21.10.2014 Views

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Discussion<br />

Topic: §<strong>112</strong>.5 Amendment <strong>of</strong> Spill <strong>Prevention</strong>, Control, and<br />

Countermeasure Plan by owners or operators.<br />

If you are the owner or operator <strong>of</strong> a facility subject to this part, you must:<br />

Amend the SPCC Plan for your facility in accordance with the general<br />

requirements in §<strong>112</strong>.7, and with any specific section <strong>of</strong> this part<br />

applicable to your facility, when there is a change in the facility design,<br />

construction, operation, or maintenance that materially affects its potential<br />

for a discharge as described in §<strong>112</strong>.1(b).<br />

Question: If during annual survey <strong>of</strong> an <strong>of</strong>fshore facilities, the MOC indicated<br />

a major MOC involving design changes which affect the discharge, should the<br />

SPCC plan be updated?<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!