<strong>REQUEST</strong> <strong>FOR</strong> <strong>QUOTATION</strong> (<strong>RFQ</strong>)<br />

NAME & ADDRESS OF FIRM: DATE: 3 September 2010<br />

REFERENCE: <strong>UNDP</strong>AFG/2010/0272<br />

INSTALLATION OF SECURITY<br />

FENCE<br />

You are requested to submit your offer to <strong>UNDP</strong> secure email address Bids.af@undp.org or in<br />

sealed envelope to the below address no later than 10 October 2010 at 14:00 hrs (Local time).<br />

United Nations Development Programme (<strong>UNDP</strong>),<br />

Procurement Unit or <strong>UNDP</strong><br />

Shah Mahmood Ghazi Watt, Kabul, <strong>Afghanistan</strong><br />

Telephone :0202124148<br />

E-mail Address: Bids.af@undp.org<br />

Note:<br />

Site inspection will be conducted on Sunday 6 October 2010, at 10:00 AM (Kabul Time).<br />

S/no<br />

Specification and <strong>RFQ</strong> for security fence upgrading of Country office Unit Qty<br />

Unit<br />

Cost<br />

USD<br />

Total Cost<br />

USD<br />

1<br />

Demolition of existed steel cover at top of wall as applicable, The<br />

Contractor shall remove and dispose of all debris, concrete etc. The<br />

Contractor shall verify the location of debris disposal with the <strong>UNDP</strong><br />

representative.<br />

M3 6<br />

3<br />

2<br />

site preparation:<br />

Preliminary site clearance including leveling of the site.<br />

Set out the foundation at top of the wall for RCC ring.<br />

Ls -<br />

Reinforcement Cement concrete (RCC) M200<br />

Portland cement - high quality to Engineer's approval<br />

Sand - river sand<br />

Aggregate - course aggregate / rinsed clean prior to use<br />

Mix (cement:sand:aggregate) - 1:1.5:3<br />

M3 8<br />

Curing - 3 weeks using burlap sacks let continuously wet with potable water.<br />

Curing for cool weather, to prevent concrete from freezing and take initial<br />

setting.<br />

4 Shuttering High quality wood subjected to Engineer Approval M2 4


5<br />

6<br />

7<br />

8<br />

Security Fence –<br />

Perimeter Wall is already existed Fencing shall consist of the types<br />

shown in drawings, The estimated perimeter wall distance is 400 meter,<br />

but the high is deferent in each location. For detail refer to table 1.001<br />

The fence include wire mesh, GI pipe, Sniper screen<br />

Chain link fabric 9 gage 2” mesh high quality subjected to eng approval.<br />

Galvanized steel pipe with diameter 2 inch high quality subjected to<br />

Engineer Approval.<br />

Sniper screen high quality subjected to Eng Approval<br />

One row of concertina wire with 60 cm diameter high quality subjected<br />

to Eng Approval.<br />

M2 70<br />

Plaster<br />

Port land cement<br />

Sand- river sand<br />

Mix (cement sand) 1:4<br />

M2 14<br />

2cm thick layer<br />

Curing 3 weeks<br />

Painting<br />

3 layer high qualities paint M2 30<br />

Pipe: GI pipe from foundation to the height of wall<br />

M<br />

50<br />

9 Excavation: Excavation of foundation for installation of pipe M3 8<br />

Green Screen Installation of Green screen as per engineer<br />

approval<br />

Barbed wire Installation of Barbed wire on the existed security<br />

fence<br />

Delivery Term<br />

(INCOTERMS 2000) &<br />

Place<br />

CONDITIONS<br />

a DDU<br />

Total<br />

1 C&F 1 CIP 1 CPT<br />

M2<br />

50<br />

M2 17<br />

PLACE:<br />

Installation of security fence around <strong>UNDP</strong> Compound<br />

Payment Terms<br />

1. First installment (30% of the contract amount) will be paid to the<br />

contractor after verification and acceptance of 30%, actual work<br />

completed in the field.<br />

2. Second installment (30% of the contract amount) will be paid to the<br />

contractor after verification and acceptance of 60%, actual work<br />

completed in the field.<br />

3. Third installment (30% of the contract amount) will be paid to the<br />

contractor after verification and acceptance of 100%, actual work<br />

completed in the field.


4. 10 % as a liability period for 12 months will remain with <strong>UNDP</strong> for<br />

one year as a grantee.<br />

5. 10% of the total contract is performance security deposited in certified<br />

bank by <strong>UNDP</strong> prior signing of the contract.<br />

Validity of Quotation<br />

30 DAYS a 90 DAYS<br />

Preliminary Examination -<br />

Completeness of quotation. Partial bids permitted. a Partial bids not permitted<br />

Project duration<br />

Mode of Transport<br />

General Terms and<br />

Conditions<br />

30 working days after signature for contract<br />

AIR<br />

SEA<br />

SURFACE Locally<br />

OTHERS<br />

Attached (see below the Scope of Services)<br />

Please state<br />

(Procurement officials should cancel the lines which are not applicable)<br />

Quantity discount and early payment discount 0<br />

Details on any warranty/guarantee conditions: The contractor must warranty the construction work for 12 months<br />

after the completion of the project.<br />

REQUIREMENTS<br />

Language: All documentation, including installation and operating manuals shall be in:<br />

aEnglish 1 French 1 Spanish 1 Others<br />

Electricity: Volt: Hz: phase AC:


Technical Specifications, requirements and scope of the work:<br />

1) The contractor has to complete the project with best quality and according to the<br />

attached project plans and sketches under the observation of <strong>UNDP</strong> engineers. The<br />

upgrading and repairing work must be according to the norms, specifications and<br />

standard provided by <strong>UNDP</strong> Engineers. If the implemented work is not completed<br />

according standard norms and specifications, the work must be destroyed and redone<br />

by the contractor at no extra cost or wage.<br />

2) The contractor shall supply all labor (expert, skilled and unskilled), materials, tools,<br />

equipments, transportation, food, prepare accommodation, arrange security and<br />

safety plans and materials, and the works, and relevant documents as may be<br />

necessary for the full satisfactory completion of all specified works. Quality control<br />

system is an integral part of this contract and project implementation requirements,<br />

which will be direct responsibilities of the contractor to complete and fallow their<br />

work accordingly.<br />

3) The work site must be cleaned by contractor on a daily basis. The storage and<br />

security of all materials, supplies, tools, and equipments provided is the contractor’s<br />

responsibility. Upon completion of the works.<br />

4) Payment will be made on actual work done at the site according to the accepted<br />

rates. In the case of additional or extra works, the contractor has to take approval<br />

from <strong>UNDP</strong> Engineers; otherwise no payment will be made for additional or extra<br />

works.<br />

5) Contractor is to start the Work within 2 (two) working days after official permission<br />

The contractor is responsible to complete the Works within (4) weeks of the<br />

contract date, failing which the contactor shall be subject to paying 0.05 % of the<br />

total contract amount as penalty for each day the Works remains incomplete. This<br />

penalty may also be imposed, if the Contractor falls seriously behind work schedule<br />

because of any reason which is not acceptable for <strong>UNDP</strong>.


6) For more detail refer to Attached drawings Fencing work the contactor should used<br />

high qualities material as GI pipe, wire mesh and sniper screen. Wire ties rails, posts<br />

and braces shall be constructed on the secure side of the fence alignment. Chain –<br />

link fabric shall be placed on the opposite to secure area. Only 9 gage galvanized<br />

steel tie shall be used for fastening the fence fabric to fence post and rails 16 gage,<br />

long stainless steel double loop bar tie wires shall be used for fastening fence fabric<br />

to tension wire and truss rods. Hog rings shall not be allowed on censored fence.<br />

Bottom rail shall be attached to double rail ends using 3/8” carriage bolts as shown.<br />

Additional hole shall be drilled through bottom rail ends to insure the carriage bolts<br />

pass through the bottom rail as shown.<br />

7) The contractor should bring the sample of material, used in the building for the<br />

approval of the <strong>UNDP</strong> Engineers. Without the approval of <strong>UNDP</strong> engineers the<br />

contractor can not use any construction material.<br />

8) RCC (reinforce cement Concrete): The ratio of the PCC concert must be M: 200 (1,<br />

1.5, 3). Crash as per engineering norms should be used with clean sand, fresh<br />

cement and clean water. The mortar must be mix by the mixer with proper way.<br />

Vibrator must be used as per the instruction of site engineer. Curing should be at<br />

least for 15 regular days, three times a day.<br />

9) The removed loss soil from under construction building should be transport to<br />

outside of the building area where governmental authorities permit.<br />

10) The Removal debris materials and site cleaning before beginning of the project and<br />

after the completion of project should be done by contractor and the debris materials<br />

should be transport out of the project site.<br />

11) The estimation given in BoQ are approximately measured so payment will be made<br />

based on actual work done in the field by the contractor as per the given drawings<br />

and instruction of the site engineer.<br />

12) The contractor must follow the technical drawings and in the case of any changes,<br />

the contractor should take prior approval of the <strong>UNDP</strong> engineers.<br />

13) The contractor of this contract doesn’t have the right to give the project to subcontractor.<br />

14) The contractor must have site visit and based on the site visit to prepare the BoQ.<br />

<strong>UNDP</strong> will evaluate the <strong>RFQ</strong> based on the following


1. Valid AISA Licenses: The contractor must have valid AISA license<br />

2. Project List: The contractor should have completed in past at least two similar<br />

project (USD30,000) and must include the names ad contract detail(telephone<br />

numbers and email addresses) of the client;<br />

3. Staff List: This must include CV of one site engineer who will monitor the<br />

construction work on daily bases with three years experience.<br />

4. Complete BoQ: The contractor should quote for all items of the BoQ, partially<br />

BoQ will be rejected.<br />

Work Plan: This must include the sequence and duration of ALL activities proposed by<br />

the contractor to undertake the completion of the proposed construction works. The work<br />

plan should show that the contractor understand the works to be undertaken<br />

Attached are the conceptual drawings