after the Project<br />
Kick<strong>of</strong>f date<br />
Technology Status Assessment<br />
1 month after the Project<br />
Report<br />
Kick<strong>of</strong>f date<br />
Technology Transfer Plan<br />
1 month after the Project<br />
Kick<strong>of</strong>f date<br />
Website Construction<br />
To be maintained for<br />
duration <strong>of</strong> 36 month<br />
Project<br />
Annual Report #1 Interim report for Task 4<br />
- 12 months after<br />
Subcontract Award<br />
Annual Report #2<br />
Interim report for Tasks<br />
3, 4, &5 - 24 months after<br />
Subcontract Award<br />
Draft Final Report<br />
2 Months prior to Project<br />
completion date.date<br />
Presentations #1 & 2<br />
Due on completion <strong>of</strong><br />
Task 4 - 32 months after<br />
Subcontract Award<br />
Article publication #1<br />
Article acceptance by<br />
RPSEA – Prior to 36<br />
Month Project<br />
<strong><strong>09</strong>123</strong>-<strong>09</strong> - <strong>University</strong> <strong>of</strong> <strong>North</strong> <strong>Dakota</strong> (WANG)<br />