14.10.2022 Views

Charlie Chong CV-2022 October

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.0 PERSONAL DETAILS

Name:

Nationality:

Date of Birth:

Home Base:

Chong Chin Chan, Charlie

Malaysian

1958-October 9th

Shanghai

2.0 EDUCATION & Training

Academic qualifications.

• Diploma in Ferrous Metallurgy awarded by Material Engineering Institute, ASM, OH, USA.

• Certificate in Mechanical Engineering awarded by City & Guild, London, UK.

• GCE ‘A’ level awarded by Cambridge University LES, UK.

3.0 LANGUAGE ABILITIES

Speaking Writing Comprehension

Written Hearing

Chinese Excellent Excellent Excellent Excellent

English Excellent Excellent Excellent Excellent

Malay Excellent Excellent Excellent Excellent

Level: Excellent, Good, General, Poor

4.0 COMPUTER ABILITIES

Very competent in Microsoft Office (Word, Excel, PPT)

5.0 CERTIFICATIONS

5.1 Aramco Qualifications

• ID: 70020775, Name: Chin-Chan Chong, QM: 3/4/512/41/42.

QM Description Ctry Cty Last Evaluated

QM03 Mechanical-Gen(01-04,13,31,32) CN Shanghai 5/25/2016

QM04 Non-Destructive Examination

QM05 Line Pipe (01)

QM12 Coatings - Non-Critical (09)

QM41 OCTG-Oil Country Tub Gds (45)

QM42 Wellhead Equipment (45)

5.2 Technical Qualifications

• MICorr, Professional member of institute of corrosion UK,

• NACE MR0175-CS Certified User, Cert#13

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 1 of 40


• NACE Senior Corrosion Technologist, Cert#4325

https://drive.google.com/drive/folders/16m9kKqzLQC5OtWX71MkqCzsKh1Te7G5x?usp=shari

ng

• CSWIP 3.1/3.2 Inspector, IIW Welding Inspector, European Welding Inspector,

Cert#WO5210/SWO2528 (expired)

• ASQ Certified Quality Engineer, Cert#32778 (expired)

• ASNT Level III-MT, PT, RT, UT, LT, VI, ET, MFL, IR, NR, AE Cert#72917

https://drive.google.com/drive/folders/16m9kKqzLQC5OtWX71MkqCzsKh1Te7G5x?usp=shari

ng

ACCP Level III-MT, PT, RT Cert#72917

• API 570 Authorized Piping Inspector, Cert#49200

• API 510 Authorized Pressure Vessel Inspector, Cert#51575

• API 653 Authorized Tank Inspector, Passed, Cert#65047

• API 1169 Pipeline Construction Inspector, Cert#58217

• API 936 Refractory Personnel Cert#63515

• API 580 Risk based Inspection, Cert#52673

• API 577 Welding & Metallurgy, Cert#57298

• API 571 Corrosion & Materials, Cert#52582

• API SI Certified SI Source Inspector. Cert#5157556767

https://drive.google.com/drive/folders/16m9kKqzLQC5OtWX71MkqCzsKh1Te7G5x?usp=shari

ng

• European Welding Inspector Level 3 EWI3/GB/00752.

• International Institute of Welding IIW Welding Inspector IWI-S/GB/00752.

Copies of certification could be viewed on:

https://drive.google.com/drive/folders/16m9kKqzLQC5OtWX71MkqCzsKh1Te7G5x?usp=sharing

6.0 SUMMARY of WORKING EXPERIENCE

Undersign has been working in the oil and gas industries both onshore and offshore fabrication

works with responsibility for approximately 23 years. Working as yard supervisor, inspector and

NDT technician, providing supervision & inspection and to API5L mill inspection, API6A/16A/6D

wellhead, X’mas tree and valve manufacturing, OCTG API5CT mill inspection, offshore pipeline

installation , derrick fabrications, heat exchanger & pressure vessels inspection to ASME VIII.

For the past few years’ major involvements are inspection and fabrication surveillances of Ultra

Deepsea Derrick for National Oilwell Varco Shanghai and Derrick tools for Aker Solutions. Work

scopes primarily involved, derrick, crown block fabrication, high pressure mudline, cementline and

production line fabrication to ASME B31.3 Normal & High pressures. API6A/16A/6D wellhead,

X’mas tree and valve manufacturing.

Expertise acquired may be roughly summarized as:

1. API 5L mill inspection.

2. API 6A/16A/6D Wellhead & Christmas Tree, BOP & valve inspection.

3. API5CT OCTG inspection.

4. API 1104/ DNV OS-F101 onshore & offshore pipeline inspection.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 2 of 40


5. ASME VIII heat exhanger & pressure vessel inspection.

6. ASME B31.1 normal & high pressure fluid services inspection.

7. Steel structure fabrications to AWS D1.1 & ANSI/AISC 360.

8. Process piping fabrication and installation.

9. Welding inspection and technology.

10. Coating maintenance program/inspection and corrosion monitoring.

11. Internal coating, FRP, 3LPE specifications developments and reviews.

Undersign is familiar with following standards and codes requirements, among others:

Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API5L, API RP2A

WSD, API2B, API2H, API Spec 6A Specification for Wellhead and Christmas Tree Equipment, API

Spec. API Spec 6D, Specification for Pipeline and Piping Valves, API Apec 16A Specification for

Drill Through Equipment, API5CT, API Spec 4F, Specification for Drilling and Well Servicing

Structures, API RP49, API RP55, API1104, API620, AWS D1.1, AISC 360, NACE RP001, NACE

MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/VIII/IX, SSPC

specs, NFPA 70, API RP 500B, DNV RP B401, BS7361 and DNV-OS-F101(2000), ANSI/AISC 360

codes. DNV-OS-E101, C401, B401, B101, F101- Submarine Pipeline and other DNV-OS rules.

China National GB Specifications and CNPC SY Specifications.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 3 of 40


7.0 Work experiences.

Following are brief description of undersign employment history and related work experiences and

responsibility.

7.1

Employment period : December 2016 – March 2018

Employer

: Technip Geo-Production Malaysia

Position

: Subject Matter Expert- NDE/Welding

Client

: Seconded to Petronas PIC

Location

: Malaysia

Project

: PIC- Petronas Integrated Project

Brief description:

PIC is PETRONAS' largest investment in Malaysia, located in Pengerang, Johor and forming part of

Johor state's ambitious Pengerang Integrated Petroleum Complex (PIPC). The PIC project is

designed to produce premium differentiated petrochemicals; meeting domestic demand for

petroleum products and the Malaysian government's future legislative requirements on the

implementation of Euro 5. With total investment of USD27 billion.

Responsibility & Job involved:

• Onblock and offblock underground pipeline to both API 1104 & ASME B31/4/B31.8.

• Transmission pipeline to refinery to API 1104.

• Interpretation of radiographic films.

• Data intepretation of AUT/PAUT on pipeline and refinery piping.

• Tank fabrication, welding to API 650/ API620 Annex R & Annex Q.

• HP piping fabrication inspections.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Perform process and system audits.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 4 of 40


7.2

Employment period : 2015 November – December 2016

Employer

: National Oil Well Varco (NOV) Wellbore Technology.

Position

: Saudi Aramco Inspector.

Client

: Saudi Aramco

Project

: Aramco Inspection

Location

: China.

Project

: Fadhili Gas Program (FGP) Project

: PP-14 Sales Gas Delivery System

: Karan Project

: Safaniya Upgrade Trap Compression Facilities

Brief description:

Work as Saudi Aramco Inspector providing inspection and source inspection to Saudi Aramco

Project. The applicable codes and standards were;

- Saudi Aramco SAMSS/SABP/SAEP/SAES/SAIP/Form 175IR.

- NACE MR0175/ ASTM A923C (Sigma Phase) / ASTM A262E (IGC)

- API 5L Line Pipe

- API Spec 4F “Spec. for Drilling and Well Servicing Structures” 2 nd Edition.

- API 6A “API Spec 6A Specification for Wellhead and Christmas Tree Equipment”.

- AWS D1.1 Welding of Steel Structure 2008.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 5 of 40


7.3

Employment period : 2006 September – November 2015

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor.

Client

: NOV Shanghai

: Nabors Drilling International / NDUSA

: NDC Abu Dhabi

: Cronos

: ConocoPhillips

: Perstorp Formox AB

Project

: Ultra-deepwater drillship derrick construction and fabrication.

: Land base drilling rigs.

: DNV 2.7-1/2/3 Offshore Containers.

: Sour service assessment of offshore facilities.

: Chemical plant vessel fabrications.

: Ninh Binh Urea Fertilizer Plant.

Location

: China/Vietnam.

Brief description:

Work as a surveyor at DNV Energy Shanghai, PR China, providing inspection and certification

services to ultra-deep water offshore drillship derrick fabrication works. The applicable codes and

standards were;

- API Spec 4F “Spec. for Drilling and Well Servicing Structures” 2 nd Edition.

- API 6A “API Spec 6A Specification for Wellhead and Christmas Tree Equipment”.

- AWS D1.1 Welding of Steel Structure 2008.

- AISC Manual of steel construction, 13 th editions.

- DNV Offshore Standard DNV-0S-El01 "Drilling Plant", October 2008.

- DNV Offshore Standard DNV-OS-F101 “Submarine pipeline System” 2010.

- DNV Offshore Standard DNV-0S-C101 "Design of Offshore Steel Structures, General (LRFD

method)", April 2008.

- NACE MR0175 -2009 Petroleum and natural gas industries - Materials for use in

H2S-containing environments in oil and gas production

- SSPC codes for painting and surface preparations.

- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation

compliance assessment to API RP49 & API RP55.).

- Consultancy inspection and certification on quality conformity of project construction for Ninh

Binh Urea Fertilizer Plant to GB/T Chinese Code & Standards.

Completed Offshore Derrick projects;

18 Ultra-Deepsea Derricks completed;

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 6 of 40


- Blackford Dolphin.

- DSME I to DSME V (5 derricks)

- Gazflot I and Gazflot II (2 derricks)

- HHI-I, HHI H2228 and HHI H2229 (3 derricks)

- ODFJELL-I and ODFJELL-II (2 derricks)

- Sea Dragon I and Sea Dragon II ( 2 derricks)

- DSME Odebrecht 4.

- HHI Noble I & II (2 derricks).

- HHI Drillship Noble 2505

- HHI Drillship Noble 2506

- HHI Drillship Noble 2507

- HHI DWDS1 for Fred Oslen Energy

- PDC5 for Pacific Drilling.

- PDC6 for Pacific Drilling.

- Atwood

- Ocean Rig 5

- Ocean Rig 6

- Seadrill 6

Completed H2S Oilfield Assessment Project;

- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation

compliance assessment to API RP49 & API RP55 to COOSO requirements.)

Completed Land Based Drill Rig Projects;

- Nabor Drilling – NDUSA & Nabor International drill rigs fabrication at SJ Yard.

- NDC – National Drilling Company Abu Dhabi UAE land based drill rig at Baoji Yard

BOMCO.

Responsibility & Job involved:

• Involved in derrick fabrication surveillance.

• Interpretation of radiographic films.

• HP piping fabrication inspections.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 7 of 40


• Conducting fabrication safety survey.

• Coating and painting qualifications and approvals.

• Material selections and approval for project implementations.

• AISI A4130 high pressure piping with NACE MR01-75 compliances.

• Material qualification Norsok Standard M-630 Ed5 on MDS D43 Duplex.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• AWS D1.1-96, NACE MR01-75, ANSI B31.3, ASME section IX, API Spec 4F “Spec. for

Drilling and Well Servicing Structures” 2 nd Edition. AWS D1.1 Welding of Steel Structure 2006.

AISC Manual of steel construction, 13 th editions. DNV Offshore Standard DNV-0s-El0 1

"Drilling Plant", October 2006. DNV Offshore Standard DNV-0s-C101 "Design of Offshore

Steel Structures, General (LRFD method)", April 2004, API RP2A WSD, API2B, API2H, AWS

D1.1-96, NACE RP001, NACE MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8,

ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and

DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV

E101, DNV RP-F103, DNV RP-B403, Norsok standard in general.

References:

Mr. YP Tee. DNV Energy Country Manager 86-(0)21-62788086 yak.peik.tee@dnv.com, Mr. Bide

Alford NOV Shanghai Quality Director bide.alford@nov.com. Perstorp Formox AB Mr. Erik

Timander Erik.Timander@perstorp.com, Pan Chien CHIEN.Pan@conocophillips.com

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 8 of 40


Blackford Dolphin.

DSME Discoverer Clear Leader.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 9 of 40


DSME Discoverer Americas.

ODFJell Deepsea Atlantic.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 10 of 40


ODFJell Deepsea Atlantic.

ODFJell Deepsea Stavanger

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 11 of 40


Gazflot-I

Gazflot-II

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 12 of 40


HHI Deepwater Champion.

Petrobras HHI Deepsea Metro-I

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 13 of 40


Petrobras HHI Deepsea Metro-II

Nabors Drilling land based drill rig B&E 5000 series at Loadmaster/SJ Yard.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 14 of 40


NDC Abu Dhabi Rig# 1/2/3/4/5/6/7 fabricated at BOMCO Baoji Yard.

NDC Abu Dhabi Rig# 1/2/3/4/5/6/7 fabricated at BOMCO Baoji Yard.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 15 of 40


7.4

Employment period

Employer

Position

Project

Clients

Location

: 2005 Sept – 2006 September.

: Det Norske Veritas AS Shanghai Station, China.

: PQMS / Surveyor.

: Changbei Gas Development Project

: CNPC/ SCEPCO, Shell China

: China.

Brief description:

Work as a Inspector / Surveyor in DNV Shanghai, PR China, providing PQMS inspection for CPC /

Shell JV at Changbei Gas Development Project. The project was a joint venture between China

National Petroleum Corporation (CNPC) and Shell China Exploration & Production Company Ltd.

(SCEPCO) to explore and develop gas resources at Changbei Block which will supply 3.0 bcm/yr of

natural gas during the plateau period.

Responsibility & Job involved:

• Involved in PQMS Project Quality Management Services for main pipeline and networks

collecting pipelines and gas stations.

• Establishing of coordination / communications with CNPC/SCEPCO and Main Contractors on

QA matters and field inspections.

• Supervisory involvements on field inspection performed of Clients’ Inspector of Local

Inspection Agency.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• Shell DEP, AWS D1.1-96, NACE RP001, NACE MR01-75, API 1104, ANSI B31.2/31.4/31.8,

ASME section II/V/VII/IX, SSPC specs, China National GB specification and CNPC SY

specifications, API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE

MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC

specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE

TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV

RP-B403.

References:

Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com. Mr. Tan

Heng Lee, Lead QA Engineer Heng-Lee.Tan@shell.com

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 16 of 40


Shell SCEPCO/CNPC Changbei Gas Development Project: The project used a combination of 2km

long single and dual-lateral barefoot horizontal well drilled from surface location cluster.

Shell SCEPCO/CNPC Changbei Gas Development Project field plan.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 17 of 40


7.5

Employment period

Employer

Position

Project

Location

: 2003 January – 2005 September.

: Det Norske Veritas AS Shanghai Station, China.

: Surveyor / Corrosion Specialist.

: CNOOC Chunxiao Gas Field Development Project

: China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to Chunxiao Gas Field Development Project. The field is located in Donghai, 300KM off

Zhou Shan. It consisted of a Central Processing Platform and 2 Well Head Platforms and an Onshore

Collecting Terminal DFTS. The gas produced was collected by the CHX CEP collecting platform

and transferred to the Chunxiao via 300KM API 5LX56 sub-sea gas line.

Responsibility & Job involved:

• Involved in topside fabrication surveillance.

• Involved in 300KM of offshore Sub-sea pipeline surveillance.

• Pipe manufacturing inspection and pipe coating inspection.

• Interpretation of radiographic films

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT for CS/SS/Duplex material.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Establishing and approval of project painting and CP project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

• Painting and lining qualification testing and inspection.

• 3 rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS

7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.

References:

Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 18 of 40


CNOOC CHX CEP /TWT WHPA

CNOOC CHX WHPA

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 19 of 40


7.6

Employment period : December 2001 to November 2002

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor.

Project

: CNOOC DF1-1 Oil & Gas Field Development Project

Location

: China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to DF1-1 Gas Field Development Project. The field is located in Beibu Bay, 110KM off

Hainan Island. It consisted of a Central Processing Platform and 3 Well Head Platforms and an

Onshore Collecting Terminal DFTS. The gas produced was collected by the DF1-1 CEP collecting

platform and transferred to the Hainan Island via 110KM 22” API 5LX56 sub-sea gas line. There

was also a parallel sub-sea cable from the mainland to provide power to offshore consumers.

Responsibility & Job involved:

• Involved in topside fabrication surveillance.

• Involved in 103KM of offshore Sub-sea pipeline surveillance.

• Pipe manufacturing inspection and pipe coating inspection.

• Interpretation of radiographic films

• Interpretation & evaluating of RD-Tech automated UT systems on Serimer Dasa Saturnax-5

pipeline welding.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT for CS/SS/Duplex material.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

• 3 rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS

7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 20 of 40


References:

Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.

CNOOC Dongfang 1-1

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 21 of 40


Offshore pipeline installation for DF1-1

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 22 of 40


7.7

Employment period : May 1999 to December 2001

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor / NDT Specialist.

Project

: CNOOC QHD 32-6 Field Development Project

Location

: China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to QHD 32-6 Field Development Project. The field is located in Bohai Bay off Tangshan

City. It consisted of 6 production platforms and a FPSO. The project was a joint venture between

Arco, Texaco and CNOOC.

Responsibility & Job involved:

• Involved in topside and jacket fabrication surveillance.

• Involve in the reviewed and approval of raiser tie-in procedures.

• Involved in the offshore installation.

• Cathodic protection testing and installations.

• Coating and internal lining inspections.

• Material qualification testing for H2S services in conformance with NACE MR01-75.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Conducting equipment’s receiving, MCC, NLT, pre-commissioning and commissioning works.

• Pre-commissioning & commissioning of process, electrical and instrument systems.

• Participated in systems’ commissioning.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

• 3 rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.

• Pipe manufacturing inspection and pipe coating inspection.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, DNV RP B401 and BS 7361, NACE TPC,DNV RP B401 and BS 7361, DNV B101,

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 23 of 40


DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.

References:

Mr. Huo Jinlin CNOOC, QHD 32-6 Chief Company Representative 086-022-25808664. Mr. YP Tee.

DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.

Bohai Shiji FPSO & mooring.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 24 of 40


7.8

Employment period : May 1998 to May 1999

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor / Corrosion Specialist.

Project

: CNOOC Weizhou Oil & Gas Field Development Project.

Location

: China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to Weizhou Oil & Gas Field Development Project. The field is located in Beibu Bay off

Hainan Island. It consisted of 5 production platforms, namely WZ10-3C, WZ10-3A, WZ10-3AP,

WZ10-3B, WZ11-4A and WZ12-1 collecting platform. The gas & oil produced are collected by the

WZ12-1 collecting platform are transfer to the Weizhou Island via 12”/18” sub-sea oil line and 8”

sub-sea gas line which is located approximately 32km away.

Responsibility & Job involved:

• Involved in W12-1 topside and Living Quarter fabrication surveillance.

• Involve in the reviewed and approval of raiser tie-in procedures.

• Involved in the offshore installation of WZ12-1 integrated platform.

• Involved in the fabrication surveillance of WZ11-4C production platform.

• Involved in the modification works of the jack-up rig WZ10-3AP production platform.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Conducting equipment’s receiving, MCC, NLT, pre-commissioning and commissioning works.

• Pre-commissioning mechanical, electrical and instrument systems.

• Participated in systems’ commissioning.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, NACE TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV E101, DNV

RP-F103, DNV RP-B403.

References:

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 25 of 40


Mr. Lu YuanFa. WZ12-1, Chief Company Representative, Deputy Project Manager

86-(0)759-3900338. Mr. YP Tee. DNV’s Offshore Services Manager 86-(0)21-62788086.

Weizhou 12-1

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 26 of 40


7.9

Employment period : April 1997 to May 1998

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor.

Project

: CNOOC Pinghu Oil & Gas Field Development Project.

Location

: Korea and China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to Pinghu Oil & Gas Field Development Project. The field is located in East China Sea

approximately 400km south east of Shanghai. It consists of a single 6-legged self-contained drilling

and production platform with living quarter. Gas and oil produced are piped onshore via a 14” OD

gas line and a 10” OD oil pipeline to a gas processing plant and storage tanks onshore.

Responsibility & Job involved:

• Involved in topside and jacket fabrication surveillance.

• Involve in the reviewed and approval of raiser tie-in procedures.

• Involved in the offshore installation.

• Pipe manufacturing inspection and pipe coating inspection.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Conducting equipment’s receiving, MCC, NLT, pre-commissioning and commissioning works.

• Pre-commissioning & commissioning of process, electrical and instrument systems.

• Participated in systems’ commissioning.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

• Witnessing of CTOD and HIC tests.

• API 5L pipes mill inspection.

• 3 rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, DNV RP B401 and BS 7361.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 27 of 40


References:

Mr. Yang Binyi- CNOOC, Pinghu Chief Company Representative 0082-522-50-1576/9. Mr. YP Tee.

DNV’s Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.

Pinghu.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 28 of 40


7.10

Employment period : June 1995 to April 1997

Employer

: PETRONAS / Shell Joint Venture.

Position

: Quality Assurance Supervisor.

Project

: Multi Product Pipeline & Distribution Terminal Project.

Location

: Malaysia, Singapore.

Brief description:

The MPP-KVDT Project consisted of 140km of 14” OD pipeline and a distribution terminal, inter

connected to Petronas refinery and Shell refinery, delivering multi-product to KL City, Klang valley

and the then newly constructed KL International Airport.

Klang Valley Distribution Terminal Start Date: March 1993 Completion Date: June 1998 The

project entailed engineering, procurement, construction and commissioning of a strategic storage and

distribution terminal with a capacity for storing up to 140,000 cubic meetings of hydrocarbon

products. The facility is located on a site of more than 60 acres in the Klang Valley corridor between

Kuala Lumpur and the West Coast of Malaysia. Gasoline and diesel products arrive at the terminal

via a multi-product pipeline from Petronas and Shell refineries at Melaka and Port Dickson. There

are individual storage facilities for leaded gasoline, unleaded gasoline and diesel, and a separate

injection additive facility to cater for the different fuel formulation requirements of Petronas and

Shell. The heart of the facility is the state-of-the-art computer control system, which is integrated

with the multi-product pipeline product control system and monitors and controls the loading of road

tankers. It also provides an accounting base for each of the Joint Venture partners (Petronas and

Shell).

Responsibility & Job involved:

• Involved in pipeline, storage facilities & distribution terminal fabrication, quality inspection and

surveillance to Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion.

• Pipe manufacturing inspection and pipe coating inspection.

• Reviewed and approval of quality procedures.

• Establishing acceptance criteria and interpretation of codes and project specifications.

• Welding inspection on fit-up, dimension and visual.

• Witnessing of WPQT and WQT.

• Final inspection and issuing of certificate of compliance.

• Initiated and conducted job specific audits, example SCADA/TAS functional audits, and

pre-startup audits.

• Setup quality system for Project Management Team.

• Initiated and conducted audits on EPCC Contractors quality systems.

• Participated in project safety and environmental control activities.

• Participate in HAZOP / HAZAN and follow up actions.

• Reviewed of commissioning procedures.

• Participate in the commissioning team.

• Reviewed of pipeline construction procedures.

• Reviewed of tank construction procedures.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 29 of 40


• Supervision and monitoring of quality control on work activities to API 1104 for pipeline, ANSI

B31.3 for distribution terminal, BS 2654 and API 650 for tanks.

• Provide inspection services for painting, internal coating and FBE coating. Witnessing of FBE

test to ASTM G42 and Shell/Petronas specification DEP L5/1-2-3.

• Coordinate with local statutory bodies on regulatory requirements & PTI/PTO.

• Assisting and participation in implementing tank automatic welding.

Applicable codes & standards.

• Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API 1104, ANSI

B31.3, API 650, BS 2654, ASTM G42, Shell & Petronas specifications. SSPC and ISA

standards.

References:

Ir. Chan FungSeng. Project Manager for Petronas / Shell JV (Petronas Dagangan Sdn. Bhd.) Tel:

603-7823700. Dato Wan Kamarrudin – Joint PM, Shell Malaysia Trading Sdn Bhd. Tel:

603-7823700.

Petronas / Shell KVDT

http://wikimapia.org/#lat=2.955427&lon=101.6640687&z=16&l=0&m=b

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 30 of 40


7.11

Employment period : November 1992 to June 1995

Employer

: Det Norske Veritas Pte. Ltd. Singapore.

Position

: Surveyor.

Project

: Phillip Petroleum Xijiang Field project

: Total Thailand Bongkok Field.

: Vietsopetro Vietnam White Tiger Project.

: Atomash, Valkadon, Russia. Vessel Inspection.

: Lanchou Petrochemical, China. Drilling Equipment.

: McDermott, Indonesia, Vessel & Jacket Fabrication.

: Dowell Schlumberger, Drilling equipment certification.

: HEA, Australia, Boiler and Heat Exchanger certification.

: Cooper Oil Tools / FMC / Baker Hughes, Xmas trees &

Data lodging’s cabin certification.

Location

: Malaysia, Singapore, Thailand, China, Russia and Indonesia.

Brief description:

Work as a surveyor in DNV Singapore, providing inspection and 3 rd party certification services to

major oil & gas companies.

Responsibility & Job involved:

• Involved in jacket, production platform & re-injection platform fabrication surveillance.

• Welding inspection, heat treatment and piping hydrotesting.

• Witnessing of WPQT and WQT.

• Conduct system and process audits.

• Reviewed and approval of NDE and quality procedures.

• Witnessed and conduct anode electrochemical test and evaluation.

• Performed pre-commissioning and commissioning of offshore facilities.

• 3rd party inspection and certification of wellhead facilities control valves and Xmas trees.

• Certification and testing of drilling data logging cabin tower cranes and lifting equipment.

• 3 rd party certification and inspection of vessels and heat exchangers.

• Painting, coating and internal lining inspection.

• General offshore platform inspection and certification works.

References:

Mr. YP Tee. Head of Facilities, Equipment & QA Department, DNV Singapore. Tel: 65-7796363. Mr.

Tan Kah Seng- Process Engineer Heerema Far East Pte. Ltd. Tel: 65-2251085.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 31 of 40


Phillip Petroleum Xijiang Field 24-3 / 30-2 Platform.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 32 of 40


7.12

Employment period : May 1991 to November 1992

Employer

: Comprimo Malaysia

Position

: Quality Control Coordinator.

Project

: Shell Refinery Jetty Loading/Receiving Facilities.

Location

: Malaysia, Singapore

Brief description:

Shell refinery jetty loading facilities, consisted of approximately 4km x 12 products of off-plot

pipelines. Ranging from 36” to 8” NPS, extended into the newly constructed marine

loading/receiving jetty, 2km into the Strait of Malacca.

Responsibility & Job involved:

• Performed inspection and quality activities on the construction of multi-product pipeline to

Shell/PETRONAS DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API 1104.

• Pipe manufacturing inspection and pipe coating inspection.

• Perform inspection and quality activities on the construction of multi-product loading &

receiving terminal to ANSI B31.3.

• Coordinate with Local Statutory Bodies on PTI & PTO matters.

• Initiated and conducted audits on Contractors quality systems.

• Participated in project safety and environmental control activities.

• Reviewed of commissioning procedures.

• Participate in the commissioning team.

• Reviewed of pipeline construction procedures.

• Reviewed of tank construction procedures.

• Supervision and monitoring of quality control on work activities to API 1104 for pipeline, ANSI

B31.3 for distribution terminal, BS 2654 and API 650 for tanks.

• Inspection and testing of the impressed current and sacrificial cathodic protection system for

both pipeline and jetty terminal.

References:

Mr. JT Goh-Project Quality Manager, Comprimo Malaysia Sdn Bhd. Tel: 65-7435378 Mr. Tan

Cheong Meng-Corrosion Specialist, Shell Refinery Port Dickson. Tel: 606-6471311

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 33 of 40


Shell Refinery Port Dickson export pipeline and loading jetty.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 34 of 40


7.13

Employment period : July 1990 May 1991

Employer

: MMC Gas Sdn Bhd. Malaysia.

Position

: Pipeline Inspector.

Project

: Petronas Gas Utilization Project (PGUP II).

Location

: Malaysia, Singapore

Brief description:

Petronas PGUP II consisted of approximately 750km of 36 inches API 5Lx70 transmission pipeline.

Delivering LNG to power station and tap off station for industrial reticulation. The pipeline covered

central and southern regions of Peninsular Malaysia and Singapore.

Responsibility & Job involved:

• Performed inspection and quality activities on the construction of gas pipeline to API 1104 and

metering station to ANSI B31.3.

• Involved in the front end and back end activities.

• Pipe manufacturing inspection and pipe coating inspection.

• To perform visual, fit-up, weld up, checks on pipeline welding.

• Witnessed of WPQT/WQT.

• Radiographic interpretation.

• Monitoring on weld defect rates and corrective measures.

• Seconded to EPDM “Saturnax” Automatic Welding Team and its successful implementation.

• Back-end lowering operation, including shrink sleeve, holiday detection and reinstatement

works.

• Tie in activities.

• Interpretation and evaluation of “Pipetronic” intelligence pig's recordings.

• Quality control activities on pipe spools and header fabrication.

• Reviewed of QA/QC procedures.

• Witnessing of CTOD tests to API 1104 Appendix A’s requirements.

• FBE pipe coating quality control activities.

References:

Mr. Roy B Backeley-Senior Metallurgist, MMC Gas Sdn. Bhd. Tel: 403-2849140. Mr. Ong Nam

Siong-Deputy Quality Manager, MMC Gas Sdn. Bhd. Tel: 603-2547111.

7.14

Employment period : April 1989 to July 1990

Employer

: Sabah Shipyard, Malaysia.

Position

: General Inspector.

Project

: Petronas “Dulang” Off –Shore Production Platforms.

Location

: Malaysia

Brief description:

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 35 of 40


Petronas “Dulang-A”, Production Platform and “Dulang-B” Living Quarter is situated in the South

China Sea “Dulang” fields.

Responsibility & Job involved:

• Assigned as both Welding and Painting Inspector.

• Welding and painting inspection.

• Material verification.

• Dimensional control and Hydrotesting.

References:

Mr. CM Cheyu Quality Control Manager, SASHIP Sdn Bhd. Tel: 087-41228. Mr. Rosli

Shafe-Quality Assurance Engineer, Petronas Carigali Tel: 087-412228.

Petronas Dulang platform

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 36 of 40


7.15

Employment period : May 1987-April 1989

Employer

: Malaysian Shipyard and Engineering.

Position

: Painting Inspector.

Project

: Esso Production Incorporation “Seligi-A” Offshore

Production Platform Project.

: Shell St Joseph Platform De-bottle Necking Project.

Location

: Malaysia & Singapore.

Brief description:

• Esso EPMI “Seligi-A” Project consisted of 5 production platforms and 3 no of dehydration

platform. Situated in the South China Sea off Trengganu, Peninsular Malaysia.

• Shell St Joseph De-bottlenecking project consisted of a single platform for St Joseph Field

located in the South China Sea off Sarawak, Malaysia.

Responsibility & Job involved:

• Assigned as Painting Inspector.

• Painting Inspection and quality control.

References:

Mr. Nordin Mat Yussoft-MSE Quality Control Manager. Tel: 607-2512111. Mr. Ong Nam Hwa-MSE

Quality Control Engineer. Tel: 607-2512111.

Petronas Seligi “A”

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 37 of 40


Shell St Joseph Platform.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 38 of 40


7.16

Employment period

Employer

Position

Project

Location

: Oct 1984-May1987

: Sepakat Setia Perunding Civil & Structural Consultant.

: General Inspector.

: Inter-Urban Toll Express Way.

: Malaysia

Brief description:

The project consisted of 120km of highway and bridges and toll facilities between Air Keroh and

Pagoh Interchanges, in the state of Malacca extended into the state of Johore, Malaysia.

Responsibility & Job involved:

• Foundation piling and load testing.

• Structural and reinforce concrete quality control.

• Welding inspection.

• Coating inspection.

• Survey and leveling.

• Highway construction supervision.

• Bridge construction, supervision and quality control.

References:

Mr. CG Patrick-Chief Resident Engineer, SSP Sdn Bhd. Tel: 606-982523. Mr. B.Jovanovic-Chief

Structural engineer, EnergoProject. Tel: 606-982520

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 39 of 40


7.17

Employment period : August 1983- October 1984

Employer

: Bina Runding Sdn Bhd. Civil & Structural Consultant.

Position

: Inspector of Works.

Project

: Erection & Prefabrication of 43 schools.

Location

: Malaysia

Responsibility & Job involved:

• Foundation piling and load testing.

• Structural and reinforce concrete quality control.

• Highway construction supervision.

• Coating inspection.

• Survey and leveling.

References:

Ir. Hiam Hoon.-Resident Engineer Tel: 607-3222984

7.18

Employment period : August 1981- August 1983

Employer

: Malaysian International Consultant Sdn Bhd.

Position

: Inspector of Works.

Project

: Western Johore Agricultural Development

Project (Phase I)

Location

: Malaysia

Responsibility & Job involved:

• Foundation piling and load testing.

• Highway construction supervision.

• Structural and reinforced concrete quality control.

• Welding inspection.

• Survey and leveling.

References:

Ir. Mutiar Rahman-Resident Engineer Tel: 607-38373451

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 40 of 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!