<strong>REQUEST</strong> <strong>FOR</strong> <strong>QUOTATION</strong> (<strong>RFQ</strong>)<br />
NAME & ADDRESS OF FIRM: DATE: 3 September 2010<br />
REFERENCE: <strong>UNDP</strong>AFG/2010/0272<br />
INSTALLATION OF SECURITY<br />
FENCE<br />
You are requested to submit your offer to <strong>UNDP</strong> secure email address Bids.af@undp.org or in<br />
sealed envelope to the below address no later than 10 October 2010 at 14:00 hrs (Local time).<br />
United Nations Development Programme (<strong>UNDP</strong>),<br />
Procurement Unit or <strong>UNDP</strong><br />
Shah Mahmood Ghazi Watt, Kabul, <strong>Afghanistan</strong><br />
Telephone :0202124148<br />
E-mail Address: Bids.af@undp.org<br />
Note:<br />
Site inspection will be conducted on Sunday 6 October 2010, at 10:00 AM (Kabul Time).<br />
S/no<br />
Specification and <strong>RFQ</strong> for security fence upgrading of Country office Unit Qty<br />
Unit<br />
Cost<br />
USD<br />
Total Cost<br />
USD<br />
1<br />
Demolition of existed steel cover at top of wall as applicable, The<br />
Contractor shall remove and dispose of all debris, concrete etc. The<br />
Contractor shall verify the location of debris disposal with the <strong>UNDP</strong><br />
representative.<br />
M3 6<br />
3<br />
2<br />
site preparation:<br />
Preliminary site clearance including leveling of the site.<br />
Set out the foundation at top of the wall for RCC ring.<br />
Ls -<br />
Reinforcement Cement concrete (RCC) M200<br />
Portland cement - high quality to Engineer's approval<br />
Sand - river sand<br />
Aggregate - course aggregate / rinsed clean prior to use<br />
Mix (cement:sand:aggregate) - 1:1.5:3<br />
M3 8<br />
Curing - 3 weeks using burlap sacks let continuously wet with potable water.<br />
Curing for cool weather, to prevent concrete from freezing and take initial<br />
setting.<br />
4 Shuttering High quality wood subjected to Engineer Approval M2 4
5<br />
6<br />
7<br />
8<br />
Security Fence –<br />
Perimeter Wall is already existed Fencing shall consist of the types<br />
shown in drawings, The estimated perimeter wall distance is 400 meter,<br />
but the high is deferent in each location. For detail refer to table 1.001<br />
The fence include wire mesh, GI pipe, Sniper screen<br />
Chain link fabric 9 gage 2” mesh high quality subjected to eng approval.<br />
Galvanized steel pipe with diameter 2 inch high quality subjected to<br />
Engineer Approval.<br />
Sniper screen high quality subjected to Eng Approval<br />
One row of concertina wire with 60 cm diameter high quality subjected<br />
to Eng Approval.<br />
M2 70<br />
Plaster<br />
Port land cement<br />
Sand- river sand<br />
Mix (cement sand) 1:4<br />
M2 14<br />
2cm thick layer<br />
Curing 3 weeks<br />
Painting<br />
3 layer high qualities paint M2 30<br />
Pipe: GI pipe from foundation to the height of wall<br />
M<br />
50<br />
9 Excavation: Excavation of foundation for installation of pipe M3 8<br />
Green Screen Installation of Green screen as per engineer<br />
approval<br />
Barbed wire Installation of Barbed wire on the existed security<br />
fence<br />
Delivery Term<br />
(INCOTERMS 2000) &<br />
Place<br />
CONDITIONS<br />
a DDU<br />
Total<br />
1 C&F 1 CIP 1 CPT<br />
M2<br />
50<br />
M2 17<br />
PLACE:<br />
Installation of security fence around <strong>UNDP</strong> Compound<br />
Payment Terms<br />
1. First installment (30% of the contract amount) will be paid to the<br />
contractor after verification and acceptance of 30%, actual work<br />
completed in the field.<br />
2. Second installment (30% of the contract amount) will be paid to the<br />
contractor after verification and acceptance of 60%, actual work<br />
completed in the field.<br />
3. Third installment (30% of the contract amount) will be paid to the<br />
contractor after verification and acceptance of 100%, actual work<br />
completed in the field.
4. 10 % as a liability period for 12 months will remain with <strong>UNDP</strong> for<br />
one year as a grantee.<br />
5. 10% of the total contract is performance security deposited in certified<br />
bank by <strong>UNDP</strong> prior signing of the contract.<br />
Validity of Quotation<br />
30 DAYS a 90 DAYS<br />
Preliminary Examination -<br />
Completeness of quotation. Partial bids permitted. a Partial bids not permitted<br />
Project duration<br />
Mode of Transport<br />
General Terms and<br />
Conditions<br />
30 working days after signature for contract<br />
AIR<br />
SEA<br />
SURFACE Locally<br />
OTHERS<br />
Attached (see below the Scope of Services)<br />
Please state<br />
(Procurement officials should cancel the lines which are not applicable)<br />
Quantity discount and early payment discount 0<br />
Details on any warranty/guarantee conditions: The contractor must warranty the construction work for 12 months<br />
after the completion of the project.<br />
REQUIREMENTS<br />
Language: All documentation, including installation and operating manuals shall be in:<br />
aEnglish 1 French 1 Spanish 1 Others<br />
Electricity: Volt: Hz: phase AC:
Technical Specifications, requirements and scope of the work:<br />
1) The contractor has to complete the project with best quality and according to the<br />
attached project plans and sketches under the observation of <strong>UNDP</strong> engineers. The<br />
upgrading and repairing work must be according to the norms, specifications and<br />
standard provided by <strong>UNDP</strong> Engineers. If the implemented work is not completed<br />
according standard norms and specifications, the work must be destroyed and redone<br />
by the contractor at no extra cost or wage.<br />
2) The contractor shall supply all labor (expert, skilled and unskilled), materials, tools,<br />
equipments, transportation, food, prepare accommodation, arrange security and<br />
safety plans and materials, and the works, and relevant documents as may be<br />
necessary for the full satisfactory completion of all specified works. Quality control<br />
system is an integral part of this contract and project implementation requirements,<br />
which will be direct responsibilities of the contractor to complete and fallow their<br />
work accordingly.<br />
3) The work site must be cleaned by contractor on a daily basis. The storage and<br />
security of all materials, supplies, tools, and equipments provided is the contractor’s<br />
responsibility. Upon completion of the works.<br />
4) Payment will be made on actual work done at the site according to the accepted<br />
rates. In the case of additional or extra works, the contractor has to take approval<br />
from <strong>UNDP</strong> Engineers; otherwise no payment will be made for additional or extra<br />
works.<br />
5) Contractor is to start the Work within 2 (two) working days after official permission<br />
The contractor is responsible to complete the Works within (4) weeks of the<br />
contract date, failing which the contactor shall be subject to paying 0.05 % of the<br />
total contract amount as penalty for each day the Works remains incomplete. This<br />
penalty may also be imposed, if the Contractor falls seriously behind work schedule<br />
because of any reason which is not acceptable for <strong>UNDP</strong>.
6) For more detail refer to Attached drawings Fencing work the contactor should used<br />
high qualities material as GI pipe, wire mesh and sniper screen. Wire ties rails, posts<br />
and braces shall be constructed on the secure side of the fence alignment. Chain –<br />
link fabric shall be placed on the opposite to secure area. Only 9 gage galvanized<br />
steel tie shall be used for fastening the fence fabric to fence post and rails 16 gage,<br />
long stainless steel double loop bar tie wires shall be used for fastening fence fabric<br />
to tension wire and truss rods. Hog rings shall not be allowed on censored fence.<br />
Bottom rail shall be attached to double rail ends using 3/8” carriage bolts as shown.<br />
Additional hole shall be drilled through bottom rail ends to insure the carriage bolts<br />
pass through the bottom rail as shown.<br />
7) The contractor should bring the sample of material, used in the building for the<br />
approval of the <strong>UNDP</strong> Engineers. Without the approval of <strong>UNDP</strong> engineers the<br />
contractor can not use any construction material.<br />
8) RCC (reinforce cement Concrete): The ratio of the PCC concert must be M: 200 (1,<br />
1.5, 3). Crash as per engineering norms should be used with clean sand, fresh<br />
cement and clean water. The mortar must be mix by the mixer with proper way.<br />
Vibrator must be used as per the instruction of site engineer. Curing should be at<br />
least for 15 regular days, three times a day.<br />
9) The removed loss soil from under construction building should be transport to<br />
outside of the building area where governmental authorities permit.<br />
10) The Removal debris materials and site cleaning before beginning of the project and<br />
after the completion of project should be done by contractor and the debris materials<br />
should be transport out of the project site.<br />
11) The estimation given in BoQ are approximately measured so payment will be made<br />
based on actual work done in the field by the contractor as per the given drawings<br />
and instruction of the site engineer.<br />
12) The contractor must follow the technical drawings and in the case of any changes,<br />
the contractor should take prior approval of the <strong>UNDP</strong> engineers.<br />
13) The contractor of this contract doesn’t have the right to give the project to subcontractor.<br />
14) The contractor must have site visit and based on the site visit to prepare the BoQ.<br />
<strong>UNDP</strong> will evaluate the <strong>RFQ</strong> based on the following
1. Valid AISA Licenses: The contractor must have valid AISA license<br />
2. Project List: The contractor should have completed in past at least two similar<br />
project (USD30,000) and must include the names ad contract detail(telephone<br />
numbers and email addresses) of the client;<br />
3. Staff List: This must include CV of one site engineer who will monitor the<br />
construction work on daily bases with three years experience.<br />
4. Complete BoQ: The contractor should quote for all items of the BoQ, partially<br />
BoQ will be rejected.<br />
Work Plan: This must include the sequence and duration of ALL activities proposed by<br />
the contractor to undertake the completion of the proposed construction works. The work<br />
plan should show that the contractor understand the works to be undertaken<br />
Attached are the conceptual drawings